BAKERSFIELD FIRE DEPARTMENT
OFFICE OF ENVIRONMENTAL SERVICES
INSPECTOR CRAIG PERKINS
1501 TRUXTUN AVE.
BAKERSFIELD, CA 93301
Test Date: 11/7/2012
Order Number: 3408230
Dear Regulator,
Date Printed and Mailed: 11/28/2012
Enclosed are the results of recent testing performed at the following facility:
7-ELEVEN #16329, MKT 2368
1701 PACHECO ROAD
BAKERSFIELD, CA 93307
Testing performed:
DISPENSER SUMP TEST
LINE ANNULAR TEST
SPILL BUCKET TEST
STP SUMP TEST
Sincerely,
Dawn Kohlmeyer
Manager, Field Reporting
SWRCB, January 2002 Page t of 1
FI: 11U= � 1 11
This form is intended for use by contractors performing periodic testing of UST secondar n systems. t
,y contai ment sy ems. Use he appropriate
pages of th isform to report results jbr all components tested. The comp leredform, written test procedures, and printouts from tests
(if applicable), should be provided to the facility ownerloperalorfor submittal to the local regulatory agency.
L FACILITY INFORMATION
Facility Name: 7-ELEVEN '"16329, MKT 2308
jDate of Testing: 1117/2012
Facility Address: 1701 PACHECO ROAD , BAKERSFIELD, CA 93307
Facility Contact: Manager- "Fri et" jPhone: 834-1350
jDate Local Agency Was Notified of Testing: 10/29/2012
[Narne of Local Agency Inspector (if present during testing): AU=MW C2e&Ig hdco-2A2A
2. TESTING CONTRACTOR INFORMATION
Company Name: TANKNOLOGY INC.
Technician Conducting Test: ROBERT ALLEN
Credentials: W CSLB Licensed Contractor r— SWRCB Licensed Tank Tester
License Type: A/UT License Number: 743160/5238715
Manufacturer Trainin
Manufacturer Component(s) Date Training Expires
Incon STS 5/2312013
-3- !91TMMARV OF TEST RESULTS
Component Pass Fail Not Repairs Component Pass Fail Not Repairs
ested Made Tested Made
Tank Annular# I X
Tank Annular# 2 X
Tank Annularfl 3 X
STP Containment for Tank I nil 2 - I X
STP Containment for Tank I rul 2 - I X
UDC # 1;2 X
Spill Box T3 PUL put fill X
Spill Box T3 PUL put fill X
Spill Box T3 PUL put vapor X
Spill Box T3 PUL put vapor X
t.
L
If hydrostatic testing was performed, describe what was done with the water after completion of tests: Test water -removed from site.
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING TMS TESTING
To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements
Technician's Signature: lxz� Date: 11/7/2012
WO: 3408230
SWRCB, January 2002 Page I of 1
Test Method Developed By: �" Tank Manufacturer ro Industry Standard Professional Engineer
r Other (Specify)
Test Method Used By: r Pressure 'r. vacuum r Hydrostatic
Other (Specify)
Test Equipment Used: 4' 6iq it d a[ ag_e Equipment Resolution: F0- 15h,.,ca
Is Tank Exempt From Testing?'
'rank Capacity.
Tank Material:
Tank Manufacturer:
Product Stored:
Wait time between applying
pressure/vacuum/water and starting test:
Test Start Time:
Initial Reading (RI):
Test End Time:
Final Reading (RF):
Test Duration:
Change In Reading (RF• RI)
Pass /Fail Threshold or Criteria:
Test Resulat
Was sensor removed for testing?
Was sensor properly replaced and verified
functional after testing?
i
Tank# 1
Yes Eo No
9600
Steel
unknown
RUL 2
60 min
11:00:00
- 10.00000 in. HG
12:00:00
- 10.00000 In. HG
1 hr
0.00000 in. HG
+f- 0.00000
Pass
r Yes r No r NA
r Yes r No Co' NA
Comments? include information on repairs made prior to testing, and recommended follow-up for failed tests
Tank# 2
ryes t No
9600
Steel
unknown
RUL
60 min
11:00:00
- 10.00000 in. HG
12:00:00
- 10.00000 in. HG
1 hr
0.00000 in. HG
+f- 0.00000
Pass
r Yes (*- No r NA
+C` Yes r No to NA
Tank# 3
r Yes f+' No
9600
Steel
unknowm
PUL
60 min
11 :00:00
- 10.00000 in. HG
12:00 :00
- 10.00000 in. HG
1 hr
0.00000 in. HG
+�- 0.00000
'Pass-
r Yes t* Nor NA
r Yes r Nor* NA
Tank.
(-Yes r No
min
+f-
Y e S r No r NA
r Yes r Nor NA
I Secondary containment systems where the continuous monitoring automarica °°y moll°doi-s uOLn La,e pi- °rr°mry di °u bua.Vlluai y
containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic
containment testing.
SWRCB, January 2002 Page I of 1
6. PIPING SUMP TESTING
Test Method Developed By: -rank Manufacturer 14-0 Industry Standard Professional Engineer
Other (Specij,�)
Test Method Lased By: Pressure r— Vacuum W Hydrostatic
Other (Spect&)
Test Equipment Used: INCON Equipment
Resolution: 0.002 in.
STP Containment for
Tank I rul2-1
STP Containment for
Tank I rul 2- I
'Sump Diameter/Dimensions:
44 in.
44 in.
in.
in
Sump Depth:
41.00 in.
41.00 in.
in.
in.
Sump Material.
Polyethylene
Polyethylene
Height from Tank Top to Top of
Highest Piping Penetration:
13.00
13.00
Height from Tank Top to Lowest
Electrical Penetration:
8.00
8.00
Condition of sump prior to testing:
good
good
Portion of Sump Tested'
15
15
Does turbine shut down when
sump sensor detects liquid (both
product and water)?*
Yes r No NA
r Yes r No NA
r Ys r N. r NA
r Yesr Nor NA
Turbine shutdown response time
sec
see
sec
see
Is system programmed for fail-safe
shutdown?*
r Yes r Nor* NA
r Yes r No r-o NA
r Ycsr Nor NA
r Yes Nor NA
Was fail-safe verified to be
operational?*
r Yes rNor NA
r Yes Nor* NA
r Yes Nor NA
r Yes r Nor NA
Wait time between applying
f prCsSure/vacuumAvater and starting
test
15 min
15 min
min
min
Test Start Time;
11:54.00
12.11:00
Initial Reading (RI):
5.60380 in. H2O
5.50810 in. H2O
Test End Time:
12:10:00
12:27:00
Final Reading (RF):
5.59170 in. H2O
5.55130 in. H2O
Test Duration:
15 min
15 min
I Change in Reading (RP -RI} :
-0.01210 in. H2O
0.04320 in. H2O
Pass/Fail Threshold or Criteria:
+/-0.00200
+/-0.00200
Test Reialt:
Fail
Fail
Was sensor removed for testing?
ro Yes r Nor NA
ro Yes r No r NA
r Yes Nor NA
r Yes Nor NA
Was sensor properly replaced, and
verified functional after este-
ro Yes r Nor NA
r. Yes Nor NA
I
r Yes Nor NA
r Yes Nor NA
Camments ? (include information on repairs noade prior to testing, and reco?7imended.follow-up foy-.failed tests)
I if lie entire depth of the sump is not tested. specify how much was tested. If the answer to any of the questions indicaled with an asterisk (I is "NO" or "NA". the entire sump
must be tested.
SWRC3, January 2002
Page 1 of 1
Test Method Developed By: (' UDC Manufacturer ro Industry Standard Professional Engineer
r Other (Specify)
Test Method Used By: r Pressure r vacuum re Hydrostatic
r Other (Specify)
Test Equipment Used: rL_1KC7_ :N::j Equipment Resolution: E010 �9�_l K.- 41
IUDC
UDC #112
UDC
UDC
Manufacturer:
unknown
UDC Material.
Fiberglass
i
UDC Depth:
31.00
Height from UDC Bottom to Top of
Highest Piping Penetration:
9.00
Height from UDC Bottom to Lowest
EfWrical Penetration. i
Condition of LIDC prior to testing,
00
9.
Good
Portion of vDc -rested'
Does turbine shut down when UDC
sensor detects liquid (both product and
water)?•
r Yes r No 0 NA
r Yes r No r NA
r Yes r No r NA
r Yes No r NA
Turbine shutdown response time
sec E
sec
sec
sec
Is system programmed for fail-safe
shutdown?-
r Yes r No r* NA
r Yes r No r NA
r Yes r No r NA
r Yes r No NA
Was fail-safe verified to be operational?*
r Yes r No 0 NA
r Yes r No r NA
r Yes r Nor NA
r Yes r Nor NA
Wait time between applying
pre ssurelvacluunWwater and starting test i
15 min
min
min
min
Test Start Time:
11:54:00
Initial Reading (R3):
2,55840 in. H2O
12:10:00
Test End Tgme!
Final Reading (RF):
2.55800 in. H2O
Test Duration:
15 min
Change in Reading (P.F-RI)
-0.00040 In. H2O
Pass/Fall Threshold or Criteria:
+/-0.00200
Test ResLilti
Was sensor removed for testing?
''Pass
ro Yes r Nor NA
r Yes r No r NA
r Yes r Nor NA
r Yes r No r NA
Was surisor property replaced and
verified functional after testing?
Yes r No r NA
r Yes r Nor NA
r Yes r No r NA
r Yes r Nor NA
Comments ? (include information on repairs made prior to testing, and recommended follow -up for failed tests)
3 IF the entire depth of the UDC is not tested, speciFy how much was tested. If the answer to any of the questions Indicated with an asterisk (1) is ?NO? or ?NA?, the
entire UDC must be tested.
Page I of 1
SPILL/OVERFILL CONTAINMENT BOXES
Facility is Not Equipped With Fill Riser Containment Sumps F
Fill Riser Containment Sumps are Present, but were Not Tested F
Test Method Developed By: r Spill Bucket Manufacturerro Industry Standard r Professional Engineer
r Other (Specify) :
Test Method Used By: r Pressure r Vacuum r* Hydrostatic
r Other (Specify) :
Test Equipment Used, N: =Q0 =Nj
Equipment Resolution: 0.002 in.
Bucket Diameter:
Spill Box #
Tank T3 PUL PUL
Fill - Direct
11.00
Spill Box #
Tank T3 PUL PUL
Fill - Direct
11.00
Spill Box
Tank T3 PUL PUL I
Vapor - Direct
11.00
Spill Box #
Tank T3 PUL PUL
Vapor - Direct'
11.00
Bucket Depth:
13.00
13.00
13.00
13.00
Walt time between applying
pressure/vacuum/water and
starting test
15 min
15 min
15 min
15 min
Test Start Time.
11:54,00
12:11:00
11:54:00
12:11,00
Initial Readings, }:
5.6858 in. H2O
5,6851 in, H2O
7.1436 in. H2O
7.1436 in. H2O
Test End Time.,
12:10:00
12:27:00
12:10:00
12:27:00
Final Reading ap-
Test Duration:
5.6851 in. H2O
15 min
5.6845 in. H2O
15 min
7.1437 In. H2O
15 min
7.1437 in. H2O
15 min
Change In Reading c,4,-K,)
0.00 in. H2O
0.00 in. H2O
0.00 in. H2O
0.00 in. H2O
Pass/Fail Threshold or Criteria:
+/ 0.0020
0.0020
0,0020
0.0020
Test Result:
Pass:
Pass
Pass
Pass
Comments ? (include information on repairs made prior to testing, and recommended follow-up for failed tests)
WO, 3408230
O
O
GA
O
dJ
in
in
0:
WRAM
9-d
E
0
rn
1-41
(U
4.J
N
(A
7-11 J6329
1701 PACHECO RD
16329
RAKERSFIELD
1701 PACHECO RD
CAL IFORM16
aAKERSFIELD
3408230
CALIFORNIA
3408230
1107/2012 12:10 Pm
11/07/2012 !2:27 PM
SUMP LEAK TEST REPORT
SUMP LEAK TEST REPORT
UDGI-2
UDW-2
TEST STARTED 11:54 AM
TEST STARTED 11/07/2012
TEST STARTED 12:11 PM
BEGIN LEVEL 2.5584 IN
TEST STARTED 11/07/2812
END TIME 12:10 PM
BEGIN LEVEL 2.5565 IN
END DATE 11/07/2012
END TIME 12:27 PM
END LEVEL 2.5580 IN
END DOTE 11/G7/2012
LEAK THRESHOLD 0.002 IN
END LEVEL 2.5558 IN
TEST RESULT PASSED
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
87SYSUM
87SYSUM
TEST STARTED L1154 AM.
TEST STARTED 11/07/2012
TEST STARTED 12:11 PM
BEGIN LEVEL 5.6038 IN
TEST STARTED 11/07/2012
END TIME 12:10 PM
BEGIN LEVEL 5.5801 IN
END DATE 11/07/2012
END TIME 1027 PM
END LEVEL 5.5917 IN
END DATE 11/07/2012
LEAK THRESHOLD 0.002 IN
END LEVEL 5,5513 IN
TEST RESULT FAILED
LEW THRESHOLD 0.002 IN
TEST RESULT FAILED
91SPILL
91SPILL
TEST STARTED 1054 AM
TEST STARTED 11/07/2012
TEST STARTED 12:11 PM
BEGIN LEVEL 5.6858 IN
TEST STARTED 11/07/2012
END TIME 12:10 PM
BEGIN LEVEL 5.6851 IN
END DATE 11/07/2012
END TIME 12:27 PM
END LEVEL 5.6851 IN
END DATE 11/07/2012
LEAK THRESHOLD 0.002 IN
ESD LEVEL 5.6845 ih
TEST RESULT PASSED
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
91VAP
91VAP
TEST STARTED 11:54 AM
TEST STARTED 11/07/2012
TEST WARTED 12:11 PM
BEGIN LEVEL 7.1436 IN
TEST STARTED 11/07/2012
END TIME 12:10 P'll
BEGIN LEVEL 7.1436 IN
END DATE 111002012
END TIME 12:27 PM
EMD LEVEL 7.1437 IN
END DATE 11/07/2012
LEAK THRESHOLD 0.002 IN
END LEVEL 7.1437 IN
TEST RESULT PASSED
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED