Loading...
HomeMy WebLinkAboutAST INSP 9-2013r UNIFIED PROGRAM INSPECTION CHECKLIST WMININNUMEM Aboveground Petroleum Storage Tank r ram FACILITY NAME , `" 1 INSPECTION DATE i INSPECTION TIME ADDRESS Prepare an SPCC plan CFR 112.3] PHbAE NO. NO OF EMPLOYEES FACILITY CONTACT BUSINESS ID NUMBER CONSENT TO INSPECT NAME /TITLE SFCTIMI 1' Rpcnrric Review' Calitornia Health & Satety Code, 25270 DESCRIPTION Y N N/A COMMENTS Prepare an SPCC plan CFR 112.3] - Review or amend SPCC plan [CFR 112.5 (a)(d)] y SPCC plan available on site [CFR 112.3(e) A- h Conduct inspections and test in accordance with written procedures [CFR 112.7(e)] AA4,,-tkj,, Maintain records of inspections, tests and/or procedures [CFR 112.7(e) Records of inspections or tests signed by inspector [CFR 112.7(e)] IX , nr. SF MIM 2' SPCC Plan Elements: Calitornia Health & Satety Code: Z5ZTU.4.5. Z5Z <U.11 DESCRIPTION Y N N/A COMMENTS Self- certification for Tier I or 11 facility 112.6(a )(1),(b)(1)] - Professional engineer certification [CFR 112.3(d) and 11 2.6(b)(4) y Documentation of 5 year review and evaluation of SPCC plan [CFR 112.5(b)] h Amendments required within 6 months of changes/certifications [CFR 112.5(a) and 112.6(a)(2), (b)(4)] Management authorization of resource commitment to implement the SPCC [CFR 112.7 & 112.6(a) ] Diagram �,ith location and contents of containers, transfer stations, connecting piping [112.7(a)(3)]..,, , nr. T e of oil and storage capacity for each container CFR 112.7(a)(3)]a Discharge prevention measures and procedures for routine handling CFR 112.7(a)(3) 1 ell Countermeasures for discovery, response and clean-up [CFR112.7(a)(3)] Required contact list and phone.numbers [CFR 112.7(a)(3)] ' ' CFf'TI(7N q• ronornI CPI- -'- Wanmrampntc' t :;mtnrnm mp_airn & NarP_ry UnCIP_' ZCfZ /U_4.5_ ZnZ /U_5_ ZnZ /U_ 'IZ DESCRIPTION Y N N/A COMMENTS Provide corrosion protection [CFR 112.8(c)(4)(5), (d)(1)] - Containers compatible with materials stored [CFR 112.8(c)(1)] y Implement SPCC plan review changes or amendments within 6 months CFR 112.5(a)(d)] S. x Prepare an oil contingency plan or written control /removal commitments [CFR 112.7(d)] !@Fr-TIC1N d• GPC('_ Plan Trnininn• C:alifnrnia Health X SatP_tV Cndp_' Z5Z1U_4.5 i FW '',w' ,,3V � 1,�- - e DESCRIPTION Y N N/A m... COMMENTS Training program [CFR 112.7(f)] - Train personnel in operation and maintenance of equipment [CFR 112.7(f) a Conduct annuals ill prevention briefings [CFR 112.7(f)(3)] SFf- T11.7N -• Far_ility Incnpntenn, cantnrnia Healtn & 52tetV Code: ZbZIU.4.9 DESCRIPTION Y N N/A COMMENTS Meet provisions of conditional exemption [H &S 25270.4.5(b)] - Facility security adequate CFR 112.7(g)] a Clean-up materials readily available CFR 112.7(c)] Overfill protection procedures.or devices in place and operative [CFR 112.8(c)(8) Portable /mobile containers positioned to prevent discharge CFR 112.8(c)(11 Loading / unloading rack drains into containment area CFR 112.7(h) Provide appropriate containment /diversionary structures to prevent discharge [CFR 112.8(a), 112.7(c) Secondary containment adequate to contain capacity of largest container + precipitation CFR 112.8(c)] 1 ell Remove accumulation of oil in secondary containment [CFR 112.8(c)(10)]� Secondary containment valve(s) closed [CFR 112.8] ' Implement SPCC plan elements CFR 112.3] ANY HAZARDOUS WASTE ON SITE? ❑ YES 14 NO jSignatureoffteoi t Explain: POST INSPECTION INSTRUCTIONS: • Refer to the back of this inspection report for re latory citations and corrective actions • Correct the violation(s) noted above by l • Within 5 days of correcting all of the violations, sign and retur• A a copy of this page to: Bakersfield Fire Dept., Prevention Services, 2101 H Street, California 93301 Date Pink - Prevention Services Copy White - Business Copy Yellow - Business Copy to be Sent in after return to Compliance Signature (that all violations have been corrected as noted) Y FD2156b (Rev 9/10)