Loading...
HomeMy WebLinkAboutAST INSP 9-2013K- 7 �- FIRC� .. .................... .. /tRl? ? UNIFIED PROGRAM INSPECTION CHECKL T; Aboveground Petroleum Storage Tank Progra BAKERSFIELD FIRE DEPT. P reyrnt1-d Services 2101 H Street s Bakersfield, CA 93301'' Tel.: (661) 326 -397 Fax: (661) 852 -21171 , Yh FACILITY NAME f' r, INSPEC IO N DATE .� INSPECTION TIME ADDRESS 9-A PHONE NO. 0 NO OF EMPLOYEES FACILITY CONTACT BUSINESS ID NUMBER CONSENT TO INSPECT NAME /TITLE SFCTlnN I- Racnrric Rpvipw, Calitnrnla HP_alth & NatAty Cotle, Z5Z /D DESCRIPTION Y N N/A COMMENTS Prepare an SPCC plan [CFR 112.3] Ix X Review or amend SPCC plan [CFR 112.5 (a)(d)] SPCC plan available on site CFR 112.3(e)] Conduct. inspections and test in accordance, with written. procedures [CFR 112.7(e)] - Maintain records of inspections, tests arid%W rocedures [CFR 112.7(e)] D ., 0 ge ,R Records of inspections or tests signed by inspector [CFR 112.7(e)] 1 , " SECTION 2: SPCC Plan Elements: California Health & Safety Code; 25270.4.5, Z527U.'IZ DESCRIPTION Y N N/A COMMENTS Self- certification for Tier I or II facility [112.6(x)('1 ,(b)(1) Ix X Professional engineer certification [CFR 112.3(d) and 112.6(b) 4 Documentation of 5 year review and evaluation of SPCC plan, [CFR 112.5(b)] Amendments required within 6 months of changes/certifications CFR 112.5(a) and 112.6(a)(2), (b)(4) Management authorization of resource commitment to implement the SPCC [CFR 112.7 & 112.6(a)] Diagram with location and contents of containers, transfer stations, connecting piping [I 12.7(a)(3)] D ., 0 ge ,R Type of oil and storage capacity for each container CFR 112.7(x)(3) he <51 A Discharge prevention measures and procedures for routine handling {CFR 112.7(a) (3) Countermeasures for discovery, response and clean-up [CFR112.7(a)(3)] Required contact list and phone numbers [CFR 112.7(a)(3)], CFrTIC1N -4• (-Zonoral CP['(= Withr Ulramonm" (:mimrnla Hpairn & -NaTP_TV UnC1P__ ZnZ1U_4.n_ ZnZ1U_n_ ZnZ /U_"IZ DESCRIPTION Y N N/A COMMENTS Provide corrosion protection [CFR 112.8(c)(4)(5), (d)(1)] Ix X Containers compatible with materials stored CFR 112.8(c)(1)] Implement SPCC plan review changes or amendments within 6 months CFR 112.5(a)(d)] Prepare an oil contingency plan or written control /removal commitments [CFR 112.7(d)] CF�'_Tlf1N A- GP['_f_ Plan Trnininn Califnrnia Health P. Safety Code- 25270.4.5 DESCRIPTION Y N N/A COMMENTS Training program CFR 112.7(f) Ix Train personnel in operation and maintenance of equipment [CFR 112.7(f) Conduct annuals ill prevention briefings [CFR 112.7(f)(3)] SECTION 5: Facility Inspection: California Health & Sreet Code; Z5Z7U.4.5 DESCRIPTION - Y N N/A COMMENTS Meet provisions of conditional exemption [H &S 25270.4.5(b)] Facility security adequate [CFR 112.7(g)] Clean-up materials readily available CFR 112.7 (c)s Overfill protection procedures or devices in place and operative CFR 112.8(c)(8)] Portable /mobile containers positioned to prevent discharge [CFR 112.8(c )(11) Loading / unloading rack drains into containment area CFR 112.7(h) Provide appropriate containment /diversionary structures to prevent discharge [CFR 112.8(a), 112.7(c)] Secondary containment adequate to contain capacity of largest container + precipitation CFR 112.8(c) Remove accumulation of oil in secondary containment CFR 112.8(c)(10) Secondary containment valve(s) closed [CFR 112.8] % Implement SPCC plan elements [CFR 112.3] ANY HAZARDOUS WASTE ON SITE? ❑ YES ❑ NO Si nafareofRecei t Explain: POST INSPECTION INSTRUCTIONS: • Refer to the back of this inspection report for regulatory citations and corrective actions r.'! • Correct the violation(s) noted above by )0/1 '?//:1 Signature (that all violation have been corrected as noted) • Within 5 days of correcting all of the violations, sign and return a copy of this page to: Bakersfield Fire Dept., Prevention Services, 2101 H Street, California 93301 ! ,/ Date White - Business Copy Yellow - Business Copy to be Sent in after return to Compliance Pink - Prevention Services Copy F132156b (Rev 9/10)