Secondary Containment Testing Report Form
This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the
appropriate pages of this form to report results for all components tested. The completed form, written test procedures, and
printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency.
1.FACILITY INFORMATION
Facility Name: Date of Testing:
Facility Address:
Facility Contact: Phone:
Date Local Agency Was Notified of Testing :
Name of Local Agency Inspector (if present during testing):
2.TESTING CONTRACTOR INFORMATION
Company Name:
Technician Conducting Test:
Credentials: CSLB Licensed Contractor SWRCB Licensed Tank Tester
License Type: License Number:
Manufacturer Training
ManufacturerComponent(s)Date TrainingExpires
3.SUMMARY OF TEST RESULTS
ComponentPassFail Not
Tested
Repairs
Made ComponentPassFail Not
Tested
Repairs
Made
If hydrostatic testing was performed, describe what was done with the water after completion of tests:
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements
Technician’s Signature:________________________________________________ Date:_________________________
$POGJEFODF6454FSWJDFT
*OD
")B[
$%
Flower Street Mini Mart 11/18/2015
928 Flower St, Bakersfield, CA 93305
Sham(661) 322-1521
11/16/2015
Kris Karns
BryanASelf
✔✔
ICC CA SERVICE TECHNICIAN 06/08/2017
ICC UST INSTALLATION/RETROFITTING 05/12/2016
INCON TS-STS
Vapor Return Secondary ✔
11/18/2015
SWRCB, January 2002 Page ____ of ____
5.SECONDARY PIPE TESTING
Test Method Developed By: Piping Manufacturer Industry Standard Professional Engineer
Other (Specify)
Test Method Used: Pressure Vacuum Hydrostatic
Other (Specify)
Test Equipment Used: Equipment Resolution:
Piping Run # Piping Run # Piping Run # Piping Run #
PipingMaterial:
Piping Manufacturer:
PipingDiameter:
Length of Piping Run:
ProductStored:
Method and location of
piping-run isolation:
Wait time between applying
pressure/vacuum/water and
starting test:
Test Start Time:
Initial Reading (RI):
Test End Time:
Final Reading (RF):
TestDuration:
Change in Reading (RF-RI):
Pass/Fail Threshold or
Criteria:
Test Result: Pass Fail Pass Fail Pass Fail Pass Fail
Comments – (include information on repairs made prior to testing, and recommended follow-up for failed tests)
✔
✔
VR
FRP
Smith
3.00"
350'
Vapor
Test Boot
5 Min
12:30 pm
5.00" PSI
1:30 pm
5.00" PSI
1 Hour
0.00"
0.00"
✔