B A K E R S F I E L D
CITY MANAGER'S OFFICE
MEMORANDUM
Apri
TO: Honorable Mayor and City Council
FROM: Alan Tandy, City Manager l
��
SUBJECT: Generallnformation
GOOD NEWS
---� We sincerely thank the SEIU members for voting to approve the dei
their pay increase. Their action demonstrates a spirit of cooperati�
understanding of our very difficult budget challenges. We recogni
sacrifice and appreciate their willingness to help lessen the organi�
damage as we endure the worst economic times in the City's histor
—� The State Water Resources Control Board (SWRCB) prepared a dra
which rebutted and responded to the North Kern parties' objeci
the order revising the fully appropriated status of the river. The orc
denied the North Kern parties' petition for reconsideration. With thi
news we are 3-0 on this issue.
The issue of whether and how much unappropriated water is avail�
a result of the first point litigation will be determined in the future as
processes applications to appropriate.
MISCELLANEOUS CITY NEWS
� In March 2009, the unemployment rate in Kern County was 15.2 K
and increased to 17.4 percent in February 2010. According to
statistics released by the State's Employment Development Depa
the unemplovment rate in Kern Countv in March 2010 was 18.3 per�
Honorable Mayor and City Council
� ° April 23, 2010
Page 2
� A memo from the Finance Director is enclosed regar
recommendation to implement an electronic payment program
by Bank of America. The program will allow the City to pay
through VISA, which should improve internal controls by reduc
number of paper checks processed and provide cash incentive
City based on the amount of payments made. Staff's survey �
southern California cities that participate in this program r�
genuine satisfaction with the ease of transition and improvement�
city's processes.
� The City is set to proceed on Monday, May 3rd with construction
that will reconstruct two major roadways, as follows:
o Coffee Road - all lanes from the Kern Island Canal (north of
Falls) to Meany Avenue
o Coffee Road - northbound lanes from Olive Drive to Norris R�
o Minq Avenue - all lanes from Gosford Road to New Stine Roc
Work will be done Monday through Saturday between the hour�
a.m. to 7:30 p.m. The estimated completion dates are June 25t�
Coffee Road projects and August 4th for the Ming Avenue project.
release with more information is enclosed.
� The thick red line on the enclosed chart shows that the sn�
accumulation in the Kern River Basin is slightly above average for
of year. The table on the second page of the attachment indicc
the peak storage estimate of the Isabella Reservoir will be just bE
cap set by the Army Corps of Engineers.
-� After 55 years, the Bakersfield Firefighters Relief Association has <
not to hold the 56th Annual Red, White & Boom fireworks show.
never been a City-sponsored event. It is unfortunate that this
event is falling victim to the downturned economy.
-� A memo from the Water Resources Department is enclosed regar�
annual Consumer Confidence Report and notification of water q�
the City's water system that will be included with billing informatioi
. v
' Honorable Mayor and City Council
�' April 23, 2010
Page 3
water quality standards and are actively monitored by Cal
ensure continued protection of the City's water supply.
� The following reports are enclosed:
• Economic and Community Development Department's Activit�
from January 1 through March 31, 2010.
• Special Enforcement Gang Violence Report.
• Streets Division's weekly work schedule.
WESTSIDE PARKWAY UPDATE
� As part of Phase 2 construction, beginning Monday, April 26th, the
fences and walls west of Calloway Drive, on the north side of the `
Parkway, will be removed - approximately sixty-four properties
affected. This will provide for additional time need�d to c
soundwalls around the owner improvements on these properties.
BUDGET NEWS
! SACRAMENTO, CA - Sacramento County's projected shortfc
General Fund budget grew from $119.1 million to $166.5 million in
months. The chief factor is the increasing burden of employee
costs. The initial estimated cost of cost-of-living adjustments ar
negotiated raises slated to be received in FY 2010-11 was aro�
million. This estimate did not take into account increased pensi�
and is now projected to be closer to $68 million.
The County and employees must contribute more to cover the
retiree pensions not covered by investment earnings on pensior
For FY 2010-1 1, contribution rates will go up 2 to 3 percent for publ
employees and about 4 percent for everyone else. In ess�nce thE
is as follows:
• For public safety employees: Retirement costs will be bet�
and 57 cents for every dollar of salary spent, up from 50 to .
this year.
• For all other employees: Retirement costs will be between 2�
.�....,.1,. C�.. �..�.... �.1�11�... _L __.I_.�.. _._ _._1 . .._ L�_.__ /1/1 t_ nr _
� h
' Honorable Mayor and City Council
4
April 23, 2010
Page 4
The layoffs for the coming fiscal year could be avoided if err
unions accept a 10 percent cut in pay and benefits by June 3rd.
! MODESTO, CA - Modesto is projecting a$12 million shortfali and i�
departments to prepare scenarios cutting 3 percent, 5 percent, 7 K
and 10 percent of their budgets. Additionally, departments arE
asked to analyze what 8 percent cuts to personnel budgets wo�
like. Negotiations with employee unions are underway, and the �
know more upon their conclusion. All of the unions skipped pay ra
year except the police officers union.
RESPONSE TO COUNCIL REQUEST
� Councilmember Couch
Repair of canal fencing.
AT:rs:rk
cc: Deparfment Heads
Roberfa Gafford, Cifiy Clerk
� ����)l111�1��%.
. �� . ..
MEMORANDUM
TO: Alan Tandy, City Manager
FROM: Nelson Smith, Finance Director ��
DATE: Apri120, 2010
SUBJECT: Electronic Payments through Bank of America
The Finance department recently met with representatives from Bank of America regardin;
they offer called E-payables. The system allows vendors to be paid through VISA while ai
time providing the City an opportunity to receive cash incentives based on the amount of v
payments made. E-payables should also improve internal controls by reducing the number
checks processed (which are more susceptible to fraud) and electronic payments made will
to be processed by the intended vendor's card merchant banking system.
Over the past few years we have received numerous inquiries from vendors regarding the �
electronic payment options. We have been very hesitant to open up this option (until now)
the additional costs the City would incur in bank fees. This relatively new program (about
more than solves that concern and is actually expected to generate revenue for the General
The program will be voluntary to any City vendors that accept VISA payments but will ha�
for them as well. The system allows them to have the cash on hand quicker than with papE
should reduce their processing costs. At the same time the City "float" of daily interest ea�
be harmed as our settlement payments with the bank are generally seven days after the ven
We also had the opportunity to discuss the E-payables program with three other cities in S�
California to see what their experiences were (Riverside, Glendale, and Pasadena). All of
representatives contacted expressed how Bank of America made the transition very easy a�
minimal time that was required from City staff. Riverside and Pasadena each earned cash
excess of $ l 00K per year. Glendale has not been in the program for a full year yet but is a
revenue at similar levels.
Based on the feedback received, the ease of transition, no upfront costs expected to be inct
Citv. the imnrovement to Citv nrocesses and the revenue n�tential f�r the (7eneral Fund_ w
�
B A K E R S F I E L D
Pubfic Works Department
Raul Rojas — Public Works Director
FOR IMMEDIATE RELEASE
Thursday, April 22, 2010
PRESS RELEASE
Contact: Rick Millwee
Construction Superintendent
(661) 326-3358
The City of Bakersfield is set to proceed on Monday, May 3, 2010 with construction projects that
will reconstruct two major roadways in the City of Bakersfield
reconstructed are as follows:
The roads which will be
Coffee Road - all lanes from the Kern Island Canal (north of Granite Falls) to Meany Avenue
Coffee Road - northbound lanes from Olive Drive to Norris Road
Ming Avenue — all lanes from Gosford Road to New Stine Road
Work on these projects will be done Monday through Saturday between the hours of 7:30 AM to
7:30 PM. The estimated date of completion for the construction work on Coffee Road is June
25, 2010 and the estimated date of completion for the construction work on Ming Avenue is
August 4, 2010.
Traffic in these areas will be reduced down to one lane in each direction during construction.
In addition, access to side streets and driveways will be closed only for the period of time that
reconstruction is occurring at that intersection. Detours and alternate access points will be
provided during these closure periods. This will result in traffic delays, so drivers are urged to
use alternate routes. The City thanks the public for their patience during this period.
For more information, please contact Rick Millwee, Public Works Construction Superintendent,
at (661) 326-3049.
{;!;l.i
City of Bakersfield • Public Works Department • 1600 Truxtun Avenue
Bakersfield, California • 93301
(661) 326-3724 • Fax (661) 852-2120
Z
�
Q
�
�
C
V
U
Q w
� �
V zo
a � Q
� ON
zT
Z Cn a
� � Q
� �
� W
m
LLI
�
�
!.�
�
` �
�.
i
�`
N
�
� �
Cv
Q
�
I i
�-.,..,u„�,�� i
�
i
i
' J��.
' � 'c
�
�
--- -------- -------}---
_: '
� _ �
� � �
s ; ;;
�� i
� - I
� �
-�� '- �
_; i
� r.
� � � 7 � � � � � � � � � .r � � � r �. � � Y .. �. � '
= `: . ,.
�
� ""' i I
� � � I
� � i
� �
� �
� tfi '
O'� (D
r
(
� — — — — — — � ! � � � '
i
�
� O —
O �
N
CO o
o c
N
------�-- --
� :
�4 � :
r: N ; `�; ' '� ; ' �f
� � � a <� �� � �
rn �� i ; �� : i t
� � . ! �
��— o � � J
i
' ,- _ ' ''y -.r - . ,
;
� � �=�s
------�--_-----'------- ---- --.-------�— — —,
; � _�_
; c� ;
i ; � � �
I � ' — ;
; � � �; - -
Q Cl `'•
, Q �
�... �, ,7
; o � , {, �
o �.
�
' � ,i �
--------------------- ---- --------- ------ --7�, ---�
� ! � / �
i {
i c=:
: � ; � ;
�
� t\i
; ,
, ! G �
�
�
a
�
Q
�
U
�
w
? o
Q-' Q
N
d' �
LU �
� V
�
�
�
6l_
� w
� �
O �
� �
V N
IL
�
�
� �
i..{� ��p �
IJJ
�z/ �'
L.L �
W �
Y �
W
�
�
�
N
m
o �'
o �'
v
c v
� r
� �
� U
� N
`
�
L
O
z
�
O
�
O
ti
`
ro
d
m
�
m
x
ro
J
O
�
k
�
��
�
�
.`
�
�
U
Q
O
�
a
°o
h
k
O
w
a
�R
ro
U
`7
ll.
�
�
w
'V^
v/
O
F
N
4i
�
n
¢
c
0
j
�
a�
�
�
m
N O CO
J � O CO
Q � V �
�
F
� I N( o I N� M I O
ZINI�INI�Io
O(� I N I N I a I^
�
(� I� I� I M I� I�
Q I� I� I� ( O I N
`7 I t0 (� I�r I N I C�P
� I� I� I N I N� M
2 I� I� I�( N I M
M
Q I o I N(� I O I N
m
r (y
�2 I� I� I N I�(�
pj I�IOINI�Iu�
N
W M N �
�
7 I N I o I O I � I N
W
O
r
�
�
0
�
0
a
c
W
W
(�
u) � O
N ;F �
Q Q � ° �
-' z� j N O
J
� E- p C IY
� � Q � W
N
p p � d tY
W ¢
o w g � w
Z C C!� � �
O O O �0 O N CO tC
4 O � � O � � �
r
u n n u u u u u
N
U>
� O
0 0
� a
C
p � rn � U:
� m m � -
N 0 � U
6 U � q, S 4,
� � i/i in 3 � y
m � o � p ° m �
aNi Y y° 'S � Y "-
� o a' � � o o �,
� C� = m� p_ Z U
C
.i] � � � U N
`� Y F�- a� 2 ii
W
H
Q
�
�
�
W
W
�
�
�
�
�
Y
Q
W
a
W
F--
�
�
N
Wy
}
O
J
ll..
Z
r
J
W
�3
?
l7
z
�
�
¢
w
�
�
¢
�
0
w
�
�
M
�
�
C
5
�
�
LL
U
�
M^
l�
�
N
T
N
�
.
�:
�
�
B A K E R S F I E L D �
�'��� :
MEMORANDUM
►� •
TO: Alan Tandy, City Manager
FROM: Art Chianello, Interim Water Resources Manager ,�(_,'
G '
SUBJECT: Notification of 1,2,3-Trichloropropane (TCP) in the City of BakE
Water System
The Water Department was first notified in 2004 that several City of Bakersfiel
system wells contain 1,2,3-trichloropropane (TCP) in excess of the California Dep
of Public Health's (CDPH) notification level. The public is notified each year thro
"Consumer Confidence Report" that is included in their billing statement. Current
53 active wells contain TCP at levels that exceed the notification level. The purpo:
memo is to update the City, Mayor and Council Members with the latest levels oi
the wells (table attached).
"Notification level" is defined as the level of a contaminant in drinking water
considered not to pose a significant health risk to people ingesting that water or
basis; it is simply the level at which we must make customers aware of thf
Notification levels do not require operational changes on our part. A"response
considerably higher than a notification level; when a contaminant reaches a rE
level, operational changes are recommended. In the case of TCP, the notificatior
0.005 parts per billion (Ng/L), and the response level of 0.5 �g/L is 100 tir
notification level.
In 2009, two of the 26 wells exceeded the response level and were immediately r
from service. Cal Water is actively monitoring water quality at these wells and ar
the trended data to determine if and when a source of supply needs to be take
service or treated. When a well is taken out of service, some customers could ex�
lower water pressure during peak demand periods. Should it ever become nece
take wells out of service, we would make every effort to utilize other sources of s
�.� ,
�
1
�
1,2,3-trichloropropane detections in the City of Bakersfield's water systen
Range of Average
Well number detections �Ng��' Comment
�1�9��)
2-01 0.009 - 0.010 0.010
5-01 0.210 - 0.260 0.235
8-01 0.018 - 0.066 0.042
10-02 0.018 - 0.030 0.023
11-01 0.025- 0.047 0.036
13-01 0.010 - 0.270 0.173
14-01 0.330 - 0.390 0.363
15-01 0.087 - 0.100 0.094
16-01
19-01
21-01
23-01
26-01
28-01
29-01
30-01
33-01
35-01
36-01
37-01
39-01
41-01
43-01
203-01
205-01
0.300 - 0.520 0.387 Taken out of service No�
2009
ND-0.011
0. 007
0.370 - 0.660 0.490 Taken out of service No�
2009
ND - 0.096
0.007 - 0.010
ND - 0.110
ND - 0.029
0.180 - 0.320
0.075 - 0.086
0.130 - 0.150
ND - 0.310
0.032 - 0.045
0.016 - 0.022
ND - 0.006
ND - 0.098
ND - 0.032
N D - 0. 005
� �. a
� ��:
�� .
� � •
� �
� �:
� :
�
��
�� :
� ��
� �.
�� .
� ��i
r
•
.�
�,�±,��,����
p �s- 3 � � � S ��' • 1 �•
f �`� �� t � " . .
B A K E R S F I E L D
Economic and Community Development Department
M E M O R A N D U M
�,Dt� �a�ba��r"�; �.�f��¢.�.
TO;
FROM;
Alan Tandy,
Donna Kunz,
j% r .a
City Manager ` � � r �
���
Economic Development Director
April 2�
SUBJECT: Economic and Community Development Department Activit
from January 1, 2010 throu h March 31, 2010,
CAPITAL IMPROVEMENT PROJECTS
1. Lowell Park Restroom Construction Proiect
CDBG funds of $350,000 (FY 07-08) are available for design and constructic
restroom facilities to replace the existing deteriorated restrooms at Lowell Park
at 4th and "P" streets, Federal environmental review was completed in Octol
The Recreation and Parks Department is the lead department, and is workinc
in preparing the bid package, Recreation and Parks Department expects
the bidding process during the summer of 2010 with project completion ant
by December 2010,
NON-PROFIT/PUBLIC FACILITY PUBLIC SERVICE PROJECTS
The following various non-profit organizations are being financially assisted to
the level of service for operating their public facilities,
1. Bakersfield Senior Center
CDBG funds are used by this agency to maintain its current level of services
a hot lunch program, recreational programs, and entertainment to sE
southeast and central Bakersfield, The agency has expended 73% of its
allocation to date,
2. Bakersfield Homeless Center
Emergency Shelter Grant (ESG) funds are used by this agency for opE
expenses such as staff, postaae, telebhone, utilities. insurc�n�P. P�� iinmPnt rPr
4. Alliance Aqainst Familv Violence and Sexual Assault
ESG funds are used by this agency for operation and maintenance expen
agency expended 50% of its $15,788 allocation to date.
HOUSING, ECONOMIC AND NEIGHBORHOOD REVITALIZATION PROJECTS
The following private and non-profit organizations are being assisted b�
acquire, develop or improve their housing and neighborhood/commercial
1. Southeast Bakersfield Infill Housing Proiect
The City was awarded a$500,000 CaIHFA loan to build affordable ho
scattered lots in southeast Bakersfield. The RDA assumed all rights and oblic
the loan on February 26, 2003, To date, seventeen new homes ha�
constructed.
Hybrid has completed the construction of a home at 226 East 6th Street
begun construction on their third home located at 1213 Murdock Street, D�
current economic climate, construction has been halted at 1213 Murdock ar
has had difficulties in finding a buyer for the home on East 6th Street, Staff is �
working with Hybrid to discuss options,
2. Southeast Neighborhood Revitalization Proiect -(SE)
During Fiscal Year 2006-07 staff developed a three year program for a five blc
and called it the Filson Street Area Targeted Neighborhood Revitalization F
Targeted residents whose income does not exceed 120% of the area mediar
may qualify for the program, The program is funded with Southeast Tax In�
funds which includes down payment assistance and a front porch grant.
Program accomplishments include the installation of one new manufacturE
located at 1818 Lewis Street, downpayment assistance for the purchase nf ar
property located at 1808 Filson Street, and completion of one front porch ap�
for construction, installation of a wrought iron fence and columns at 3502 Ha
and the installation of sidewalk and curbs and gutter throughout the area,
3. Home Accessibilitv (HA) Grant Pro ram
The program offers grants of up to $3,500 for constructing accessibility impro�
in privately or publicly owned structures for those clients who are p
challenged, This program aids low income physically challenged people
within Bakersfield's city limits, An amendment to the 2008-2009 HA Agreerr
approved by the City Council on December 1 b, 2009 which includes a buc
4. West Columbus Affordable Housing Proiect - Residences at West Col�
On April 9th, 2008, staff sent out a Request for Proposal & Qualification
development Firm/Agencies to acquire and develop the 3,5 +/- acre resi
zoned site located at 500 West Columbus Avenue in Bakersfield, California,
was chosen by the City through an in-depth proposal evaluation and a f
developer interview. GEAHI will be applying for low income tax credit finc
March 2010, and state financing to assist them with the design and
construction, Construction of the 56 unit project is expected to begin in Jc
2011 and when complete, will primarily serve emancipated foster youth,
5. The Parkview Cottaqes Housing Proiect
The Parkview Cottages consists of 74 single-family housing units, ranging frorr
1,820 square feet, Each unit will be two stories and have a two/three car
Currently, home buyers occupy 30 units and 15 additional units are pre-cor
and available for sale. Staff closed escrow on 9 units, 1 unit closed with no as
3 units are pending escrow closure and 2 units remain for sale. Staff hopes
these escrows closed by the end of the July 2010,
Staff has negotiated an amendment to the disposition agreement requ
developer/builder to construct two speculative homes at a time and continuE
out the development as the houses sell, With this revised schedule the projec
achieve sellout in four years or less,
6. Fair Housing
During this quarter, 123 calls were received: three were substantial service c
dealing with fair housing issues, and one of the complaint forms was returnE
the client, All three calls were race-related,
7, Baker Street Revitalization Proiect (Old Town Kern Mixed Use Proiect)
Baker Street Village Phase 1 is moving forward, with the purchase of the proje�
Housing Authority from the previous developer, The Housing Authority rec
federal grant that will enable it to complete the project, Construction is expE
resume in September 2010.
8. Mill Creek Linear Park Proiect
Mill Creek Linear Park is a major recreational linear park that includes a
creek" and pedestrian corridor traveling along the Kern Island Canal from
State to California Avenues. The theme of the project focuses on the late 1�
with a historic flavor that includes replicas of a covered bridae and mill ho�
0
cans, and water fountains, Completion of project is anticipated to be May :
opening event is being planned with Recreation and Parks,
9. South Mill Creek Commercial
The planned five acre Mill Creek Village Commercial project will re�
contaminated metal recycling business, an auto repair and body shop, a dilc
emptywarehouseand a predominantlyvacantcommercial dilapidated buil�
several abandoned partial structures, The proposed project is located in the S�
Redevelopment Project Area, alongside the southern tip of Mill Creek, The re:
in the planned retail development will have outdoor patio seating overloc
Creek, a 1,5-mile stretch of agriculture canal, which is being redeveloped intc
recreational amenity,
Redevelopment Agency staff has assumed the responsibility for marke
planned retail commercial project due to the expiration of the exclusive ne<
agreement with Southwest Consulting, Inc, A marketing plan was developE
will enable the Agency to retain tenant selection approval as well as arch
control of the future development. The marketing plan will also enable the Ac
incentivize a deal for a prospective tenant by offering a combination of land�
infrastructure improvements, payment of permits and fees, a land contributic
tenant has the option to purchase a commercial pad, Staff has been co
several restaurants to try to generate interest in the site, We are also wor�
several commercial brokers and placed advertisements in several restaur
retail magazines,
10. South Millcreek Housing
In September 2008, the City Council and Bakersfield Redevelopment
approved a Disposition and Development Agreement with Chelsea Inv
Corporation for the construction of 70 mid-rise garden style affordable ren
Chelsea Investment Corporation is in the process of applying for and secur
percent state tax credits by June of 2010, If successful, construction is anticiK
begin in the fall of 2010 and be completed by fall of 2011,
In February and March 2009, the City Council and Bakersfield Redevel
Agency approved two Disposition and Development Agreements with Sc
Consulting for the construction of 36 upscale townhomes and 57 mid-rise apc
The Developer has encountered numerous obstacles in obtaining con;
financina due to the �ersistent ec�n�mi� c�risi�. ThPrPfnrP ir, nrrlPr tn m
Staff will also request the Millcreek Courtyard project be deferred up to 36 r�
allow additional time for repayment of the cash flow loan from the salE
Creekview Villas townhomes, Construction on the Creekview Villas is antici
begin in May 2010. In addition, staff is currently working with a local engineE
and landscape architect to provide engineering design, surveying, IandscaK
preparation of construction documents for construction of the interior streets �
South Millcreek project area, Funds for these improvements will mostly be �
the Prop 1 C grant secured in 2009 from the state,
11. South Millcreek Plaza Cinema Complex
South Mill Creek Plaza is a mixed-use lifestyle, ground-up developr
approximately 7 acres. The site is designed to accommodate a total of 89,OC
feet of space, featuring 28,000 sq, feet of entertainment related retail, rE
space and a 61,000 square feet state of the art 16 screen, 2,600 seat r
cinema, Maya Bakersfield Cinemas, the developer, has developed the first �
the project south of Rabobank Arena and Convention Center, and sout
railroad tracks between California Avenue, "M" Street and the Kern Island �
The South Mill Creek Plaza is a major factor in reducing blight in the area
provided the Southeast Redevelopment Project Area with an anchor tenan�
be a catalyst for additional development along California Avenue. The
breaking ceremony was held on July 29, 2008, Construction was complete�
Maya Cinema phase of the project in the summer of 2009, with the grand
held on July 15, 2009, Since the opening of the theater, over 400,000 tickets ha
sold to date, In addition, construction on the 28,000 sq, feet of entertainmen
retail, restaurant space is on hold until the developers can obtain cor�
financing and tenants for this phase of the project,
12. Graffiti Removal Program - Citvwide
CDBG funds are used to assist in graffiti removal in low- and moderate-incor�
throughout the city, primarily in wards 1, 2, 3, 6, and 7, The program received
in CDBG funds for the current fiscal year, For FY 2010-11, $120,000 in CDBG f�
being proposed to serve low- and moderate-income areas.
13. Mercv Housing California (6Zuantico/Madison)
The apartments are located at 1885 Madison Street and owned and oper
Mercy Housing California, TI Funds will be used to benefit about 56 units in the
of $350,000 and will be used for exterior renovation and on-site improvemE
Owners Participation Agreement (OPA) was executed last Mav and the reha
project will affer 67 units of affordable senior rental housing, a food court, c
space parking garage,
15. Bovs qnd Girls Club of Kern Countv
The roof repair project has been completed and a notice of completioi
February 16, 2010.
16. Acauisition & Relocation - Catholic Charities
The building formerly occupied by Catholic Charities has been demolished
will be converted into park/commercial space in connection with the �
Linear Park Project,
17. E. California Avenue Property
Clinica Sierra Vista recently expressed an interest and willingness to negotiat
Redevelopment Agency for the development of a portion of the propert
Sierra Vista has recently been awarded funds from the American Recc
Reinvestment Act 2009 (A.R.R.A,) Stimulus funds to construct a 3,863 square fc
office on a portion of the parcel, One of the major requirements of recE
Stimulus funds is the applicant has to demonstrate reasonable site control �
start of project construction,
On August 4, 2009 the Bakersfield Redevelopment Agency approved an
Negotiation Agreement (ENA) with Clinica Sierra Vista to cover a period of
with an option for a 90 day extension, The deal points for the project c
incorporated into a Disposition and Development Agreement which is schE
approval by the Bakersfield Redevelopment Agency in May 2010.
18, Haven Cottages
Golden Empire Affordable Housing, Inc,, II (GEAHI-II) has entered into an ac
for $600,000 in HOME funds and $492,218,70 in CHDO funds from the City of Bc
The funds wauld be used for the development of a new 24 unit permanent s
housing complex designated for chronically homeless individuals, The ho�
consist of 24 - 412 sq. ft, one-bedroom units. Total project cost is estir
approximat�ly $4,4 million and will utilize various funding sources,
The project is located at 2300 S, Union Ave„ at the northeast corner of the in;.
of Union Avenue and White Lane, The project encompasses approximately :
and is locat�d in the Southeast Bakersfield Redevelopment Area, The NEP
has been campleted and GEAHI-II is currently in the process of obtaininq 1
19. Friendship House - Communitv Action Partnership of Kern
Community Action Partnership (CAP) of Kern requested $247,342 for impr
outdoor sports complex located on the Friendship House Community Cente
at 2424 Cottonwood Road while $3,039,000 has been secured from thE
California, Department of Parks and Recreation. This project was reconsid
funding identified from year end closings and savings, This project was in
Amendment # 3 FY 07/08 Action Plan to allow the use of funds for dE
construction of the Friendship House Center, and staff will also include the
the upcoming 2010 implementation plan to allow future RDA project financ
funds become available, The NEPA (National Environmental Policy Act) pr�
been completed, Late last year the State of California informed CAP of Ker
State Park funding earmarked for this activity is available for this project anc
reimbursing invoices submitted for the project, CAP of Kern is also awaiting
of the extension document from the Governor, as of now the project end�
2010, If the extension is not received in the next couple of months they will nc
to continue with this project. CAP of Kern is currently preparing their RFP
contractors for the Community Center,
20. Neighborhood Stabilization Program
This federal program, established under the 2008 Housing and Economic I
Act (HERA), provided almost $9 million to the City of Bakersfield, There r
strong interest in our pown Payment Assistance Program, which has assist
purchase of 34 homes as well as efforts by the Housing Authority of the Coun
to purchase and rehabilitate single family homes. A large portion of NSP fu
gone toward the purchase and renovation of a 99 unit senior independ
facility at 2221 South Real Road, now known as Pinewood Glen, Rehabilitati�
now underway and it is anticipated that all the NSP funds will be spent pr
deadline of September 2010,
21. Homelessness Prevention and Rapid Re-Housing
The first funding requests for HPRP have been received from Bethany Service;
$46,019,00, This represents three percent of the total funding available to Be1
a point of reference, 60% of the funds must be expended by September 3(
.
Date:
To:
From:
Subject
Aprii 19, 2010
� �����
A�R � Q Z�4�
��. y
���.ir ��_d_Si�:y+tf+��+�� �L�..r....
F . . , L ,\d' .
BAKERSFIELD POLICE
MEMORANDUM
Alan Tandy, City Manager
Greg Williamson, Chief of Police ��
Special Enforcement Gang Violence Report
J i'� �
' S.
f� ,y(�•'
,/ Q �K�,R
n� j �;;;�
���;�: :; ?�
,�
,' �'oi
`�:
��..::
� v���
�,,
I have enclosed the Special Enforcement Unit's monthly report for March
if you have any questions.
GSW/vrf
Ple
88
23
15
27
212
19
�{GE OPp���k,
. �8 fl�`� f1
:/p,� �
a
,s�u.
�AKEIZSFIELI� POLICE I�EP1�IZrI'1VIE1lTT'
G1�NG UNI�'
1VIONT�-ILY REPOI�T
1!/IAIZC�I 2010
Gang iJn�t l�Ionthly 5tats for 1Vgarch 2010
Felony Arrests 287 FI's 4 Vehicle R
Misdemeanor Arrests
Felony Warrant
Arrests
Misdemeanor Warrant
Arrests
Hours In Training
Guns Seized
235 � Felony Arrests
39 Citations
403 Probation and Parole
Searches
557 Hrs. Assisting Other
De artment Sections
86 Supplemental Reports
63 GeneralOffense
Reports
�Cear to Date Gang Unit S$atistics
januaB-y — March 201U
51 Misdemeanor Arrests
32 Felony Warrant
Arrests
78 Misdemeanor Warrant
Arrests
1117 Hours In Training
56 I Guns Seized
842 I F I's
73 Citations
1155 Probation and Parole
Searches
1246 Hrs. Assisting Other
De artment Sections
201 Supplemental Reports
191 GeneralOffense
Reports
186 I Patrol Cal
10 I Search W
108
6
5
4
5
Court Pre
2010 Sho
2009 Sho
2008 Sho
2007 Sho
9 Vehicle R
404 Patrol Ca
29 Search V�
249
17
13
10
19
Court Pre
2010 Shc
2009 Shc
2008 Shc
2007 Shc
���EAPf��;f k
4 fl rp�.
,F
pd 1_i. �
���
100
90
80
70
60
50
40
30
20
10
0
7��
600
500
400
300
200
100
�AKEIZSFIELI� P4LICE I�EPAR`I'IVIEI�T�'
G1�NG UNIT
IVIOIVTHLY IZEPOIZT
M1�IZCH 2O10
l�a�ch 2009-2010 COMPARISON
Felony Arrests Misdemeanor Guns Seized Search
Arrests Warrants
. s::�
i II �,uY I I.
��fCEAFf7(4:4:
� .£,A ftf� .
��,
o�
���
�1�KERS�'IELY� POLICE I�EP1-�1ZTI�IEI�T'
GAI�G LJNIT
1VIOl�T�'HLY IZEPORT
1VIAIZCI-� 2010
GAliTG �TIOL,EIl10E INI�EX 2008-2010 (2010 - YE1�I� `I'O I�1�'I'E OI�L'
50
45
40
35
30
25
20
15
10
5
0
2008 2009 2010 YTD
❑HOMICIDES oSHOOTIfVGS
��� Ofl'i�_k�i
� :N ft 1G
t�
�::�
$��
�1�ICERSFIEL,I� POLICE I�EPIIIZT'IVIEI�T�I'
Gt�I�TG LJl\TIT
li�I01\TTI�L�C IZEPORT
M1�IZCH 2O10
2008-2010 (2010 �CE1�IZ TO DATE ONLY) - YEARLY �'OTAL,S COlVIP1�R
2000
1800
1600
1400
1200
1000
800
600
400
200
0
s000
7000
s000
5000
4000
3000
2000
1000
Arrests Guns Seized Search Warrant:
■ 200� ■ 2009 0 2010 YTD
H
�
w
�
H
�
�
�
W
Q
w
H
0
�
A
w
�
�
�
w
�
�
�
�
z
�
�.%
�
�
c�
N
�
O
W
�
h-�
�
E"�
z
0
�
O
�
N
�
�
�
�
�
w
�a �
�� � :�
� W :. � � ��
���,�� ..4 ,.
�
i'�
�
z
0
w
�
�
Q
O
N
�
�
w
�
0
�
0
N
.�
0
�
0
N
�
O
O
N
�
c�
�
�
0
0
�
�
A
w
N
�
�
w
�
C�
�
�
�
�
Paqe 1 of 2
STREETS DIVISION — WORK SCHEDULE
WEEK OF APRIL 26, 2010 — APRIL 30, 2010
Resurfacinq/Reconstructinq streets in the followinq areas:
Reconstructing streets in the area between
of District Boulevard.
Gosford Road & Pin Oak Boulevard, south
Preparing streets for reconstruction in the area between Wible Road & Castlepoint
Street, north of Panama Lane.
Crack sealing streets in the area between Truxtun Avenue & Stockdale Highway, east
of Coffee Road.
Miscellaneous Streets Division proiects:
Installing curb & gutters in the area between California Avenue & 4t" Street, east
of "L" Street. (CDBG FUNDED PROJECT).
Installing curb & gutters in the area between Flower Street & Bernard Street, Alta
Vista Drive to Baker Street (CDBG FUNDED PROJECT).
Working on the City's part of the "Quite Zone Project"
Week of April 26_2010_Work Schedule
THIS SPACE INTENTIONALLY LEFT BLANK
Paqe 2 of 2
STREETS SWEEPING SCHEDULE
Mondav, April 26, 2010
Between Coffee Rd. & Verdugo Ln. — Brimhall Rd., south to the Kern River boundary.
Cul-De-Sacs, west of Windsong St., between Brimhall Rd. & Thistlewood Ct.
City areas between Rosedale Hwy. & Stockdale Hwy. — Verdugo Ln. to the west City Limit.
Between Jenkins Rd. & Allen Rd. — Stockdale Hwy. & Birkenfeld Ave.
Between Hosking Rd. & Astro Ave. — So. "H" St. & Union Ave.
Tuesdav, April 27, 2010
City areas between Olive Dr. & Downing Ave. — Coffee Rd. & Knudsen Dr./Mohawk St.,
including Patton Wy. From Weldon Ave. to Meany Ave.
Between W. Columbus St. & 34th St. — Chester Ave. & San Dimas St.
Beween Union Ave. & Madison St. — Casa Loma Dr. & White Ln.
Between Westwold Dr. & So. Laurelglen Blvd. — Gosford Rd. & Woodglen Dr.
Wednesdav, April 28, 2010
City areas between Snow Rd. & Rosedale Hwy. — Jewetta Ave., west to the City limit.
Between Ming Ave. & So. Laurelglen Blvd. — Coffee Rd. & EI Portal / Laurelglen Blvd.
Thursday, April 29, 2010
Sweeping streets in areas that are not on the monthly, set, sweeping schedule.
Fridav, April 30, 2010
Sweeping streets in areas that are not on the monthly, set, sweeping schedule.
�
Week of April 26_2010_Work Schedule
Sacramento County's ballooning deficit: What happened? - Sacramento City News -
eI`��il�a Ss4�'l��l�t�',�'�t'��3 �31;�? �L�,;�k� r �.;, �,
Page 1 of 3
Sacramento County's ballooning
deficit: What happened?
rlewis@sacbee.com
Published Wednesday, Apr. 21, 2010
In just two months, the projected shortfall in Sacramento County's general fund budget for
the coming fiscal year has ballooned by 40 percent - from $119.1 million to $166.5 million.
Nearly 750 county workers lost their jobs last year to the budget ax; hundreds more - as
much as 10 percent of the remaining work force - are on the chopping block this year. For
workers facing layoffs and scores of county residents, a basic question resounds: Why do
things look so much worse now than they did in February?
County budget officials cite several factors. Chief among them: the increasing burden of
employee pension costs; the hidden expense of laying off workers; and the lingering effects
of accounting gimmicks used to paper over this year's deficit.
"It is just one big guess," said Tom Burkart, the county's budget officer, discussing the
challenges officials have trying to make accurate projections during volatile economic times.
Personnel costs way off
Personnel costs account for the biggest growth in the projected deficit: $23.8 million.
In February, officials said cost-of-living adjustments and other negotiated raises would cost
the general fund $44 million in fiscal year 2010-11. That estimate didn't take into account
increased pension costs.
Officials now project the cost will be closer to $68 million.
Investment earnings on pension system assets aren't enough to fully cover the cost of retiree
pensions. As a result, the county and employees typically must contribute to the Sacramento
County Employees' Retirement System annually to help make up the difference.
The system - like most major pension systems - had massive investment losses in the wake
of the recession. The county is compensating by paying more into the system.
In December, officials still didn't know what the new contribution rate would be, Burkart said.
They made their budget calculations based on this year's contribution rate.
http://www.sacbee.com/2010/04/2l /v-print/2693662/sacramento-countys-ballooning.html 4/21 /2010
Sacramento County's ballooning deficit: What happened? - Sacramento City News - Page 2 of 3
✓
Now county officials say pension-related contribution rates are going up 2 percent to 3
percent for public safety employees and about 4 percent for everyone else.
So for every dollar of salary the county spends on public safety employees next year, it will
spend between 54 cents and 57 cents in retirement costs, up from 50 cents to 55 cents this
year. For other employees, the cost will be between 24 cents and 29 cents per $1 of salary,
up from 20 cents to 25 cents today.
It costs to lay off workers
Laying off workers costs money, because the county must pay unemployment benefits. It
also is on the hook for payouts such as unused vacation or sick time that employees get
when they leave county service.
Under former County Executive Terry Schutten, the county did not fully account for these
costs, said Steve Szalay, interim county executive. Unemployment insurance and termination
payments now are projected to cost the county about $15 million this year and about $20
million next year, Szalay said.
Budget gimmicks linger
At the start of this fiscal year, the county relied on a number of accounting tricks to pass
what appeared on paper to be a balanced budget. As a result, officials are revising
projections for next year that were made on this year's somewhat dubious assumptions.
"There was less transparency and more of a desire to make things look better than maybe
they actually were," said Supervisor Roberta MacGlashan. "We do have a different county
executive in the mix. I think he inherited some numbers."
In addition to increased unemployment insurance costs, the Board of Supervisors passed this
year's budget assuming the county would get several million in state money for mandated
programs. That was despite strong indications the state would not be providing such money,
Szalay said.
Budget staff recently realized the current budget still called for the county to get $6.2 million
in these state funds next year. The money probably won't be coming, so officials have taken
that funding out of the updated budget projections.
Deficit carries over
This figure hasn't changed since February, but is still worth pointing out as it represents the
largest chunk of the looming shortfall: To address this year's deficit, the Board of Supervisors
used $80 million in one-time funds such as reserves and borrowed money.
By not addressing the underlying spending problems at the start of this fiscal year, the
county effectively pushed a hefty chunk of its deficit to July 1. Szalay has vowed to tackle the
2010-1i budget without using one-time funds - except for labor concessions, if the unions
agree to givebacks.
Such a move would allow the county to fix its structural imbalance and shore up its credit
ratings, which have plummeted, largely as a result of past budgeting practices that the
http://www.sacbee.com/2010/04/21 /v-print/2693662/sacramento-countys-bal looning.html 4/2l /2010
Sacramento County's ballooning deficit: What happened? - Sacramento City News - Page 3 of 3
ratings agencies have deemed dubious.
O Copyright The Sacramento Bee. A// rights reserved.
_ _ _.. - - -__ __ ___.__._. __._._.. _ .__ _. __ _ _ _ __ _. __ _
Call The Bee's Robert Lewis, (916) 321-1061,
http://www.sacbee.com/2010/04/2l /v-print/2693662/sacramento-countys-bal looning.html 4/21 /2010
1,300 San Jose workers face layoffs, transfers - Sacramento News - Local and Breaking 5... Page ] of 1
`�k�I;SA�'��.:1����:ii�[�()�li�� k;���;t�:�f,-6�r�;
1,300 San �ose workers face
layoffs, transfers
The Associated Press
Published Wednesday, Apr. 21, 2010
SAN JOSE -- More than 1,300 San Jose employees have been warned they could be laid off
or transferred as the city struggles to close a$116-million budget gap.
The notices sent Tuesday affect more than a sixth of the full-time work force. At least 450
employees could be laid off - including 88 police officers and 74 firefighters.
Other workers would shift to similar or lower-paying jobs.
Hundreds of part-time employees also would be laid off or have their hours reduced.
The city has said it could avoid layoffs for the coming fiscal year if employee unions accept a
10-percent cut in pay and benefits by June 3. However, unions so far have rejected that
idea.
http://www.sacbee.com/2010/04/21/v-print/2694621/1300-san jose-workers-face-layoffs.h... 4/21/2010
The Modesto Bee � Modesto's budget deficit rises to $l2M
��� ��- Pi•iut Tl��is drticle
_.
Posted on Tue, Apr. 20, 2oio
Modesto's budget deficit rises to $12M
By L.eslie Albrecht
/a/brechf@modbee. com
last updated: April 20, 2010 12:10:58 AM
Modesto's projected budget shortfall has swelled to $i2 million, up from the
$8 million to $io million leaders anticipated earlier this year.
Officials will spend the neact month hammering out how to bridge the
spending gap in the $io3 million general fund, which pays for police, fire,
parks and other quality of life services.
The deficit grew after some departments failed to meet revenue goals, said
Mayor Jim Ridenour. He declined to say which departments.
Modesto recently received one piece of better budget news: Sales taac revenue
in the last quarter of 2009 met projections. That's important because sales taac
is the city's biggest source of general fund revenue. Those dollars have dried
up as the economic decline has kept shoppers out of stores.
Ridenour and City Manager Greg Nyhoff have asked department heads to
paint a picture of how potential cuts would affect their operations. They're
Page 1 of 1
. ��. � ��.
modbee.eom
Modesto Police captured fleeing suspect, parolee Brian Horton,
33, of Watertord in a north east Modesto neighborhood off Litt
Road. An MPD K9 named Barry was used in the capture.
Barry's handler is Officer Souza. Horton is suspected of
burglarizing a home near the 900 block of Parkwood Drive in
Modesto according to Det. Steve Stanfleltl. November 5, 2009
(BART AH YOU/bahyou@modbee.com) - Modesto Bee - Bart
Ah You
asking all department leaders to prepare scenarios cutting 3 percent, 5 percent, � percent and io percent of their
budgets.
Ridenour said he also asked departments to show him what 8 percent cuts to personnel budgets would look like.
"That gives me a good idea of where we would be if we just laid a bunch of people off, which we're not going to do, but
we wanted to see what it would look like," Ridenour said.
In the Police Department, even the smallest level of cuts would mean losing employees, said Chief Mike Harden.
"At the end of the day, to get that target, it's personnel costs, which make up about 8o percent of my entire budget,"
Harden said. "We've had to offer up both sworn and civilian staff alike."
Harden said it's too early to say how many employees, if any, the Police Department could lose.
He and other officials will know more after the city completes negotiations with employee unions. All of those groups
skipped pay raises last year except the police officers union.
The city will hold a series of public budget workshops in May. Ridenour is scheduled to present his proposed budget to
the City Council in early June. The city's new budget year starts July i.
Read more about the city's current budget at ����>>�v.m�clestogo�-,c�mf cnic�/c]�cs/�gi�_annti�l-report.pdf
Bee staff writer Leslie Albrecht can be reached at lalbreclit�?n�odbee.coin or 5�8-23�8. Follow her at
l�tt(��/tpyitter.coin/lieere_porter.
This article is protected by copyright and should not be printed or distributed for anything except personal use.
Copyright OO 2010, The Madesto Bee, 1325 H St., Modesto, CA 95354
Phone: (209) 578-2000.
http://www.modbee.com/2010/04/ 19/v-prind 1134280/modestos-budget-deficit-rises. htm l 4/22/2010
�
�
B A K E R S F I E L D %
�'��y �
MEMORANDUM
April 2
TO: Alan Tandy, City M ager
`� ��'
FROM: Maurice Randall, Business Manager
THROUGH: Art Chianello, Acting Water Resources Manager
SUBJECT: REPAIR CANAL FENCING
Council Referral No. 128 (Ward No. 4)
During the City Council meeting of September 9, 2009, Council Member Couch rec
staff repair the fence surrounding the canal at the southwest corner of Old River Rc
White Lane Blvd.
� Water Resources and Public Works Department staff got together and discus:
required work necessary to correct the fencing and other problems along the Buer
Canal at Old River Rd. and White Lane Blvd. One of the issues was to determine v�
responsible and required to make the repairs since the repairs involved work on a b�
road crossing and fencing along a canal owned by another water district. It was detE
that the Streets Division in Public Works should make the repairs. The required re
both the fencing along the canal and bulkhead road crossing were schedul�
completed by the City's Street Division by April 5, 2010.