Loading...
HomeMy WebLinkAboutAST PROGRAM 6-12-15} VR.. BAKERSFIELD FIRE DEPT. R aRrN 1, ; Prevention Services 2101 H Street .: Bakersfield, CA 93 301 UNIFIED PROGRAM INSPECTION CHECKLIST". Tel.:. (661) 326- 3979 Fax: (661) 852 -2171 Aboveground Petroleum Storage Tank Program FACILITY NAME ` I I.A. I fk "v, INSPECTION DATE ? INSPECTION TIME ADDRESS PHONE NO.. NO OF EMPLOYEES FACILITY CONTACT BUSINESS ID NUMBER CONSENT TO INSPECT NAME /TITLE, SECTION 1, Records Review, Galitornia Health & Satety Gocie: Z5Z7U DESCRIPTION Y N N/A COMMENTS Prepare an SPCC plan [CFR 112.3] V ;,, it r '` Review or amend SPCC plan [CFR 112.5 (a)(d)] Q SPCC plan available on site [CFR 112.3(e)] N,. Conduct inspections and test in accordance with written procedures CFR 112.7(e)] Maintain records of inspections, tests and/or procedures CFR 112.7(e) , Records of inspections or tests signed by inspector [CFR 112.7(e)] SECTION 2: SPCC Plan Elements: California Health & Safety Code: 25270.4.5. 25270.12 DESCRIPTION YJ N N/A COMMENTS Self- certification for Tier I or II facility [112.6(a)(1),(b)(1) V ;,, it r '` Professional engineer certification CFRl 12.3(d) and 112.6(b)(4)] Documentation of 5 year review and evaluation of SPCC plan [CFR 112.5(b)] N,. Amendments required within 6 months of changes/certifications CFR 112.5(a) and 112.6(a)(2), (b)(4) Management authorization of resource commitment to implement the SPCC CFR 112.7 & 112.6(a)] Diagram with location and contents of containers, transfer stations, connecting piping [112.7(a)(3)] Type of oil and storage capacity for each container [CFR 112.7(a)(3) -r Discharge prevention measures and procedures for routine handling CFR 112.7(a)(3)] , Countermeasures for discovery, response and clean-up [CFR112.7(a)(3)] K Required contact list and phone numbers [CFR 112.7(a)(3) `, CFr-TlnlU R• rZanarnl SPf?C Rnniiiramentc" Calitnrnia Health K Safety Cndw 25770.4.5- 25270.5_ Z5Z7U_'12 DESCRIPTION Y N N/A COMMENTS Provide corrosion protection [CFR 112.8(c)(4)(5), d)(1)] V ;,, it r '` Containers compatible with materials stored [CFR 112.8(c)(1)] Implement SPCC plan review changes or amendments within 6 months CFR 112.5(a)(d)] .: Prepare an oil contingency plan or writtencontrol /removal commitments [CFR 112.7(d)] SF['_Tl("1N A- SPCC Plan Trnininn, Calitnrnia Health & Satety Cocle: Z5Z70.4.h DESCRIPTION Y N N/A COMMENTS Training program CFR 112.7(f) Train personnel in operation and maintenance of equipment [CFR 112.7(f)] Conduct annuals ill prevention briefings [CFR 112.7(f)(3)] SECTION 5- Facility Insnection, Calitornia Health & Satety Gode: Z5Z7U.4.5 DESCRIPTION Y N NIA COMMENTS Meet provisions of conditional exemption [H &S 25270.4.5(b)] Facility security adequate [CFR 112.7(g)] Clean-up materials readily available CFR 112.7(c) Overfill protection procedures or devices in place and operative [CFR 112.8(c)(8)] t+ Portable /mobile containers positioned to prevent discharge [CFR 112.8(c)(11 Loading/ unloading rack drains into containment area CFR 112.7(h)] Provide appropriate containment /diversionary structures to prevent discharge [CFR 112.8(a), 112.7(c)] Secondary containment adequate to contain capacity of largest container + precipitation [CFR 112.8(c) ] , Remove accumulation of oil in secondary containment [CFR 112.8(c)(10)] Secondary containment valve(s) closed CFR 112.81 `, Implement SPCC plan elements [CFR 112.3] '" AV ANY HAZARDOUS WASTE ON SITE? 1 YES ❑ NO ISignatureof Recei t Explain: POST INSPECTION INSTRUCTIONS: • Refer to the back of this inspection report for regulatory citations and corrective actions _. .... • Correct the violation(s) noted above by Signature (t-hat all violations have been corrected as noted) • Within 5 days of correcting all of the violations, sign and return a copy of this page to: Bakersfield Fire Dept., Prevention Services, 2101 H Street, California 93301 Date White - Business Copy Yellow - Business Copy to be Sent in after return to Compliance Pink - Prevention Services Copy FD2156b (Rev 9/10)