Loading...
HomeMy WebLinkAboutAST INSPECTION 5/13/2015f i UNIFIED PROGRAM INSPECTION CHECKLIST Aboveground Petroleum Storage Tank Program BAKERSFIELD FIRE DEPT. K s F ► L n Prevention Services FIRE 2101 H Street aRM r Bakersfield, CA 93301 Tel.: (661) 326 -3979 Fax: (661) 852 -2171 FACILITY NAME )< - su � `,, INSP CTION DATE 1. . INSPECTION TIME ADDRESS f PHONE NQ; 1 NO OF EMPLOYEES FACILITY CONTACT BUSINESS ID NUMBER CONSENT TO INSPECT NAME /TITLE btG I IUN 1: KecoraS Keview: Gantornia Heaitn & satety GOde: 25270 DESCRIPTION Y N N/A COMMENTS Prepare an SPCC plan [CFR 112.3] p` Review or amend SPCC plan [CFR 112.5 (a)(d)]y SPCC plan available on site [CFR 112.3(e)] "K Conduct inspections and test in accordance with written procedures [CFR 112.7(e )] -, A Maintain records of inspections, tests and/or procedures [CFR 112.7(e)] §. Records of inspections or tests signed by inspector [CFR 112.7(e)] �« SECTION 2: SPCC Plan Elements: California Health & Safety Code: 25270.4.5. 25270.12 DESCRIPTION Y N N/A COMMENTS Self-certification for Tier I or II facility 1 12.6(a)(1),(b)(1)_.� p` Professional engineer certification CFR112.3(d) and 112.6(b)(4)] Documentation of 5 year review and evaluation of SPCC plan [CFR 112.5(b)] "K Amendments required within 6 months of changes/certifications CFR 112.5(a) and 112.6(a )(2), (b)(4)] E A authorization of resource commitment to implement the SPCC CFR 112.7 & 112.6(a) §. -Management -Diagram with location and contents of containers, transfer stations, connecting piping [112.7(a)(3)] �« Type of oil and storage capacity for each container CFR 112.7(a)(3) :, 1 ) V fi I Discharge prevention measures and procedures for routine handling {CFR 112.7(a)(3)], 5 Countermeasures for discovery, response and clean-up [CFR112.7(a) (3)] r Required contact list and phone numbers [CFR 112.7(a)(3)] SECTION 3, General SPCC Reauirements: California Health & Safety Code: 25270.4.5. 25270.5. 25270.12 DESCRIPTION Y N N/A COMMENTS Provide corrosion protection [CFR 112.8(c)(4)(5), (d)(1)] p` Containers compatible with materials stored CFR 112.8(c)(1)] Implement SPCC plan review changes or amendments within 6 months CFR 112.5(a)(d)] "K Pre are an oil contingency plan or written control /removal commitments [CFR 112.7(d)] SECTION 4: SPCC Plan. Trainina: California Health & Safety Code: 25270.4.5 DESCRIPTION Y N N/A COMMENTS Training program CFR 112.7(f) p` Train personnel in operation and maintenance of equipment [CFR 112.7(f) Conduct annuals ill prevention briefings [CFR 112.7(£)(3) "K SECTION 5, Facilitv Inspection: California Health & Safety Code: 25270.4.5 DESCRIPTION Y N N/A COMMENTS Meet provisions of conditional exemption [H &S 25270.4.5(b); Facility security adequate [CFR 112.7(g)] materials readily available CFR 112.7(c)] -Clean-up Overfill protection procedures or devices in place and operative [CFR 112.8(c)(8)] Portable /mobile containers positioned to prevent discharge CFR 112.8(c)(11) §. Loading / unloading rack drains into containment area [CFR 112.7(h)] Provide appropriate containment /diversionary structures to prevent discharge [CFR 112.8(a), 112.7(c)] Secondary containment adequate to contain capacity of largest container + precipitation [CFR 112.8(c)] 5 Remove accumulation of oil in secondary containment CFR 112.8(c) (10) r Secondary containment valve(s) closed [CFR 112.8] Implement SPCC plan elements [CFR 112.3] 1 ' ANY HAZARDOUS WASTE ON SITE? ❑ YES ❑ NO Si natureofRecei t Explain: ....•'' 1' Y �+^. .�/ ...a.tw l `.' �'}'...�' c POST INSPECTION INSTRUCTIONS: �, • Refer to the back of this inspection report for,re 'la Refer 5ItatioLis and corrective actions Y • Correct the violation(s) noted above by Z_ 7'/ S Signature (that all violations have been corrected as noted) W h' S d f +. P+1, 1 t' d to f th' t • It 1n ays o correc ing a o e v10 a Ions, slgn an re rn a copy o rs page Q. r Bakersfield Fire Dept., Prevention Services, 2101 H Street, California 93301 Date White - Business Copy Yellow - Business Copy to be Sent in after return to Compliance Pink - Prevention Services Copy FD2156b (Rev 9/10) r