GENERAL NOTES
1. ALL GRADING SHALL CONFORM WITH APPENDIX J - CALIFORNIA BUILDING CODE
AND STANDARDS PERTAINING THEREOF AND PRELIMINARY SOILS REPORT
BY SALEM ENGINEERING GROUP. INC. DATED_ -W1 13
2. THE DESIGN ENGINEER SHALL EXERCISE SUFFICIENT SUPERVISOR CONTROL
DURING GRADING AND CONSTRUCTION TO INSURE COMPLIANCE WITH THE
PLANS, SOILS REPORT, SPECIFICATIONS AND CODE WITHIN HIS PURVIEW.
3. GRADING WORK WILL BE SUPERVISED AS ENGINEERED GRADING IN
ACCORDANCE WITH APPENDIX J OF THE CALIFORNIA BUILDING CODE
4. SURFACE DRAINAGE TO BE ONE (19:) PERCENT MINIMUM TO APPROVED
DRAINAGE FACILITIES, EXCEPT AS WAIVED BY THE BUILDING OFFICIAL.
5. CIVIL ENGINEER, GEOTECHNICAL ENGINEER AND BUILDING OFFICIAL WILL BE
NOTIFIED FORTY EIGHT (48) HOURS PRIOR TO PLACING ANY FILL MATERIAL
6. ALL FILL TO BE COMPACTED TO A MINIMUM OF NINETY (90%) PERCENT
MAXIMUM DENSITY AS DETERMINED BY APPROVED METHOD PER APPENDIX
J OF THE CURRENT CALIFORNIA BUILDING CODE AND CERTIFIED BY
TESTS AND REPORT FROM SOILS ENGINEER.
7. FILL MATERIAL SHALL BE PLACED IN LAYERS NOT EXCEEDING SIX (6)
INCHES IN COMPACTED THICKNESS AND COMPACTED AT OPTIMUM MOISTURE
CONTENT BY AN APPROVED METHOD.
8. ALL FILL AREAS TO BE CLEARED OF ALL VEGETATION AND OTHER
UNSUITABLE MATERIAL FOR A STRUCTURE FILL AND THE AREA SCARIFIED
TO A DEPTH OF SIX (6) INCHES.
9. FACES OF ALL CUT AND FILL SLOPES TO BE SHALL BE PLANTED WITH A
(MOUND COVER INDIGENOUS TO THE AREA AND MAINTAINED AGAINST EROSION.
10. ALL CUT AND /OR FILL SLOPE SHALL NOT BE STEEPER THAN TWO (2)
HORIZONTAL TO ONE (1) VERTICAL
11. BERMS OR DRAINAGE DEVICES ARE REQUIRED AT TOP OF ALL FILL SLOPES.
12. DIVERTER TERRACES (SWALES) WITH THREE (3) FEET MINIMUM WIDTH AND
ONE (1) FOOT MINIMUM DEPTH ARE REQUIRED AT TOP GE CUT AND FILL
SLOPES WHEN EXISTING TERRAIN SLOPES TOWARD TOP OF CUT.
13. FILL AREAS SLOPING STEEPER THAN FIVE TO ONE (5:1) SHALL BE KEYED
AND BENCHED TO SUPPORT FILL
14. ALL FILL SLOPES SHALL NOT CUT WITHIN TWELVE (12) FEET
HORIZONTALLY OF THE TOP OF EXISTING AND /OR PLANNED SLOPES.
15. ALL SLOPES IN EXCESS OF THREE (3) FEET MINIMUM WIDTH AND ONE (1)
FOOT MINIMUM DEPTH ARE REQUIRED AT TOP OF CUT SLOPES WHEN EXISTING
TERRAIN SLOPES TOWARD TOP OF CUT.
16. ALL CONSTRUCTION EQUIPMENT SHALL BE TUNED AND MAINTAINED IN
ACCORDANCE WITH THE MANUFACTURER'S SPECIFICATIONS.
17. WORK CREWS SHALL SHUT OFF CONSTRUCTION EQUIPMENT WHEN NOT IN
USE.
18. ANY WORK WITHIN EXISTING CITY RIGHT OF WAY WILL REQUIRE AN OPEN
STREET PERMIT.
19. USA NOTE:
THE CONTRACTOR IS RESPONSIBLE TO CALL U.S.A. ALERT BEFORE BEGINNING
ANY YORK ON THE PROJECT (1- 800 - 227 - 2600).
AN OPEN STREET PERMIT SHALL BE OBTAINED FROM THE CITY OF BAKERSFIELD
PUBLIC WORKS DEPARTMENT FOR ANY WORK PERFORMED WITHIN EXISTING
ACCEPTED STREET RIGHT OF WAY. UNLESS SECURED BY A SUBDIVISION AGREE-
MENT, SECURITY BASED ON AN APPROVED ENGINEER'S ESTIMATE FOR THE WORK
PERFORMED WITHIN RIGHT OF WAY AND INSURANCE AS REQUIRED SHALL BE
PROVIDED PRIOR TO ISSUANCE OF A PERMIT.
IF THE PROJECT IS SUBJECT TO THE PROVISIONS OF THE NATIONAL POLLUTANT
DISCHARGE ELIMINATION SYSTEM (NPDES), A - NOTICE OF INTENT" (NCI) TO COMPLY
WITH THE TERMS OF THE GENERAL PERMIT TO DISCHARGE STORM WATER ASSOCIATED
WITH CONSTRUCTION ACTIVITY (WQ ORDER NO. 92- 08 -DWQ) MUST BE FILED WITH
STATE WATER RESOURCES CONTROL BOARD IN SACRAMENTO BEFORE THE BEGINNING
OF ANY CONSTRUCTION ACTIVITY. COMPLIANCE WITH THE GENERAL PERMIT REQUIRES
THAT A STORM WATER POLLUTION PREVENTION PLAN (SWPPP) BE PREPARED, CONTIN-
UOUSLY CARRIED OUT, AND ALWAYS BE AVAILABLE FOR PUBLIC INSPECTION DURING
NORMAL CONSTRUCTION HOURS.
THE LANDSCAPED AREAS ARE TO BE DESIGNED AND GRADED TO MINIMIZE
EXCESS LANDSCAPE DRAINAGE ACROSS THE SIDEWALK FOR THOSE AREAS
OVER 2%.
NOTE: FOR PERMIT PURPOSES ONLY.
THE SOIL CALCULATIONS ARE BASED ON GRADING
LINES AND ELEVATIONS SHOWN ON THE DRAWINGS
AND ARE FOR PERMIT PURPOSES ONLY. ACTUAL
QUANTITIES OF EARTHWORK COULD VARY FROM
THAT STATED DEPENDING UPON VARYING SOIL
DENSITIES AND ON THE DEGREE OF SITE PREPA-
RATION ACTUALLY PERFORMED IN THE FIELD.
IT IS THE INTENT OF THE ENGINEER THAT COMPLETED
GRADING LEAVES NO EXPORT OR IMPORT. TO ACCOMPLISH
THIS, ADJUSTMENT OF PADS MAY BE NECESSARY
AND WILL BE DIRECTED BY THE ENGINEER.
IF IT APPEARS ADJUSTMENTS MAY BE NECESSARY,
SUFFICIENT NOTICE MUST BE GIVEN TO THE ENGINEER
SO THAT ADJUSTMENTS MAY BE MADE PRIOR TO
COMPLETION GE GRADING WORK.
I
to
SOIL CALCULATIONS:
CUT 24,330 CY
FILL 3,450 CY
SHRINKAGE 4,860 CY
SUBSIDENCE 5,250 CY
STOCKPILE 10,770 CY
- REAR P.L.
IAO 4\0
- -- A/.6 - - - -- 7
1
e per'
h -A // / BUILDING
/ e PAD e j 04 JV�
A�
i
8 F
AKERSFIELD
TRACT rlo. 7231
GRADING PLAN
BEWN MARK USM.
TOP OF CONCRETE MONUMENT AT THE CENTERLINE
INTERSECTION OF TORT LORENE AVENUE AND ABIGIAL
WAY. PER TRACT NO. 6152 PHASE 6 GRADING PLANS
U.S.G.S. DATUM
PRIVATE ENGINEERS NOTICE TO CONTRACTORS
THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES OR STRUCTURES SHOWN
ON THESE PLANS ARE OBTAINED BY A SEARCH OF THE AVAILABLE RECORDS. TO THE BEST
OF OUR KNOWLEDGE THERE ARE NO EXISTING UTILITIES EXCEPT AS SHOWN ON THIS MAP.
THE CONTRACTOR IS REWIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT THE
UTILITY VINES SHOWN AND ANY OTHER LINES NOT OF RECORD OR NOT SHOWN ON THIS
DRAWING.
ENGINEER SHALL NOT BE RESPONSIBLE FOR THE ACCURACY OR COMPLETENESS OF ANY SUCH
INFORMATION OR DATA
UNDERGROUND SERVICE ALERT SHALL BE CONTACTED TWO WORKING DAYS PRIOR TO CONST-
RUCTION. 1- 800 - 227 -2600
ENGINEER'S STATMENT;
I HEREBY STATE THAT THESE PLANS AND SPECIFICATIONS COMPLY WITH
CITY OF BAKERSFIELD ORDINANCES, STANDARDS, AND DESIGN CRITERIA,
AND THAT THEY INCLUDE ALL IMPROVEMENT REQUIREMENTS OF THE ADVI-
SORY AGENCY OR OTHER REVIEW BOARD.
I AM RESPONSIBLE FOR ALL CALCULATIONS AND DRAWINGS ON THESE PLANS
AND ANY ERRORS, OMISSIONS, OR VIOLATIONS OF THOSE ORDINANCES, STAN-
DARDS, AND DESIGN CRITERIA SHALL BE CORRECTED DURING CONSTRUCTION.
EXP. 9 -30 -15
ADDITIONAL NOTES
OWNER: SMITH REVOCABLE TRUST
/ / e NOTES:
e e /
ti AO - - - 1/ SIDEYARD SLOPE TO BE 2% FOR 10'
- - - - - -
,p OR TO PROPERTY LINE AS SHOWN
<� ALL LOTS TO BE GRADED ACCORDING
4AR' / TO THE TYPICAL DETAIL UNLESS OTHERWISE
FRONT P.L. / OTHERWISE INDICATED ON THESE PLANS
Drawing File: FrGRD7231 TYPICAL LOT GRADING
4
01/07/2014
FINISH GRADING & SWALES TO BE
COMPLETED BY BUILDER AT TIME OF HOUSE
CONSTRUCTION.
PADS TO BE GRADED FROM FRONT TO
BACK AT .5% AT ROUGH GRADE
• •
PANAMA , LANE
0
y
HOSKING ROAD
TOTAL ACREAGE
TOTAL . GROSS AC.
TOTAL BUILDABLE
sm
t Uw
TIZACT No. OR PHASE 5
0 . 53 PCB. 55
5Q4.�3 "
S 359 °24 41 E TRACT 80MARY
SEE SHEET 3
I, 7 6 5 4 3 2 1
L1 I'
1424 17TH STREET
_. -.
._ -- - - -__ -- -- - CHISOLM TRAIL AVENUE
BAKERSFIELD, CA
93301
OWNER:
LANTZ FAMILY, LP
®
STD CITY MONUMENT ENCASEMENT PER COB STD ST -13
4805 CENTENNIAL
WAY #301
S
BAKERSFIELD, CA
93312
OWNER:
WIBLE INVESTORS 11,
LLC
6' BLOCK WALL
4805 CENTENNIAL
WAY #300
30.00
BAKERSFIELD, CA
93312
SUBDIVIDER:
WMBLE INVESTORS 11,
LLC
N
4805 CENTENNIAL
WAY #300
BAKERSFIELD, CA
93312
ENGINEER:
SMITHTECH /USA, INC.
0
1424 17TH STREET
END OF CURVE
BAKERSFIELD, CA
93301
/ / e NOTES:
e e /
ti AO - - - 1/ SIDEYARD SLOPE TO BE 2% FOR 10'
- - - - - -
,p OR TO PROPERTY LINE AS SHOWN
<� ALL LOTS TO BE GRADED ACCORDING
4AR' / TO THE TYPICAL DETAIL UNLESS OTHERWISE
FRONT P.L. / OTHERWISE INDICATED ON THESE PLANS
Drawing File: FrGRD7231 TYPICAL LOT GRADING
4
01/07/2014
FINISH GRADING & SWALES TO BE
COMPLETED BY BUILDER AT TIME OF HOUSE
CONSTRUCTION.
PADS TO BE GRADED FROM FRONT TO
BACK AT .5% AT ROUGH GRADE
• •
PANAMA , LANE
0
y
HOSKING ROAD
TOTAL ACREAGE
TOTAL . GROSS AC.
TOTAL BUILDABLE
sm
t Uw
TIZACT No. OR PHASE 5
0 . 53 PCB. 55
5Q4.�3 "
S 359 °24 41 E TRACT 80MARY
SEE SHEET 3
I, 7 6 5 4 3 2 1
L1 I'
0
141.21
_. -.
._ -- - - -__ -- -- - CHISOLM TRAIL AVENUE
- -
TYP STORM DRAIN PIPE AS NOTED
S
®
STD CITY MONUMENT ENCASEMENT PER COB STD ST -13
� I
cn
S
4 --
CENTER LINE --
STREET SLOPE
GB
GRADE BREAK
6' BLOCK WALL
8 9 10 11 12 13
w
14c
30.00
EP
EXISTING PAYMENT
SLOPE SECTION DETAIL
L5
l
N
w
co
PT OF REVERSE CURVE
PIVC PT OF VERTICAL CURVE 10 20 20 10
STREET WIDTH
BC
SEE SHEET 4
0
31
END OF CURVE
22
23
24
25
26
27
`n
TRANS TRANSITION EEC
FLOW LINE
2
V
C21 20 19 18 17 16
15
HEET
0
c
w
I_
SEE S EET 4
T1N0
W
RIO GRANDE LAME
o
N
- - - -
►� 1
63
3 4 5 fi 7 g
0
141.21
-a.
TY P TYPE "A" CATCH BASIN PER COB STD D -14
- -
TYP STORM DRAIN PIPE AS NOTED
S
®
STD CITY MONUMENT ENCASEMENT PER COB STD ST -13
2
cn
S
4 --
CENTER LINE --
STREET SLOPE
GB
GRADE BREAK
6' BLOCK WALL
S 359 °03'43» E
3
30.00
EP
EXISTING PAYMENT
SLOPE SECTION DETAIL
L5
A A'
N
PRC
PT OF REVERSE CURVE
PIVC PT OF VERTICAL CURVE 10 20 20 10
STREET WIDTH
BC
SEE SHEET 4
0
31
END OF CURVE
22
23
24
25
26
27
(5
TRANS TRANSITION EEC
FLOW LINE
.OWr -
V
SEE
HEET
30
SEE S EET 4
T1N0
W
N
►� 1
2
3 4 5 fi 7 g
co
z
29
- -
RIO -LOBO LANE
�I
I
26
25
24
23 22 21 20
27
SEE SHEET 4
I
SEESLEET 4
TRAC'i
BOMAW
S 89'03'22" E
940.22 mom T f
EXI51-1w-1 6--0
LOT 1
I
t
500'
0
RCP WIRGJ CL 111 MANHOLE TYPE "A" PER COB STD SW-4
-a.
TY P TYPE "A" CATCH BASIN PER COB STD D -14
- -
TYP STORM DRAIN PIPE AS NOTED
S
®
STD CITY MONUMENT ENCASEMENT PER COB STD ST -13
2
(TO BE CONST OR EXISTS AS NOTED)
S
4 --
CENTER LINE --
STREET SLOPE
GB
GRADE BREAK
6' BLOCK WALL
CR
CURB RETURN
30.00
EP
EXISTING PAYMENT
SLOPE SECTION DETAIL
L5
A A'
N
PRC
PT OF REVERSE CURVE
PIVC PT OF VERTICAL CURVE 10 20 20 10
STREET WIDTH
BC
BEGINNING OF CURVE
EC
END OF CURVE
LOT GRADING
PCC
PT OF COMPOUND CURVE
TRANS TRANSITION EEC
FLOW LINE
.OWr -
SLOPE OF FLOW LINE
00.0
LOT PAD ELEVATION
ADDITIONAL NOTES ON ?
LEGAL DESCRIPTION
THAT PORTION OF PARCEL C OF LOT LINE ADJUSTMENT
NO. 05 -0981 AS PER THAT CERTAIN CERIFICATE OF
COMPLIANCE RECORDED JULY 21 , 2006 DOCUMENT
NO. 0206177575 OF OFFICIAL RECORDS.
SCALE- 1" - 100'
0 rT 10WT 200 FT 3W Fr
PERMIT NUMBER: B13- 40000043
S 359'03'43" E 575.00
9 10 11 12
M
STOCKPILE 10,770 C. Y STOCKPILE
4:1
WILL BE USED ON LOT 1 DURING
CONSTRUCTION WHEN BEING GRADED,
500'
S 359 °03'22" E 616.76
DISTANCE & BEARING TABLE
LINE
DISTANCE
BEARING
L1
234.72
S
89 °24'41"
E
2
84.37
S
96 °27'26"
E
L3
28.81
S
89 °24'41"
E
L4
30.00
S
142 °5824"
E
L5
17.72
N
00 °55'46"
E
13
17 16
15
5�2��011 "C'
0
FNA
F A
14
w
� Q
z
� ®J
"or
h
EXISTIWS, C - Z
LOT 1
0
0
0
Q0
U,
a-
N
N
M
PARCEL I
PARCEL MAP NO. 7797
PM15 33, P6. 14
O I
_m
3
PHASE FOA
S.E. COR. OF SEC. 35, 30/27,
M.D.M. CALIF. DIV. HWY. BRASS
CAP IN L.H.
The GRADING PLAN as shown on this drawing is hereby approved,
subject to any indicated coy rections or additions. Approval by the Public
I worh< Depar:i gent and Building Department indicates approval only
as tc: tesign cntena used and conformance to City Standards, Codes
ant' ;_ i dinances. E ripneer for the subdivider or developer shall be
I res; nsible for acc;uiac;y of calculations for this plan and shall submit
i a ce: titrea "as -g, ailed" plan after completion of the grading.
APPROVED ELY:
Pubi orks D�epartrnent fat
I
Building De r went mate
79
P�op�oFE�so�q 3
A /
� BERT t. S lc ,
Qj
�J A _
yarn.
�` g TRACT ® X231
%/Z 7 � 31 Exp. 30. t1 5 �)
"RECORD DRAWN G" %qJ
°civil
�
GSA I PLA v ®RRECTOSBY. . SmithTec SSA
5 �
DATE
I N C O R P O R A T E D
HABERFELDE BUILDING
1424 11TH STREET Z
BAKERSFIELD, CALIFORNIA 93301 ROBERT E. SMITH RCE 35473 DATE
(661) 327 -8492 i _ �% JOB NO. - 12 -105 SHEET 1 OF 5 SHEETS
DRAINAGE AND _ LANDSCAPING
THE GROUND SURFACE SHOULD SLOPE AWAY FROM BUILDING PAD AND PAVEMENT
AREAS TOWARD APPROPRIATE DROP INLETS OR OTHER SURFACE DRAINAGE DEVICES.
IT IS RECOMMENDED THAT ADJACENT EXTER40R GRADES BE SLOPED A MINIMUM
OF 2 PERCENT FOR A MINIMUM DISTANCE OF 5 FEET AWAY FROM STRUCTURES.
SUBGRADE SOILS IN PAVEMENT AREAS SHOULD BE SLOPED A MINIMUM OF 1 PER-
CENT AND DRAINAGE GRADIENTS MAINTAINED TO CARRY ALL SURFACE WATER TO
COLLECTION FACILITIES AND OFF —SITE. THESE GRADES SHOULD BE MAINTAINED
FOR THE LIFE OF THE PROJECT.
UTILITY TRENCH BACKFILL
UTILITY TRENCHES SHOULD BE EXCAVATED ACCORDING TO ACCEPTED ENGINEERING
PRACTICES FOLLOWING OSHA (OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION)
STANDARDS BY A CONTRACTOR EXPERIENCED IN SUCH WORK. THE RESPONSIBILITY
FOR THE SAFETY OF OPEN TRENCHES SHOULD BE BORNE BY THE CONTRACTOR.
TRAFFIC AND VIBRATION ADJACENT TO TRENCH WALLS SHOULD BE MINIMIZED;
CYCLIC WETTING AND DRYING OF EXCAVATION SIDE SLOPES SHOULD BE AVOIDED.
DEPENDING UPON THE LOCATION AND DEPTH OF SOME UTILITY TRENCHES, GROUND-
WATER FLOW INTO OPEN EXCAVATIONS COULD BE EXPERIENCED, ESPECIALLY DURING
OR SHORTLY FOLLOWING PERIODS OF PRECIPITATION.
SANDY SOIL CONDITIONS WERE ENCOUNTERED AT THE SITE. THESE COHESIONLESS
SOILS HAVE A TENDENCY TO CAVE IN TRENCH WALL EXCAVATIONS. SHORING OR
SLOPING BACK TRENCH SIDEWALLS MAY BE REQUIRED WITHIN THESE SANDY SOILS.
UTILITY TRENCH BACKFILL PLACED IN OR ADJACENT TO BUILDINGS AND EXTERIOR
SLABS SHOULD BE COMPACTED TO AT LEAST 90 PERCENT OF MAXIMUM DENSITY
BASED ON ASTM TEST METHOD D1557. UTILITY TRENCH BACKFILL PLACED IN
PAVEMENT AREAS SHOULD BE COMPACTED TO AT LEAST 90 PERCENT OF MAXIMUM
DENSITY BASED ON ASTM TEST METHOD D1557. PIPE BEDDING SHOULD BE IN
ACCORDANCE WITH PIPE MANUFACTURER'S RECOMMENDATIONS.
THE CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL WATER- SENS111VE SOILS
FROM THE TRENCH REGARDLESS OF THE BACKFILL LOCATION AND COMPACTION
REQUIREMENTS. THE CONTRACTOR SHOULD USE APPROPRIATE EQUIPMENT AND
METHODS TO AVOID DAMAGE TO THE UTILITIES AND /OR STRUCTURES DURING FILL
PLACEMENT AND COMPACTION.
SITE PREPARATION AND GRADING
THE UPPER 2 TO 4 INCHES OF THE SOILS CONTAINING ASPHALTIC CONCRETE, VEGETATION,
ROOTS AND OTHER OBJECTIONABLE ORGANIC MATTER ENCOUNTERED AT THE TIME OF
GRADING SHOULD BE STRIPPED AND REMOVED FROM THE BUILDING AND PAVEMENT AREAS
AND AT LEAST 5 FEET OUTSIDE THE BUILDING PERIMETER. DEEPER STRIPPING MAY BE
REQUIRED IN LOCALIZED AREAS. THESE MATERIALS WILL NOT BE SUITABLE FOR USE AS
ENGINEERED FILL HOWEVER, STRIPPED TOPSOIL MAY BE STOCKPILED AND REUSED IN
IN LANDSCAPE OR NON — STRUCTURAL AREAS.
TO MINIMIZE POST — CONSTRUCTION SOIL MOVEMENT AND PROVIDE UNIFORM SUPPORT FOR
THE PROPOSED BUILDINGS, OVEREXCAVATION AND RECOMPACTION WITHIN THE PROPOSED
BUILDING AREAS SHOULD BE PERFORMED TO A MINIMUM DEPTH OF 3 FEET BELOW THE
EXISTING GRADE OR 2 FEET BELOW BOTTOM OF THE PROPOSED FOOTINGS, WHICHEVER IS
DEEPER.
PRIOR TO PLACEMENT OF FILL SOILS, THE UPPER 12 INCHES OF NATIVE SUBGRADE SOILS
SHOULD BE SCARIFIED AND MOISTURE — CONDITIONED WITH DEEP WATERING METHOD TO
BRING THE MOISTURE CONTENT OF THE UPPER 10 FEET OF SOIL BELOW THE OVEREX-
CAVATION BOTTOM) TO WITHIN 2 PERCENT OF THE OPTIMUM MOISTURE CONTENT. THE
MOISTURE CONTENT OF THE SOIL SHOULD BE VERIFIED BY DRILLING AND SAMPLING PRIOR
TO RECOMPACTION.
AFTER THE MOISTURE IS ACHIEVED TO THE DESIRED MOISTURE CONTENT, THE OVEREX-
CAVATION BOTTOM SHOULD BE RECOMPACTED TO A MINIMUM OF 90 PERCENT OF THE
MAXIMUM DRY DENSITY BASED ON ASTM D1557 -07 TEST METHOD PRIOR TO PLACING FILL
MATERIALS. THE OVEREXCAVATION AND RECOMPACTION SHOULD ALSO EXTEND LATERALLY
TO A MINIMUM OF 5 FEET BEYOND THE OUTER EDGES OF THE PROPOSED FOOTINGS.
WITHIN THE PAVEMENT AREAS, IT IS RECOMMENDED THAT OVEREXCAVATION AND RECOM-
PACTION BE PERFORMED TO AT LEAST 12 INCHES BELOW EXISTING GRADE OR FINISH GRADE,
WHICHEVER IS DEEPER. THIS COMPACTION EFFORT SHOULD STABILIZE THE SURFACE SOILS
AND LOCATE ANY UNSUITABLE OR PLIANT AREAS NOT FOUND DURING OUR FIELD
INVESTIGATION.
ANY FILL MATERIALS ENCOUNTERED DURING GRADING SHOULD BE REMOVED AND REPLACED
WITH ENGINEERED FILL THE ACTUAL DEPTH OF THE OVEREXCAVATION AND RECOMPACTION
SHOULD BE DETERMINED BY OUR FIELD REPRESENTATIVE DURING CONSTRUCTION.
SANDY SOIL CONDITIONS WERE ENCOUNTERED AT THE SITE. THESE COHESIONLESS SOILS
HAVE A TENDENCY TO CAVE IN TRENCH WALL EXCAVATIONS. SHORING OR SLOPING BACK
TRENCH SIDEWALLS MAY BE REQUIRED WITHIN THESE SANDY SOILS. THE SHRINKAGE ON
RECOMPACTED SOIL AND FILL PLACEMENT IS ESTIMATED AT 15 TO 25 PERCENT.
THE UPPER SOILS, DURING WET WINTER MONTHS, MAY BECOME VERY MOIST DUE TO THE
ABSORPTION CHARACTERISTICS OF THE SOIL. EARTHWORK OPERA11ONS PERFORMED DURING
WINTER MONTHS MAY ENCOUNTER VERY MOIST UNSTABLE SOILS, WHICH MAY REQUIRE
REMOVAL OF SOIL TO A STABLE BUILDING FOUNDATION. PROJECT SITE WINTERIZATION
CONSISTING OF PLACEMENT OF AGGREGATE BASE AND PROTECTING EXPOSED SOILS DURING
CONSTRUCTION SHOULD BE PERFORMED.
AN EXISTING CANAL TRENDS FROM THE NORTHWEST TO THE SOUTHEAST OF THE PROPERTY.
THE CANAL AND ANY OTHER BURIED STRUCTURES, FOOTINGS AND UTILITIES SHOULD BE
PROPERLY REMOVED AND THE RESULTING EXCAVATIONS SHOULD BE BACKFILLED WITH
ENGINEERED FILL
THIS TESTING AND OBSERVATION IS AN INTEGRAL PART OF OUR SERVICE AS ACCEPTANCE
OF EARTHWORK CONSTRUCTION IS DEPENDENT UPON COMPACTION OF THE MATERIAL AND
THE STABILITY OF THE MATERIAL THE GEOTECHNICAL ENGINEER MAY REJECT ANY MATERIAL
THAT DOES NOT MEET COMPACTION AND STABILITY REQUIREMENTS. FURTHER RECOMMEN-
DATIONS OF THIS REPORT ARE PREDICATED UPON THE ASSUMPTION THAT EARTHWORK
CONSTRUCTION WILL CONFORM TO RECOMMENDATIONS SET FORTH IN THE SECTION AND
IN SECTION 9.4.
Drawing File: FCGRD7231
01/07/2014
ENGINEERED FILL AND COMPACTION
THE UPPER ORGANIC —FREE, ON SITE SOILS ARE PREDOMINANTLY SILTY SANDS AND SANDY
SILTS. THESE SOILS WILL BE SUITABLE FOR REUSE AS ENGINEERED FILL, PROVIDED
THEY ARE CLEANSED OF EXCESSIVE ORGANICS AND DEBRIS. THE PREFERRED MATERIALS
SPECIFIED FOR ENGINEERED FILL ARE SUITABLE FOR MOST APPLICATIONS WITH THE EXCEP-
TION OF EXPOSURE TO EROSION. PROJECT SITE WINTERIZATION AND PROTECTION OF EX-
POSED SOILS DURING THE CONSTRUCTION PHASE SHOULD BE THE SOLE RESPONSIBILITY
OF THE CONTRACTOR, SINCE HE HAS COMPLETE CONTROL OF THE PROJECT SITE.
IMPORTED NON — EXPANSIVE NON — CORROSIVE FILL SHOULD CONSIST OF A WELL— GRADED,
SLIGHTLY COHESIVE SILTY FINE SAND OR SANDY SILT, WITH RELATIVELY IMPERVIOUS
CHARACTERISTICS WHEN COMPACTED. THIS MATERIAL SHOULD BE APPROVED BY THE
ENGINEER PRIOR TO USE AND SHOULD TYPICALLY POSSESS THE FOLLOWING CHARACTERISTICS:
MAXIMUM
PERCENT PASSING NO. 200 SIEVE
50
MAXIMUM
PARTICLE SIZE
Y
MAXIMUM
PLASTICITY INDEX
10
MAXIMUM
UBC STANDARD 29 -2 EXPANSION INDEX
15
PRIOR TO PLACEMENT OF FILL SOILS, THE UPPER 8 INCHES OF NATIVE SUBGRADE SOILS
SHOULD BE SCARIFIED, MOISTURE — CONDITIONED TO "NO LESS° THAN THE OPTIMUM MOISTURE
CONTENT AND RECOMPACTED TO A MINIMUM OF 90 PERCENT OF THE MAXIMUM DRY DENSITY
BASED ON ASTM D1557 -07 TEST METHOD.
FILL SOILS SHOULD BE PLACED IN LIFTS APPROXIMATELY 6 TO 8 INCHES THICK, MOISTURE —
CONDITIONED TO NEAR THE OPTIMUM MOISTURE CONTENT (PLUS OR MINUS 2%) AND COM-
PACTED TO ACHIEVE AT LEAST 90 PERCENT OF THE MAXIMUM DRY DENSITY AS DETERMINED
BY ASTM D1557 -07. ADDITIONAL LIFTS SHOULD NOT BE PLACED IF THE PREVIOUS LIFT DID
NOT MEET THE REQUIRED DRY DENSITY OR IF SOIL CONDITIONS ARE NOT STABLE.
SURFACE DRAINAGE CONTROL
THE GROUND IMMEDIATELY ADJACENT TO THE FOUNDATION SHALL BE SLOPED AWAY FROM
THE BUILDING. IMPERVIOUS SURFACES WITHIN 10 FEET OF THE BUILDING FOUNDATION SHALL
BE SLOPED AT A MINIMUM OF 2 PERCENT AWAY FROM THE BUILDING AND DRAINAGE GRADIENTS
MAINTAINED TO CARRY ALL SURFACE WATER TO COLLECTION FACILITIES AND OFF SITE,
THESE GRADES SHOULD BE MAINTAINED FOR THE LIFE OF THE PROJECT.
ROOF DRAINS SHOULD BE INSTALLED WITH APPROPRIATE DOWNSPOUT EXTENSIONS OUT—
FALLING ON SPLASH BLOCKS SO AS TO DIRECT WATER A MINIMUM OF 5 FEET AWAY FROM THE
STRUCTURES OR BE CONNECTED TO THE STORM DRAIN SYSTEM FOR THE DEVELOPMENT.
EXCAVATION STABILITY
TEMPORARY EXCAVA11ONS PLANNED FOR THE CONSTRUCTION OF THE PROPOSED BUILDING
AND OTHER ASSOCIATED UNDERGROUND STRUCTURES MAY BE EXCAVATED, ACCORDING
TO THE ACCEPTED ENGINEERING PRACTICE FOLLOWING OCCUPATIONAL SAFETY AND HEALTH
ADMINISTRATION (OSHA) STANDARDS BY A CONTRACTOR EXPERIENCED IN SUCH WORK.
OPEN, UNBRACED EXCAVATIONS IN UNDISTURBED SOILS SHOULD BE MADE ACCORDING TO
THE TABLE BELOW:
RECOMMENDED EXCAVATION SLOPES
DEPTH OF EXCAVATION FT
SLOPE HORIZONTAL: VERTICAL
0 -5
1:1
5 -10
2:1 —j
IF, DUE TO SPACE LIMITATION, EXCAVATIONS NEAR EXISTING STRUCTURES ARE PERFORMED
IN A VERTICAL POSITION, BRACED SHORINGS OR SHIELDS MAY BE USED FOR SUPPORTING
VERTICAL EXCAVATIONS. THEREFORE, IN ORDER TO COMPLY WITH THE LOCAL AND STATE
SAFETY REGULATIONS, A PROPERLY DESIGNED AND INSTALLED SHORING SYSTEM WOULD
BE REQUIRED TO ACCOMPLISH PLANNED EXCAVATIONS AND INSTALLATION. A SPECIALTY
SHORING CONTRACTOR SHOULD BE RESPONSIBLE FOR THE DESIGN AND INSTALLA11ON OF
SUCH A SHORING SYSTEM DURING CONSTRUCTION. BRACED SHORINGS SHOULD BE
DESIGNED FOR A MAXIMUM PRESSURE DISTRIBUTION OF 30H, (WHERE 'H° IS THE DEPTH
OF THE EXCAVATION IN FEET). THE FOREGOING DOES NOT INCLUDE EXCESS HYDROSTATIC
PRESSURE OR SURCHARGE LOADING.
FIFTY PERCENT OF ANY SURCHARGE LOAD, SUCH AS CONSTRUCTION EQUIPMENT WEIGHT,
SHOULD BE ADDED TO THE LATERAL LOAD OVEN HEREIN. EQUIPMENT TRAFFIC SHOULD
CONCURRENTLY BE LIMITED TO AN AREA AT LEAST 3 FEET FROM THE SHORING FACE OR
EDGE OF THE SLOPE. THE EXCAVATION AND SHORING RECOMMENDATIONS PROVIDED
HEREIN ARE BASED ON SOIL CHARACTERISTICS DERIVED FROM THE TEST BORINGS WITHIN
THE AREA. VARIATIONS IN SOIL CONDITIONS WILL LIKELY BE ENCOUNTERED DURING
THE EXCAVATION.
SALEM ENGINEERING GROUP, INC. SHOULD BE AFFORDED THE OPPORTUNITY TO PROVIDE
FIELD REVIEW TO EVALUATE THE ACTUAL CONDITIONS AND ACCOUNT FOR FIELD CONDITION
VARIA11ONS NOT OTHERWISE ANTICIPATED IN THE PREPARA11ON OF THIS RECOMMENDATION.
SLOPE HEIGHT, SLOPE INCLINATION, OR EXCAVATION DEPTH SHOULD IN NO CASE EXCEED
THOSE SPECIFIED IN LOCAL, STATE, OR FEDERAL SAFETY REGULATION, (E.G. OSHA)
STANDARDS FOR EXCAVATIONS, 29 CFR PART 1926, OR ASSESSOR'S REGULATIONS.
IF
F AKERSFIEL
TRACT No.
GRADING PLAN
9
C TRACT BOUNDARY c 0
6' WOOD FENCE
—� 2'
ADJACENT PROPERTY
PAD VARIES
2:1 MAX.
2:1 MAX.
PAD
5
2'
PAD
R.O.W. D
I
I
0
0
VARIES —�
2:1 MAX.
A B y R. 0. W. B
z5'
PAD a_
0
Z\
= o
0
VARIES —�
2:1 MAX.
TYPICAL STEP SECTION
FRONT YARD ® R.O.W.
PERMIT TO BE OBTAINED PRIOR TO
CONSTRUCTION FOR RETAINING WALL
E TRACT BOUNDARY E
6' WOOD FENCE
ADJACENT PROPERTY
2' -3' RETAINING WALL
PAD
ADJACENT PROPERTY/
MN. �" s�
TYPICAL STEP SECTION
PAD
PARK @ R. 0. W
TRACT BOUNDARY
TYPICAL STEP SECTION
STEP SECTION
@ TRACT BOUNDARY
PERMIT TO BE OBTAINED PRIOR TO
R/W
ROW
CONSTRUCTION FOR RETAINING WALL
3®' 3®'
10' - 12'1 18' - 20'# 18' - 20' **
10' - 12'
E9 TRACT
BOUNDARY E
?
1 2'
1 4° PER FT 2% 2q
2 2. 1
' 1 4 ® R FT.
6` WOOD FENCE
' ,
2 -3 RETAINING WALL
CONST. TYPE °B" CURB do GUTTER - iii_
-
PAD
WITH 4.5' STANDARD TYPE SIDEWALK
PER CITY STANDARD ST -3 1 BELOW FL ROUGH GRADE LINE
.3 BELOW FL
ADJACENT PROPERTY
iNPJ. COVERAGE s°
� NEw CANAL PIPE
CROSS SECTION 6® R /�I
NOTES:
CITY OF BAKERSFIELD PLATE S -27 — REVISED N.T.S.
MAXIMUM CROSS FALL TO
LOW GUTTER SHALL BE 0.5'
6
TYPE "A" LOCAL STREET
# SLOPE FROM HIGH GUTTER
SEE PLAN SHEETS
TRACT
BOUNDA R Y
Tol 4.5 R®VAL 22
0
STEP
SEC T/ ON
.25' A.C. OVER .45 C.A.B.
OVER .50' 957 COMP. O.G.
T/C 7X3 1
"RECORD DFRAWING"
CORRE-CTI(AS 3Y;
DATE----/, 12 -Z1
,v FESS %p
F <c: Ga�_RT
No-35473 y m
Exp. 9- 30-15
��qTF
op C
a �rOQi, \P
i I
i
I ( PAD ,PA's 4 �}
I U I PAD D � �� ", � q -, � -� � i
-I /
I 49.0 .5 0 ' 49.7
TRACT BOUNDARY j ,{ 00
I LO r O to Li- .J9 J�. V� 49.2/ 48.94
7 6 ASE
�0 4 i t
_ PAD PAD PAD PAD A AD PAD i
;
T �P CANAL 4�; 48.1 47.9 47.8 47® 47.5 '
..... !_ 5`' G �� E E
... �0 G 'fv AL �y 6 �°' o 50.5 °' co o ; Ls
.50 <%✓ii 9�� ! EX. q�1 1 �6o-�. c� C° c- r° i
Gj Ln
• • - '' /% <c �g J 48.31
_. G a .202%
.... .:.� -9 �� ISOLM _ _TRAIL WU _.4� rx
F` , �v iu', ll��-
..
.:.. ... I - -- -- - 46:� E ��
--
..... ..
n
9,j
R R N �. G .., p , v
..... _ }`F 1• .30.201% (> 3 4 8. % =� `t
v a � G � r -(51 5 5/� i
lam. Li J J !`�1'" ! \
TG. � AI A G 48.69 " �8.; 2z i
PAD PAD PAD PAD PAD AD �"
s PAD -
F- N 48.2 48.1 -�� 47.8 47.7 4® Q �; ;
I ..... v 47.6
• -- 8 9 10 11 z
I ..... 12 1 3 14
TOP CANAL A t
EXISTING I a.3 I
I 6` 1 OP r 1 \3 AL
2 18 1 70
CANAL PIPE ..... +`�. i ;
i ... a� F 48.81 A
1"77
U � 1 a_ 2 0 19 18 16 15
..... O o ° 0 17 PAL I PA ��, PAD PAD PAD PAD A A' PAD j
PAD
4800 T , .2 48.4 48.6 49.0 49.0
I
> t 5 gAVA a c,0 rn y I i
.. �� (� S.D. B62 ° N LO r, !2
J /�
• I I - -
o �- .308% �--�, X41.12
U vi �4 1 A i �1 F �'F - -- - - -- -
�R. o TAP ti�L 0 LANE
..... I _ N .67 RI
C:)
-�3* -- - - - - -_ - - -- --
:.SUE
46.72
O B p1
� X45 0Ao 300%
.. y' 1
I
,ter;
i f
i
I i
I I i
i
I
TCH a5 -..- - - - -- --
-- -- - -- - M ,d B � h -
SHEET 4 , ` J J
2 18 18 12 ( 1,, �9
PAD FAD PAD L PAD -.4.
AD PAD
.. I r-� n r i'AD
..... PAD B' B PA `.38
("P, -IL j -�� , i r
' t r ,� n
6 F F I N 48.0 48.2 48.4 48 6 -49 E , Al 4 % ; _1
947.2 I - ANA E > 22 2� 2 I 25 <
45.34 F �� MATCH A DL1
A ' �
I '< r 1
47.00 PAD 4 3 C'
Q I S4 4 PHASE ToP y; r,!A�_ O 48. x,.
41.1 0
2 6
6 5 3 4 7
®- � � � PAD PAD PAD PAD ` , '�` PAD
OD FL 45.19 I PAD PAD
46.8 47.0 47.1 47.3 47.5
PAD a- I 4 7.4 O P A I' - 4 7.6, Q 00
G Q 2 �° 47.7'1 G N B' OPT w 'N 'L �n
46.98 I 47.0° > G d � 4?.E ? x:,9..:1 �i ,o �✓ -t
LL 4(. 4 -i 4 sal
} F R 3 cv B.Ofr�' LJ
_ �-�- .202% B LL
b \ \
_RIO - LOBO LANE
{` AD
C I
C' GB
OGH-
PA L7 6
48.1rB
1:-
b6.6 1
CD
l.�
G CD
�r
.202%
SCALE.- I I " = 50'
NOTE: ALL ELEVATIONS ARE +300'
N OTES.-
OCANAL KtLUC:A i EU 10
UNDERGROUND PIPE.
p A� � PA1 I ��n
i
G i i� 1 PAD
i p f PD
,
417.6 T 7 ; 0 `6.8 1 46.4 �� >>
9 of- r O,
TRACT; BOUNDARY
FITNCE
SHEET 4 E 10'
12
13
PAD 14 0 ... ...
PAD PAD ....
48� 11 w
G PAD .............. ...... ..
4, .
48. 1 48.2
N 48.5 . ......... ..
`T 47.01 ^ 7-3 .. • .... .:
LOT 1 u; m i
`c
pcO/ F`CRI I°- 0
CC) -216q 5�E%
I
Fes-- L LJ
G Li]
46.83
-r4 72.31
"RECORD DRAWW
CORRECTIONS BY.
DATE--
�� pR�JFESSj�n✓
c�EctT E• S q�� .
5
No. ^5473
Exp. 9-30 -15
`CAL
i
SmithTechAUSA
I N C 0 R P 0 R A T E D
HABERFELDE BUILDING
1424 17 -I H STREET
BAKERSFIELD, CALIFORNIA 93301
(661) 327 -8492 FAX 327 - -8493'
f, - -
ROBERT E. tMITH RCE 35473 DATE
?I JOB NO. - 12 -105 SHEET 3 OF 5 SHEETS
48.77
8.8-
8
GB
5�
PAD
PAD
47.8
47.9
GGo
5,5 44
u--
L'.3
JB
{` AD
C I
C' GB
OGH-
PA L7 6
48.1rB
1:-
b6.6 1
CD
l.�
G CD
�r
.202%
SCALE.- I I " = 50'
NOTE: ALL ELEVATIONS ARE +300'
N OTES.-
OCANAL KtLUC:A i EU 10
UNDERGROUND PIPE.
p A� � PA1 I ��n
i
G i i� 1 PAD
i p f PD
,
417.6 T 7 ; 0 `6.8 1 46.4 �� >>
9 of- r O,
TRACT; BOUNDARY
FITNCE
SHEET 4 E 10'
12
13
PAD 14 0 ... ...
PAD PAD ....
48� 11 w
G PAD .............. ...... ..
4, .
48. 1 48.2
N 48.5 . ......... ..
`T 47.01 ^ 7-3 .. • .... .:
LOT 1 u; m i
`c
pcO/ F`CRI I°- 0
CC) -216q 5�E%
I
Fes-- L LJ
G Li]
46.83
-r4 72.31
"RECORD DRAWW
CORRECTIONS BY.
DATE--
�� pR�JFESSj�n✓
c�EctT E• S q�� .
5
No. ^5473
Exp. 9-30 -15
`CAL
i
SmithTechAUSA
I N C 0 R P 0 R A T E D
HABERFELDE BUILDING
1424 17 -I H STREET
BAKERSFIELD, CALIFORNIA 93301
(661) 327 -8492 FAX 327 - -8493'
f, - -
ROBERT E. tMITH RCE 35473 DATE
?I JOB NO. - 12 -105 SHEET 3 OF 5 SHEETS
64
EXISTING
CANAL PJRE'
47.00
. ...... - ---- - ----------
"RtQ BG GRANDE NDE LANE
Q�D -4--t
C:Dl
.30 -------- --------
B �x'
cl I
416 IV, N v 0 OL CD
MATCH LW
G
C) 2
47.96 8 4Q
1218 18 12 0 PAD PAD A
M II)AL' I p /A L"),
PAD PAD \'!1-VPA
o
PAD
z
4 '8
18 4
48.9
B B 48� 0"-'-\ \48 7 48.9
48.0 48.2 48.4 P /-A 41. 8, 41 jj
PAD NA
2 7,
X147.2 22 23 24 25 r..
cli
S_ 2 ;.
C,
A7 .................. 0
SHEET As%�/"
FL 45-34 PH NE
>
G T_ 8.03 4- 0 \V\NAL IOD(6 55E FRONT %CET GB
00 82 48. B9
9 PAD Lw A - ASE TWO (Z)"- FOR DETAIL
3 MATCH
47.1 6 GE", GB
7 '---! -1- 8
2 3 4 6, 5
U, PAD PAD �'AD
-11 PAD PAD PAD PAD PAD PAD
7.5
FL45.19 FOP-1 4 �.,� �✓
7.6
I C*I! 4ZO 4Z1 47.3 47.4
468
lc�l 8 0- _7 cl-i Q0
"_)00
3. 0� cq
"PAD G 00 c'
o b, 17 Ln LO
U-S Joe
.14- Ln Ln 'd-
47.71 V!� C) / �! '! 6 n
G Z_
46.98 -0
CN
O --*-.202%
3V B
24" S.D. 00
66 FL 45.16 (D RIO LOBO L ANE
! "CA". CA,Ni/, J_
.4 \�_l 8" S.D. 00
F >
CR FL PAD CR F C%4 B --a-201% 48.23
I Cb CB
co
28 C-14
Ij 00 00
47.1 0 48.58 cc� C� "ri V/ L6
14"1 1 LO r,
9 Is
4/
A9
B
co �� V 3 LL �N) G
46.75 PAD
PAD
_7 FL 45.31 12,18 118 12.< PAD PAD PAD
PAD PAD Al
F \'_� 1\1'�
-i 1 11 98AM 47.9
PAD 46.9 47.-0-1 4Z2 4Z3 4T5' 0 '___ 1 C'1113.'l
p
127 23 22 21 9 19
G 4Z2 26 25 1 24 GU,
41.63 G 49.';'.'
G
46.671
68
G
46.33
P �� 0
P D A
PA _0! PA D
1
,4 L9
0
_T 4
4 8.
10-
Q0
C
/c p E j 03
will
------ V_ v
E
1 >10 20 2010
12
1 03 6.24 1 13
PAL7 PAD PAD PAD PAD
48.19 c� 48.1 G
47764,44 48.2
61
c D r-1) 48.5
G
4-7.01\/,,I
�_
1-.202%
FL46.14
�6
00
\_1 100
FL 46.17
4 19' 7 2 .218q
201 % C-4
00
c� 2 CR
LD zCID FL -
�4_ FL 46.58 G
v Q6
•21gq, CR 46.83
PAD PAD PkD ti
46. 8
0.0 48.2
48.4 PAD
18 4 9. -4 7 16 48.5
46.99 p
A, Ig
A -71 Ql I-OP [-,,I AL
4 7. 6
"mcT E30LM c PHASE MfEE 4 �- �3 0
C' 1
47, 9
0
FOR FUTURE 6 ��
DEVELOPMENT EXISTING
�W END FENC PIPE CASING L PT FFIC"
46.81 47.91 LOT 1 ,,v�
.G
46.80
500'
4 7.31 G
Z'
LOT A
G
L.L. A. J05-0557 4-1 4 6 46 6
PER CERTIFICATE >
cc
< 10,770 C. Y STOCKPILE
OF COMPLIANCE 10
_c) #w #yu 10D molsmE To commoN THE SOIL
00 AND SPREAD OUT IT WJU BE USED ON LOT 1
PER D 0 C. DURING CONSTRUCTION WHEN BEING GRADED
#0206033630, 0. R. STOCKPILE
4:1
500
"s-
-EXISTING 301 CANAL EASEMENT CENTER EXISTING PIPE CASING
PER DOC. No. 0205W263 PHASE THFlEE CANAL PIPE
PAD PAO PAD
"n
4
46,8 4-6.4 i 0,3
9A7
G u
48. 2 8 Re
2
OP CANA!- E)JSTIIVG C
9 tK
G
0 P '('� 8.40
4i 44
_3...
<
LOT I
G (ri
4
r
48,601
��
�v
00
k
NOTES:
1 UANAL KLLUU/Air_u 1
UNDERGROUND PIPE.
'i TAFT HIGHWAY (S.R. 119)
ll_immr'J� 4
PARCEL I
PARCEL YAP NO. 7797
va DO 1 /1
O
0
m
r. M. D. U) 4 1
-fA
o':/ " S.E. COR. OF SEC. 35, 30/27RWW
CORRECTIONS SY:erZ M. G.M . CALIF. DIV. HWY. BRASS
���__u�� CAP IPA L.H.
lj�T E.
No-35473
EXP. 9-30-15
c/vIII,_
OFCAUF
SCALE: 11 )) 50'
NOTE: ALL ELEVATIONS ARE. +300
•
m
C-3111-i
z TRACT NO. 7231
SmlthTechA USA GRADING FLAN
I N C 0 R P 0 R A T E D
HABERFELDE BUILDING 7- Zt!
1424 17TH STREET
BAKERSFIELD, CALIFORNIA 93301 ROBERT E. SMITH RICE 35473 DATE
(661) 327-8492 FAX 327-84931, JOB NO. - 12-105 SHEET 4 OF 5 SHEETS
A
�1=
0
30
29
w
27
THIS SHEET IS TO BE USED FOR EROSION CONTROL PURPOSES ONLY. THIS SHEET
WILL NOT BE USED FOR GRADING PURPOSES.,
TRACT Bommy 03
7 6 5 4
CHISOLM TRAIL AVENUE
8 9 10 11 12 13 14
21 20
19 18 17 16 15
RIO -GRANDE LANE
Al
0
0
22 23 24 25 26 27
0
PliASE
PHASE TWO
2 3 4 5 6 7 8 9
*
4-
RIO LOBO LANE
4-
C.)
0
LOF A
QIMPI_ A N F
P V_
ER, P016.
26 25 I 24
23 122 1 21
[Lf X 1 r- ,T N/D,
L OT I
I
■
20 1 19 1 18
r
1. LAND DISTURBING ACTIVITIES SHALL NOT COMMENCE UNTIL APPROVAL TO DO SO
HAS BEEN RECEIVED BY GOVERNING AUTHORITIES.
I THE GENERAL CONTRACTOR SHALL STRICTLY ADHERE TO THE STORM WATER
POLLUTION PREVENTION PLAN (SWPPP) DURING CONSTRUCTION OPERATIONS. IF
FIELD CONDITIONS WARRANT IT, THE SWPPP MAY BE MODIFIED AS LONG AS THE
CONSTRUCTION GENERAL PERMIT CONDITIONS ARE MET. ANY ALTERATIONS TO THE
SWPPP MUST BE NOTED IN THE SWPPP BINDER KEPT ON SlIE.
3. NO LAND CLEARING OR GRADING SHALL BEGIN UNTIL ALL PERIMETER EROSION AND
SEDIMENT CONTROL MEASURES HAVE BEEN INSTALLED.
4. THIS PLAN SHALL NOT BE CONSIDERED ALL INCLUSIVE AS THE GENERAL CONTRACTOR
SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT SOIL SEDIMENT FROM LEAVING
THE SITE AND BE IN COMPLIANCE WITH THE CONSTRUCTION GENERAL PERMIT.
5. GENERAL CONTRACTOR SHALL COMPLY NTH ALL STATE AND LOCAL ORDINANCES
THAT APPLY.
6. ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES WILL BE INSTALLED IF
DEEMED NECESSARY BY ON SITE INSPECTION.
7. DRAIN INLET PROTECTION SHALL BE PROVIDED TwOUMT THE DURATION OF THE
PROJECT. EXISTING DRAIN INLETS SHALL BE PROTECTED UNTIL FINAL REMOVAL AND
THE CONNECTING PIPE SHALL BE PROPERLY CAPPED TO PREVENT SEDIMENT FROM
ENTERING THE STORM DRAIN SYSTEM.
8. GENERAL CONTRACTOR SHALL BE RESPONSIBLE TO TAKE WHATEVER MEANS
NECESSARY TO ESTABLISH PERMANENT SOIL STABILIZATION ON ANY EXPOSED AREAS
WHEN THE PROJECT IS COMPLETE.
I
17 1 16
ALI
4el 4kr
15
t)
N
T
wm—i
0
PHASE
VAN
0
A
A
')WPPP BMP LEGEND
TC-
I STABILIZED CONSTRUCTION
ENTRANCE
0 WM_j
MATERIAL DELIVERY AND
STORAGE
ASE-1
SILT FENCE
U.00%.
STORM DRAIN AND CATCH
BASIN PROTECTION PER 5E-10
SILT FENCE PER SE-1
rd_
1
r'I
is
s
__ J
-72? 7-t 3 /
*RECORD DRAWNG-
CORRECTIONS 8Y:z9TK
DATE___,��.
gOFIE,3s/, 0,
vvr E.
nJO, 35473 rn I
71
[z-XP. 9_30_15
STRAW WATTLE DETAIL
N.T.S.
KEEP SEDIMENT FROM ENTERING CATCH BASIN
FL
GRAVEL BAG DETAIL
N.T.S.
I N.T.S.