HomeMy WebLinkAboutSB989 2014TA INT I A LUING£
7 14! 5 6 2 2 2
September 23, 2014
VIA FED EX 7712 4837 4540
Bakersfield Fire Department
2101 H Street
Bakersfield CA 93301
Re: Secondary Containment Testing
Pacific Bell Telephone Co. dba AT&T California
1918 "Mvv STREET, BAKERSFIELD5 CA
GEOPAR: SA004
To Whom It May Concern:
2 3 CA 9,�"(;6
Enclosed are the results for the following tests completed on September 19,
2014:
■ Secondary Containment Testing Report Form
Please do not hesitate to call me if you have any questions.
Very, Truj;v Yours
ar4losE. Cardenas
Program Manager
CA lics 588098 1; AZ hc# 0959 84 "r NV lic�,'; 0049666 1 TX lica CPQOv0041
Secondary Containment Testing Report Form
This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the
appropriate pages of this form to report results for all components tested. The completed form, written test procedures, and
printouts from tests (if applicable), should be provided to the facility owner /operator for submittal to the local regulatory agency.
. err .m 7 W kTV1d'%"%/V ♦ TYd -%XT C.,,.;l,+- TTI• C' A OOA
Facili Name: Pacific Bell Telephone Co. dba AT &T California
Date of Testing: 9/19/2014
Facility Address: 1918 M STREET, Bakersfield, CA 93301
Facility Contact: Grant Armstrong
Phone: (661) 327 -6903
r— Initial
- Repair Test
Date Local Agency Was Notified Of Testing: 9/16/2014
- 6 Month
r— Other
Name of Local Agency Inspector (if present during testing): Shane Gardner
Tri ennial
m C1nrV%Td" rd-%XM D A d -rlrnD irwr D x4ATMN
Company Name: Tait Environmental Services
Technician Conducting Test: Adolfo Aguilar
Credentials: CSLB Licensed Contractor SWRCB Licensed Tank Tester
ICC UST Service Technician
License Type: A B AS C -10 HAZ
I License Number: 588098
Repairs
Made
Man ufactu rer T raining_
Pass
Manufacturer
Component(s)
Repairs
Made
Date Training Expires
ICC Technician
5238610
6/17/2016 _
Franklin Fueling / Incon TS -STS
1732573702
r7
7/14/2016 _
I crTlt4A4At2V nlP TF.CTRFCTTI,T
If hydrostatic testing was performed, describe what was done with the water after completion of tests:
_..__w...,.- . -- --- r .._. .. w..,... ......w........_ ............... . w...__......_.... ,.
Took Non -Haz. Test Water To TAIT Shop.
For
.............................................................................................. ...............................
any equipment capable of generating a print out of test results, you must attach a copy of the test report to this
certification System printout attached.
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements
Technician's Signature: Date: 9/19/2014
Companent
Pass
Fail
Not
Tested
Repairs
Made
Component
Pass
Fail
Not
Tested
Repairs
Made
Fill Sump SA004UO01
F
r7
r7
r
r
r—
I—
F
r
F
f
r7
r
17
r
If hydrostatic testing was performed, describe what was done with the water after completion of tests:
_..__w...,.- . -- --- r .._. .. w..,... ......w........_ ............... . w...__......_.... ,.
Took Non -Haz. Test Water To TAIT Shop.
For
.............................................................................................. ...............................
any equipment capable of generating a print out of test results, you must attach a copy of the test report to this
certification System printout attached.
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements
Technician's Signature: Date: 9/19/2014
o rrr r nrcro rnNTA 1NA41P.NT CTT1ViP TFIRTTNG
Facility is Not Equipped With Fill Riser Containment Sumps
Fill Riser Containment Sumps are present, but were Not Tested
Test Method Developed By: F ' Sump Manufacturer Industry Standard F Professional Engineer
Other(Specify)
Test Method Used: F Pressure r Vacuum F1 Hydrostatic
Other(Specify)
Test Equipment Used: Incon TS -STS Equipment Resolution:
u
`$ ill Sump Fill S ump
Fill SA004U00I
Sump Diameter: 48"
.0006
Fill Sump Fill Sump
Sump Depth:
54"
Height from Tank Top to Top of
Highest Piping Penetration:
2511
Height from Tank Top to Lowest
Electrical Penetration:
35"
Condition of sump prior to
testing :
Portion of Sump Tested:
Excellent
2" above penetration
Sump Material:
Fiberglass
Wait time between applying
pressure /vacuum /water and
st arti ng test:
15 Minutes
Test Start Time:
9:15 AM
9:30 AM
Initial Reading (RI):
6.6625"
6.6622"
Test End Time:
9:30 AM
9:45 AM
Final Reading (RF):
6.6621"
6.6618"
Test Duration:
Change in Reading (RF-RI):
15 Min.
15 Min.
.0004"
.0004"
Pass/Fail Threshold or Criteria:
.002"
.002"
Test Result:
Pass Fail
Pass Fail
Pass F' Fail
Pass Fail
Is there a sensor in the sump?
V Yes r No
F Yes No
r Yes f No
Yes No
Does the sensor alarm when either
product or water is detected ?;
Was sensor removed for testing?
r Yes '" No NA
v ! y� No NA
Yes No NA
Yes 1 No NA
Yes No NA
Yes' No NA
"' Yes No NA
Yes No ! NA
Was sensor properly replaced and
verified functional after testing?
Yes No NA
Yes No NA
Yes No NA
Yes ' No ! :NA
Comments - (include information on repairs made prior to testing, and recommended follow -up for failed tests)
Re- Installed Sensor To Lowest Point But Not Tested.
ATT SA004
1918 M. ST,
BAKERSFIELD
CALIFORNIA
TAIT ENVIRONMENTAL
09/19/2014 9:30 AM
SUMP LEAK TEST REPORT
FILL
TEST STARTED 9:15 AM
TEST STARTED 09/19/2014
BEGIN LEVEL 6,6625 IN
END TIME 9:30 AM
END DATE 09/19/2014
END LEVEL 6.6621 IN
LEAK THRESHOLD 0,002 IN
TEST RESULT PASSED
ATT SA004
1918 M. ST,
BAKERSFIELD
CALIFORNIA
TAIT ENVIRONMENTAL
09/19/2014 9:45 AN
SUMP LEAK TEST REPORT
FILL
TEST STARTED 9:30 AM
TEST STARTED 09/19/2014
BEGIN LEVEL 6,6622 IN
END TIME 9:45 AM
END DATE 09/19/2014
END LEVEL 6.6618 IN
LEAK THRESHOLD 0,002 IN
TEST RESULT PASSED
TEST DATE: 9/19/2014 CLIENT: AT &T GEOPAR: SA004 PAGE J- OF �---