Re: Wastewater System, Facility Located at 1233 R. California Ave., Bakersfield, CA
Dear Ms. Secara,
Pursuant to your request, WZI has conducted an inspection of the above ground standby
wastewater tank and associated equipment that was installed at Crystal Geystz Water Company
facility in Bakersfield., California and has prepared this letter report to document our findings.
The purpose of the tank is to allow for temporary supplemental storage. capaCity if wastewater Of
high pH or other problern is generated. The inspection was conducted at the request of the
Bakersfield Fire Department.
WZI is a professional sex-vice consulting firm with experience in regulatory compliance,
environmental engineering and geology. The members of WZI are State of California
Professional Environmental Assessors, Professional Engineers and Geologists. WZI expresses no
opinion as to disciplines, subjects and practices outside those specifically enumerated below.
Further, WZI expresses no opinion herein &i to any matters of California or Federal law- This
letter is based on the foregoing and subject to limitations, qualifications, exccptions and
assumptions set forth herein.
Facility Description
The facility produces and markets bottled water and other soft drinks from froxsh water supplied
by the City of Bakersfield and other purchased ingredients. Glass and plastic bottles are also
purchased. The facility operates 24 hours a day. The existhig wastewater system consists of a
6,582 gallon recessed con rete tank and associated piping. Water is piped into the facility from
the city water main, 'Mast water is pumped from the wastewater tank and discharged into the city
sewer system. The current flow rate provided by Crystal Geyser is approximately 64 gallons per
minute (3,840 gallons per hour).
4700 STOCKDALE MGM^ S;lnr:; 120 SAKE-R$Fir*LD, CALIFORUJA 82300 (661) 326-1112 FAX (661) 326-01►1
07/07/2006 14:10 FAX C G B 121003
WZ1 INC.
Facility- Inspection
In order to evaluate the wastewater system, an inspection of the wastewater system and the above
ground tank was conducted on June 30, 2006 by Allen Rubbert of WZT_ It is our understanding
that there have been two violations of discharged wastewater involving low pH and excess
volume- On the advice of the Bakersfield Fire Department, a Sensaphone has been installed with
sensors to detect p11 abnormalities and/or a high fluid level and is operational. This device sets
off an alarm and lights, which notifies the quality control supervisor or the maintenance
mechanic to shut down the wastewater system and the City water supply pdor to discharging
wastewater.
A 1,000 gallon standby tank and an associated pump was recently -installed io pump out the
wastewater tank contents. This water is then treated to proper discharge, spe6fications, then re-
introduced into the wastewater tank for discharge. The standby tank is double wall plastic and is
located on top of the recessed wastewater concrete tang_
If additional assistance is required, Safety Clean can be called to provide this service_
used on the conditions observed during the inspection of June 30, 2006, the. wastewater system
addition is considered adequate to prevent release of non-specification waswwater to the city
sewer system.
Allen H. Rubbert
Professional Engineer
No. P 1136
Expires 3-31-09
Attachment
R
Nc. P1136
CCC
07/07/2006 14:11 FAX c G B 1@004
CF
9661 AON
40
I Ir
zt j
C?
IND.
.8 LLJ
AW
'Ego a
lk LLI
I h,
LiJ
It
LLI
-3 R4Z�
(n vie
:Z:
%V IF
I tl
I.- T
N A f Ojp;.7z
�Mum �m� -W_qkkc.%L4d - N 96, ZZ, -