HomeMy WebLinkAboutRES NO 049-15RESOLUTION NO. Q 4 9 — 15
RESOLUTION OF THE BAKERSFIELD CITY COUNCIL APPROVING AN
AMENDMENT TO THE LAND USE MAP DESIGNATION OF THE
METROPOLITAN BAKERSFIELD GENERAL PLAN LOCATED AT THE
NORTHWEST CORNER OF SOUTH FAIRFAX ROAD AND EAST WILSON
ROAD. (GPA /ZC NO. 14- 0444).
WHEREAS, McIntosh & Associates representing Fairfax Holdings, LLP, filed an application
with the City of Bakersfield Community Development Department requesting an amendment
to the land use map designation of the Metropolitan Bakersfield General Plan from LR (Low
Density Residential) to HMR (High Medium Density Residential) on 17.37 acres located at the
northwest corner of South Fairfax Road and East Wilson Road (the "Project "); and
WHEREAS, the City Council adopted a Mitigated Negative Declaration with mitigation
measures for the Project; and
WHEREAS, the Planning Commission held a public hearing on March 5, 2015, and
approved Resolution No. 09 -15, which recommended that the City Council deny the Project;
and
WHEREAS, an appeal of the Planning Commission's decision to recommend denial of
the Project was submitted by McIntosh & Associates, the applicant, on March 12, 2015; and
WHEREAS, the Clerk of the City Council set Wednesday, May 6, 2015 at 5:15 p.m. in the
Council Chambers of City Hall, 1501 Truxtun Avenue, Bakersfield, California, as the time and
place for a public hearing before the City Council to consider the approval of the
amendment as required by Government Code Section 65355, and notice of the public
hearing was given in the manner provided in Title 17 of the Bakersfield Municipal Code; and
WHEREAS, during the hearing, the City Council considered all facts, testimony, and
evidence concerning the staff report, Mitigated Negative Declaration and the Planning
Commission's deliberation, and action.
NOW, THEREFORE, BE IT RESOLVED by the Bakersfield City Council as follows:
1. The recitals above are incorporated herein by this reference.
2. The City Council hereby grants the applicant's appeal.
3. The Project is subject to mitigation measures found within the adopted Mitigated
Negative Declaration for the Project.
4. The Project is hereby approved subject to the conditions of approval in Exhibit A
and located on the map as shown in Exhibit B, both of which are incorporated
herein.
5. The Project approved herein is hereby made part of the 2nd amendment to the
Land Use Element of the Metropolitan Bakersfield General Plan for calendar year
2015 in accordance with Government Code Section 65358 (b).
�
Page 1 of 2
o��AK�9.n
s
� r
ORIGINAL
HEREBY CERTIFY that the foregoing Resolution was passed and adopted by the
Council of the City of Bakersfield at a regular meeting held on MAY 0 6 2015 by
the following vote:
AY
COUNCILMEMBER:
OES:
COUNCILMEMBER:
ABSTAIN:
COUNCILMEMBER:
ABSENT:
COUNCILMEMBER:
MAY 0 6 2015
✓ ✓ ✓ ✓ ✓ ✓ ✓
RIVERA, MAXWELL, WEIR, SMITH, HANSON, SULLIVAN, PARLIER
ROBERTA GAFFORD, CM
CITY CLERK and Ex Officio Clerk of the
Council of the City of Bakersfield
APPROVED as to form:
VIRGINIA GENNARO
City Atto y
By:
ANDREW HEGLUND
Deputy City Attorney
Exhibits: A Conditions of Approval
B General Plan Amendment Map
dl \S: \GPAs \GPA 2nd 2015\ 14 -0444 \Res Ord \New folder \CC Res GPA APPROVE _ 14- 0444.docx
Page 2 of 2
>- m
v �
ORIGINAI
Exhibit A
Conditions of Approval
General Plan Amendment No. 14 -0444
Public Works
Along with the submittal of any development plan, prior to approval of improvement
plans, or with the application for a lot line adjustment or parcel merger, the following
shall occur (If a tentative subdivision map over the entire GPA /ZC area is submitted, than
these conditions can be met with the map):
a. Provide fully executed dedication for South Fairfax Road to arterial standards for
the full frontage of the area within the GPA request. Dedications shall include
sufficient widths for expanded intersections and additional areas for landscaping as
directed by the City Engineer. Submit a current title report with the dedication
documents. If a tentative subdivision map over the entire GPA /ZC area is
submitted, dedication can be provided with the map.
b. This GPA /ZC area is too small to support it's own storm drainage sump. The City will
allow no more than one sump per 80 acres; therefore, this GPA /ZC area must be
included within the drainage area of adjoining property. Submit a comprehensive
drainage study of the entire drainage area, to be reviewed and approved by the
City Engineer. The study shall show the development's proportionate share of the
necessary ultimate storm drainage facilities. The developer shall participate in the
development of a Planned Drainage Area, or shall provide some other method for
the construction of the ultimate facilities satisfactory to the City Engineer. Any
required retention site and necessary easements shall be dedicated to the City.
c. Sewer service must be provided to the GPA /ZC area. The developer shall be
responsible for the initial extension of the sewer line to serve the property. This sewer
line must necessarily be sized to serve a much larger area than the project area.
The City is willing to aid the developer in the formation of a Planned Sewer Area
and /or an Assessment District to provide a mechanism for the reimbursement of
oversizing costs to the developer.
d. Developer is responsible for the construction of all infrastructure, both public and
private, within the boundary of the GPA /ZC area. This includes the construction of
any and all boundary streets to the centerline of the street, unless otherwise
specified. The developer is also responsible for the construction of any off site
infrastructure required to support this development, as identified in these conditions.
The phasing of the construction for all infrastructure will be addressed at the
subdivision map stage.
For orderly development.
The entire area covered by this General Plan Amendment shall be included in the
Consolidated Maintenance District. The applicant shall pay all fees for inclusion in the
Consolidated Maintenance District with submittal of any development plan, tentative
subdivision map, Site Plan Review, or application for a lot line adjustment for any portion
of this GPA area If the parcel is already within a consolidated maintenance district, then 0AKF9�
� m
v o
Page 1 of 3
OHIOINAL
Exhibit A
Conditions of Approval
GPA No. 14 -0444
owner shall update the maintenance district documents, including the Proposition 218
ballot and the Covenant. The ballot and covenant shall be signed and notarized.
For orderly development.
2. Payment of the proportionate share of the cost of the median for the arterial frontage of
the property within the GPA /ZC request is required prior to recordation of any map or
approval of any improvement plan for the GPA /ZC area.
For orderly development.
3. Per Resolution 035 -13, the area within the GPA /ZC shall implement and comply with the
"Complete Streets" policy.
For orderly development.
4. Local Mitigation: Pay the proportionate share of the following mitigation measures (not
paid for by the Regional Transportation Impact Fee nor included with normal
development improvements) as indicated in Tables 6 of the traffic study. An estimate
and fee schedule should be developed by the applicant and approved prior to
recordation of a map or issuance of a building permit. Proportionate shares from the
study as follows:
a. Brundage Ln & Fairfax Rd, Add 1 EBL, 1 EBT, 1 WBL, 1 WBT, 1 NBL, 1 SBT, 2.70%
share
b. Fairfax Rd & E. Wilson Rd, Add 1 NBT, 1 SBT, 9.89% share
For orderly development
5. The development is required to pay into the adopted Regional Traffic Impact Fee fixed
rate program.
For orderly development
6. Prior to development of the site, the developer /applicant shall provide to the City Traffic
Engineer a level of service study (delay counts) at the intersection of Redbank Road and
Fairfax Road for traffic signal warrants.
For orderly development
California Department of Transportation Condition
7. Prior to any development on the site, the developer /applicant shall prepare a Traffic
Impact Study and CalTrans shall approve the Study. Also, the Scope of the Traffic Study
shall be approved by CalTrans prior to commencement of the Study.
For orderly development
8. Development of the site shall be limited to a maximum of 288 dwelling units.
For orderly development
City Attorney Condition
9. In consideration by the City of Bakersfield for land use entitlements, including but not
limited to related environmental approvals related to or arising from this project, the
applicant, and /or property owner and /or subdivider ( "Applicant" herein) agrees to IQ ®AK4g9
Page 2 of 3
> m
�= o
U
ORIGINAL
Exhibit A
Conditions of Approval
GPA No. 14 -0444
indemnify, defend, and hold harmless the City of Bakersfield, its officers, agents,
employees, departments, commissioners and boards ( "City" herein) against any and all
liability, claims, actions, causes of action or demands whatsoever against them, or any
of them, before administrative or judicial tribunals of any kind whatsoever, in any way
arising from, the terms and provisions of this application, including without limitation any
CEQA approval or any related development approvals or conditions whether imposed
by the City, or not, except for City's sole active negligence or willful misconduct. This
indemnification condition does not prevent the Applicant from challenging any decision
by the City related to this project and the obligations of this condition apply regardless of
whether any other permits or entitlements are issued.
The City will promptly notify Applicant of any such claim, action or proceeding, falling
under this condition within thirty (30) days of actually receiving such claim. The City, in its
sole discretion, shall be allowed to choose the attorney or outside law firm to defend the
City at the sole cost and expense of the Applicant and the City is not obligated to use
any law firm or attorney chosen by another entity or party.
DL: S: \GPAs \GPA 2nd 2015\ 1 4-0444\Conditions Ex A 4_10_15.docx
Page 3 of 3
zQ g oLU
oo
is
WUJ
W�Z �pp� q�Egjbg E}$qE Qty M �F
$
(7 ir�nw U a d'�r�a °�r� �nx i U:7Cnxy �tU94v� Wa O V
Ix
h= A _ A M m 0 i 0 2 7 m= a a a O O O� N�� N CO
� 1
w 1 1
uj, � j 1
1 1_ _ ___.1S b31000 --- - — --- v 1S x31000
J
V70H - -
O
U
N
LPL
D
J
W
U.
N
W
0
LL
0
O
O L
J
U)
'A
a
06
u �
O
Z
O
N
J
Z
J
JO
_J
H
0
a
O/H VPV
x
4'