Loading...
HomeMy WebLinkAboutSB989 POST REPAIR SECONDARY 4/27/2015April 27, 2015 Shane Gardner / Kris Karns BAKERSFIELD FIRE DEPARTMENT 2101 H Street Bakersfield, CA 93301 SB989 POST REPAIR SECONDARY COMPLIANCE TEST SUBJECT: SB 989 POST REPAIR COMPLIANCE TESTING AT COSTCO FUELING STATION — 3800 ROSEDALE HWY, BAKERSFIELD, CA 93308 — FACILITY NO. 688 Below please find the post repair secondary containment testing results for the above - referenced site. These results are being sent to you per the requirement of SB 989. Repairs were made pursuant to Bakersfield City Fire Permit #15- 10000205. Post Repair testing performed by Wayne Perry, Inc., in the presence of Inspector Karns, on 4/24/2015 with components passing. Please see attached report for further details. CONTRACTOR: License No: Technician: Sincerely, Wayne Perry, Inc. JW ary young Mary Young Program Coordinator Wayne Perry, Inc. 300345 Leonard Alan Evans — ICC #8221154 Attachments — Testing Results Cc: Dennis Bock — Costco Wholesale Costco Site #688 8281 Commonwealth Avenue Buena Park, California 90621 Phone (714) 826 -0352 Fax (714) 523 -9735 Page 1 of 3 Secondary Containment Testing Report Form This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the appropriate pages of this form to report results for all components tested. The completed form, written test procedures, and printouts from tests (if applicable), should be provided to the facility owner /operator for submittal to the local regulatory agency. 1. FACILITY INFORMATION Facility Name: COSTCO #688 1 Date of Testing: 4/24/2015 Facility Address: 3800 ROSEDALE HWY, BAKERSFIELD, CA 93308 Facility Contact: I Phone: Date Local Agency Was Notified of Testing: 4/22/2015 Name of Local Agency Inspector (ifpresent during testing): Kris Karns 2. TESTING CONTRACTOR INFORMATION Company Name: Wayne Perry, Incorporated Technician Conducting Test: Leonard Alan Evans — ICC #8221154 Credentials: X CSLB Licensed Contractor SWRCB Licensed Tank Tester License Type: A, HAZ, C21, C10, B , C61, D40 License Number: 300345 Manufacturer Training Manufacturer Component(s) Date Training Expires Furnished on request 3. SUMMARY OF TEST RESULTS rr•r ® ® ® ®�� i i rir•r • Sump M MAN, o oaoo o oor�c� 0000 c c■�c•�oo 0000 0 0000 0000 0 0000 000r■�■ o oc•�c•�o oor■�o 0 0000 r•�000 o or�oo 0000 c c•�c■�oo 0000 c c�000 If hydrostatic testing was performed, describe what was done with the water after completion of tests: No drums were left on site CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements Technician's Signature: A411 Date:_ 4/24/2015 Page 2 of 3 Test Method Developed By: ❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer Other (Sped) Test Method Used: ® Pressure ❑ Vacuum ❑ Hydrostatic ❑ Other (Specify) Test Equipment Used: See attached testing procedures Equipment Resolution: i. rwM'v ......n V ^4�-F v2t � S` rc� ..... ,. �W. a"% ✓..�.,eka�.a,fi..N.+m..,�.v. � ..r.J� C 3:. +rd,rnrti:.� Piping Run # 87 Piping Run # Piping Run # Piping Run # Syphon Piping Material: Fiberglass Piping Manufacturer: Smith Piping Diameter: 2 99/3" Length of Piping Run: Approx 20' Product Stored: Regular Method and location of Test Boots in Sump piping-run isolation: Wait time between applying 30 minutes 30 minutes 30 minutes 30 minutes pressure /vacuum/water and starting test: Test Start Time: 8:45am Initial Reading (RI): 5 psi Test End Time: 9:45am Final Reading (RF): 5 psi Test Duration: 1 hour 1 hour 1 hour 1 hour Change in Reading (RF -RI): 0 Pass/Fail Threshold or 0.00 0.00 0.00 0.00 Criteria: Test- Result: ® Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑Pass ❑Fail Comments — (include information on repairs made prior to testing, and recommended follow -up for failed tests) Repairs made pursuant to Bakersfield Fire Permit 15- 10000205 — Inspector Kris Karns present during inspection Page 3 of 3 2. PIPING SUMP TESTING Test Method Developed By: F-1 Sump Manufacturer Z Industry Standard F-1 Professional Engineer ❑ Other (Specify) Test Method Used: F-1 Pressure ❑ Vacuum Hydrostatic ❑ Other (Specify) Test Equipment Used: See attached testing procedures Equipment Resolution: Yti .1R 4 4 , Sump # 87 Aux Sump# 87 Aux Sump# 91 Sump# 91 Sump Diameter: 48" 4899 48" 4899 Sump Depth: 6299 62" 62" 62" Sump Material & Manufacturer: Fiberglass Fiberglass Fiberglass Fiberglass Height from Tank Top to Top of 2691) 2691 2699 2699 Piping Penetration: -Highest Height from Tank Top to Lowest 2491 2499 2299 2299 Electrical Penetration: Condition of sump prior to testing: Fair Fair Fair Fair Portion of Sump Tested' Above highest Above highest Above highest Above highest penetration penetration penetration penetration Does turbine shut down when sump sensor detects liquid (both [:1 Yes ❑ No Z NA ❑Yes [:1 No Z NA ❑Yes ❑ No Z NA ❑ Yes ❑ No Z NA product and water)?* Turbine shutdown response time Is system programmed for fail-safe F] Yes El No Z NA ❑Yes ❑ No Z NA ❑Yes [I No Z NA El Yes ❑ No Z NA shutdown ?* Was fail-safe verified to be ❑ Yes [:1 No Z NA ❑Yes ❑ No Z NA ❑Yes ❑ No Z NA ❑ Yes ❑ No Z NA operational?* Wait time between applying pressure/vacuum/water and starting 30 minutes 30 minutes 30 minutes 30 minutes test: Test Start Time: 9:21am, 9:38am 9:12am 9:28am Initial Reading (RI): 5.1048 5.1046 4.0364 4.0360 Test End Time: 9:36am 9:53am. 9:27am 9:434am Final Reading (RF): 5.1045 5.1039 4.0360 4.0359 Test Duration: 15 min 15 min 15 min 15 min Change in Reading (RF-R,): 0.00038 0.00067 0.00040 0.00013 Pass/Fail Threshold or Criteria: 0.002 0.002 0.002 0.002 Test Result: 0 Pass ❑ Fail Z Pass ❑ Fail Z Pass ❑ Fail 0 Pass ❑ Fail Was sensor removed for testing? 0 Yes ❑ No ❑ NA ZYes 1:1 No 1:1 NA ZYes 1:1 No 1:1 NA Z Yes ❑ No ❑ NA Was sensor properly replaced and Z Yes ❑ No ❑ NA ZYes, ❑ No ❑ NA ZYes ❑ No ❑ NA Z Yes ❑ No ❑ NA verified functional after testing? I -Comments — (include information on repairs made prior to testing, and recommended follow -up for failed tests) Repairs made pursuant to Bakersfield Fire Permit 15-10000205 — Inspector Kris Karns present during inspection 1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG-160)