Loading...
HomeMy WebLinkAboutSB-989 Results 12-11-15Confidence UST Services, Inc. 16250 Meacham Road, Bakersfield, CA 93314 800- 339 -9930 or 661 -631 -3870 FINAL TEST RESULTS ALERT 1000 / ALERT 1050 / TEI LT -3 / VMI LDT -890 CUSTOMER ADDRESS: Proactive Properties, Inc. 15000 Olive View Dr., Unit G Sylmar, CA 91342 SITE CONTACT: Bassem Azzi TECHNICIAN: Bryan Self WATER IN BACKFILL: 0.00° WORK ORDER: 35231D TEST DATE: 12/11/2015 PHONE: (805) 217 -0610 PHONE: (661) 631 -3870 DATE & TIME OF LAS1 SITE ADDRESS: White Lane Chevron 2525 White Lane Bakersfield, CA 93304 LICENSE: 11 -1756 r FUEL DELIVERY: 24 hours+ TANK INFORMATION: (WETTED) TANK 1 TANK 2 TANK 3 TANK 4 PRODUCT TYPE: 87 91 Diesel TOTAL GALLONS: PRODUCT LEVEL: PERCENT FULL: TEST METHOD: WATER IN TANK: TANK MATERIAL: P.S.I. @ BOTTOM: TEST DURATION: FINAL LEAK RATE: TEST RESULT: TANK INFORMATION ULLAGE U/F ONLY ALERT 1 05O ALERT 1050X ALERT 1050X ALERT 1 05O ULLAGE GALLONS: START PRESSURE: END PRESSURE: TEST RESULT: PRODUCT LINES: TEI LT -3 TEI LT -3 TEI LT -3 TEI LT -3 LINE TYPE: Pressure Pressure Pressure START TIME: 9:45 am 8:30 am 8:30 am END TIME: 10:00 am 8:45 am 8:45 am TEST PRESSURE: 55 PSI 55 PSI 55 PSI FINAL LEAK RATE: .007 .002 .001 TEST RESULT: Pass Pass Pass MECHNCCAL LINE LEAK DETECTORS: VMI LDT -890 VMI LDT -890 VMI LDT -890 VMI LDT -890 MODEL: SERIAL NUMBER: CHECK VALVE PSI: BLEED OFF m I: LEAK RATE TESTED: TEST RESULT: A) These systems and metnods meet or exceed the criteria in USEPA 4UCFK parts ZUU, NI-PA 3z9 -51 and an applicable state codes. B) Any failure listed above may require further action, check with all regulatory agencies. TECHNICIAN SIGNATURE: DATE: MANUFACTURER CERTIFICATION NO: I 12/11/2015 TEI LT -3: TMI 146 SWRCB, January 2002 page 1 of 3 Secondary Containment Testing Report Form This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the appropriate pages of this form to report results for all components tested The completed form, written test procedures, and printouts from tests (if applicable), should be provided to the facility owner /operator for submittal to the local regulatory agency. 1. FACILITY INFORMATION Facility Name: white Lane Chevron Date of Testing: 12/11/2015 Facility Address: 2525 White Lane, Bakersfield, CA 93304 Facility Contact: Nidal Azzi or Bassem Azzi Phone: (805) 217 -0610 Date Local Agency Was Notified of Testing : 09/15/2015 Name of Local Agency Inspector (if present during testing): Kris Karns 2. TESTING CONTRACTOR INFORMATION Company Name: Confidence UST Services, Inc. Technician Conducting Test: Frank Landa Credentials: ® CSLB Licensed Contractor ❑ SWRCB Licensed Tank Tester License Type: A -Haz, C61 -D40 License Number: 804904 Manufacturer Training Manufacturer Component(s) Date Training Expires ICC Service Technician 10/13/2016 INCON ST -STS 10/16/2016 3. SUMMARY OF TEST RESULTS -____ _____ 1 -___. -- ------ . ... _ Dsl Secondary 87 Secondary mom 91 Secondary I ©� r mom opm� mom mm mmp ; m mm�� mmm MMM If hydrostatic testing was performed, describe what was done with the water after completion of tests: CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements Technicians Signature: Date: 12/11/2015 SWRCB, January 2002 Page 2 of 3 5. SECONDARY PIPE TESTING Test Method Developed By: ❑ Piping Manufacturer 0 Industry Standard ❑ Professional Engineer ❑ Other (Spec) Test Method Used: El Pressure ❑ Vacuum ❑ Hydrostatic ❑ Other (Spec) Test Equipment Used: Calibrated Gauges Equipment Resolution: 0.0625" "Piping Piping Run # 87 Piping Run # 91 Piping Run # DSL Piping Run # Vapor erial: Fiberglass Fiberglass Fiberglass Fiberglass Piping Manufacturer: Smith Smith Smith Smith Piping Diameter: 3" 3" 3" 4" Length of Piping Run: 100' 100' 100' 100' Product Stored: Regular UNL Premium UNL Diesel Vapor Return Method and location of piping-run isolation: Boot in STP Boot in STP Boot in STP Boot in STP Wait time between applying pressure /vacuum /water and 5 min. 5 min. 5 min. 5 min starting test: Test Start Time: 8:00 am 8:00 am 8:00 am 8:00 am Initial Reading (RI): 5 Psi 5 Psi 5 Psi 5 Psi Test End Time: 9:00 am 9:00 am 9:00 am 9:00 am Final Reading (RF): 5 Psi 5 Psi 5 Psi 5 Psi Test Duration: 1 hour 1 hour 1 hour 1 hour Change in Reading (RF -RI): 0.00" 0.00" 0.00" 0.00" Pass/Fail Threshold or Criteria: 0.00" 0.00" 0.00" 0001, " Test Result: [f] Pass ❑ Fail =E1 Pass ❑ Fail E] Pass ❑ Fail { l Pass ❑ Fail Comments — (include information on repairs made prior to testing, and recommended follow -up for failed tests) Changed all (4) Udcs and all new rubber flex boots SWRCB, January 2002 Page 3 of 3 7. UNDER- DISPENSER CONTAINMENT UDC TESTING Test Method Developed By: ❑ UDC Manufacturer ® Industry Standard ❑ Professional Engineer ❑ Other (Spec) Test Method Used: ❑ Pressure ❑ Other (Spec) ❑ Vacuum ❑ Hydrostatic Test Equipment Used: TS -STS Equipment Resolution: UDC # 1 -2 UDC # 3 -4 UDC # 5 -6 UDC # 7 -8 UDC Manufacturer: Bravo Bravo Bravo Bravo UDC Material: Steel Steel Steel Steel UDC Depth: 911 911 911 911 Height from UDC Bottom to Top of Highest Piping Penetration: o„ oil o" o" Height from UDC Bottom to Lowest Electrical Penetration: o" o" o" o" Condition of UDC prior to testing: Clean Clean Clean Clean Portion of UDC Tested' Does turbine shut down when UDC sensor detects liquid (both product and water) * ❑ Yes ❑No E]NA ❑Yes ❑No E]NA ❑Yes ❑No EINA ❑Yes ❑No [ANA Turbine shutdown response time NA NA NA NA Is system programmed for fail - safe shutdowns ❑ Yes ❑No EINA ❑Yes ❑No EINA ❑Yes ❑No EINA ❑Yes ❑No EINA Was fail -safe verified to be ❑ Yes ❑No E]NA ❑Yes ❑No ONA ❑Yes ❑No ❑NA ❑Yes ❑No EINA Wait time between applying pressure /vacuum /water and starting test 5 min 5 min 5 min 5 min Test Start Time: -See 0,90% Arfi_N%k 0 OLINOL S''M 1 0 111%,� I I It' I. ILC U S Initial Reading (RI): Test End Time: Final Reading (RF): Test Duration: Change in Readin (RF -RI): Pass/Fail Threshold or Criteria: Test Result: El Pass ❑ Fail E Pass - ❑ Fail 0 Pass ❑ Fail El Pass - El Fail Was sensor removed for testing? ❑ Yes ❑No EINA ❑Yes ❑No []NA ❑Yes ❑No E]NA ❑Yes ❑No EINA Was sensor properly replaced and verified functional after testing? ❑ Yes ❑No EINA ❑Yes ❑No E]NA []Yes ❑No E]NA ❑Yes ❑No EINA Comments — (include information on repairs made prior to testing, and recommended follow -up for failed tests) Replaced all (4) UDCs with new bravo shallow box. All new hardware _ and electrical installed ' If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an asterisk ( *) is "NO" or "NA ", the entire UDC must be tested. (See SWRCB LG -160) ! CHEVRON ' CHEVRON CHEVRON 2525 WHITE LN 2525 WHITE LN 2525 WHITE LN 8ACKER8FIBD 8ACKERSFIBD 8ACKEROFIELD 12/11/2015 0:16 AN 12/11/��15 7�45 AM 12/11/2015 8:40 AM / SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT UDC 1-2 UDC 1-2 UDC 1-2 TEST STARTED 8/01 AM TEST STARTED 7�3U AM TEST STARTED 8:25 AM TEST STARTED 12/11/2015 TEST STARTED 12/11/2015 TEST STARTED 12/11/2015 / BEGIN LEVEL 0,7078 IN BEGIN LEVEL 0^7286 IN BEGIN LEVEL 0.8802 IN � ENO TIME ,8:1U AM END TIME 7:45 AM END TIME 8:40 AM END DATE 12/11/2015 ENO DATE 12/11/2015 END DATE 12/11/2015 END LEVEL 0.7007 IN / ENO LEVEL 0.7285 IN ENO LEVEL 0.8831 IN LEAK THRESHOLD 0.002 IN i LEAK THRESHOLD 0.002 IN LEAK THRESHOLD 0.002 IN TEST RESULT FAILED TEST RESULT PASSED TEST RESULT FAILED | - UDC 8 4 i UDC 3-4 | UDC 3-0 / ' TEST STARTED @:Ol AM | TEST STARTED T��0 AM TEST STARTED 8:25 AM TEST STARTED 12/11/2015 ` TEST STARTED 12/11/2015 TEST STARTED 12/17/2015 BEGIN LEVEL 0,4354 IN ^ ' BEGIN LEVEL 0.4372 IN BEGIN LEVEL 0.4353 IN END TIME 8:10 AM � END TIME 7:45 AM END TIME 8:40 AM END DATE 12/11/2015 / END DATE 12/11/2015 END DATE 12/71/2015 END LEVEL 0.4353 IN ' | END LEVEL 0.4361 IN END LEVEL 0^4353 IN / LEAK THRESHOLD 0,002 IN | LEAK THRESHOLD 0.002 IN LEAK THRESHOLD 0,002 IN i TEST RESULT PASSED ! TEST RESULT PASSED TEST RESULT PASSED CHEVRON CHEVRON CHEVRON 2525 WHITE LN 2525 WHITE LN 2525 WHITE LN BACKERSFIELD BACKERSFIELD BACKERSFIELD 12/11/2015 10 :00 AM 12/11/2015 9:31 AM 12/11/2015 9:09 AM SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT UDC 1 -2 UDC 1 -2 UDC 1 -2 TEST STARTED 9:45 AM TEST STARTED 9:15 AM TEST STARTED 8:54 AM TEST STARTED 12/11/2015 TEST STARTED 12/11/2015 TEST STARTED 12J11/2015 BEGIN BEGIN LEVEL 0,3028 IN BEGIN LEVEL 0,6256 IN LEVEL 0,6448 IN END TIME END TIME 10:00 AM END TIME 9:31 AM 9:09 AM END DATE 12/11/2015 END DATE 12/11/2015 END DATE 12/11/2015 END LEVEL 0,6241 IN END LEVEL 0,3032 IN END LEVEL 0,6142 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN TEST RESULT FAILED TEST RESULT PASSED TEST RESULT FAILED UDC 1 -2 UDC 3 -4 UDC 3 -4 TEST STARTED 9:45 AM TEST STARTED 9:15 AM TEST STARTED 8:54 AM TEST STARTED 12/11J2015 TEST STARTED 12/11/2015 TEST STARTED 12/11/2015 BEGIN LEVEL 2,4249 IN BEGIN LEVEL 0,3449 IN BEGIN LEVEL 0,0963 IN END TIME 9:09 AM END TIME 10:00 AM END TIME 9:31 AM END DATE 12/11/2015 END DATE 12/11/2015 END DATE 12/11/2015 END LEVEL 2,4249 IN END LEVEL 0,3453 IN END LEVEL 0,0960 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED TEST RESULT PASSED TEST RESULT PASSED CHEVRON 2525 WHITE LN BAKERSFlELD [A 1011/2015 8:24 AM SUMP �K T LEAK REPORT UDC 5-O TEST STARTED 8:09 AM TEST STARTED 12/11/2015 BEGIN LEVEL 1.2867 IN ENO TIME 8:24 AM END DATE 12/11/2015 END LEVEL 1.2886 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED UDC 7-8 TEST STARTED 8:08 AM TEST STARTED 12/11/2015 BEGIN LEVEL 5,0502 IN END TIME 8:24 AM B0 DATE 12/11/2015 END LEVEL 5,0582 IN LEAK THRESHOLD 0'002 IN TEST RESULT PASSED CHEVRON 2525 WHITE LN BAKERSFIBD CA ' 12/11/2015 7:0 AM SUMP LEVEL REPORT ' SUMP UDC 5-8 NO PROBE CHEVRON 2525 WHITE LN BAKERSFlELD CA 12/11/8015 8:05 AM SUMP LEAK TEST REPORT UDC 5-B TEST STARTED 7:49 AM TEST STARTED 12/11/2015 ( BEGIN LEVEL 1.2888 IN | END TIME* 8:04 AM i ENO DATE 12y11/2015 / END LEVEL 1.2887 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED UDC 7-8 TEST STARTED 7:48 AM TEST STARTED 12/11/2015 BEGI^ LEVEL 5�0597 IN END TIME 8:04 AM END DATE 12/11/2015 END LEVEL 5,0583 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED