Loading...
HomeMy WebLinkAboutFAX07/13/2006 14:34 FAX C G B 12M E. OkifornIm Avenue, Bakersfield (M) 323432W Fax M-7284 Ta Fmno Irma Page= Datec NO / 0 0 j 13 Upgoot E3 For Review . 0 PkAme Conmoont 0 Pleme ftply El Pkme ftowis 0 cognmentm 07/13/2006 14:34 FAX C G B Procedures for Above Ground Containment Tank These are the steps to follow in the event there is a high volume flow problem or a high or low pH problem. 1 Make sure red valve handle (on the pump side of the tank) is open. (Open is the valve handle to rrned across the piping,, closed the valve is the same dir:retion as the piping.) Once red valve is open, turn on aiTr to pump (black valve on air line on pump switched on and make sure handle is directed upward on air compressor where air line is attached.) This will start pumping wastewater tank, contents into eontai nmen t tank. 2) Pump out Soo gallons to containment tank, this should give you room to start stabil''na pH in wr.stewater tank. 3) Close red valve and turn air pump off 4) After pH is stable you can start putting small amounts of containment stank material back, into wz.stewa.ter treatment tank for processing. Open the other red valve (on alley side of tank) and gravity feed small amounts of water back in to process. WATCH pH CHARTS! Continue until containment tank is empty. 16002 07/13/2006 14:34 FAX C G B nAMERICA'S NATURAL 5EVERAGog COMPAW SAFETYMEE -1-^ CONDUCTED ON: t-1 (A CONDUCTED BY: TITLE: TOPICS OF DISCUSSION. (1) (3) 5�f (4) oj� LC, 5 ISSUED DOCUMENTS: �,L j) c-, �b a .,A e-a &w .,,A EMPLOYEE -SIGNATURE Q 003 CRYSTAL GEYSER WATER COMPANY P.Q. Box 304, 501 Washington Street, Callstop, CA 94515-0304 (707) 942-05-01 FAX (707) '942-0647