Loading...
HomeMy WebLinkAboutFMC 2014ATG IMPACT VALVE LEAK DETECTOR SPILL BUCKET TEST 11000 N. MoPac Expressway, Suite 500 Austin, Texas 78759 Phone: (512) 451-6334 Fax: (512) 459-1459 Date Printed and Mailed: 9/2/2014 BAKERSFIELD FIRE DEPARTMENT OFFICE OF ENVIRONMENTAL SERVICES INSPECTOR ERNIE MEDINA 1501 TRUXTUN AVE. BAKERSFIELD, CA 93301 Test Date: 8/12/2014 Order Number: 3420740 Dear Regulator, Enclosed are the results of recent testing performed at the following facility: CHEVRON 201527 6601 Ming Avenue BAKERSFIELD, CA 93309 Testing performed: Sincerely, Dawn Kohlmeyer Manager, Field Reporting LDT 5000 Field Test Apparatus Line Leak Detector Test Page 1 of 1 Work Order:3420740 Date:8/12/2014 Site Name / ID:CHEVRON 201527 / 201527 Address:6601 Ming Avenue City:BAKERSFIELD State:CA Zip:93309 Tank ID Product Product Line Tested From Existing/New Mechanical/Electronic Manufacturer/Model Serial No. Pump Operating Pressure (psi) Calibrated Leak (ml/min) Calibrated Leak (gph) Holding PSI *N/A for Electronic LD's Resiliency (ml) *N/A for Electronic LD's Metering PSI *N/A for Electronic LD's Opening Time (sec) *N/A for Electronic LD's Test Results T1 SUPREME SUPREME 1 2 Existing Electronic Veeder Root PLLD 013644 28.00 189.0 3.00 Pass T2 PLUS PLUS 1 2 Existing Electronic Veeder Root PLLD 178672 28.00 189.0 3.00 Pass T3 REGULAR REGULAR 1 2 Existing Electronic Veeder Root PLLD 036939 30.00 189.0 3.00 Fail Technician Comments: Technician Name:Edwin Pineda Certification #:2344 Technician Signature:Expire Date:4/5/2015 Environmental Compliance for Petroleum Systems © 2014 Tanknology Inc., Austin, TX.    All rights reserved.    tanknology.com Impact Valve Inspection Impact Valve Operational Inspection Work Order:3420740 Date:8/12/2014 Site Name/ID:CHEVRON 201527 Address:6601 Ming Avenue City:BAKERSFIELD State:CA Zip:93309 Dispenser Number Grade Secure Mount? Valve Lock?Pass/ Fail Comments 1/2 87 Pass Fail Not Tested 1/2 89 Pass Fail Not Tested 1/2 91 Pass Fail Not Tested 3/4 87 Pass Fail Not Tested 3/4 89 Pass Fail Not Tested 3/4 91 Pass Fail Not Tested 5/6 87 Pass Fail Not Tested 5/6 89 Pass Fail Not Tested 5/6 91 Pass Fail Not Tested 7/8 87 Pass Fail Not Tested 7/8 89 Pass Fail Not Tested 7/8 91 Pass Fail Not Tested Technician Comments: Technician Name:Edwin Pineda Signature: Environmental Compliance for Petroleum Systems ©2014 Tanknology Inc., Austin, TX. All rights reserved. tanknology.com Appendix VI (Copies of Monitoring System Certification form and UST Monitoring Plot Plan available at http://www.swrcb.ca.gov.) MONITORING SYSTEM CERTIFICATION For Use By All Jurisdictions Within the State of California Authority Cited: Chapter 6.7, Health and Safety Code; Chapter 16, Division 3, Title 23, California Code of Regulations This form must be used to document testing and servicing of monitoring equipment. A separate certification or report must be prepared for each monitoring system control panel by the technician who performs the work. A copy of this form must be provided to the tank system owner/operator. The owner/operator must submit a copy of this form to the local agency regulating UST systems within 30 days of test date. A. General Information Facility Name:CHEVRON 201527 Bldg. No.: Site Address:6601 Ming Avenue City:BAKERSFIELD Zip:93309 Facility Contact Person:Regina 11/13/13 Contact Phone No.:661-831-1270 Make/Model of Monitoring System:Veeder Root TLS-350 Date of Testing/Servicing:8/12/2014 B. Inventory of Equipment Tested/Certified Check the appropriate boxes to indicate specific equipment inspected/serviced: Tank ID:T1 SUPREME - SUPREME In-Tank Gauging Probe.Model:MAG Annular Space or Vault Sensor.Model:VR-409 Piping Sump / Trench Sensor(s).Model:VR-208 Fill Sump Sensor(s).Model:VR-352 Mechanical Line Leak Detector.Model: Electronic Line Leak Detector.Model:Veeder Root PLLD Tank Overfill / High-Level Sensor.Model:ATG Other (specify equipment type and model in Section E on Page 2). Tank ID:T2 PLUS - PLUS In-Tank Gauging Probe.Model:MAG Annular Space or Vault Sensor.Model:VR-409 Piping Sump / Trench Sensor(s).Model:VR-208 Fill Sump Sensor(s).Model:VR-352 Mechanical Line Leak Detector.Model: Electronic Line Leak Detector.Model:Veeder Root PLLD Tank Overfill / High-Level Sensor.Model:ATG Other (specify equipment type and model in Section E on Page 2). Tank ID:T3 REGULAR - REGULAR In-Tank Gauging Probe.Model:MAG Annular Space or Vault Sensor.Model:VR-409 Piping Sump / Trench Sensor(s).Model:VR-208 Fill Sump Sensor(s).Model:VR-352 Mechanical Line Leak Detector.Model: Electronic Line Leak Detector.Model:Veeder Root PLLD Tank Overfill / High-Level Sensor.Model:ATG Other (specify equipment type and model in Section E on Page 2). Tank ID: In-Tank Gauging Probe.Model: Annular Space or Vault Sensor.Model: Piping Sump / Trench Sensor(s).Model: Fill Sump Sensor(s).Model: Mechanical Line Leak Detector.Model: Electronic Line Leak Detector.Model: Tank Overfill / High-Level Sensor.Model: Other (specify equipment type and model in Section E on Page 2). Dispenser ID:1/2 Dispenser Containment Sensor(s).Model:BE-406 Shear Valve(s). Dispenser Containment Float(s) and Chain(s). Dispenser ID:3/4 Dispenser Containment Sensor(s).Model:BE-406 Shear Valve(s). Dispenser Containment Float(s) and Chain(s). Dispenser ID:5/6 Dispenser Containment Sensor(s).Model:BE-406 Shear Valve(s). Dispenser Containment Float(s) and Chain(s). Dispenser ID:7/8 Dispenser Containment Sensor(s).Model:BE-406 Shear Valve(s). Dispenser Containment Float(s) and Chain(s). Dispenser ID: Dispenser Containment Sensor(s).Model: Shear Valve(s). Dispenser Containment Float(s) and Chain(s). Dispenser ID: Dispenser Containment Sensor(s).Model: Shear Valve(s). Dispenser Containment Float(s) and Chain(s). *If the facility contains more tanks or dispensers, copy this form. Include information for every tank and dispenser at the facility. C. Certification - I certify that the equipment identified in this document was inspected/serviced in accordance with the manufacturers’ guidelines. Attached to this Certification is information (e.g. manufacturers' checklists) necessary to verify that this information is correct and a Plot Plan showing the layout of monitoring equipment. For any equipment capable of generating such reports, I have also attached a copy of the report; (check all that apply): System set- up Alarm history report Technician Name (print):Edwin Pineda Signature: Certification No.: B37453 License. No.:743160 Class 'A' Testing Company Name:Tanknology Phone No.:(800) 800-4633 Testing Company Address:11000 N. MoPac Expressway Suite 500 Date of Testing/Servicing:8/12/2014 Monitoring System Certification Page 1 of 3 12/07 D. Results of Testing/Servicing Software Version Installed:327.04 Complete the following checklist: Yes No*Is the audible alarm operational? Yes No*Is the visual alarm operational? Yes No*Were all sensors visually inspected, functionally tested, and confirmed operational? Yes No*Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their proper operation? Yes No* N/A If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) operational? Yes No* N/A For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate positive shut-down? (Check all that apply) Sump/Trench Sensors; Dispenser Containment Sensors. Did you confirm positive shut-down due to leaks and sensor failure/disconnection? Yes; No Yes No* N/A For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank fill point(s) and operating properly? If so, at what percent of tank capacity does the alarm trigger? % Yes* No Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the manufacturer name and model for all replacement parts in Section E, below. Yes* No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) Product; Water. If yes, describe causes in Section E, below. Yes No*Was monitoring system set-up reviewed to ensure proper settings? Attach set up reports, if applicable Yes No*Is all monitoring equipment operational per manufacturer's specifications? * In Section E below, describe how and when these deficiencies were or will be corrected. E. Comments: Replaced a siphon jet valve on 87 tank due to fail leak detector test,also replaced a shutoff oring in 91 drain due to fail spill bucket test,also found water in 87 stp,89 fill,stpand 91 fil sumps,also replaced the veeder root battery. Monitoring System Certification Page 2 of 3 12/07 F. In-Tank Gauging / SIR Equipment: Check this box if tank gauging is used only for inventory control. Check this box if no tank gauging or SIR equipment is installed. This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. Complete the following checklist: Yes No*Has all input wiring been inspected for proper entry and termination, including testing for ground faults? Yes No*Were all tank gauging probes visually inspected for damage and residue buildup? Yes No*Was accuracy of system product level readings tested? Yes No*Was accuracy of system water level readings tested? Yes No*Were all probes reinstalled properly? Yes No*Were all items on the equipment manufacturer's maintenance checklist completed? * In the Section H, below, describe how and when these deficiencies were or will be corrected. G. Line Leak Detectors (LLD): Check this box if LLDs are not installed. Complete the following checklist: Yes No* N/A For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) Simulated leak rate: 3 g.p.h.; 0.1 g.p.h; 0.2 g.p.h. Yes No*Were all LLDs confirmed operational and accurate within regulatory requirements? Yes No*Was the testing apparatus properly calibrated? Yes No* N/A For mechanical LLDs, does the LLD restrict product flow if it detects a leak? Yes No* N/A For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? Yes No* N/A For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? Yes No* N/A For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? Yes No* N/A For electronic LLDs, have all accessible wiring connections been visually inspected? Yes No*Were all items on the equipment manufacturer's maintenance checklist completed? * In the Section H, below, describe how and when these deficiencies were or will be corrected. H.Comments: 87 leak detector fail,the siphon jet valve was replaced and purge about 130 gallons of fuel to remove the air from lines,but still fail. Page 3 of 3 12/07 SWRCB, January 2002 Page 1 of 1 Secondary Containment Testing Report Form This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the appropriate pages of this form to report results for all components tested. The completed form, written test procedures, and printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. 1. FACILITY INFORMATION Facility Name: CHEVRON 201527 Date of Testing: 8/12/2014 Facility Address: 6601 Ming Avenue , BAKERSFIELD, CA 93309 Facility Contact: Regina 11/13/13 Phone: 661-831-1270 Date Local Agency Was Notified of Testing: Name of Local Agency Inspector (if present during testing): Shane Gardner 2. TESTING CONTRACTOR INFORMATION Company Name: TANKNOLOGY INC. Technician Conducting Test: Edwin Pineda Credentials: CSLB Licensed Contractor SWRCB Licensed Tank Tester License Type: A-UT License Number: 743160-8026748 Manufacturer Manufacturer Training Component(s)Date Training Expires PHILTITE SPILL BUCKETS 8/12/2014 3. SUMMARY OF TEST RESULTS Component Pass Fail Not Tested Repairs Made Spill Box T1 SUPREME supreme fill X Spill Box T1 SUPREME supreme fill X Spill Box T2 PLUS plus fill X Spill Box T3 REGULAR regular fill X Component Pass Fail Not Tested Repairs Made If hydrostatic testing was performed, describe what was done with the water after completion of tests: CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements Technician's Signature:Date:8/12/2014 WO: 3420740 WATER WAS PUT IN FIVE GALLON BUCKETS AND PUT IN TRUCK FOR NEXT SITE. SWRCB, January 2002 Page 1 of 1 9. SPILL/OVERFILL CONTAINMENT BOXES Facility is Not Equipped With Spill/Overfill Containment Boxes Spill/Overfill Containment Boxes are Present, but were Not Tested Test Method Developed By: Spill Bucket Manufacturer Industry Standard Professional Engineer Other (Specify): Test Method Used By: Pressure Vacuum Hydrostatic Other (Specify): Test Equipment Used: LAKE TEST Equipment Resolution: 0.0625 in. Bucket Diameter: Bucket Depth: Wait time between applying pressure/vacuum/water and starting test Test Start Time: Initial Reading (RI): Test End Time: Final Reading (RF): Test Duration: (RF-RI) : Pass/Fail Threshold or Criteria: Test Result: Spill Box # Tank T1 SUPREME SUPREME - Fill 1 - Direct - Below Grade in containment sump 12.00 14.00 0 min 09:40:00 14.00 in. H20 09:42:00 13.75 in. H20 2 min -0.25 in. H20 +/- -0.25 Fail Spill Box # Tank T1 SUPREME SUPREME - Fill 1 - Direct - Below Grade in containment sump 12.00 14.00 0 min 09:58:00 14.00 in. H20 10:58:00 14.00 in. H20 1 hr 0.00 in. H20 +/- 0.00 Pass Spill Box # Tank T2 PLUS PLUS - Fill 1 - Direct - Below Grade in containment sump 12.00 14.00 0 min 09:40:00 14.00 in. H20 10:40:00 14.00 in. H20 1 hr 0.00 in. H20 +/- 0.00 Pass Spill Box # Tank T3 REGULAR REGULAR - Fill 1 - Direct - Below Grade in containment sump 12.00 14.00 0 min 09:40:00 14.00 in. H20 10:40:00 14.00 in. H20 1 hr 0.00 in. H20 +/- 0.00 Pass Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) WO: 3420740 Step Instruction Product Tank Type (DW FRP, DW Steel, SW FRP) 1 Annular Riser Height (measured) 2 Tank Diameter 3 For FRP tanks, 1/2 circumference of the tank (see Note 1 below) 4 Required annular sensor length: FRP = Riser + 1/2 Circumference = step 1 + step 3 Steel = Riser + diameter = step 1 + step 2 5 Mark & label the required sensor length on sensor cord. Label should be under the cap & serve to prevent the cord being pulled too short. 6 FRP Tanks: Is the sensor installed with the marked required length lining up with the top of the annular riser? 7 Steel Tanks: Is the sensor toughing bottom with slack above the marked required sensor length? 8 Are the DW pipe boots pulled back in tank sumps? (Y/N or N/A, note if can't be verified because clamshell pointing down 9 Are tank sump sensors back in their holders and in the correct position? (Y/N or N/A document with photo) Tank 1 - SUPREME SUPREME Fiberglass 42.00 in. 0.00 in. 0.00 in. 42.00 in. Yes Yes Yes Yes Tank 2 - PLUS PLUS Fiberglass 48.50 in. 0.00 in. 0.00 in. 48.50 in. Yes Yes Yes Yes Tank 3 - REGULAR REGULAR Fiberglass 45.00 in. 0.00 in. 0.00 in. 45.00 in. Yes Yes Yes Yes Chevron Monitoring Certification Checklist Store Number: 201527 Address: 6601 Ming Avenue BAKERSFIELD, CA 93309 Date: 8/12/2014 Technician: Edwin Pineda Company: TANKNOLOGY INC. Has the Veeder Root Battery been replaced & dated prior to failsafe? (If battery backup failed, label and leave failed battery on top of console, note in comments and advise your OM) Replaced Today Has Veeder Root Programming before & after testing been printed & verified? (especially tank manifolding setup - see Note 2) Yes Has Veeder Root Programming before & after been attached to the Work Order? Yes Have all sensor model numbers been verified against the Veeder Root cord label? Make a note if sensor label missing or illegible, & approx. cord length for -208/-209 with missing labels Yes Additional Comments: Note 1:DW FRP Tank Circumference 1/2 Circum =(3.14 x tank diam) 2 10' diameter 1/2 Circum = 188" 8' diameter 1/2 Circum = 151" 6' diameter 1/2 Circum = 113" Note 2: Certain Veeder Root Software versions will automatically revert to the default tank manifold settings any time the programming is changed, such as when sensors are temporarily X'ed out, etc. Site Diagram (This site diagram is for reference only and is not drawn to scale) Work Order:3420740 Site ID / Name:201527 / CHEVRON 201527 Address:6601 Ming Avenue City:BAKERSFIELD State:CA Zip:93309 W.O.# SC1-3420740 Cust Ref#: PO #0015140464 I10100 AUG 12, 2014 15:30 CHEVRON 201527 6601 MING AVE BAKERSFIED CA. 661-831-1270 SYSTEM STATUS REPORT h23:DEGRD COLLECT WARN I50301 AUG 12, 2014 15:30 # 1:CHEVRON 201527 I50302 AUG 12, 2014 15:30 # 2:6601 MING AVE I50303 AUG 12, 2014 15:30 # 3:BAKERSFIED CA. I50304 AUG 12, 2014 15:30 # 4:661-831-1270 I51700 AUG 12, 2014 15:30 SYSTEM TYPE AND LANGUAGE FLAG SYSTEM UNITS U.S. SYSTEM LANGUAGE ENGLISH SYSTEM DATE/TIME FORMAT MON DD YYYY HH:MM:SS I50F00 AUG 12, 2014 15:30 MON DD YYYY HH:MM:SS I60100 AUG 12, 2014 15:30 TANK CONFIGURATION DEVICE LABEL CONFIGURED 1 SUPREME ON 2 PLUS ON 3 REGULAR ON 4 OFF I60200 AUG 12, 2014 15:30 TANK PRODUCT LABEL TANK PRODUCT LABEL 1 SUPREME 2 PLUS 3 REGULAR 4 I60300 AUG 12, 2014 15:30 TANK PRODUCT CODE TANK PRODUCT LABEL 1 SUPREME 1 2 PLUS 2 3 REGULAR 3 4 4 I60400 AUG 12, 2014 15:30 TANK FULL VOLUME TANK PRODUCT LABEL GALLONS 1 SUPREME 11849 2 PLUS 11849 3 REGULAR 11849 4 0 I60700 AUG 12, 2014 15:30 TANK DIAMETER TANK PRODUCT LABEL INCHES 1 SUPREME 117.75 2 PLUS 117.75 3 REGULAR 117.75 4 0.00 I60900 AUG 12, 2014 15:30 TANK THERMAL COEFFICIENT TANK PRODUCT LABEL 1 SUPREME 0.000700 2 PLUS 0.000700 3 REGULAR 0.000700 4 0.000000 I61200 AUG 12, 2014 15:30 TANK MANIFOLDED PARTNERS TANK PRODUCT LABEL SIPHON MANIFOLDED TANKS LINE MANIFOLDED TANKS 1 SUPREME NONE NONE 2 PLUS NONE NONE 3 REGULAR NONE NONE 4 NONE NONE I62100 AUG 12, 2014 15:30 TANK LOW PRODUCT LIMIT TANK PRODUCT LABEL GALLONS 1 SUPREME 700 2 PLUS 700 3 REGULAR 0 4 0 I62200 AUG 12, 2014 15:30 TANK HIGH PRODUCT LIMIT TANK PRODUCT LABEL GALLONS 1 SUPREME 11256 2 PLUS 11256 3 REGULAR 11256 4 0 I62300 AUG 12, 2014 15:30 TANK OVERFILL LEVEL LIMIT TANK PRODUCT LABEL GALLONS 1 SUPREME 10664 2 PLUS 10664 3 REGULAR 10664 4 0 I62400 AUG 12, 2014 15:30 TANK HIGH WATER LEVEL LIMIT TANK PRODUCT LABEL INCHES 1 SUPREME 2.0 2 PLUS 2.0 3 REGULAR 2.0 I62800 AUG 12, 2014 15:30 TANK MAXIMUM VOLUME LIMIT TANK PRODUCT LABEL GALLONS 1 SUPREME 11849 2 PLUS 11849 3 REGULAR 11849 4 0 I62900 AUG 12, 2014 15:30 TANK DELIVERY REQUIRED LIMIT TANK PRODUCT LABEL GALLONS 1 SUPREME 1421 2 PLUS 1421 3 REGULAR 1421 4 0 I70300 AUG 12, 2014 15:30 LIQUID TYPE SENSOR LOCATION TYPE 1 91 STP TRI-STATE (SINGLE FLOAT) 2 91 FILL DUAL FLT. DISCRIMINATING 3 91 ANNULAR TRI-STATE (SINGLE FLOAT) 4 89STP TRI-STATE (SINGLE FLOAT) 5 89 FILL DUAL FLT. DISCRIMINATING 6 89 ANNULAR TRI-STATE (SINGLE FLOAT) 7 87 STP TRI-STATE (SINGLE FLOAT) 8 87 FILL DUAL FLT. DISCRIMINATING 9 87 ANNULAR TRI-STATE (SINGLE FLOAT) 10 TRI-STATE (SINGLE FLOAT) 11 TRI-STATE (SINGLE FLOAT) 12 TRI-STATE (SINGLE FLOAT) 13 TRI-STATE (SINGLE FLOAT) 14 TRI-STATE (SINGLE FLOAT) 15 TRI-STATE (SINGLE FLOAT) 16 TRI-STATE (SINGLE FLOAT) I78500 AUG 12, 2014 15:30 PRESSURE LINE LEAK TANK NUMBER LINE TANK NUMBER Q 1:SUPREME 1 Q 2:PLUS 2 Q 3:REGULAR 3 I90200 AUG 12, 2014 15:30 SOFTWARE REVISION LEVEL VERSION 327.04 SOFTWARE# 346327-100-E CREATED - 07.02.06.10.28 S-MODULE# 330160-004-a SYSTEM FEATURES: PERIODIC IN-TANK TESTS ANNUAL IN-TANK TESTS ISD PMC I20600 AUG 12, 2014 15:31 CHEVRON 201527 6601 MING AVE BAKERSFIED CA. 661-831-1270 TANK ALARM HISTORY TANK 1 SUPREME HIGH WATER ALARM AUG 12, 2014 14:02 AUG 30, 2013 14:05 SEP 14, 2012 14:06 OVERFILL ALARM AUG 12, 2014 13:52 AUG 30, 2013 13:56 SEP 14, 2012 13:57 LOW PRODUCT ALARM AUG 12, 2014 13:47 OCT 4, 2011 9:49 SUDDEN LOSS ALARM AUG 12, 2014 13:47 MAR 3, 2014 10:52 AUG 30, 2013 13:02 HIGH PRODUCT ALARM AUG 12, 2014 13:52 AUG 30, 2013 13:56 AUG 30, 2013 13:54 INVALID FUEL LEVEL AUG 12, 2014 13:47 OCT 4, 2011 9:49 PROBE OUT AUG 12, 2014 14:06 AUG 12, 2014 13:47 MAR 3, 2014 10:52 HIGH WATER WARNING AUG 12, 2014 14:02 AUG 30, 2013 14:05 SEP 14, 2012 14:06 DELIVERY NEEDED AUG 12, 2014 13:47 MAY 7, 2013 17:51 MAY 5, 2013 10:41 MAX PRODUCT ALARM AUG 12, 2014 13:52 AUG 30, 2013 13:56 OCT 4, 2011 9:51 LOW TEMP WARNING AUG 30, 2013 13:03 SEP 14, 2012 14:14 SEP 14, 2012 13:52 TANK 2 PLUS LEAK ALARM NOV 18, 2011 13:01 HIGH WATER ALARM AUG 12, 2014 14:00 AUG 30, 2013 13:56 SEP 14, 2012 14:13 OVERFILL ALARM AUG 12, 2014 13:49 AUG 30, 2013 14:00 SEP 14, 2012 13:57 LOW PRODUCT ALARM AUG 12, 2014 13:46 SUDDEN LOSS ALARM AUG 12, 2014 13:45 MAR 3, 2014 10:54 AUG 30, 2013 13:03 HIGH PRODUCT ALARM AUG 12, 2014 13:52 AUG 12, 2014 13:49 AUG 30, 2013 13:59 INVALID FUEL LEVEL AUG 12, 2014 14:09 AUG 12, 2014 13:46 AUG 30, 2013 14:03 PROBE OUT AUG 12, 2014 14:07 AUG 12, 2014 13:45 MAR 3, 2014 10:54 HIGH WATER WARNING AUG 12, 2014 14:00 AUG 30, 2013 13:56 SEP 14, 2012 14:13 DELIVERY NEEDED AUG 12, 2014 13:46 JUN 28, 2014 19:18 MAY 13, 2013 17:03 MAX PRODUCT ALARM AUG 12, 2014 13:52 AUG 30, 2013 13:59 OCT 4, 2011 10:25 LOW TEMP WARNING AUG 12, 2014 14:09 MAR 3, 2014 13:55 SEP 14, 2012 14:24 TANK 3 REGULAR LEAK ALARM NOV 18, 2011 12:31 HIGH WATER ALARM AUG 12, 2014 14:00 AUG 30, 2013 13:56 SEP 14, 2012 14:06 OVERFILL ALARM AUG 12, 2014 13:49 JUL 4, 2014 12:10 NOV 15, 2013 23:48 SUDDEN LOSS ALARM AUG 12, 2014 13:46 MAR 3, 2014 9:05 AUG 30, 2013 13:00 HIGH PRODUCT ALARM AUG 12, 2014 13:51 AUG 12, 2014 13:49 AUG 30, 2013 13:58 INVALID FUEL LEVEL AUG 12, 2014 13:46 OCT 4, 2011 10:06 PROBE OUT AUG 12, 2014 14:07 AUG 12, 2014 13:46 MAR 3, 2014 12:11 HIGH WATER WARNING AUG 12, 2014 14:00 AUG 30, 2013 13:56 SEP 14, 2012 14:06 DELIVERY NEEDED AUG 12, 2014 13:46 APR 11, 2014 18:51 OCT 1, 2011 19:25 MAX PRODUCT ALARM AUG 12, 2014 13:51 AUG 30, 2013 13:58 OCT 4, 2011 10:07 LOW TEMP WARNING MAR 3, 2014 12:11 I30200 AUG 12, 2014 15:31 CHEVRON 201527 6601 MING AVE BAKERSFIED CA. 661-831-1270 LIQUID ALARM HISTORY REPORT SENSOR LOCATION 1 91 STP AUG 12, 2014 10:30 SENSOR OUT ALARM AUG 12, 2014 10:00 FUEL ALARM AUG 30, 2013 10:18 SENSOR OUT ALARM 2 91 FILL AUG 12, 2014 10:30 SENSOR OUT ALARM AUG 12, 2014 10:03 HIGH LIQUID ALARM AUG 12, 2014 10:02 LIQUID WARNING 3 91 ANNULAR AUG 12, 2014 10:53 FUEL ALARM AUG 12, 2014 10:30 SENSOR OUT ALARM AUG 12, 2014 10:05 FUEL ALARM 4 89STP AUG 12, 2014 10:30 SENSOR OUT ALARM AUG 12, 2014 10:09 FUEL ALARM MAY 21, 2014 14:13 FUEL ALARM 5 89 FILL AUG 12, 2014 10:30 SENSOR OUT ALARM AUG 12, 2014 10:11 LIQUID WARNING AUG 12, 2014 10:10 FUEL ALARM 6 89 ANNULAR AUG 12, 2014 10:54 FUEL ALARM AUG 12, 2014 10:30 SENSOR OUT ALARM AUG 12, 2014 10:12 FUEL ALARM 7 87 STP AUG 12, 2014 10:30 SENSOR OUT ALARM AUG 12, 2014 10:06 FUEL ALARM MAY 21, 2014 9:43 FUEL ALARM 8 87 FILL AUG 12, 2014 10:30 SENSOR OUT ALARM AUG 12, 2014 10:07 FUEL ALARM AUG 12, 2014 10:06 LIQUID WARNING 9 87 ANNULAR AUG 12, 2014 10:51 FUEL ALARM AUG 12, 2014 10:30 SENSOR OUT ALARM AUG 12, 2014 10:08 FUEL ALARM I38200 AUG 12, 2014 15:31 CHEVRON 201527 6601 MING AVE BAKERSFIED CA. 661-831-1270 PRESSURE LINE LEAK ALARM HISTORY REPORT Q 1:SUPREME AUG 12, 2014 11:33 PLLD SHUTDOWN ALARM AUG 12, 2014 11:33 GROSS LINE FAIL AUG 12, 2014 10:53 PLLD SHUTDOWN ALARM AUG 12, 2014 10:30 PLLD SHUTDOWN ALARM AUG 12, 2014 10:05 PLLD SHUTDOWN ALARM AUG 12, 2014 10:00 PLLD SHUTDOWN ALARM SEP 13, 2013 9:10 PLLD SHUTDOWN ALARM SEP 13, 2013 9:10 GROSS LINE FAIL SEP 7, 2013 13:05 PLLD SHUTDOWN ALARM SEP 7, 2013 13:05 GROSS LINE FAIL Q 2:PLUS AUG 12, 2014 11:41 PLLD SHUTDOWN ALARM AUG 12, 2014 11:41 GROSS LINE FAIL AUG 12, 2014 10:54 PLLD SHUTDOWN ALARM AUG 12, 2014 10:30 PLLD SHUTDOWN ALARM AUG 12, 2014 10:12 PLLD SHUTDOWN ALARM AUG 12, 2014 10:09 PLLD SHUTDOWN ALARM MAY 21, 2014 14:13 PLLD SHUTDOWN ALARM APR 7, 2014 10:49 PLLD SHUTDOWN ALARM APR 7, 2014 10:49 GROSS LINE FAIL SEP 7, 2013 14:39 PLLD SHUTDOWN ALARM Q 3:REGULAR AUG 12, 2014 10:51 PLLD SHUTDOWN ALARM AUG 12, 2014 10:30 PLLD SHUTDOWN ALARM AUG 12, 2014 10:08 PLLD SHUTDOWN ALARM AUG 12, 2014 10:06 PLLD SHUTDOWN ALARM MAY 31, 2014 13:43 PLLD SHUTDOWN ALARM MAY 31, 2014 13:43 GROSS LINE FAIL MAY 21, 2014 9:43 PLLD SHUTDOWN ALARM SEP 13, 2013 9:35 PLLD SHUTDOWN ALARM SEP 13, 2013 9:35 GROSS LINE FAIL SEP 7, 2013 11:04 PLLD SHUTDOWN ALARM I10100 AUG 12, 2014 15:31 CHEVRON 201527 6601 MING AVE BAKERSFIED CA. 661-831-1270 SYSTEM STATUS REPORT h23:DEGRD COLLECT WARN