HomeMy WebLinkAboutSB-989 Results 9-24-16SWRCB, January 2002
Secondary Containment Testing Report Form
Page 1 of 6
This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the
appropriate pages of this form to report results for all components tested. The completed form, written test procedures, and
printouts from tests (if applicable), should be provided to the facility owner /operator for submittal to the local regulatory agency.
1. FACILITY INFORMATION
Facility Name: White Lane Chevron Date of Testing: 09/24/2016
Facility Address: 2525 White Lane, Bakersfield, CA 93304
Facility Contact: Nidal Azzi or Bassem Azzi Phone: (805) 217 -0610
Date Local Agency Was Notified of Testing : 09/15/2015
Name of Local Agency Inspector (if present during testing): Kris Karns
2. TESTING CONTRACTOR INFORMATION
Company Name: Confidence UST Services, Inc.
Technician Conducting Test: Cameron Mason
Credentials: ® CSLB Licensed Contractor ❑ SWRCB Licensed Tank Tester
License Type: A -Haz, C61 -D40 License Number: 804904
Manufacturer Training
Manufacturer Component(s) Date Training)
ICC Service Technician 10/13/2016
INCON ST -STS 10/16/2016
Z CTT1V4MA12V "F TFCT RFCTTT,TC
Component
Pass
Fail
Not
Tested
Repairs
Made
Component
Pass
Fail
Not
Tested
Repairs
Made
87 Annular
®
❑
❑
❑
87 Vapor Spill Bucket
®
❑
❑
❑
91 Annular
®
❑
❑
❑
91 Vapor Spill Bucket
®
❑
❑
❑
Diesel Annular
®
❑
❑
❑
UDC 1/2
❑
®
1 ❑
❑
87 Secondary
❑
®
❑
❑
UDC 3/4
❑
®
❑
❑
91 Secondary
❑
®
❑
❑
UDC 5/6
❑
®
❑
❑
Diesel Secondary
❑
®
❑
❑
UDC 718
❑
®
❑
❑
87 STP
®
❑
❑
❑
❑
❑
❑
❑
91 STP
®
❑
❑
❑
❑
❑
❑ 1
❑
Diesel STP
®
❑
❑
❑
❑
❑
❑
❑
87 Fill Spill Bucket
®
❑
❑
❑
❑
❑
❑
❑
91 Fill Spill Bucket
®
1 ❑
❑
❑
❑
❑
1 ❑
❑
Diesel Fill Spill Bucket
®
1 ❑
❑
1 ❑
j
❑
❑
1 ❑ 1
❑
If hydrostatic testing was performed, describe what was done with the water after completion of tests:
Water was returned to test tank.
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements
Technician's Signature: Date: 09/24/2016
SWRCB, January 2002
4. TANK ANNULAR TESTING
Page 2 of 6
[] Industry Standard ❑ Professional Engineer
E] Vacuum ❑ Hydrostatic
Equipment Resolution: 0.0625"
Tank # 91 Tank # Diesel Tank #
Is Tank Exempt From Testing ?'
❑ Yes 0 No
❑ Yes El No
❑ Yes 0 No
❑ Yes ❑ No
Tank Capacity:
12,000
12,000
12,000
Tank Material:
Steel
Steel
Steel
Tank Manufacturer:
Unknown
Unknown
Unknown
Product Stored:
87
91
Diesel
Wait time between applying
pressure /vacuum /water and
starting test:
5 min.
5 min.
5 min.
Test Start Time:
10:00 am
10:00 am
10:00 am
Initial Reading (RI):
-10.00 hg
-10.00 hg
-10.00 hg
Test End Time:
11:00 am
11:00 am
11:00 am
Final Reading (RF):
-10.00 hg
-10.00 hg
-10.00 hg
Test Duration:
1 hour
1 hour
1 hour
Change in Reading (RF -RI):
0.00 hg
0.00 hg
0.00 hg
Pass/Fail Threshold or Criteria:
0.00 hg
0.00 hg
0.00 hg
Test Result:
❑ Pass ❑ Fail
Q Pass ❑ Fail
❑ Pass ❑ Fail
❑ Pass ❑ Fail
Was sensor removed for testing?
E] Yes ❑No DNA
DYes ❑No DNA
E]Yes ❑No DNA
❑Yes ❑No DNA
Was sensor properly replaced an d'
verified functional after testin ?
0 Yes ❑ No ❑ NA
[]Yes ❑ No DNA
Yes ❑No ❑NA
❑Yes ❑No DNA
Comments — (include information on repairs made prior to testing, and recommended follow -up for failed tests)
Replaced all 3 annular sensors with Veeder -Root 420 sensors.
' Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary
containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment
testing. {California Code of Regulations, Title 23, Section 2637(a)(6)}
SWRCB, January 2002 Page 3 of 6
5. SECONDARY PIPE TESTING
Test Method Developed By:
❑ Piping Manufacturer E] Industry Standard ❑ Professional Engineer
❑ Other (Spec)
Test Method Used:
0 Pressure
❑ Vacuum
❑ Hydrostatic
❑ Other (Spec)
Test Equipment Used: Calibrated Gauges
Equipment Resolution: 0.0625"
Piping Run # 87
Piping Run # 91
Piping Run # DSL
Piping Run # VR
Piping Material:
Fiberglass
Fiberglass
Fiberglass
Fiberglass
Piping Manufacturer:
Smith
Smith
Smith
Smith
Piping Diameter:
3.00"
3.00"
3.00"
4.00"
Length of Piping Run:
100.00'
100.00'
100.00'
100.00'
Product Stored:
87
91
Diesel
Gasoline Vapor
Method and location of
Boot in STP
Boot in STP
Boot in STP
Boot in STP
piping-run isolation:
Wait time between applying
pressure /vacuum /water and
5 min.
5 min.
5 min.
5 Min.
starting test:
Test Start Time:
10:00 am
10:00 am
10:00 am
10:00 am
Initial Reading (RI):
5.00 PSI
5.00 PSI
5.00 PSI
5.00 PSI
Test End Time:
11:00 am
11:00 am
11:00 am
11:00 am
Final Reading (RF):
0.00 PSI
0.00 PSI
0.00 PSI
0.00 PSI
Test Duration:
1 hour
1 hour
1 hour
1 hour
Change in Reading (RF -RI):
5.00 PSI
5.00 PSI
5.00 PSI
5.00 PSI
Pass/Fail Threshold or
0.00 PSI
0.00 PSI
0.00 PSI
0.00 PSI
Criteria:
Test Result:
❑- Pass ❑ Fail
❑ Pass ❑ Fail
❑ Pass - ❑ Fail
❑ Pass El Fail
Comments — (include information on repairs made prior to testing, and recommended follow -up for failed tests)
Replaced bad test boot on 87 product secondary. 2.4" x 3.5" Icon split repair test boot.
SWRCB, January 2002 Page 4 of 6
6. PIPING SUMP TE STING
Test Method Developed By: ❑ Sump Manufacturer D Industry Standard ❑ Professional Engineer
❑ Other (Spec)
Test Method Used: ❑ Pressure ❑ Vacuum D Hydrostatic
❑ Other (Spec)
Test Equipment Used: TS -STS
Equipment Resolution:
Sump # 87
Sump # 91
Sump # DSL
Sump #
Sump Diameter:
37.00"
37.00"
37.00"
Sump Depth:
64.00"
64.00"
64.00"
Sump Material:
Fiberglass
Fiberglass
Fiberglass
Height from Tank Top to Top of
Highest Piping Penetration:
12.00"
12.00"
12.00"
Height from Tank Top to Lowest
Electrical Penetration:
36.00"
36.00"
36.00"
Condition of sump prior to testing:
Clean
Clean
Clean
Portion of Sump Tested'
A.P.P.
A.P.P.
A.P.P.
Does turbine shut down when
sump sensor detects liquid (both
product and water)? *
❑ Yes 0 N DNA
❑Yes ❑No DNA
❑Yes ❑No DNA
❑Yes ❑No ❑NA
Turbine shutdown response time
N/A
N/A
N/A
Is system programmed for fail -safe
shutdown ?*
❑'Yes ❑No DNA
❑Yes ❑No DNA
❑Yes [I No 0 N
❑Yes ❑No ❑NA
Was fail -safe verified to be
o erational?*
❑ Yes ❑ No 0 NA
❑ Yes ❑ No 0 NA
❑ Yes ❑ No El NA
❑ Yes ❑ No ❑ NA
Wait time between applying
pressure /vacuum/water and starting
test:
Test Start Time:
Initial Reading (RI):
SEE INCON RESULTS
Test End Time:
Final Reading (RF):
Test Duration:
Change in Reading (RF -RI):
Pass/Fail Threshold or Criteria:
Test Results
[] Pass ' ❑ Fail '
D Pass - ❑ Fail
0 Pass ❑ Fail
❑ Pass ❑ Fail
Was sensor removed for testing?
D Yes ❑No ❑NA
QYes ❑No ❑NA
DYes ❑No ❑NA
❑Yes 0 N 0 N
Was sensor properly replaced and
verified functional after testin ?
� Yes ❑ No ❑ NA
DYes []No ❑ NA
B Yes ❑ No ❑ NA
❑Yes ❑ No ❑ NA
Comments — (include information on repairs made prior to testing, and recommended follow -up for failed tests)
' If the entire depth of the sump is not tested, specify how much was tested. If the answer to My of the questions indicated with an
asterisk ( *) is "NO" or "NA ", the entire sump must be tested. (See SWRCB LG -160)
SWRCB, January 2002
Page 5
of 6
7. UNDER- DISPENSER CONTAINMENT DC TESTING
Test Method Developed By:
❑ UDC Manufacturer
® Industry Standard ❑ Professional Engineer
❑ Other (Spec)
Test Method Used:
❑ Pressure
❑ Vacuum
❑ Hydrostatic
❑ Other (Spec)
Test Equipment Used: TS -STS
Equipment Resolution: 0.002"
UDC # 1 -2
UDC # 3 -4
UDC # 5 -6
UDC #
7 -8
UDC Manufacturer:
Bravo
Bravo
Bravo
Bravo
UDC Material:
Steel
Steel
Steel
Steel
UDC Depth:
4.00"
4.00"
4.00"
4.00"
Height from UDC Bottom to Top
N/A
N/A
N/A
N/A
of Highest Piping Penetration:
Height from UDC Bottom to
N/A
N/A
N/A
N/A
Lowest Electrical Penetration:
Condition of UDC prior to
Clean
Clean
Clean
Clean
testing:
Portion of UDC Tested'
A.P.P.
A.P.P.
A.P.P.
A.P.P.
Does turbine shut down when
UDC sensor detects liquid (both
❑ Yes 0 N El NA
❑Yes ❑No E]NA
❑Yes ❑No EINA
❑Yes
❑No
EINA
product and water)?*
Turbine shutdown response time
N/A
N/A
N/A
N/A
Is system programmed for fail-
safe shutdown?
❑ yes 0 N El NA
❑Yes ❑No EINA
❑Yes ❑No EINA
❑Yes
❑No
EINA
Was fail -safe verified to be
operational?*
❑ Yes 0 N El NA
❑Yes []No EINA
❑Yes ONO EINA
❑Yes
❑No
EINA
Wait time between applying
pressure /vacuum /water and
5 Min.
5 Min.
5 Min.
5 Min.
starting test
Test Start Time:
Initial Reading RI):
Test End Time:
NCON
RESULTS
Final Reading (RF):
Test Duration:
Change in Readin (RF -RI):
Pass/Fail Threshold or Criteria:
Test Result:
❑ Pass 0 Fail
❑ Pass 0 Fail
❑ Pass E Fail
❑: Pass [) Fail
Was sensor removed for testing?
❑ Yes ❑No EINA
❑Yes ❑No ETNA
❑Yes ❑No EINA
❑Yes
❑No
ONA
Was sensor properly replaced and
❑ Yes ❑No EINA
❑Yes ❑No EINA
❑Yes ❑No EINA
❑Yes
❑No
EINA
verified functional after testing?
Comments — (include information on repairs made prior to testing, and recommended follow -up for failed tests)
Visual fail on all 4 dispenser pans. Suspected bad penetrations.
' If the entire depth of the UDC is not tested, specify how much was tested. If the answer to a_y of the questions indicated with an
asterisk ( *) is "NO" or "NA ", the entire UDC must be tested. (See SWRCB LG -160)
SWRCB, January 2002
Page 6 of 6
9. SPILL /OVERFILL CONTAINMENT BOXES
Facility is Not Equipped With Spill /Overfill Containment Boxes ❑
Spill /Overfill Containment Boxes are Present, but were Not Tested ❑
Test Method Developed By:
❑ Spill Bucket Manufacturer E] Industry Standard ❑ Professional Engineer
❑ Other (Spec)
Test Method Used:
❑ Pressure ❑ Vacuum Hydrostatic
❑ Other (Spec)
Test Equipment Used: lake Test
I Equipment Resolution: 0.00"
Spill Box # 87 F
Spill Box # 91 F
Spill Box # DSl F
Spill Box # 87 V
Bucket Diameter:
12.00"
12.00"
12.00"
12.00"
Bucket Depth:
12.00"
12.00"
12.00"
12.00"
Wait time between applying
pressure /vacuum /water and
5 min.
5 min.
5 min.
5 min.
starting test:
Test Start Time:
11:30 am
11:30 am
11:30 am
11:30 am
Initial Reading (Rj):
11.00"
11.00"
11.00"
11.00"
Test End Time:
12:30 pm
12:30 pm
12:30 pm
12:30 pm
Final Reading (RF):
11.00"
11.00"
11.00"
11.00"
Test Duration:
1 Hour
1 Hour
1 Hour
1 Hour
Change in Reading (RF -RI):
0.001,
0.001,
0.001,
0.001,
Pass/Fail Threshold or
0.00"
0.00"
0.00"
0.00"
Criteria:
Test Res ult:
Pass ❑ Fail
0 Pass ❑ Fail
D Pass ❑ Fail
E Pass ' ❑ Fail
Comments — (include information on repairs made prior to testing, and recommended follow -up for failed tests)
SWRCB, January 2002
9. SPILL /OVERFILL CONTAINMENT BOXES
Page 6 of 6
Facility is Not Equipped With Spill /Overfill Containment Boxes ❑
Spill /Overfill Containment Boxes are Present, but were Not Tested [I
Test Method Developed By: ❑ Spill Bucket Manufacturer E] Industry Standard ❑ Professional Engineer
❑ Other (Spec)
Test Method Used: ❑ Pressure ❑ Vacuum El Hydrostatic
❑ Other (Spec)
Test Equipment Used: Lake Test
Equipment Resolution: 0.00"
Spill Box # 87 v
Spill Box #
Spill Box #
Spill Box #
Bucket Diameter:
12.00"
Bucket Depth:
12.00"
Wait time between applying
pressure /vacuum /water and
5 min.
starting test:
Test Start Time:
11:30 am
Initial Reading (Rj):
11.00"
Test End Time:
12:30 pm
Final Reading (RF):
11.00"
Test Duration:
1 Hour
Change in Reading (RF -R,):
0.00"
Pass/Fail Threshold or
0.001,
Criteria:
Test Res ult:
El Pass ❑ Fail
0 Pass ❑ Fail
❑ Pass ❑ Fail
❑ Pass ❑ Fail
Comments — (include information on repairs made prior to testing, and recommended follow -up for failed tests)
WHITE LANE CHEVRON
2525 WHITE LANE
BAKERSEIELD CA 93304
09/24/2015 11 :52 AM
SUMP LEAK TEST REPORT
87 STP
TEST STARTED 11 :36 AM
TEST STARTED 09/24/2015
BEGIN LEVEL 2,7398 IN
END TIME 11:51 AM
END DATE 09/24/2015
END LEVEL 2,7402 IN
LEAK THRESHOLD 0,002 IN
TEST RESULT PASSED
91 STP
TEST STARTED 11:36 AM
TEST STARTED 09/24/2015
BEGIN LEVEL 4,7722 IN
END TIME 11:51 AM
END DATE 09/24/2015
END".LEVEL 4, 7721 IN
LEAK THRESHOLD 0,002 IN
TEST RESULT PASSED
DSL STP
TEST STARTED 11:36 AM
TEST STARTED 09/24/2015
BEGIN LEVEL 5,0684 IN
END TIME 11:51 AM
END DATE 09/24/2015
END LEVEL 5.0685 IN
LEAK THRESHOLD 0,002 IN
TEST RESULT PASSED
WHITE LANE CHEVRON
2525 WHITE LANE
BAKERSEIELD CA 93304
t
G
t
09/24/2015 12:11 PM
SUMP LEAK TEST REPORT
3
i
87 STP
TEST STARTED 11 :56 AM
TEST STARTED 09/24/2015
BEGIN LEVEL 2,7400 IN
END TIME 12:11 PM
END DATE 09/24/2015
END LEVEL 2.7397 IN
LEAK THRESHOLD 0,002 IN
TEST RESULT PASSED
91 STP
TEST STARTED 11:56 AM
TEST STARTED 09/24/2015
BEGIN LEVEL 4,7720 IN
END TIME 12 :11 PM
END DATE 09/24/2015
END LEVEL 4.7719 IN
LEAK THRESHOLD 0,002 IN
TEST RESULT PASSED
DSL STP
TEST STARTED 11 :56 AM
TEST STARTED 09/24/2015
BEGIN LEVEL 5,0688 IN
END TIME 12 :11 PM
END DATE 09/24/2015
i END LEVEL 510686 IN
j LEAK THRESHOLD 0,002 IN
TEST RESULT PASSED