Loading...
HomeMy WebLinkAboutAST PROGRAM 1-22-14BAKERSFIELD FIRE DEPT. T.....: L..._K.._..5_...�'I.. Qx....a7 Prevention Services FIRE 2101 H Street ARM Bakersfield, CA 93301 UNIFIED PROGRAM INSPECTION CHECKLIST Tel.: (661) 326 -3979 Fax: (661) 852 -2171 Aboveground Petroleum Storage Tank Program FACILITY NAME INSPE TIO DATE INSPECTION TIME ADDRESS +�jy (pnP y `9 gp PHONE NO. n NO OF EMPLOYEES FACILITY CONTACT BUSINESS ID NUMBER CONSENT TO INSPECT NAME /TITLE Q=r' -r1nK1 -I- 9?ar -nrA4m Waveale /- (- niotr%min Hanith X -NAtATU I= Af/P_' YNY 111 DESCRIPTION Y N N/A COMMENTS Prepare an SPCC plan [CFR 112.3] K 6 C Review or amend SPCC plan [CFR 112.5 (a)(d)] SPCC plan available on site CFR 112.3(e)] . x 1 Conduct inspections and test in accordance with written procedures [CFR 112.7(e)] IXI Maintain records of inspections, tests and/or procedures [CFR I I2.7(e)] . Records of inspections or tests signed by inspector [CFR 112.7(e)] x L' g� ) 40 CP(`TIrl1U 7- CP('f' Plan V-1 amAntc" t :nii mm HPa1Tn & NaTP-TV Un[7P -' ZnZ /U -4 -n- LOL/UAL DESCRIPTION YJ N N/A COMMENTS Self - certification for Tier I or II facility [112.6(a)(1),(b) (1)] K 6 C Professional engineer certification [CFR112.3(d) and I12.6(b) 4 Documentation of 5 year review and evaluation of SPCC plan [CFR 112.5(b)] . x 1 Amendments required within 6 months of changes/certifications CFR 112.5(a) and 112.6(a)(2), (b)(4)] IXI Management authorization of resource commitment to implement the SPCC [CFR 112.7 & 112.6(a) ] . Diagram with location and contents of containers, transfer stations, connecting piping 112.7(a)(3)] x L' g� ) 40 T pe of oil and storage capacity for each container [CFR 1 °" Oil Discharge prevention measures and procedures for routine handling CFR 11 2.7 a (3) Countermeasures for discovery, response and clean-up CFR112.7(a)(3)] Required contact list and phone numbers CFR 112.7(a)(3)] @CnTI/li►I '4. QUr-r- {. nnoeiramnntC- (-911tr%rnlm manirn l:. ]1S1raru I .-nnp, /!1 / /11_a_"1_ L_'fL /11 -11- LnL /:.U- I L DESCRIPTION Y N N/A COMMENTS Provide corrosion protection [CFR 112.8(c)(4) (5), (d)(1)] K 6 C Containers compatible with materials stored [CFR 112.8(c)(1)] Implement SPCC plan review changes or amendments within 6 months [CFR 112.5(a)(d)] "" . Prepare an oil contingency plan or written control /removal commitments CFR 112.7(d)] IXI 42Cr- r1/'11U n- CUE-f- vl7n -1 rninsn - r-immr% nla 1-IQalrn ]r. tiarAru I.nf7P_' /__1L /ti to -n DESCRIPTION Y N N/A COMMENTS Training program CFR 112.7(] K 6 C Train personnel in operation and maintenance of equipment [CFR 112.7(f)] Conduct annuals ill prevention briefings [CFR 112.7(f)(3)1 . 0 Cf' -rlf'%Ll r.- (- 91ott%rnvm mckmim 74 N.2TAT11 1 -nf9P- /Pf7 / 11_LL -'1 DESCRIPTION Y N N/A COMMENTS Meet provisions of conditional exemption [H &S 25270.4.5(b)] Facility security adequate [CFR 112.7(g)] Clean-up materials readily available CFR 112.7(c Overfill protection procedures or devices in place and operative CFR 112.8(c)(8)] Portable /mobile containers positioned to prevent discharge [CFR 112.8 (c)(11) Loading / unloading rack drains into containment area CFR 112.7(h)] X1-1 i Provide appropriate containment /diversionary structures to prevent discharge [CFR 112.8(a), 112.7(c)] t Secondary containment ade uate to contain capacity of largest container + precipitation CFR 112.8( I Remove accumulation of oil in secondary containment [CFR 112.8(c)(10)] Secondary containment valve(s) closed [CFR 112.81 Implement SPCC plan elements [CFR 112.3] ANY HAZARDOUS WASTE ON SITE? 'YES ❑ NO Si natureof.Recei t - •••""'• �.- f Explain: -., °° �` 1 ( -° I (--r- J C, > e 01 POST INSPECTION INSTRUCTIONS: • 15X1Cl LU U1C VYLU& V1 U11J L1v11 acYVil iVi I, r, cswiy ..a�u�..,.,� cua..a vvia.+.+.. +•...+.��_.� - - • Correct the violations) noted above by • Within 5 days of correcting all of the violations, sign and return a copy of this page to: Bakersfield Fire Dept., Prevention Services, 2101 H Street, California 93301 White - Business Copy Yellow - Business Copy to be Sent in after return to Compliance Signature (that all violations have been corrected ag noted) Date Pink - Prevention Services Copy FD2156b (Rev 9/10) 0 r