HomeMy WebLinkAboutAST 9-2013BAKERSFIELD FIRE DEPT.:
.....
L Services
P 1�.Prevention
.....
FIRE
Mr 2101 H Street
A Mr T
Bakersfield, CA 933.01
UNIFIED PROGRAM INSPECTION CHECKLIST Tel.: (661) 326-3979
Fax: (661) 8.52-2171
.Abovegroun. d: :Petroleum St orage Tank, rogran
ti
fi FACILITY NAME ; X0"1 INSPECTION DATE, INSPECTION rTIME
.:r.
Q\:A
3,
NE -NO. - N -6
: 'E.
P OF. EMPLOYEES
ADDRE S
C'
U NUMBER
BUSINESS ID NU:�
FACILITY CONTACT
COPtSENT TO INSP
E T NAME /TITLE
IZ-) A A,77 4f 5�
10_ U.4p MOrl
SECTION 1: ecords Review: California Health & Safety Code; 25270
DESCRIPTION
Y
N
N/A
COMMENTS
Prepare an SPCC plan [CFR 112.3]
X
x
Review or amend SPCC plan [CFR 112.5 (a)(d)]
V
F
SPCC plan available on site [CFR 112.3(e)]
X
Conduct inspections and test in accordance with written procedures [CFR 112.7(e)
>0
M-aintairrrecordsof ins pe..ctions: ;-test-s
Records of inspections or tests signed by inspector -CFR 112.7(e)]
frc� T a, S?C' 'A�/ "p, �e
_RFr�TICIM 7• -gP(-.f-- Plan Flampnt--ft, 1-.ahtnrnia Health & satp-tv uncip, Z5ZfU_4_5_ ZbZIU.IZ
DESCRIPTION
Y
N
N/A
COMMENTS
Self-certification for Tier I or 11 facility [112.6 a)(1),(b)(1)]
X
x
Professional eggineer certification [CFRl 12.3(d) and 112.6(b)(4)]
V
F
Documentation of 5 year review and evaluation of SPCC plan [CFR 112.5 (b)]
X
Amendments required within 6 months of changes/certifications [CFR 112.5(a) and 112.6(a)(2), (b)(4)]
>0
Management authorization of resource commitment to implement the SPCC [CFR 112.7 & 112.6(a)]
Diagram with Iodation and contents of containers, transfer stations, connecting piping [I 12.7(a)(3)]
of oil and storage capacitylor each container [CFR 112.7(d)(3)]
-Type
Discharge prevention, measures and 'procedures for routine handling, f CFR 1127(a)(3)]
Countermeasures for.discoyery,,resp nse and dleanm-up,[CFRlJ.2.7(a)Q)1
I .and, 'ph one, nunibers:�[CFR-112.7(a)(3)]
irqd contact ist
25270.4.5, -25270.:5;.25270:12
heral SPCC' Safbty* Gode,
CECTION'
Kequirements:, California CallfothiA, Health &
DESCRIPTION
Y
N.'
N/A
COMMENTS
Provide co"tros-1-on'pioiection [CFR 112.8(c)(4)(5), (d)(1)]
X
x
Containers compatible.withmaterials stored [CFR 112.8(c)(1)]
F
Implement SPCC plan review changes or amendments within 6 months [CFR 112.5(d)(d)].
X
Prepare an oil contingency plan or written- control /removal commitments [CFR 112.7(d)]
SECTION 4: SPCC Plan Training: California Health & Safety Code; 25270.4`:5
DESCRIPTION
Y
N
N/A
COMMENTS
Training program [CFR 112.7(f)]
X
x
Train personnel in operation and maintenance of equipment [CFR 112.7(f)]
F
Conduct annual spill prevention briefings [CFR 112.7(f)(3)]. -
X
-Qg=r-TlrlM 5• 'Facility Incnchftinn, U.n1itnrnia Health & _SatATV Unria' ZhZfU-4-5
DESCRIPTION
Y
N
N/A
COMMENTS
Meet provisions of conditional exemption [H&S 25270.4.5(b)]
x
"Facitfty-'s&6utity -ti-de- untie' - CFR-112: {7-r° )_ ...
Clean-up materials readily available [CFR 112.7(c)]
Overfill protection procedures or devices in place and operative [CFR 112.8(c)(8)]
Portable/mobile containers positioned to prevent discharge [CFR 112.8(c)(11)
Loading / unloading rack drains into containment area [CFR 112.7(h)]
Provide appropriate containment /diversionary structures to prevent discharge [CFR 112.8(a), I 12.7(c)]
Secondary containment adequate to contain capacity of largest container+ precipitation [CFR 112.8(c)]
accumulation of oil in secondary containment [CFR 112.8(c)(10)]
-Remove
Secondary containment valve(s) closed _[CFR 112.8]
Implement SPCC plan elements [CFR 112.3]
ANY H.AZARDOUS'VVASTE ON SITE? AYES D:Np Signatui6 of Receivt
Explain:
POSYINSPECTIONINSTRUCTIONSc
• Refer p �ator,
to the back of this, inspection report f 'Irr7 I citations and corrective
Correct the violation(s) noted above by G 6 Signore th
Within 5 days ofcorrecting all of the violations, sign and return a copy of this pdge to:
Bakersfield Fire Dept., Prevention. Services, 2101 H Street, California 93301
Date
White - Business Copy Yellow - Business Copy to be Sent in after return to Compliance Pink - Prevention Services Copy
LA
FACILITY NAME p
•'?n `W 4 `
3 t a V
INSPECIpTON DATE
M
�
PfgNE NO. r,
uJ5
NO OF EMPLOYEES
BAKERSFIELD FIRE DEPT.
BUSINESS ID NUMBER
CONS NT TO INS°RECT NAME /TITLE
13 : E R' S...._F ..1. f
..;�) Prevention Services
FARE
R
2101 H Street
SPCC plan available on site [CFR 112.3 (e)]
'
Bakersfield, CA 93301.
UNIFIED
PROGRAM INSPECTION CHECKLIST
Tel.: (661) 326 -3979
Maintain records of inspections, tests and/or procedures [CFR 112.7(e)]
Fax: (661) 852 -2171
Aboveground
Petroleum Storage Tank Program
Records of inspections or tests signed by inspector [CFR 112.7(e)]
FACILITY NAME p
•'?n `W 4 `
3 t a V
INSPECIpTON DATE
INSPECTION TIME
ADDRESS a -
PfgNE NO. r,
uJ5
NO OF EMPLOYEES
FACILITY CONTACT
BUSINESS ID NUMBER
CONS NT TO INS°RECT NAME /TITLE
SECTION 1: Records Review: Calitornia Health & batety Code; 15Z1U
DESCRIPTION
Y
N
N/A
COMMENTS
Prepare an SPCC plan [CFR 112.3]
'
Review or amend SPCC plan [CFR 112.5 (a)(d)]
Aj 0 -�
SPCC plan available on site [CFR 112.3 (e)]
'
Conduct inspections and test in accordance with written procedures [CFR I I2.7(e)]
Maintain records of inspections, tests and/or procedures [CFR 112.7(e)]
Records of inspections or tests signed by inspector [CFR 112.7(e)]
-RFf*TlON 7- SP['C: Plan File-q, Cantnrnla HP_alth & 5atetV c:ene' ZbZfU.4.5. LSLLU.1Z .
DESCRIPTION
Y
N
N/A
COMMENTS
Self - certification for Tier I or H facility 112.6(a )(1),(b)(1)]
'
Professional engineer certification [CFR112.3 d an d 112.6(b)(4)]
Aj 0 -�
Documentation of 5 year review and evaluation of SPCC plan [CFR 112.5(b)
'
Amendments required within 6 months of changes/certifications [CFR 112.5(a) and 112.6(a)(2), (b)(4)
Management authorization of resource commitment to im lement the SPCC CFR 112.7 & 112.6(a)]
Diagram with location and contents of containers, transfer stations, connecting piping [112.7(a)(3)
Type of oil and storage ca acity for each container [CFR 112.7(a)(3)
Dischar e revention measures and procedures for routine handling CFR 112.7(a)(3)]
Countermeasures for discovery, response and clean-up [CFR112.7(a)(3)]
Required contact list and hone numbers [CFR 112.7(a (3)]
yA
crlr�TlnK1 'z f3onnr�l CDf'f` Ranidramante- f'.alifnrnin 1- lekalth R Anfatu Cnrlp- 2527(1' d_ 5_ 2527(1.5. 25270.12
DESCRIPTION
Y
N
N/A
COMMENTS
Provide corrosion protection [CFR 112.8(c)(4)(5), (d)(1)
'
Containers compatible with materials stored [CFR 112.8 (c)(1)]
Aj 0 -�
Implement SPCC plan review changes or amendments within 6 months [CFR 112.5(a)(d)]
'
Prepare an oil contingency plan or written control /removal commitments [CFR 112.7(d)]
CP1`TIr1PJ A- CPrf` Plan Trnininri• C'alitnrniA HaAltn Y. SATATV (:nflP__
DESCRIPTION
Y
.N
N/A
COMMENTS
Training program [CFR 112.7(]
'
Train personnel in operation and maintenance of equipment [CFR 112.7(f)]
Aj 0 -�
Conduct annual s ill revention briefings [CFR 112.7(f)(3)]
c�frTlnN �- �arility incnarrtinn- Califnrnia Health � Safety Code' 25270.4.5
DESCRIPTION
YJ
N
N/A
COMMENTS
Meet provisions of conditional exemption [H &S 25270.4.5(b)]
Facility security adequate [CFR 112.7(g)]
Clean-up materials readily available CFR 112.7(c)
Overfill protection procedures or devices in place and operative [CFR 112.8(c)(8)]
Portable /mobile containers positioned to prevent, discharge [CFR 112.8(c)(11)
Loading / unloading rack drains into containment area CFR 112.7(h
Provide appropriate containment /diversionary structures to prevent discharge [CFR 112.8(a), 112.7(c)]
Secondary containment adequate to contain capacity of largest container + precipitation [CFR 112.8(c)
Remove accumulation of oil in secondary containment [CFR 112.8(c)(10)
Secondary containment valve(s) closed [CFR 112.8]
yA
Implement SPCC plan elements [CFR 112.3]
'
IY HAZARDOUS WASTE ON SITE? PIYES ❑ NO ISignature ofReceipt
plain:
CST Vt TC"V d"rVVd% T TXTCwTriTTd"rVTd -%TT0. -
A V1.7A All QP1 L'li A AVl\ All AA \V< X-I-
• Refer to the back of this inspection report for regulatory citations and corrective actions
• Correct the violation(s) noted above by l c.
• Within 5 days of correcting all of the violations, sign and return a copy of this page. to:
Bakersfield Fire Dept., Prevention Services, 2101 H Street, California 93301
Signature (that all violations have been corrected as noted)
Date
White - Business Copy Yellow - Business Copy to be Sent in after return to Compliance Pink - Prevention Services Copy FD2156b (Rev 9/16)