Loading...
HomeMy WebLinkAboutAST INSPECTION CHECKLISTr 0 UNIFIED PROGRAM INSPECTION CHECKLIST Aboveground Petroleum Storage Tank Program FACILITY NAME., YJ , INSPECTION DATE DATE INSPECTION TIME Prepare an SPCC plan [CFR 112.3] '1 /-7 ADDRESS r PHONE NO. 0" &�j NO OF EMPLOYEES SPCC plan available on site [CFR 112.3(e)] FACILITY CONTACT BUSINESS ID NUMBER Maintain records of inspections, tests and/or procedures [CFR 112.7(e)] CONSENT TO INSPECT NAME /TITLE Records of inspections or tests si ed by inspector [CFR 112.7(e)] SECTION 1: Records Review: California Health & Safety Code: 25270 DESCRIPTION YJ N N/A I COMMENTS Prepare an SPCC plan [CFR 112.3] '1 -- Review or amend SPCC plan [CFR 112.5 (a)(d)] SPCC plan available on site [CFR 112.3(e)] Conduct inspections and test in accordance with written procedures [CFR 112.7(e)]� Maintain records of inspections, tests and/or procedures [CFR 112.7(e)] Records of inspections or tests si ed by inspector [CFR 112.7(e)] SECTION 2: SPCC Plan Elements: California Health & Safety Code: 25270.4.5. 25270.12 DESCRIPTION Y N N/A COMMENTS Self- certification for Tier I or II facility 112.6(a)(1), (b)(1) -- Professional engineer certification CFR112.3(d) and 112.6(b)(4) Documentation of 5 year review and evaluation of SPCC plan [CFR 112.5(b)] Amendments required within 6 months of changes/certifications [CFR 112.5(a) and 112.6(a)(2), )(4)];i Management authorization of resource commitment to implement the SPCC CFR 112.7 & 112.6(a)] Diagram with location and contents of containers, transfer stations, connecting piping [112.7(a)(3)] Type of oil and storage capacity for each container [CFR 112.7(a)(3) Discharge prevention measures and procedures for routine handling {CFR 112.7(a) (3)] Countermeasures for discovery, response and clean-up [CFR112.7(a)(3)] ` Required contact list and phone numbers [CFR 112.7(a)(3)] SFCTIC)N R- rjanaral SPCC Rernjirements- California Health & Safety Code- 25270.4.5. 25270.5. 25270.12. DESCRIPTION Y N N/A COMMENTS Provide corrosion protection CFR 112.8(c)(4)(5), (d)(1)] -- Containers compatible with materials stored [CFR 112.8(c)(1) Implement SPCC plan review changes or amendments within 6 months [CFR 112.5(a)(d)] Prepare an oil contingency plan or written control /removal commitments CFR 112.7(d)] SFCTlnN d- SPCC Plan Trainina- California Health & Safety Code: 25270.4.5 DESCRIPTION Y N N/A COMMENTS Training program CFR 112.7(f) Train personnel in operation and maintenance of equipment [CFR 112.7(f)] Conduct annuals ill prevention briefings [CFR 112.7(f)(3)] SFCTION 5- Facilitv Insnection: California Health & 5atety Cocie: Z5Z7U.4.5 DESCRIPTION Y N N/A COMMENTS Meet provisions of conditional exemption [H &S 25270.4.5(b)] Facility security adequate [CFR 112.7(g)] Clean-up materials readily available [CFR 112.7(c) Overfill protection procedures or devices in place and operative [CFR 112.8(c)(8) Portable /mobile containers positioned to prevent discharge CFR 112.8(c)(11) Loading / unloading rack drains into containment area [CFR 112.7(h) Provide appropriate containment /diversionary structures to prevent discharge [CFR 112.8(a), 112.7(c)] Secondary containment adequate to contain capacity of largest container + precipitation CFR 112.8(c) Remove accumulation of oil in secondary containment CFR 112.8(c)(10)] °" Secondary containment valve(s) closed [CFR 112.81 �N Implement SPCC plan elements CFR 112.31 ANY HAZARDOUS WASTE ON SITE? AYES ❑ NO ISignatureof Recei t Explain: �t POST INSPECTION INSTRUCTIONS: • Refer to the back of this inspection report for rril ry citations and corrective actions • Correct the violation(s) noted above by _ I at 1 c" • Within 5 days of correcting all of the violation' 's, sign and return a copy of this page to: Bakersfield Fire Dept., Prevention Services, 2101 H Street, California 93301 Date Pink 7 Prevention Services Copy White - Business Copy Yellow- Business Copy to be Sent in after return to Compliance Signature (that all violations have been corrected as noted) FD2156b (Rev 9/10) A