Loading...
HomeMy WebLinkAbout1.7-6758 Ph 2GRADING NOTES: ROAD 1. ALL GRADING SHALL CONFORM TO THE CITY OF BAKERSFIELD ORDINANCES 29. CL CENTERLINE AND STANDARDS PERTAINING THERETO (2013 CALIFORNIA BUILDING CODE, ELEV ELEVATION GB GRADE BREAK APPENDIX J) AND SHALL BE SUPERVISED AS ENGINEERED GRADING IN XFL EXIST. FLOWLINE EVC END VERTICAL CURVE ACCORDANCE WIN CITY OF BAKERSFIELD ORDINANCES. PROPOSED PAD ELEV. 2. ALL GRADING SHALL CONFORM TO THE RECOMMENDATIONS CONTAINED EXIST. TOP OF CURB ELEV. IN, AND MADE A PART HEREOF, THE PRELIMINARY SOILS REPORT EXIST. GUTTER FLOWLINE ELEV. :aa 7a -U PREPARED BY SOILS ENGINEERING, INC., FILE NO. 04 -10923 DATED O. Jl5X DIRECTION AND PERCENT OF OCTOBER 21, 2004, (UPDATED FEBRUARY 2005) AND ALL ADDENDUMS 30. ix THERETO. IN CASE OF A CONFLICT BETWEEN 77-IE PLANS AND SPECIFICAT7ONS, EXIST. FLOWLINE THE MORE STRINGENT REQUIREMENTS WILL TAKE PRECEDENCE. CENTERLINE OF STREET J. THE DESIGN ENGINEER SHALL EXERCISE SUFFICIENT SUPERVISORY - - - - - - - - -- PAD COMPACTION LIMITS CONTROL DURING GRADING AND CONSTRUCTION TO INSURE COMPLIANCE FUTURE FLOWLINE - - - p WITH THE PLANS, SPECIFICATIONS AND CODE WITHIN HIS PURVIEW. ~ TYPE "A" CATCH BASIN Z 31. 4. 7HE SOIL ENGINEER, DESIGN ENGINEER, AND BUILDING OFFICIAL EXIST. STORM DRAIN SHALL BE NOTIFIED 48 HOURS PRIOR TO PLACING ANY MATERIAL. FUTURE STORM DRAIN 5. THE GRADING CONTRACTOR SHALL CONTACT ALL COMPANIES WITH ® CONSTRUCTION NOTES UNDERGROUND FACILITIES PRIOR TO BEGINNING CONSTRUCTION AND Q 44W-UTILITY: S -SEWER VERIFY THE LOCATION AND DEPTH OF ALL UNDERGROUND FACILITIES, D -DRAIN m INCLUDING TELEPHONE, ELECTRIC, WATER, SEWER, OIL AND GAS H 2 LINES. 7HE ENGINEER ASSUMES NO RESPONSIBILITY FOR BURIED 32• Q LINES NOT INDICATED ON THE PLAN OR FOR INFORMATION OBTAINED FROM OUTSIDE SOURCES (USA 1 -800- 227 -2600) 6. 7HE GRADING CONTRACTOR SHALL BE RESPONSIBLE FOR GRADING ALL AREAS TO + OR - 0.10 FOOT. IF AN AREA SHOULD BE FOUND TO BE MORE THAN 0.10 FOOT OUT OF LEVEL AFTER COMPAC77NG AND 33 ACCEPTANCE OF GRADING, THE CONTRACTOR SHALL RETURN AND CORRECT THE GRADING AT NO COST TO THE OWNER. 7 THE GRADING CONTRACTOR SHALL WATER AS REQUIRED DURING THE GRADING OPERATIONS TO PREVENT 7HE OCCURRENCE OF A DUST NUISANCE AND SHALL PR07ECT CURBS AND OTHER OBJECTS WHICH ARE TO REMAIN. 8. EXCA VA 77ON - EXCA VA 77ON SHALL CONSIST OF ALL EXCA VA 77ON INVOLVED IN GRADING THE PROJECT AS SHOWN ON 7HE PLANS, EXCEPT ANY EXCA VA 77ON SEPARATELY DESIGNATED AND PAID FOR AS A SEPARATF ITEM. 9. EMBANKMENTS - EMBANKMENT CONSTRUCTION SHALL CONSIST OF CONSTRUCTING LOT EMBANKMENTS INCLUDING THE PREPARATION OF AREAS FOR WHICH THEY ARE TO BE PLACED, 77-IE CONSTRUCTION OF DIKES WITHIN OR OUTSIDE THE CONSTRUCTION AREA, THE PLACING AND COMPACTING OF APPROVED MATERIAL WITHIN THE CONSTRUCTION AREA WHERE UNSUITABLE MATERIAL HAS BEEN REMOVED, AND 77-IE PLACING AND COMPAC77NG OF EMBANKMENT MATERIAL IN HOLES, FOR 7HE CONSTRUCTION EMBANKMENTS PREPARING SUB -GRADE AT THE GRADING PLANE, CONFORMING TO THE GRADE TOLERANCE, DOING NECESSARY PLOWING OR BENCHING, IMPOR77NG OR BORROW, PLACING AND COMPACTING MATERIAL TO THE LINE AND GRADES SHOWN ON THE PLANS AND AS DIRECTED BY 77-IE ENGINEER SHALL BE CONSIDERED AS INCLUDED IN 77-IE CONTRACT PRICE PAID PER CUBIC YARD FOR EXCAVATION, AND NO ADDITIONAL COMPENSATION WILL BE ALLOWED 34. FOR SUCH WORK. 10. 77-IE WORK EMBRACED HEREIN SHALL BE IN ACCORDANCE WITH THE 35. STANDARD SPECIFICATIONS OF THE STATE OF CALIFORNIA DEPARTMENT OF IRA NSPOR TA 77ON, CURRENT EDITION, INSOFAR AS THE SAME MAY 36. APPLY IN ACCORDANCE WITH THE N07ES HEREON. IN CASE OF CONFLICT WITH THE STANDARD SPECIFICA77ONS AND ANY NOTES 37 HEREON, THE NOTES HEREON SHALL TAKE PRECEDENCE OVER AND BE USED IN LIEU OF SUCH CONFLIC77NG PORTIONS SAID SPECIFICATIONS SHALL APPLY BUT NOT BE LIMITED TO THE FOLLOWING. A) ALL CONCRETE SHALL BE CLASS B" AS IN ACCORDANCE WITH SECTION 90 AND SHALL HAVE AT LEAST 2500 PSI COMPRESSIVE STRENGTH AT 28 DAYS B) ASPHALTIC CONCRETE SHALL BE TYPE B" MEDIUM GRADED, 38. 112" MAXIMUM AGGREGATE; AND INTIMATELY MIXED WITH 5 -7% ASPHALT. 11. IN 7HE EVENT CONSTRUCTION STAKING BASED ON MCINTOSH & ASSOCIATES' PLANS, DRAWINGS, OR 07HER DOCUMENTS IS PERFORMED BY ANOTHER FIRM, MCINTOSH & ASSOCIATES SHALL BE HELD HARMLESS AND RELEASED 39 FROM ALL LIABILITY ARISING FROM 7HE USE OF SAID PLANS, DRAWINGS, OR OTHER DOCUMENTS. 12. McINTOSH & ASSOCIATES SHALL NOT BE RESPONSIBLE OR LIABLE FOR UNAUTHORIZED CHANGES TO, OR USES OF, THESE PLANS ALL CHANGES TO THESE PLANS MUST BE APPROVED, IN WRI77NG, BY 40 MCINTOSH & ASSOCIATES. 13 UPON COMPLETION OF GRADING AND BEFORE THE START OF CONSTRUCTION, A FINAL SOILS REPORT SHALL BE PREPARED BY THE SOIL ENGINEER. 14. THE SOIL ENGINEER SHALL REVIEW ALL EXCA VA 77ONS PRIOR TO BACKnLLING AND SHALL BE N071FIED OF ANY ITEM ENCOUNTERED DURING THE GRADING OPERATIONS THAT MIGHT AFFECT FOUNDA77ON STABILITY SO RECOMMENDA7701VS CAN BE MADE BY THE SOIL ENGINEER. 15. CUT AND FILL SLOPES SHALL NOT BE STEEPER THAN 2: 1. 16. ALL SLOPES GREATER THAN THREE FEET IN VERTICAL HEIGHT SHALL BE PREPARED AND MAINTAINED TO PREVENT EROSION. 17 IMPORTED FILL MATERIAL: REFER TO SPECIFIC EARTHWORK RECOMMENDATION FOR IMPORTED FILL MATERIAL REQUIREMENTS ON SHEET 2 HEREIN. 18. CLEARING AND GRUBBING- REFER TO SPECIFIC EARTHWORK RECOMMENDATION FOR CLEARING AND GRUBBING REQUIREMENTS ON SHEET 2 HEREIN. 19. AREAS TO RECEIVE FILL (EXCEPT BUILDING PADS): REFER TO SPECIFIC EARTHWORK RECOMMENDATION FOR AREAS TO RECEIVE FILL REQUIREMENTS ON SHEET 2 HEREIN. 20. FILL MATERIAL: REFER TO SPECIFIC EAR7HWORK RECOMMENDATION FOR FILL MATERIALS LAYERING AND REQUIREMENTS ON SHEET 2 HEREIN. 21. QUANTITIES FOR EARTHWORK EXCA VA 77ON AND OVER EXCA VA 7701V - 31, 654 CU. YD. EMBANKMENT - 19,189 CU. ?D. QUAN 7777ES ARE FOR GRADING PERMIT ONLY. 7HE ENGINEER MAKES NO WARRANTY OF THE ANTICIPATED SHRINKAGE FACTOR. IN CASE OF EXCESS OR SHORTAGE, THE CONTRACTOR SHALL CONTACT THE ENGINEER SO THAT ADJUSTMENTS MAY BE MADE. THE CONTRACTOR SHALL NOT USE THESE QUANTITIES TO BASE HIS BID ON. 22. BUILDING PAD PREPARATION. REFER TO SPECIFIC RECOMMENDATION ON SHEET 2 HEREIN. 23. PA VEMEN T AREAS. REFER TO SPECIFIC RECOMMENDA 77ON ON SHEET 2 HEREIN. 24. AN OSHA PERMIT IS REQUIRED WHEN WORKERS MUST ENTER TRENCHES OR EXCA VA TION FIVE (5) FEET OR DEEPER. 25. SUFFICIENT ACCESS TO 7HE EXISTING AND ABANDONED WELLS SHALL BE MAINTAINED IN ORDER FOR THE DIVISION OF GAS, OILS AND GEOTHERMAL RESOURCES ( DIV7SION) TO INVESTIGATE THE CONDITION OF THE WELL HEADS AND CHECK FOR LEAKAGE. IF ANY REABANDONMENTS ARE REQUIRED, THE DIVISION SHALL FURNISH THE NECESSARY SPECIFICATIONS TO THE PROPERTY OWNER. 26. AT THE IN177AL CONSTRUCTION MEETING PRIOR TO GRADING ACTI W TIES ALL CONSTRUCTION WORKERS MUST BE INFORMED AS TO THE SYMPTOMS OF VALLEY FEVER. 27. THE CONTRACTOR SHALL COMPLY WITH 77-IE GUIDE FOR ASSESSING AND MITIGATING AIR QUALITY IMPACTS (GAMAQI), JANUARY 10, 2002 REVISION, GUIDANCE DOCUMENT WHICH LISTS THE FOLLOWING MEASURES AS APPROVED AND RECOMMENDED FOR CONSTRUCTION ACTIVITIES WITHIN THE SAN JOAQUIN VALLEY AS FOLLOWS: A. MAINTAIN ALL CONSTRUCTION EQUIPMENT AS RECOMMENDED BY MANUFACTURER MANUALS B. SHUT DOWN EQUIPMENT WHEN NOT IN USE FOR EXTENDED PERIODS OF TIME. C USE ELECTRIC EQUIPMENT FOR CONSTRUCTION WHENEVER POSSIBLE IN LIEU OF DIESEL OR GASOLINE POWERED EQUIPMENT. D. CURTAIL USE OF HIGH - EMITTING CONSTRUCTION EQUIPMENT DURING PERIODS OF HIGH OR EXCESSIVE AMBIENT POLLUTANT CONCENTRATIONS EXCESSIVE AMBIENT POLLUTANT CONCENTRATIONS SUCH AS "SPARE - THE -AIR" DAYS AS DECLARED BY THE SJVAPCD. E. ENCOURAGE CONSTRUCTION EMPLOYEES TO CARPOOL OR USE SHUTTLE TO RETAIL ESTABLISHMENTS AT LUNCH. 28. PRIOR TO S17E GRADING, SUBDIVIDER SHALL HAVE A PRECONS7RUC77ON SURVEY CONDUCTED TO SEARCH FOR NA77VE KIT FOX DENS. SURVEY SHALL BE SUBMITTED TO THE PLANNING DIRECTOR FOR REVIEW PRIOR TO GRADING THE APPLICANT MAY BE SUBJECT TO SPECIAL NOTIFICATION REQUIREMENTS TO AGENCIES PRIOR TO GRADING LAND CONTAINING DENS PRIOR TO THE APPROVAL OF A GRADING PLAN, SUBDIVIDER IS SUBJECT TO THE MIGRATORY BIRD TREATY ACT. INCLUDING THE SWANSON HAWK DURING THE RAPTOR NESTING SEASON (FEBRUARY THROUGH SEPTEMBER). IF CONSTRUCTION IS TO OCCUR DURING RAPTOR NESTINGAREEDING SEASON (FEBRUARY 7HROUGH SEPTEMBER) NO CONSTRUCTION ACTIVITY SHALL TAKE PLACE WITHIN 500 FEET OF A ACTIVE NEST. TREES TO BE REMOVED THAT CONTAIN NESTS SHALL BE REMOVED ONLY DURING NON- BREEDING SEASON (OCTOBER 7HROUGH JANUARY) THE PRESENCE OF ANY PREVIOUSLY UNIDENTIFIED PROTECTED SPECIES WHICH ARE NOT ADDRESSED IN THE MBHCP, INCLUDING THOSE PROTECTED UNDER THE FEDERAL MIGRATORY BIRD 7REATY ACT, SHOULD BE AVOIDED AND EVALUATED BY A QUALIFIED BIOLOGIST PRIOR TO CONSTRUCTION. 77-IE FISH & WILDLIFE SERVICE (USFWS) AND CALIFORNIA DEPARTMENT OF FISH & GAME (CDFG) SHOULD BE NOTIFIED OF PREVIOUSLY UNREPORTED PROTECTED SPECIES. ANY UNAN77CIPA7E'D TAKE OF PROTECTED WILDLIFE SHALL BE REPORTED IMMEDIATELY TO THE CDFG AND USFVS. IF ARCHEOLOGICAL OR PALEONTOLOGICAL RESOURCES ARE DISCOVERED DURING EXCAVATION AND GRADING AC77WTIES ON -SITE, THE CONTRACTOR SHALL STOP ALL WORK AND THE DEVELOPER SHALL RETAIN A QUALIFIED ARCHEOLOGIST TO EVALUATE THE SIGNIFICANCE OF THE FINDING AND APPROPRIATE COURSE OF ACTION. SALVAGE OPERATION REQUIREMENTS IN APPENDIX K OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT GUIDELINES SHALL BE FOLLOWED AND THE TREATMENT OF DISCOVERED NA77VE AMERICAN REMAINS SHALL COMPLY WITH STATE CODES REGULATIONS OF 7HE AMERICAN HERI TA GE COMMISSION. SHOULD HUMAN REMAINS BE DISCOVERED AT ANY TIME ON ANY PORTION OF 7HE PROJECT, WORK SHALL HALT AND 7HE CORONER BE NOTIFIED IMMEDIATELY (SECTION 7050.5 OF THE HEALTH AND SAFETY CODE). IN THE ABSENCE OF AN ARCHAEOLOGICAL MONITOR, A QUALIFIED ARCHAEOLOGIST AND THE LOCAL NA 71VE AMERICAN COMMUNITY SHALL ALSO BE NOTIFIED. THE CONTRACTOR SHALL COMPLY WITH SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT (SJVAPCD) REGULATION Vlll, DUST CONTROL MEASURES TO ENSURE COMPLIANCE SPECIFICALLY DURING GRADING AND CONSTRUCTION PHASES. THE MITIGATION MEASURES TO BE TAKEN ARE AS FOLLOWS- A. WA TER EXPOSED SURFACES (SOIL) 7HREE- TIMESIDA Y. B. WATER ALL HAUL ROADS AT A MINIMUM OF THREE TIMES PER DAY. C. REDUCE SPEED ON UNPAVED ROADS TO LESS 7HAN 15 MILES PER HOUR. D. STABILIZE ALL DISTURBED AREAS, INCLUDING STORAGE PILES, WHICH ARE NOT BEING ACTIVELY U77LIZED FOR CONSTRUCTION PURPOSES USING WATER OR BY COVERING 10771 A TRAP, OTHER SUITABLE COVER OR VEGETATIVE GROUND COVER. E. CON7ROL FUGITIVE DUST EMISSIONS DURING LAND CLEARING, GRUBBING, SCRAPING, EXCAVATION, LEVELING, GRADING, OR CUT & FILL OPERATIONS WITH APPLICATION OF WATER OR BY PRESOAKING. F. WHEN TRANSPORTING MATERIALS OFFSITE, MAINTAIN A FREEBOARD LIMIT OF AT LEAST SIX INCHES AND COVER OR EFFEC77VELY WET TO LIMIT VISIBLE DUST EMISSIONS. G. LIMIT AND REMOVE THE ACCUMULATION OF MUD AND /OR DIRT FROM ADJACENT PUBLIC ROADWAYS AT THE END OF EACH WORKDAY. (USE OF DRY ROTARY BRUSHES IS PROHIBITED EXCEPT WHEN PRECEDED OR ACCOMPANIED BY SUFFICIENT KET77NG TO LIMIT VISIBLE DUST EMISSIONS AND USE OF BLOWERS IS EXPRESSLY FORBIDDEN). H. STABILIZE THE SURFACE OF STORAGE PILES FOLLOWING THE ADDITION OR REMOVAL OF MATERIALS USING WATER. I. REMOVE IRA CKOUT WHEN IT EXTENDS 50 OR MORE FEET FROM THE S /TF AT THE END OF EACH WORKDA Y. J. CEASE GRADING AC77W77ES DURING PERIODS OF HIGH WINDS (GREATER THAN 20 MPH OVER A ONE -HOUR PERIOD). K. ASPHALT- CONCRETE PAVING SHALL COMPLY WITH THE SJVAPCD RULE 4641 AND RESTRICT USE OF OF CUTBACK, SLOW -CURE AND EMULSIFIED ASPHALT PAVING MATERIALS SURFACE DRAINAGE TO BE ONE (1%) PERCENT MINIMUM, EXCEPT AS WAIVED BY THE BUILDING OFFICIAL. GRADING WORK WILL BE SUPERVISED AS ENGINEERED GRADING IN ACCORDANCE WITH CHAPTER 33 OF 77-IE C.B.C. NO WORK SHALL BE PERFORMED INSIDE CURRENT CALTRANS RIGHT -OF -WAY UN77L AN ENCROACHMENT PERMIT IS OBTAINED. IF THE PROJECT IS SUBJECT TO 7HE PROVISIONS OF THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES), A NOTICE OF INTENT" (NOI) TO COMPLY W177-1 THE TERMS OF THE GENERAL PERMIT TO DISCHARGE STORM WATER ASSOCIATED WITH CONSTRUCTION AC77WTY (WO ORDER NO. R5- 2013 -0153) MUST BE FILED WITH STATE WA TER RESOURCES CONTROL BOARD IN SACRAMENTO BEFORE 77-IE BEGINNING OF ANY CONSTRUCTION ACTIVITY. COMPLIANCE WITH THE GENERAL PERMIT REQUIRES THAT A STORM WATER POLLUTION PLAN (SWPPP) BE PREPARED, CONTINUOUSLY CARRIED OUT, AND ALWAYS BE AVAILABLE FOR PUBLIC INSPECTION DURING NORMAL CONSTRUCTION HOURS AN OPEN STREET PERMIT SHALL BE OBTAINED FROM THE CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT FOR ANY WORK PERFORMED WITHIN EXISTING ACCEPTED STREET RIGHT OF WAY. UNLESS SECURED BY A SUBDIVISION AGREEMENT, SECURITY BASED ON AN APPROVED ENGINEER'S ES77MATF FOR THE WORK PERFORMED WITHIN THE RIGHT OF WAY AND INSURANCE AS REQUIRED SHALL BE PROVIDED PRIOR TO ISSUANCE OF A PERMIT. DUST CONTROL CONTRACTOR SHALL OBTAIN A COPY OF THE DUST CONTROL PLAN (DCP) FOR THIS PROJECT FROM THE DEVELOPER, AND SHALL KEEP A COPY ON SI7E AT ALL TIMES FOR THE DURATION OF CONTRACTORS OCCUPANCY OF THE SITE, CONTRACTOR IS REQUIRED TO COMPLY WITH THE PROVISIONS OF SAID PLAN. STORM WATER POLLUTION PREVEN77ON CONTRACTOR SHALL OBTAIN A COPY OF THE STORM WA7ER POLLUTION PREVEN7701V PLAN (SWPPP) FOR THIS PROJECT FROM THE DEVELOPER, AND SHALL KEEP A COPY ON S17F AT ALL TIMES FOR 77-IE DURATION OF CONTRACTORS OCCUPANCY OF 77-IE SITE, CONTRACTOR IS REQUIRED TO COMPLY WITH THE PROVISIONS OF SAID PLAN. ....... - PACHECO ROAD 19 :J[21 20S D 22 ❑ 23 N24 IE OR AW D 0 30 0 29 28 0 27 0 0 26 MrCHEN ROAD m of HOSK NG 31 0 = 34 35 36 31 V) McKEE ROAD GREENFD;LD H WY. PU MPM CENTER 5 3 1 a 16:: 6 PRO IEC CURNOW Q 2 o � 9 w 8 N 10 11 12 7 0 ❑ Ln 17 EI 7,,F 7,4 71, T F.-, VICINITY MAP NO SCALE PROJECT AREA: - 14.74 ACRES BENCHMARK, BENCHMARK DISK STAMPED - 0 1157 RESET 1969 AT OLD RIVER, AT THE JUNCTION OF STATE HIGHWAY 119 AND OLD RIVER ROAD, IN THE TOP OF THE EAST END OF THE NORTH CONCRETE HEAD WALL OF TRIPLE CONCRETE BOX CULVERT B 11.44 OVER S77NE CANAL, 19 112 FEET NORTH OF THE CENTER LINE OF THE HIGHWAY, 50 FEET WEST OF THE EXTENDED CENTER LINE OF OLD RIVER ROAD LEADING SOUTH, 64 FEET EAST OF THE CENTER LINE OF OLD RIVER ROAD LEADING NORTH, AND ABOUT LEVEL WITH 7HE HIGHWAY. ELEVA 71ON = 343.30 (U. S. G. S DA 7UM NA VD 88) BASIS OF BEARINGS: THE BEARING OF N. 89 04 JJ" W. SHOWN FOR THE SOUTH LINE OF THE SOUTHWEST 114 OF SECTION 34, T.30 S., R.27 E. AS SHOWN ON SURVEY INVES77GA TION MAP NO. 7 -1 BK. 6, PG. 27 WAS USED AS THE BASIS OF BEARINGS SHOWN HEREON. LEGAL DESCRIP770N. PORTION OF THE SOUTH HALF OF THE SOUTHWEST QUARTER OF SECTION 34, TOWNSHIP 30 SOU7H, RANGE 27 EAST, M.D.M.; IN THE CITY OF BAKERSFIELD, COUNTY OF KERN. G 0 I: CITY OF BAKERSFIELD KERN COUNTY CALIFORNIA GRADING PLAN TRACT 6758 UNIT 2 M c K E E ROAD - -- 1,1FUTURE COMMERCIAL! ¢� o `-18" M A I N E U `J J II w u co \\ II j -- -I-- �- -- 31 s O I \` 32 `�L--- - -� - -� m _. to II 9 16 17 `. 24" 30 1 g^ z \ � I 7 33 ,- SAMUELSON STREET -- SAMUELSON STREET -- z \ 0 (� 6 10 15 18 ' 34 35 ' 36 ' 37 ' ; k� 3 4 CU CU 38 39 51 - I o I I- -- - - - -I - -- } - ---� i I I I I I p I � z M 9' I o 5 -O WT 14 w� 19 r- -- - I i i i i- -- (~ ' S z �I� I D U N 1 T J OYSTER __ -�J �JJ J ;c.�p; - - -- I 30 129 I I z_ __- m ; ` }- 18" WAY -' �- 12 1 z I , 1 44 45I 46 147 148 I49 150 I = 1 I S 3 I I I I I I � 6 � ' 4 w- - - -1�� 20 - -' I -_ _ I ' I I I I m I ¢ �� 28 I 27 ao 11 __ m L-__ .- J_- L_- 1__- L.__�__L� __--, o 3 cn 18 18" WFORD_- PILLS 18" _D-0 _ RIV�1 e E 7 - - - -4 ¢ 30 ^ w BIDDEFORD STREET 2 M 21 22 23 1 43 42 I a 11 10 9 8 a w z uj 24 25 26 27 28 41 w 1 N Of o � ¢ J 29 30 131 39 132 133 134 135 i 36 37 I 38 I 40 ( z w I Y 1a; 12 I = o tz = I I I I I I I I I I Q 1� -- U +� 0 - -� �---�- L -- - --� ---- L--- I---- L- _- L--- L� w = ` 13 o m 18 QUEBEC TR. 6757 AVENUE AVENU E r . JJ 30" F V 10 UNIT I 28 ; 27 ; 26 ; 25 ,� Q, ; ; ; ; 1 ~ -- l0 �1 24 23 22 21 20 19 18 17 116 , 15 STORM DRAIN 0 �I� � 1 �I� -T POINT OF CONNECTION M I I I 6 �I p1 I 1 i I I I 1 I I 1 1 I ( ' 0 II � 5 m 1 1 2 . 3 , 4 . 5 16 ,7 , 8 1 9 , 10 f'1i 12 13 i 14 1x15 ; 16 cs 0 - �- -- �I - ¢ 6 CAPE --- COD -_ AVENUE 24 U - -T - - -- - - -1 - - - - - - -- 10 68 l z� -1 I��r�r �L� I i I - �� o - -- -- _- 1--- 1-- I--� -- 1 3 67 66 1 65 f 64 <1 29 128 1 I I I I I I I L LS7 l PHA _jj I I I 27 ' 26 25 241 23� P2 21 2 -19 ; 18 17 I = o �4 - - -� - r - _ _ 2 i - -� - --� + 30 t 31 32 -;33� 34 35 36 37� -I -- I -± - -� M _4 I 12 60 1 61 162 1 63 138 39 40 41 42 I w J Of, = T X14 L. - - -1 -- L - -I --- L-- _�- -1- - -- " 8" -- y 24 - - -T P R_0_V I_ C E TAW N w A V E N U E __ li-] "56 13 i i A i �� T - T r I z¢ ---� - -� -- - - --1- - � >_ U7 1 ; - - -� - ' 59 i 581 57! 55 i 54! 53 521 51 p JI 1 I T '4 0 AAVENUE P 50 49 48 47 I 46 1 45 1 44 1 43 o AVENUE �I I) 551 w; 14- I 1 I I t 1 i I ¢I I I I I I I -. l I--- }-�- �-F - �. --y- -�-I - +tom - +-- +- -1--r' Q I 15 I I I YI I I I I i , , _ 54 J i _ _ _ I ' 1 ' 21 1 22 1 23 1 24 ' 25 ' ' 26 127 1 28 I 29 I 30 I 31 , 32 133 1 w ` t__ 18 19 20 -� -�� STORM DRAIN w 53 � Ld 16 ;17 V J fT 3 -F- 8" l N t J_ 31- _ 36 � - - POINT OF CONNECTION Q R _ 'mil �I 52 -- H ATH AW Z Lu __ _D STOR 18 - -- - - -- A VEN U E �0 (' _ p 1 43 ¢ w 42 �,57 TO BEONS UC D_ 1 T1 1 >\?n ' 46 '- -- c�v -- W/ UNIT 2 I , 38 , 37 , 36 , 35 ,34 / 51 , r 48 147 , ¢ ¢ I r - I 39 I� 50 f 49 ;g iI� ' 44 _j 41 , 38 1 w I - i -i I - 1 - I w _ s --� j-� r �-{z� I i 45 \ z 40 ' 39 ; ; ; ; UNJ JI I L_�? - N 5 6 7 1 8 1 9 110 1 11 I 13 -- 0 HATCHVILLE AVENUE I 14 � � � iPH 37 I- I 36 29 228 W �0 - T - -� -I 15 �. NOT A PART -- - - ---a b ' 1 19 1 18 ' 17 1 27 ' r - -- � 16 35 30 �- --� V I 21 I -- -�� - -- - -- � 26 34 %��'�, 31 ' ' o ' 22 ' EXPANDED SUMP LL_ FROM TR. 6491 - --� O - -- �� 33 I 32 '- -- D 23 , TO SERVE BOTH i 24 \\ v) TRACTS 6757 & 6758 - - - -- I TAFT HIGHWAY (SR -119) I � NUMBER OF LOTS,• UNIT 2 - 69 LOTS SHEET INDEX SHEET 1 COVER PAGE /GENERAL NOTES SHEET 2 SOIL REPORT NOTES SHEET 3 GRADING PLAN SHEET 4 CROSS SECTIONS AND DETAILS TRAFFIC INDEX TABLE ROAD I TI LOCAL STREETS 14.5 rRr \CT 1\10, 6 7 09 KEY MAP SCALE: 1 "= 200' WHITE Wt -- -- PROPERTY LINE w CL M I I I 1% 1% I, I wl z J rl � wl �f 0- 0 Ckf CLl I ofN 0 °I N f PROPOSED HOUSE 5 �I I w z J !!f I>- I� Iw CL 0 X CL BUILDER A SWALES AT TO TIMGRE DE I OF HOUSE COMPLETION I LINE N N COMBINATION SIDEWALK CURB & GUTTER TYPICAL LOT SWALE GRADING NO SCALE LEGEND ABBREMA110NS EP EDGE OF PAVEMENT FS FINISH SURFACE TC TOP OF CONCRETE OE OVER- EXCAVATION FL FLOWLINE FF FINISH FLOOR CL CENTERLINE FC FINISH CONCRETE ELEV ELEVATION GB GRADE BREAK XFP EXIST. FINSIHED PAD FG FINISH GRADE XFL EXIST. FLOWLINE EVC END VERTICAL CURVE fp 100.00 PROPOSED PAD ELEV. 61 PROPOSED GUTTER FLOWLINE ELEV. EXIST. TOP OF CURB ELEV. EXIST. GUTTER FLOWLINE ELEV. :aa 7a -U PROPOSED LANDSCAPE ELEV. O. Jl5X DIRECTION AND PERCENT OF _- SLOPE FOR DRAINAGE ix FLOWLINE EXIST. FLOWLINE - - - CENTERLINE OF STREET - - - - PROPERTY LINE /RIGHT -OF -WAY - - - - - - - - -- PAD COMPACTION LIMITS ------------ - - - - -- FUTURE FLOWLINE - - - p STORM DRAIN ~ TYPE "A" CATCH BASIN Z WITH 3.5' WIDE OPENING UNLESS OTHERWISE NOTED EXIST. STORM DRAIN - - - o -- FUTURE STORM DRAIN ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■.. ■■ PHASE BOUNDARY ® CONSTRUCTION NOTES PIPE SIZE Q 44W-UTILITY: S -SEWER D -DRAIN m SECTION DESIGNATION: SECTION LETTER H 2 SHEET WHERE SECTION IS SHOWN DIG A I AERT Call: TOLL FREE 1- 800 - 227 -2600 AT LEAST TWO DAYS BEFORE YOU DIG UNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA rn 0 M M F ¢ 1 - o z oo U Of d- z Ow Q w Q W U 0 30� J � w co o E co o U) N 0_ Li Y ¢ m V ` M a Z W �SI1 - 1\ pe) 47, 0 M \ a Z m � o m J U } mm W Y U O U N b� J J > U cJ a 0 NINE G.P. NO. 14-40000024 CITY RECORDS NO.: I` 0 W Z I N � r i 0) a - Z 0 Z Q W ix 2 0 °O =00 W Z ~ Z m W J co) Q U J Q m H m Q W I r i 0) LL 0 SOILS ENGINEERING, INC. February 21. 2005 Centex Homes 5601 Truxtun Avenue, Suite 225 Bakersfield, CA 93309 0624 Attention: Duke Ashiock Subject Update of Preliminary Soils Investigation & Sump Study For Tentative Tract 6491. located north of Taft Highway in Bakersfield, California Reference: Preliminary Soils Investigation for property located on the east side of Ashe Road between McKee Road & Taff Highway in Bakersfield, California File No. 04 -10923 Dated: October 21, 2004 Gentlemen ,I File No, 04 -10923 On February 21. 2005 two (2) borings were drilled in the proposed addition area located east of the site, north of Taft Highway and east and wrest of Mountain Ridge Road. These borings are attached as Figures B -14 & B -15. The soils in this area are consistent with those in the original report.. Therefore. the recommendations given in the above referenced Preliminary Soils Investigation will be fully applicable to the addition area. Sump Study & Slope Stability Two (2) borings were drilled in the area of the proposed sump for Tentative Tract 6491. Our scope of work consisted of the following: 1. Field Investigation Two (2) exploratory borings were drilled to a minimum depth of forty (40) feet below existing ground surface in the proposed drainage basin area. The borings were advanced using an eight -inch diameter auger attached to a CME 75 drill rig. Earth materials encountered were logged, classified in accordance with the Unified Soils Classification System, and graphically presented on Test Boring logs (attached. Figures 17 & 18). Undisturbed soil samples of representative subsurface soils were obtained by driving a two 4400 YEAGER WAY • BAKERSFIELD, CALIFORNIA 93313 PHONE (661) 831 -51m • FAX-t661)331-2111 SOILS ENGINEERING, INC. l pdate of Prelinrinart` Soils Investigation Drainage Basin Stu4 for Proposed Sting Tentative Tract 6491 Bakersfield, (_1 -1 File No. 04 -10923 April 19, 2605 Page 1 and three - eighths (2 -3/8) inch inside diameter split - barrel sampler in the soil layer in accordance with "Standard Test Method for Penetration Test and Solit- Barrel Sampling of Soils" (ASTM D1586). Penetration resistance of undisturbed soils was obtained by driving the above described sampler using a 140 -pound hammer failing a distance of 30 inches and recording blow counts for each six -inch increment of drive on Test Boring Logs. 2. Laboratory Testing Program Undisturbed samples were retrieved during our drilling operation and were tested for In- place density and moisture content (see Boring Logs. Figures 17 & 18, attached)- Sieve Analysis testing was performed on samples retrieved from the borings using ASTM Test Method D -422 and are shown on the attached Figures A -11 &A-12. Two (2) Permeability tests were performed using ASTM Test Method D2434, results are reported in Table 1. One (1) Direct Shear test was performed using ASTNT Test Method D3090 for the purpose of Slope Stability Analysis and is attached as Figure D -1 3, Engineering Report In Borings 16 & 17. clean cohesionless sand was encountered at a depth of twelve feet at invert level (see Figures A -11 & A -12. Grain Size Distribution) consisting of interbedded layers of silty sand. poorly- graded and well- graded sand. These soils are classified as SM. SP & SW. respectively. in the Unified Soils Classification System (USCS). Based on our field investigation and our laboratory testing program, it is our engineering opinion that the majority of the sump area will have a highly permeable subsurface soils as shown on the boring logs attached. Accordingly: the proposed sump will drain in seven days or less. During the construction process, our field representative will review the invert of the sump to confirm that the clean cohesionless sand layer has been exposed. If cohesive soils are encountered; they shall be removed and replaced with clean sand under the observation Of our field representative. if you have any questions or need further information. feel free to contact us. The proposed sump will have a depth of 12 feet. Based on this depth, we have performed an engineering analysis using the `Stability Chart for Soils with Friction Angle. After Taylor,1948." A safety factor greater than 1.5 will be achieved provided the areas where layers of clean sand are exposed will be be excavated and replaced by cohesive soils under our observation and testing program. A letter stating compliance with the recommendations outlined in this letter will be issued when the surnp construction is complete. 1p date of Prelimina n Sails Investigation Drainage Basin Stud e for Proposed Sump Tentative Tract 6491 Rakercfleld, CA SOILS ENGINEERING, iNC File :Vo. 04 -10913 April 19,200-5 Page 3 We hoe this p t s provides the information you require. If you have any questions. or need further assistance, please contact Our office. Respectfully submitted. SOILS ENGINEERING, INC. Tony Frangie, P.E. `~!�~ No 3 w ;f ExF. 12=31 15 TF: ch XT Attachments Figures 1A & 1B, Boring Location Map Figures 15 thru 18, Logs of Test Borings Figures A -11 & A -12. Grain Size Distribution; Figure D -1, Direct Shear Test Table 1. Permeabiiity Tests SOILS ENGINEERING, INC. PRELIVLA44RY SOILS INVESTIGATIOA File ,Vo. 04 -10923 Property on Ashe Rd Btwn McKee Rd & Taft Hwy October 21, 2004 Bakersfield, CA Pape A -I APPENDIX A GENERAL GUIDE SPECIFICATIONS FOR EARTHWORK 1. GENERAL 2. 3. 4. 1.1 Scope These specifications and plans include all earthwork pertaining to site rough grading including, but not limited to furnishing all labor and equipment necessary for clearing and grubbing; stripping; preparation of ground surfaces to receive fill; excavation; placement and compaction of structural and non - structural fill; disposal of excess materials and products of clearing, grubbing, and stripping; and any other work necessary to bring ground elevations to the lines and grades shown on the project plans. 1.2 Performance: It shall be the responsibility of the Contractor to complete all earthwork in accordance with project plans and specifications. No variance from plans and specifications shall be permitted without written approval of the Engineer - of- Record, hereinafter referred to as the "engineer" or his designated representative, hereinafter referred to as the "Soils Engineer." Earthwork shall not be considered complete until the "Engineer" has issued a written statement confirming substantial compliance of earthwork operations to these specifications and to project plans. The Contractor shall assume sole responsibility forjob site conditions during the course of earthwork operations on the project, including safety of all persons and preservation of all property; this requirement shall apply continuously and not be limited to normal working hours. The Contractor shall defend, indemnify, and hold harmless the Owners, Engineer, and Soils Engineer from any and all liability and claims, real or alleged, arising out of performance of earthwork on this project, except from liability incurred through sole negligence of the Owner. Engineers, or Soils Engineers. DEFINITIONS 2.1 Excavations: Excavation shall be defined within the content of these specifications as earth material excavated for the purpose of constructing fill embankment; grading the site to elevations shown on project plans; or placing underground pipe- lines. conduits, or other subsurface utilities or minor structures - Excavations shall be made true to the lines shown on project plans and to within plus or minus one -tenth (0.1) of a foot, of grades shown on the accepted site grading plans. 2.2 Engineered Filled: Engineered fill shall be construed within the body of these specifications as earth conforming to specifications provided in the soils or geotechnical report placed to raise the grade of the site, to backfill excavations, or to construct asphaltic concrete or Portland cement concrete pavement; and upon which the Soils Engineer has performed sufficient tests and has made sufficient observation during placement and compaction to enable him to issue a written statement confirming substantial conformance of the work to project earthwork specifications. 2.3 On -Site Material: On -site material is earth material obtained in excavation made on the project site. 2.4 Imported Material; Imported materials are earth materials obtained off the site, hauled in, and placed as fill. 2.5 "Compaction" or "Compacted": Wherever expressed or implied within the context of these specifications shall be interpreted as compaction to ninety (90) percent of the maximum density obtainable by ASTM Test Method D- 1557(Method A). 2.6 Grading Plane: The Grading Plane is the surface of the basement material upon which the lowest layer of subbase, base, asphaltic or Portland cement concrete, surfacing, or other specified layer, is placed. SITE CONDITIONS The Contractor shall visit the site, prior to bid submittal, to determine existing soil and topographic conditions, and the nature of materials that may be encountered during the course of the work under this contract, and make his own interpretation of the contents of the Preliminary Soils Report, as they pertain to said conditions. The Contractor shall assume all liability under the contract for any loss sustained as a result of variations which may exist between specific soil boring locations or changed conditions resulting from natural or man -made circumstances occurring after the date of the Preliminary Field Investigations. CLEARING AND GRUBBING 4.1 Clearing and Grubbing Clearing and grubbing shall consist of removing all debris such as metal, broken concrete, trash, vegetation growth and other biodegradable substances, from all areas to be graded. Existing obstructions below shall be removed in accordance with the following procedures: 4.1.1 Slabs and Pavements - Shall be completely removed. Asphaltic or Portland cement, concrete fragments may be used in engineered fills provided they are broken down to a maximum dimension of six (6.0) inches and thoroughly dispersed within a friable soil matrix- Engi- neered fill containing said fragments should not be placed above the elevation of the bottom of the loudest structure footing. 4.1.2 Foundations - existing at the time of grading shall be removed to a depth not less than two (2.0) feet below the bottom of the lowest structure footing. 4.1.3 Basemi..ntts a tic Tanks - buried concrete containers of similar construction located within areas destined to receive pavements, structures, or engineered fills should be completely removed and disposed of off the site. Basements, septic tanks, etc., situated outside structures, or structural fill areas shall be disposed of by breaking an opening in bottoms to permit drainage, and by breaking walls down to not less than two (2.0) feet below finished subgrade. 4.1.4 Buried Utilities - such as sewer, water and gas lines or electrical conduits to remain in service shall be re- routed to pass no closer than four (4.0) feet to the outside edge of proposed exterior footings of structures. Lines to be abandoned shall be completely removed to a minimum depth of two (2.0) feet below finished building pad grade. Concrete lines deeper than two (2.0) feet below finished building pad grade and having diameters less than six (6.0) inches can be crushed in placed. 4.1.5 Root Systems - shall be completely removed to a minimum depth of two (2.0) feet below the bottom of the lowest proposed structure foot- ing or to two (2.0) feet below finished subgrade, whichever depth is lower. Root systems deeper than the elevation indicated above shall be excavated to allow no roots larger than two (2.0) inches in diameter. 4.1.6 Cavities - resulting from clearing and grubbing or cavities existing on the site as a result of man -made or natural activity shall be backfilled with earth materials placed and compacted in accordance with Sections 5.3 and 5.4 of these specifications. 4.1.7 Preservation of Monuments Construction Stakes, Property Corner Stakes, or other temporary or permanent horizontal or vertical control reference points shall be the responsibility of the contractor. Where these markers are disturbed, they shall be replaced at the contractor's expense. 5. SITE GRADING Site grading shall consist of excavation and placement of fills to lines and grades shown on the project plans and in accordance with project specifications and recommendations of the Preliminary Soils Report, whichever is more stringent. The following are recommendations issued in this report. 5.1 Area�,_to Receive Fill: 5.1.1 Surfaces to receive fill shall be scarified to a depth of at least six (6.0) inches, or as recommended in this report, whichever is greater, until the surface is free from ruts, hummocks or other uneven features which would tend to prevent uniform compaction by the equipment to be used. 5.1.2 After the area to receive fill has been cleared and scarified, it shall be moistened and compacted to a depth of at least six (6.0) inches in accordance with specifications for compacting fill material in paragraph 5.4, below. 5.2 Excavation: 5.2.1 Excavations shall be cut to elevations plus or minus 0.1 foot of the grades shown on the accepted plans. 5.2.2 When excavated materials are to be used in engineered fill, the excavation shall be made in a manner to produce as much mixing of the excavated materials as practicable. 5.2.3 When excavations are to be backfilled, and where surfaces exposed by excavation are to support structures or concrete floor slabs, the exposed surfaces shall be scarified, moistened and compacted, as stated above for areas to receive fill. Over excavation below specified depths will not eliminate the requirement for exposed surface compaction. 5.3 Fill Materials: 5.3.1 ivtaterials obtained from on -site excavations will be considered satisfactory for construction of on -site engineered fills unless otherwise stated in the Soils Report or Foundation investigation. If unexpected pockets of poor or weak materials are encountered in excavations; and they cannot be up- graded by mixing with other materials or by other means, they may be rejected by the Soils Engineer for use in engineered fill. 5.3.2 When imported fill materials are necessary to bring the site up to planned grades, no material shall be imported prior to its approval and acceptance by the Soils Engineer. 5.3.3 The Soils Engineer shall be given notice of the proposed source of imported materials with adequate time allowance for his testing of the proposed materials. The time required for testing will vary with different types of materials, job conditions, and ultimate function of filled areas. Under best conditions the time requirement will not be less than 48 hours. 5.4 Placina. Spreading, and Compacting Fill Material: 5.4,1 The fill material shall be placed in layers which, when compacted, shall not exceed six (6.0) inches in thickness. Each layer shall be spread evenly and shall be thoroughly mixed during the spreading to insure uniformity of material in each layer. Increased thickness of layers may be approved by the Soils Engineer when conditions warrant. 5.4.2 All fills shall be placed in level layers; layers shall be continuous over the area of any structural unit, and all portions of the fill shall be brought up simultaneously within the area of any structural unit. When imported material is used, it must be placed so that its thickness is as uniform as possible within the area of any structural unit. 5.4.3 When materials are to be excavated and replaced in a compacted condition, segmented, or leap-frogging of cut -fill operation within the area of any structural unit will not be permitted unless the method is specifically described by the Soils Engineer. 5.4.4 When the moisture content of fill material is below the lower limit specified by the Soils Engineer, water shall be added until the mois- ture content is as specified; and when it is above the upper limit specified, the material shall be aerated by blading or other satisfactory methods until the moisture content is as specified. 5.4.5 After each layer has been placed, mixed, and spread evenly, it shall be thoroughly compacted to not less than ninety (90) percent of maximum density in accordance with ASTM Density Test Method D1'557. Compaction shall be by equipment of such design that it will be able to compact the fill to specified density. When the Soils Engineer specifies a specific type of compaction equipment to be used, such equipment shall be used as specified. 5.4.6 Compaction of each layer shall be continuous over its entire area and the equipment shall make sufficient trips to insure that the desired density has been obtained. 5.4,7 Field density tests shall be made by the Soils Engineer. The compaction of each layer of fill shall be subject to testing. Where sheepsfoot rollers are used, the soil may be disturbed to a depth of several inches. Density tests shall be taken in the compacted material below the disturbed surface. When tests indicate the density of any layer of fill or portion thereof is below the required ninety (90) percent density, the particular layer or portion shall be re- worked until the required density has been obtained. 5.4.8 When the Soils Engineer specifies compaction to other standards or to percentages other than ninety (90) percent, such specification, with respect to the particular items shall supersede these specifications. 5.4.9 The fill operation shall be continued in six (6.0) inches compacted layers, as specified above, until the fill has been brought to within 0.1 foot, plus or minus of the finished slopes and grades, as shown on the accepted plans. The finished surface of fill areas shall be graded or bladed to a smooth and uniform surface and no loose material shall be left on the surface. 5.4.10 No fill material shall be placed, spread, or compacted while it is frozen or thawing or during unfavorable weather conditions. When work is interrupted by weather conditions, fill operations shall not be resumed until the Soils Engineer indicates that moisture content and density of previously placed fill are satisfactory. 5.5 Observations and Testina: The Soils Engineer shall be provided with a 48 hour advance notice, in order that he may be present at the site during all earthwork activities related to excavation, tree root removal, stripping, backfilf, and compaction and filling of the site and to perform periodic compaction tests so that substantial conformance to these recommendations can be established. SOILS ENGINEERING, INC. PRF-LI.11LYARY SOILS INVESTIGATION File No. 04 -10923 Property on Ashe Rd Btwn McKee Rd do Taft iltty October 21, 2004 Bakerslield CA Page 5 RECOMMENDATIONS 1. EARTHWORK "Earthwork Specifications," in Appendix A are provided for general guidance in preparing site grading plans. In addition, the following specific recommendations are provided and supersede the latter wherever discrepancies may exist: A. Compaction Unless otherwise specified herein, the terms, "Compaction," or "Compacted," wherever used or implied within this report should be interpreted as compaction to 90 percent of the maximum density obtainable by ASTM Test Method D1557 -78, Method A. B. Optimum Moisture The term, "Optimum Moisture," wherever used or implied within this report, should be interpreted as that obtained by the above described test method. C. Stripping Prior to soil compaction, existing ground surfaces should be stripped of surface vegetation. A stripping depth of one inch should be adequate. In no instances should stripped material be used in engineered fill or blended with and compacted in original ground. D. G ound Surface Preparation Proposed Structure Areas: Ground surfaces in the proposed building area should be compacted in accordance with the following procedures: 1. Excavate earth material to a minimum depth of twelve (12) inches below existing grade in the proposed building areas. 2- The exposed surface soils shall be reviewed by the soils engineer or his representative prior to any backfili operations. The top twelve (12) inches of exposed materials shall be scarified, moisture conditioned and compacted to minimum of 90% of ASTM D -1557. 3. Moisten excavated and imported soils to near the optimum moisture orto a moisture content consistent with effective compaction and soil stability. Compact moistened soils to a minimum of 90 percent of the maximum density obtained by ASTM Test Method D1557. 4. Work to lines at least five feet beyond the outside edges of exterior footings and two feet beyond pavement edges except where excavation may undermine or damage adjacent structures or utilities. Pavement Areas: Ground surfaces to receive concrete driveway and bituminous pavements should be scarified and compacted to a minimum depth of 12 inches below the grading plane in cut areas or to 12 inches in areas to receive fill. Engineered fill placed in proposed pavement areas should conform to the requirements of Section 5.4, "Placing, Spreading and Compacting Fill Materials," of Appendix A. Compaction in proposed pavement areas should be a minimum of 90 percent of the maximum density as obtained by ASTM Test Method D1557, and should extend to a minimum of two feet beyond the outside edges of pavements. Utility Lines: Backfll for utility lines traversing areas proposed for facilities, pavements, concrete slabs - on- grade, or areas to receive engineered fill for future construction should be compacted in accordance with the same requirements for adjacent and /or overlying fill materials. Compaction should include haunch area, spring line and from top of pipe to finished subgrade. The haunch area up to one foot above the top of the pipe should be backflled with "cohesionless" material. Cohesionless native materials may be used for trench and pipe or conduit backfill. The term "cohesionless," as used herein, is defined as material which when dry, will flow readily in the haunch areas of the pipe trench. Pipe backfill materials should not contain rocks larger than two inches in maximum dimension. Where adjacent native materials exposed on the trench bottoms contain protruding rock fragments larger than two inches in maximum dimension, conduits and pipelines should be laid on a bedding consisting of clean, cohesionless sand (SP), in the Unified Soils Classification System. Compaction Requirements - where not otherwise specified in our plans or in these recommendations, the following compaction requirements are applicable to all electrical, gas or water conduits: TABLE A COMPACTION DEPTH SOURCE Haunch to 1 ft. 1 ft. Above Top of Pipe to 2'6" 2'6" Below Area Above Top Below Finished Grade to Site Class of Pipe Finished Grade Finished Subgrade Structures 90% 90% 90% Pavements 90% 90% 90 %* Non - Structural 90% 90% 90% * the top 8 inches of the subgrade shall be compacted to a minimum of 95% of ASTM D- 1557 E. Engineered Fill Earth materials obtained on site are acceptable for use as engineered fill provided that all grasses, weeds and other deleterious debris are first removed. Engineered fill materials should be placed in thin layers (less ttlan ten inches uncompacted thickness), brought to near the optimum moisture content or to a moisture content commensurate with effective compaction and soil stability, and compacted to a minimum of 90 percent of the maximum density obtainable by ASTM Test Method D1557, "Placing, Spreading and Compacting Fill Materials," in Appendix A. F. Imported Fill if it becomes necessary to import materials from off -site to complete site grading, imported soils should consist of essentially granular, silty sands with low expansion potential and free of grasses, weeds, debris, rocks larger than six inches in maximum dimension, and soluble sulfates in excess of 200 parts per million. Imported fill should contain sufficient silt and clay binder to render them stable in footing trenches and capable of maintaining specified elevation tolerances during paving operations. Imported soils to be used as engineered fill should also meet the following gradation and quality criteria: Maximum Percent Passing #200 Sieve .............................. 50 Maximum Liquid Limit ............. ............................... 40 Maximum Plasticity Index ........... ...... . . . . . . . . . . ............ 14 Minimum R -Value (for pavement areas only) ............................ 50 Maximum Expansion Index (per 1997 UBC Standard 18-2, ................. 20 G. Drainage Finished ground grades adjacent to the proposed buildings should be sloped to provide positive free drainage away from the foundations. No areas should be constructed that would allow drainage generated on the site, or water impinging upon the site from outside sources, to pond near footings and slabs or behind curbs. Where ground surfaces adjacent to subsurface walls are to be landscaped, walls should be waterproofed. Installation of gravel -filled drains to route subsurface drainage away from walls will reduce the thickness of damp - proofing resulting in a considerable savings. H. Slopes Finished slopes nearer than five feet from building foundations should be graded no steeper than five horizontal to one vertical (5:1). A slope ratio of two horizontal to one vertical (2:1) should provide adequate stability for slopes farther than five feet from footing lines. SOILS ENGINEERING, INC, a May 29, 2014 SEI File No 04 -10923 Lennar Homes c/o Jim Grombly 3610 Star Sapphire Drive Bakersfield, CA 93313 Subject: Update of Preliminary Soils Report and Seismic Design Includes Tract 6758, Unit 2 Reference Preliminary Soils Investigation For property located on the east side of Ashe Road Between McKee Road & Taft Highway In Bakersfield, California SEI File No. 04- 10923; dated October 21; 2004 Prepared for: Centex Homes Dear Mr. Grombly. In accordance with a request from McIntosh & Associates we have reviewed the above referenced Soils Report which covers the area of Tract 6758, Unit 2. We also reviewed the subject site. There have been no material changes to the site or updates in Technology that would invalidate any of the conclusions or recommendations in this report. Accordingly, the content of the "Preliminary Soils Investigation" remain wholly applicable to the subject site. SEI has also updated the Seismic Design in accordance with the 2013 California Building Code (CBC). The updated Seismic Design Values are attached. If you have any questions concerning this letter please contact SEI at (661) 831 -5100. Sincerely. SOlLS-E-N,INEERING,y Tony Frangie. PE - Vice President �M�N�11 Attachments: Seismic Des SEISMIC DESIGN VALUES The seismic design values are presented in the table below based on the 2013 California Building Code (CBC). The Site Class for Tract 6491 & Tract 6758 located NE of Ashe Road and Taft Highway in Bakersfield, Kern County, California. were determined using standard penetration test data obtained at the site. SEISMIC DESIGN CRITERIA VALUE SOURCE Risk Category 11 2013 CBC Table 1604.5 Site Specific Soils Report W co 2013 CBC Section 1613.3.2, Site Class D ASCE 7 -10 Table 20.3 -1 Mapped MCER Spectral Response _ USGS maps /Software - 2013 CBC Acceleration. short period, SS 1.188 Figure 1613.3 (1) Mapped MCEj Spectral Response _ USGS Maps!Software - 2013 CBC Acceleration, at 1 -sec. Period, S, 0.444 Figure 1613.3 (2) Lei USGS Software - 2013 CBC Table Site Coefficient, F, 1.025 1613.33(l) c4 USGS Software - 2013 CBC Table Site Coefficient, F, 1.556 1613.3.3 (2) Adjusted MCE., Spectral Response USGS Software - 2013 CBC Section Acceleration, Short periods, Sm-s = Fa S; 1.217 1613.3.3 Adjusted MCE„ Spectral Response USGS Software - 2013 CBC Section Acceleration, 1 -sec. Period, S„•. = F.; S; 0.691 1613.3.3 Design Spectral Response Acceleration, Q USGS Software - 2013 CBC Section short periods, S,s = 213 Sms 0.812 161114 Design Spectral Response Acceleration, n USGS Software - 2013 CBC Section 1 -sec period, So,= 223 Sm 0.461 1613.3.4 Peak Ground Acceleration (PGA) for Max. USGS Software - ASCE 7 -10 Fig Considered Earthquake (MCEr;) 0.445g 22 -7 Site Coefficient. FWCA. = 1.055. CJ << USGS Software - ASCE 7 -10 PGA,= Fes* PGA = 0.478 Table 11.8 -1 Site - Specific Ground Motion Procedures USGS Software - ASCE 7 -10 Fig 22- for Seismic Design, CRS 1.033 17 USGS Software - ASCE 7 -10 Fig 22- Site - Specific Ground Motion Procedures for Seismic Design, Ca, 1.045 18 Seismic Design Category short periods (SOS) D 2013 CBC Table 1613.3.5 (1) Seismic Design Category, 1 -sec period (Sr„) D 2013 CBC Table 1613.3.5 (2) MCE,, = Maximum Considered Earthquake (risk targeted). MCEe = Maximum Considered Earthquake (geometric mean) rn 0 M M t- CY) Q 0 z oo U O .10- Z w Q J J Q UJI w v � 30� J w (D cfl 00 Ln CV CK U-1 Y Q M 0 n \ o Q, n � to 0 0 Z q o J U) M W � W O U DIG AT ERT Call: TOLL FREE 1- 800 -227 -2600 00 AT LEAST TWO DAYS BEFORE YOU DIG UNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA NO. 14-40000024 r >_ M1 < < 0 N Qr W I w N LL 0 H Z W co Z _ G ~ cc Lei Q 3 ZM c4 �/ J J o � 11-- p U C0 o Q i Z I= n CJ << < W I w N LL 0 FD. K.C.S. 2" B.C. DOWN 24' FOR W. 1/4 COR. SEC. 34, 30/27 PER R/S BK. 15, PG. 178 I N I I 4,q 0 I I I � I N I� Q� NII IS) I I + �9 I° I u- =>, °I oo- 24 FP 346.7 ' �X c�-�- o,�l 1 N 1�PG� I tn 1 2 I , x S89'02'47 "E X 23 22 fP 346.8 ' fP.347. 0 I I FUTURE UNIT mix I A x � I a �' O - - -- \ 5- I I o \\ c �I� D m - - - -- I - - - - -- I I Q �\ I N °oIU N l I I W 1 101 2A IRI 1 X� I x347. X 347.3 I U I' 11 1 I 2 I 3 _ } \\ i 346 � � I I I � - 10 � - 34 . to F- z - - -� ----- �lL - -- - '"•�`1 - z fP347.6 v U - I �' \ • / / GL Of 4 4 \ 0.25% 0.25% 34 ,34. FL -GB I I C A P E 34i 347 ' i -0.51% I I ' / -A, 15.47 To �� -- - -� -- - - - - -�\ S89102.47 E 'c'- - - -- I- -_ E I I 7 ►-- ! I 4 : ! 1 FP. 347.8 ' I ?34723 , 346.9 I 347., 6 7 347. 6 34- x6 5 64 1 fP 347.5 fP 347.2 I � I I FP 347. $ , , .'47.4 fP 347.5 ( 7.7 f I - -- -- I N I aFG 4 -� I I - - - -- - --- - -- - - - -J i I o II 346.8 .% -� i �? 1 347 1 RAS -- -- -- __ _ 2 ° I NII - - - - -- U-) ' � x S89�02� " 'J , ci C 1 - I 1 I I I I � 346 6 h•4 6'® L 6 I 6 � 8 FP 34711 .1 I fl'. 347.4 3476 J48.4 1. 1I- °o V I I fP 347.9 I fP 3482 I FP 1 I Z 1 I It. I .� I 346.9 I I * S89 14.12 $ 13 nk�6 �q I FUTURE FA /� � 34 &7 -J44 1 fZj 20 -- -- - -- I FR 0.44% % S89- 0247 "E I 0.39 o L��° 4 ! � O 225.55 FUTURE 24 "D �� _ - - -0 5 N00"5� 3- 24"D D ' ke-\- D i oN ° S89'02 47"E GR 30.00' 2 IJ 7% - - - .�''�,� N00'57'13 "E 4 1 t4% 0 449 4 21 20 19 FP 347.2 FP 347.3 FP J476 I � 4--TR. 5 A` >i *,?5 I 1 I i + 18 FP 347.8 17 FP 347.9 �a J Q l I I I I- LLJ I I^ °N I 14 (/) z I FP J46.4 aCQIN1� ' U 9 16 I GEC\ FP3 11g7Cy E� j I c�'yo 1 11 r- fP 348.6 I � x x xX7-.A x x34 &4 xmm x i ��F �\ x 1193.48'. 346.1 in 346.4 - - - - - - - - - - - - - - - -- - - - -- 2 i - - - - -- - - - - -- - - -- - - - - -- - - - -I -- -- - -- X 721 E x 4 I , ( 4 I I I ® I1 5' 35 X 3 x 31 x S4 c'0,4 20' o x® I � N "N ° 1 I I I x j 1 x31 1 Y 3412 I x 3 62 ^ 3610I 4 6 8 9 12 ; 13 1 4 I I 3 o 15x V&F I ,� `� , i I 349.5 fP 349.4 FP 349.3 fP 3491 c - -- - - - -- - - - -- --- I- - - -- XI R/W - - -- ----- !er� -�- ----- #--- - -1- -x -- 0.30% - - - - - - - '�� / _ 1 - C O D A V E N U E 26% 34 11 % 891C 0.30% o - - - - - - - - - - o M I o- - 4 "D 4 D _ 346A' ` ' ' 18 C? 4 ' 0.30% F� �!S' 4 ° o ,r5, 1 ,G8 ".Fti1� .� 1 G �O M 6 .� 0.25% 1 F 4W 7 3 0.30% �- 0 V1F 0.25% 0.25%R'w � rE � 7*o, � � POINT - - _ _ _ _ 1 - - -- � - � I , 1 I 20 20' , I 2 7 � � ! I I I - fp 3465 I , I I , ! �} 30' I 30' I fP I F)? 347.9 x 347. 2 6 2 2 348.4 2 3 2 ' ' ' I ' 1 7 I I fp .6 I fp I fp 3 J49.2 345.7 2 34&9 2 346., 346.0 1 8 17 X I 348.8 348.6 fP l F. I I C W I I 347.7 I I e I I , FP � ''� I �„�t, 4 ! I + 2 I �= I Z IQ 1� - - - -- - - - -- I } u') - - - - -- - - - - - ' - - ® V) 4 34 &g 348,, 34& I 348.9 - 348.7 oN1 -- - - - - -- - - - -- - - - -- - -- -- - - - - - -- -- I - - -- 34 &7 - - -- g - -- g ' - I 47 "W 20.( X 0 °,�V - - - 0.25% 0.2 I � w FAWECTIOt� > ----------- - f �I � I x® 01 p M y+I II 34b I 31W 3 I I I r7-] I I 3 34L , 39m , 3 7x 348.6 , 34&s J I I ( ` I I FP 3464 1 FP 3483 + fP 3461 ' FP 3460 + fP 344.0 ! I I� o ^ I FP 3462 AP 348.3 FP. 3485 ! FP 3467 + fP 3487 1 FP 3 6 I FP 34&5 I FP 348.3 I O __ - -- I, I, I I ! I- - -�. - -- - - - -- I 11 I � l y Li I I , , - - -- -o - -- - - - -�,� - - -- - - - - -- ` R/W N 0.259 -- - -� -- 0.279 w PROVINCET k % 1$.D - o W D 30_1 D /Gi9 0 ° 0.27% L :. �6 a Fl_ AVE P v.co� I tFUTURE - F/L i � E� 9� �� o R /w, - - - - - 0.26% l o ! I I + I I - e - - - - � - J - - FP 346.8 LO N kr - - - - fP2 , Fl 36.3 5 8 L 4 59 57 56 1 55 1 54 el I 53 00 I fP 34 t 1 1 I ' ' - _ --5x- 3- 1 4 82 1I I I I 77 7 ? � 8 3 8 FP 383 1 N t I � XNU x3x &I x 3 x® f P 3'� I 74 r-- - cP346.55 I I ( I $ F-346.7 2 ---- ---------- - - -+-- -- - 4444 --- -- _ I - Ln r,- I _ _ 346 I - - - -- I I j,, i - - - - - - 347.5 S87'32'16'W 1 347. 348.0 251. I I N89b2'47'W� ` I I I 0 - , i - 6 .31 % ��. N i 0 "'� � `� ' +►�" U''� 11 GN o° a/ 0.257. I "F- I io t _ I o - T / w 5 > - - - -- 1 - -- 34&4 1 1 - -* ---- 1c 34U - - -- 34 &7 •1 � I I $ I _ '.0 20' I I I I I 1 I I I I I I I 30' I 5 0 ' A_ ' ' ' I I 14 48 47 46 ' 4 ' 44®' x ; , J fP 346f f fP 3# fP ,g� 4 3 0 I �° 3,gg I Fl° fP.8.5 FP. I - Z I I , I , I I „n !a �$ I -- 4444 -- I 1 I r7D cam' ■f�� -f 4444- 4444 -- 4444 -- - - - - - 444 4- 4444 -- 4444 -- i3 ? 34 &5 1 34&5 'ZZ C4 34&8 34 &g 4 1 n -G8 1 12 Q� I rIo , In I I 1 �°�� ,- I I I u- I FP 346.7 I I ' (6� I fp 34s 45 4 1 1 J{ I fp 346 4 I I I I I I I I ( I 1- 7 18 1 I 19 I 20 21 I 22 �Q� a 76 FP W 1 34. F t FP 2.4 I � 2.5 I I 26 I , I 27 I I 2 " 1 P "-w- 3 FP 3487 I I I 29 15 16 � U� „ FP. 3470 3 g 2 f�,*�3 f1w 3 I 1 Ffp 340 rl f1��'% 14 I + I UNIT 3 pp. E T U R I �. I ORAIN i UNIT 5 3 I TO BE CONSTRUCTED I - - --�- -- -- - -� -- ° 346.4 13 _ -- _ � - - �: �1 ! 8 1a D � \ WITH UNIT 2 I rar,�r,�� r, r,�r,r, ■r�rarara_i�r,r, �-ir, ��_ _r,� � r,r,�� r, T'• iy FLT w - - - - I _ - - - - - - _� 4 ¢ ` 4 4` ,� ��sr 44 ✓o fC " 44. - - -�, _ - 4 J - - 3. -� - - - 2�-�'% JP ✓ I ��� _ ~c� - �^- - _ _ _ ?Ile _ - - - -D 36 0 _ - - 36" D 38 �4 5 ��� - _ - - is FL - - - - - - - ___° _ _ _ D _ 0 57 ' \ ( o�s\� --- -- •344.95 FL �J� - - Y -- _A V E N -E 0.332 0 H H A W A Y - - -E -�f - - ST AIN -��- -- - - °z \ \ I - 4 _� T �0.29�+ ,- 4444- --- -- 0- - - - -- o 344 0.26% 7 .745. - A V3E N0.25% 3 i� I 4n -� r r -34 . - - - - - - _ ��'' I I� - � 34�.` _ T C�VNECTION 4 c I FD. K.C.S. CONC. MON. DOWN 24" FOR WITNESS CORNER 40' NORTH OF S . COR. SEC. 34, 30/27 I w PER R/S BK. 15, PG. 178 i� OO N O(V a C Z - - I \-S.W. COR. SEC. 34, 30/27 PER R.S. BK. 15, PG. 178 TAFT HIGHWAY (STATE HIGHWAY 119) CONSTRUCTION NOTES: 0 INSTALL TEMPORARY INLET STRUCTURE PER DETAIL "AA" ON SHEET 4. 2O INSTALL W- 31(CA) SIGN WITH OM4 -3 MARKER AT PHASE BOUNDARY OF TRACT IF ADJACENT PHASE IS NOT CONSTRUCTED AT SAME TIME. REMOVE AND SALVAGE SIGN WITH CONSTRUCTION OF ADJACENT PHASE. 30 CONTRACTOR TO VERIFY LOCATION AND INVERT ELEV. AT POINT OF CONNECTION OF EXISTING DRAIN LINE BEFORE CONSTRUCTION AND NOTIFY ENGINEER OF ANY DISCREPANCIES. LEGEND ABBREVIATIONS EP EDGE OF PAVEMENT I � ' I I 28 1 27 I ! 1 1 26 I I 1 25 io I FP 347.4 I FP, 3471 I fP, 346.9 + FP 346.7 N I I 4,q 0 I I I � I N I� Q� NII IS) I I + �9 I° I u- =>, °I oo- 24 FP 346.7 ' �X c�-�- o,�l 1 N 1�PG� I tn 1 2 I , x S89'02'47 "E X 23 22 fP 346.8 ' fP.347. 0 I I FUTURE UNIT mix I A x � I a �' O - - -- \ 5- I I o \\ c �I� D m - - - -- I - - - - -- I I Q �\ I N °oIU N l I I W 1 101 2A IRI 1 X� I x347. X 347.3 I U I' 11 1 I 2 I 3 _ } \\ i 346 � � I I I � - 10 � - 34 . to F- z - - -� ----- �lL - -- - '"•�`1 - z fP347.6 v U - I �' \ • / / GL Of 4 4 \ 0.25% 0.25% 34 ,34. FL -GB I I C A P E 34i 347 ' i -0.51% I I ' / -A, 15.47 To �� -- - -� -- - - - - -�\ S89102.47 E 'c'- - - -- I- -_ E I I 7 ►-- ! I 4 : ! 1 FP. 347.8 ' I ?34723 , 346.9 I 347., 6 7 347. 6 34- x6 5 64 1 fP 347.5 fP 347.2 I � I I FP 347. $ , , .'47.4 fP 347.5 ( 7.7 f I - -- -- I N I aFG 4 -� I I - - - -- - --- - -- - - - -J i I o II 346.8 .% -� i �? 1 347 1 RAS -- -- -- __ _ 2 ° I NII - - - - -- U-) ' � x S89�02� " 'J , ci C 1 - I 1 I I I I � 346 6 h•4 6'® L 6 I 6 � 8 FP 34711 .1 I fl'. 347.4 3476 J48.4 1. 1I- °o V I I fP 347.9 I fP 3482 I FP 1 I Z 1 I It. I .� I 346.9 I I * S89 14.12 $ 13 nk�6 �q I FUTURE FA /� � 34 &7 -J44 1 fZj 20 -- -- - -- I FR 0.44% % S89- 0247 "E I 0.39 o L��° 4 ! � O 225.55 FUTURE 24 "D �� _ - - -0 5 N00"5� 3- 24"D D ' ke-\- D i oN ° S89'02 47"E GR 30.00' 2 IJ 7% - - - .�''�,� N00'57'13 "E 4 1 t4% 0 449 4 21 20 19 FP 347.2 FP 347.3 FP J476 I � 4--TR. 5 A` >i *,?5 I 1 I i + 18 FP 347.8 17 FP 347.9 �a J Q l I I I I- LLJ I I^ °N I 14 (/) z I FP J46.4 aCQIN1� ' U 9 16 I GEC\ FP3 11g7Cy E� j I c�'yo 1 11 r- fP 348.6 I � x x xX7-.A x x34 &4 xmm x i ��F �\ x 1193.48'. 346.1 in 346.4 - - - - - - - - - - - - - - - -- - - - -- 2 i - - - - -- - - - - -- - - -- - - - - -- - - - -I -- -- - -- X 721 E x 4 I , ( 4 I I I ® I1 5' 35 X 3 x 31 x S4 c'0,4 20' o x® I � N "N ° 1 I I I x j 1 x31 1 Y 3412 I x 3 62 ^ 3610I 4 6 8 9 12 ; 13 1 4 I I 3 o 15x V&F I ,� `� , i I 349.5 fP 349.4 FP 349.3 fP 3491 c - -- - - - -- - - - -- --- I- - - -- XI R/W - - -- ----- !er� -�- ----- #--- - -1- -x -- 0.30% - - - - - - - '�� / _ 1 - C O D A V E N U E 26% 34 11 % 891C 0.30% o - - - - - - - - - - o M I o- - 4 "D 4 D _ 346A' ` ' ' 18 C? 4 ' 0.30% F� �!S' 4 ° o ,r5, 1 ,G8 ".Fti1� .� 1 G �O M 6 .� 0.25% 1 F 4W 7 3 0.30% �- 0 V1F 0.25% 0.25%R'w � rE � 7*o, � � POINT - - _ _ _ _ 1 - - -- � - � I , 1 I 20 20' , I 2 7 � � ! I I I - fp 3465 I , I I , ! �} 30' I 30' I fP I F)? 347.9 x 347. 2 6 2 2 348.4 2 3 2 ' ' ' I ' 1 7 I I fp .6 I fp I fp 3 J49.2 345.7 2 34&9 2 346., 346.0 1 8 17 X I 348.8 348.6 fP l F. I I C W I I 347.7 I I e I I , FP � ''� I �„�t, 4 ! I + 2 I �= I Z IQ 1� - - - -- - - - -- I } u') - - - - -- - - - - - ' - - ® V) 4 34 &g 348,, 34& I 348.9 - 348.7 oN1 -- - - - - -- - - - -- - - - -- - -- -- - - - - - -- -- I - - -- 34 &7 - - -- g - -- g ' - I 47 "W 20.( X 0 °,�V - - - 0.25% 0.2 I � w FAWECTIOt� > ----------- - f �I � I x® 01 p M y+I II 34b I 31W 3 I I I r7-] I I 3 34L , 39m , 3 7x 348.6 , 34&s J I I ( ` I I FP 3464 1 FP 3483 + fP 3461 ' FP 3460 + fP 344.0 ! I I� o ^ I FP 3462 AP 348.3 FP. 3485 ! FP 3467 + fP 3487 1 FP 3 6 I FP 34&5 I FP 348.3 I O __ - -- I, I, I I ! I- - -�. - -- - - - -- I 11 I � l y Li I I , , - - -- -o - -- - - - -�,� - - -- - - - - -- ` R/W N 0.259 -- - -� -- 0.279 w PROVINCET k % 1$.D - o W D 30_1 D /Gi9 0 ° 0.27% L :. �6 a Fl_ AVE P v.co� I tFUTURE - F/L i � E� 9� �� o R /w, - - - - - 0.26% l o ! I I + I I - e - - - - � - J - - FP 346.8 LO N kr - - - - fP2 , Fl 36.3 5 8 L 4 59 57 56 1 55 1 54 el I 53 00 I fP 34 t 1 1 I ' ' - _ --5x- 3- 1 4 82 1I I I I 77 7 ? � 8 3 8 FP 383 1 N t I � XNU x3x &I x 3 x® f P 3'� I 74 r-- - cP346.55 I I ( I $ F-346.7 2 ---- ---------- - - -+-- -- - 4444 --- -- _ I - Ln r,- I _ _ 346 I - - - -- I I j,, i - - - - - - 347.5 S87'32'16'W 1 347. 348.0 251. I I N89b2'47'W� ` I I I 0 - , i - 6 .31 % ��. N i 0 "'� � `� ' +►�" U''� 11 GN o° a/ 0.257. I "F- I io t _ I o - T / w 5 > - - - -- 1 - -- 34&4 1 1 - -* ---- 1c 34U - - -- 34 &7 •1 � I I $ I _ '.0 20' I I I I I 1 I I I I I I I 30' I 5 0 ' A_ ' ' ' I I 14 48 47 46 ' 4 ' 44®' x ; , J fP 346f f fP 3# fP ,g� 4 3 0 I �° 3,gg I Fl° fP.8.5 FP. I - Z I I , I , I I „n !a �$ I -- 4444 -- I 1 I r7D cam' ■f�� -f 4444- 4444 -- 4444 -- - - - - - 444 4- 4444 -- 4444 -- i3 ? 34 &5 1 34&5 'ZZ C4 34&8 34 &g 4 1 n -G8 1 12 Q� I rIo , In I I 1 �°�� ,- I I I u- I FP 346.7 I I ' (6� I fp 34s 45 4 1 1 J{ I fp 346 4 I I I I I I I I ( I 1- 7 18 1 I 19 I 20 21 I 22 �Q� a 76 FP W 1 34. F t FP 2.4 I � 2.5 I I 26 I , I 27 I I 2 " 1 P "-w- 3 FP 3487 I I I 29 15 16 � U� „ FP. 3470 3 g 2 f�,*�3 f1w 3 I 1 Ffp 340 rl f1��'% 14 I + I UNIT 3 pp. E T U R I �. I ORAIN i UNIT 5 3 I TO BE CONSTRUCTED I - - --�- -- -- - -� -- ° 346.4 13 _ -- _ � - - �: �1 ! 8 1a D � \ WITH UNIT 2 I rar,�r,�� r, r,�r,r, ■r�rarara_i�r,r, �-ir, ��_ _r,� � r,r,�� r, T'• iy FLT w - - - - I _ - - - - - - _� 4 ¢ ` 4 4` ,� ��sr 44 ✓o fC " 44. - - -�, _ - 4 J - - 3. -� - - - 2�-�'% JP ✓ I ��� _ ~c� - �^- - _ _ _ ?Ile _ - - - -D 36 0 _ - - 36" D 38 �4 5 ��� - _ - - is FL - - - - - - - ___° _ _ _ D _ 0 57 ' \ ( o�s\� --- -- •344.95 FL �J� - - Y -- _A V E N -E 0.332 0 H H A W A Y - - -E -�f - - ST AIN -��- -- - - °z \ \ I - 4 _� T �0.29�+ ,- 4444- --- -- 0- - - - -- o 344 0.26% 7 .745. - A V3E N0.25% 3 i� I 4n -� r r -34 . - - - - - - _ ��'' I I� - � 34�.` _ T C�VNECTION 4 c I FD. K.C.S. CONC. MON. DOWN 24" FOR WITNESS CORNER 40' NORTH OF S . COR. SEC. 34, 30/27 I w PER R/S BK. 15, PG. 178 i� OO N O(V a C Z - - I \-S.W. COR. SEC. 34, 30/27 PER R.S. BK. 15, PG. 178 TAFT HIGHWAY (STATE HIGHWAY 119) CONSTRUCTION NOTES: 0 INSTALL TEMPORARY INLET STRUCTURE PER DETAIL "AA" ON SHEET 4. 2O INSTALL W- 31(CA) SIGN WITH OM4 -3 MARKER AT PHASE BOUNDARY OF TRACT IF ADJACENT PHASE IS NOT CONSTRUCTED AT SAME TIME. REMOVE AND SALVAGE SIGN WITH CONSTRUCTION OF ADJACENT PHASE. 30 CONTRACTOR TO VERIFY LOCATION AND INVERT ELEV. AT POINT OF CONNECTION OF EXISTING DRAIN LINE BEFORE CONSTRUCTION AND NOTIFY ENGINEER OF ANY DISCREPANCIES. LEGEND ABBREVIATIONS EP EDGE OF PAVEMENT FS FINISH SURFACE TC TOP OF CONCRETE OE OVER - EXCAVATION FL FLOWUNE FF FINISH FLOOR CL CENTERUNE FC FINISH CONCRETE ELEV ELEVATION GB GRADE BREAK XFP EXIST. FINSIHED PAD FG FINISH GRADE XFL EXIST. FLOWUNE EVC END VERTICAL CURVE FP, 100.00 PROPOSED PAD ELEV. u� �? •� PROPOSED GUTTER FLOIMJNE ELEV. H EXIST. TOP OF CURB ELEV. EXIST. GUTTER FLOWUNE ELEV. 36 70 PROPOSED LANDSCAPE ELEV. O3T5z DIRECTION AND PERCENT OF - w SLOPE FOR DRAINAGE FLOWUNE EXIST. FLOWLINE CENTERUNE OF STREET - - - - PROPERTY UNE/RIGHT -OF -WAY - - - - - - - - - PAD COMPACTION LIMITS ----------- - - - - -- FUTURE FLOWUNE - - - D STORM DRAIN TYPE "A" CATCH BASIN WITH 3.5' VIDE OPENING UNLESS OTHERWISE NOTED EXIST. STORM DRAIN - - - o FUTURE STORM DRAIN ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■■ PHASE BOUNDARY ® CONSTRUCTION NOTES PIPE SIZE 4 WIF-UTIUTY: S -SEWER D -DRAIN SECTION DESIGNATION: SECTION LETTER -- -- A SHEET WHERE SECTION IS SHOWN SCALE: 1 " = 50' 50 25 0 50 100 DIG ALERT Call: TOLL FREE 1- 800 - 227 -2600 AT LEAST TWO DAYS BEFORE YOU DIG UNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA 0. P. NO. 14-40000024 M M cr a q- 0 wao Z � I Q J W U M _ co J � W W co °o tin N o! W Y Q m to M � o � M N 0 Z w m r 4i o m J "' } } m 0 W Y U ct D ! N b /�5 W � M� J J ` W ( , }1 m mm �I a ° Q 0 Ill I W I 0) N a a. H � z Z 0 W�a � � _ °0 W a a z ti Z Z m 'I W ° a a� V � o Q N � m � co a J 0 0 Ill I W I 0) PAD COMPACTION 30' 30 75' PAD COMPACTION LIMITS 20' N 20 PAD COMPACTION 15' wl w 15' PAD COMPACTION rn LIMITS 15" 10' 20' 10" 15' 10' 5' LIMITS z 0 FILL PLACED IN I Q I D FILL PLACED IN FRONT YARD AFTER vo 1 m FRONT YARD AFTER 31 SWALE CONS TRUC710N \I 1% MIN, 15% MAX J 31 �I i SWALE CONSTRUCTION 1% a I J 00 MIN, 15% MAX I FINISHED PAD I 2' N` 1� 4O' I 2' I Z FINISHED PAD 2 0% I 2 09 I\ VARIES BUILDER FENCE 2' \' EXISTING GROUND y_ I _ __ "'N' L 0VEREXCA VA TION ROUGH GRADE LINE (SEE GRADING NOTES) D.4 0 VEREXCA VA 77ON 0.4' PROPOSED 4.5' COMBINATION SIDEWALK (SEE GRADING NOTES) ROUGH GRADE LINE IS PROPOSED CURB &GUTTER EXIST. GROUND VARIES AT 0.2' BELOW FLOWLINE ELEVA TION PAD COMPACTION LIMITS FILL PLACED IN FRONT YARD AFTER SWALE CONSTRUCTION 1Z MIN, 15% MAX FINISHED PAD 0VEREXCA VA TION (SEE GRADING NOTES) 30' 20' wl 15' 10' 20' I J 1 UI o I I 2' 40' ��I I 2.07. I SECTION A SCALE: NONE 4 TYPICAL ROUGH GRADING SECTION (60' R /W) 30' 75' 20' 10' 15' I I �I\ I I t, PAD COMPACTION LIMITS FILL PLACED IN FRONT YARD AFTER SWALE CONSTRUCTION 1% MIN, 15% MAX FINISHED PAD 0.4 �-- ROUGH GRADE LINE 0.4' PROPOSED 4.5' COMBINATION SIDEWALK ROUGH GRADE LINE IS PROPOSED CURB & GUTTER AT 0.2' BELOW FLOWL /NE ELEVA TION SECTION B SCALE: NONE 4 TYPICAL ROUGH GRADING SECTION (60' R /W) PAD COMPACTION z 'L 15' 15' I I I I I 0VEREXCA VA TION (SEE GRADING NOTES) 30' 30' PAD COMPACTION LIMITS LIMITS 20' w I 20' w FILL PLACED /N 15 10 2O 10' 15' FRONT YARD AFTER I J SWALE CONSTRUCTION \ I 0I I FILL PLACED IN 1% MIN, 15% MAX 0 FRONT YARD AFTER Of I J � I % MIN, CO % MAX TION I I FINISHED PAD I 2' 40' 2' I FINISHED PAD 2. o� ?_ 1 2_ _ OVEREXCA VA TION 0VEREXCAVATION (SEE GRADING NOTES) (SEE GRADING NOTES) 0.4 ROUGH GRADE LINE 0.4' PROPOSED 4.5' COMBINATION SIDEWALK ROUGH GRADE LINE ROUGH GRADE LINE lS AT 0.2' BELOW FLOWLINE PROPOSED CURB & GUTTER ELEVA TION SECTION C SCALE: NONE 4 TYPICAL FRONT TO FRONT LOT ROUGH GRADING SECTION (60' R /W) PAD COMPACTON LIMITS EXIST. GROUND VARIES FINISHED PAD 0 VEREXCA VA TION (SEE GRADING NOTES) R 1' PAD 2 %1 2% ELEVATION PAD ELEVA TIDN 2:1 SLOPE TYPICAL FOR ADJACENT LOTS WITH AN ELEVATION DIFFERENCE OF LESS THAN 0.3 FT. SECTION E SCALE: NONE 4 FENCE 27. TRACT 6758 EXISTING PAD ELEVATION TRACT 6757 PAD ELEVA TION - ,I J 2.1 FILL SLOPE SECTION H SCALE: NONE 4 R PAD2' 27. j 2% ELEVATION P ELEVATIOAD N 2. 1 SLOPE TYPICAL FOR ADJACENT LOTS WITH AN ELEVATION DIFFERENCE OF 0.3 FT OR GREATER. SECTION F SCALE: NONE 4 R I 2' I PAD ELEVA TION 2% 2% PAD ELEVATION TYPICAL FOR ADJACENT LOTS WITH AN ELEVATION DIFFERENCE OF 0.3 FT. OR GREATER. SECTION K SCALE: NONE 4 LID TO BE 1/4" STEEL PL FASTENED TO CMP WITH 3/8" RIVETS, SPOT WELD, OR TACK WELD AT 1/8 POINTS OR BETTER. 5-0" MIN. 6" MIN. ROCK COBBLES SIZE TO BE GREATER OR EQUAL TO 2" IN DIAMETER. ROCKS TO BE SPREAD AT LEAST 5-0" RADIUS AROUND THE TEMPORARY INLET AND AT A DEPTH OF 6" MINIMUM. L:a R1 ELEVAON 2% 12% EXISTING PAD /`��``�ELEVATION 2:1 SLOPE TYPICAL FOR ADJACENT LOTS WITH AN ELEVATION DIFFERENCE OF LESS THAN 0.3 FT. SECTION I SCALE: NONE 4 BUILDER FENCE 2' 2' FUTURE PAD ELEVATION 2% 2% EXISTING GROUND SECTION L SCALE: NONE 4 PROVIDE 4 - 12 "x16" OPENINGS W/12" SEPARATION BETWEEN OPENINGS. ,—WITH 1/2" DIAMETER BARS SPACED NOT MORE THAN 2" O.C. 3/4" GRAVEL -- 6" 6" 48" INLET STRUCTURE AA SCALE: NONE 4 36 "0 GROUT fV �j RGJ -RCP DRAIN PIPE SEE STORM DRAIN PLAN VARIES f- DRAIN SHALL BE CLEANED AFTER TEMPORARY INLET IS REMOVED. R ,BUILDER FENCE 2' I F 2% LOT ELEVATION EXISTING GROUND 2: 1 FILL SLOPE SECTION G SCALE: NONE 4 R BUILDER FENCE 2' 2' PAD ELEVA77ON--,, I PAD ELEVATION SECTION J SCALE: NONE 4 EXISTING GROUND FUTURE PAD ELEVA TION - DIG AIXRT Call: TOLL FREE 1- 800 - 227 -2600 AT LEAST TWO DAYS BEFORE YOU DIG UNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA G.P. N0. 14- 40000024 rn 0 rn M H Ql a oz00 Z OL I Q J J Q Ld W U 00 0 W w 00 N �- N W w Y Q m Im N PAD COMPACTION 15' w 15' PAD COMPACTION rn LIMITS 5' 10' � I 20' 10' 5' LIMITS z 0 0. 0 :3 D Z uj m 2 J Q 0 a J 00 cl) U 01 :�i Z m a I\ m o � Lu Lu o to CE O s U M 2% MIN, 4:1 MAX M 2% MIN, 4: 1 MAX U � Q 0 I � Ili U Z z FINISHED PAD 1- 2' I 40' 2' I FINISHED PAD — v 0 2.0 1 - -- - 2 0 ?� I 2 D,- Zox 0 VEREXCA VA TION ROUGH GRADE LINE (SEE GRADING NOTES) 0.4 GRADE BREAK 0 VEREXCA VA TION (SEE GRADING NOTES) 0.4' PROPOSED 4.5' COMBINATION SIDEWALK ROUGH GRADE LINE IS AT 0.2' BELOW FLOWLINE PROPOSED CURB &GUTTER ELEVA TION SECTION D SCALE: NONE 4 TYPICAL SIDE TO SIDE LOT ROUGH GRADING SECTION (60' R /W) PAD COMPACTON LIMITS EXIST. GROUND VARIES FINISHED PAD 0 VEREXCA VA TION (SEE GRADING NOTES) R 1' PAD 2 %1 2% ELEVATION PAD ELEVA TIDN 2:1 SLOPE TYPICAL FOR ADJACENT LOTS WITH AN ELEVATION DIFFERENCE OF LESS THAN 0.3 FT. SECTION E SCALE: NONE 4 FENCE 27. TRACT 6758 EXISTING PAD ELEVATION TRACT 6757 PAD ELEVA TION - ,I J 2.1 FILL SLOPE SECTION H SCALE: NONE 4 R PAD2' 27. j 2% ELEVATION P ELEVATIOAD N 2. 1 SLOPE TYPICAL FOR ADJACENT LOTS WITH AN ELEVATION DIFFERENCE OF 0.3 FT OR GREATER. SECTION F SCALE: NONE 4 R I 2' I PAD ELEVA TION 2% 2% PAD ELEVATION TYPICAL FOR ADJACENT LOTS WITH AN ELEVATION DIFFERENCE OF 0.3 FT. OR GREATER. SECTION K SCALE: NONE 4 LID TO BE 1/4" STEEL PL FASTENED TO CMP WITH 3/8" RIVETS, SPOT WELD, OR TACK WELD AT 1/8 POINTS OR BETTER. 5-0" MIN. 6" MIN. ROCK COBBLES SIZE TO BE GREATER OR EQUAL TO 2" IN DIAMETER. ROCKS TO BE SPREAD AT LEAST 5-0" RADIUS AROUND THE TEMPORARY INLET AND AT A DEPTH OF 6" MINIMUM. L:a R1 ELEVAON 2% 12% EXISTING PAD /`��``�ELEVATION 2:1 SLOPE TYPICAL FOR ADJACENT LOTS WITH AN ELEVATION DIFFERENCE OF LESS THAN 0.3 FT. SECTION I SCALE: NONE 4 BUILDER FENCE 2' 2' FUTURE PAD ELEVATION 2% 2% EXISTING GROUND SECTION L SCALE: NONE 4 PROVIDE 4 - 12 "x16" OPENINGS W/12" SEPARATION BETWEEN OPENINGS. ,—WITH 1/2" DIAMETER BARS SPACED NOT MORE THAN 2" O.C. 3/4" GRAVEL -- 6" 6" 48" INLET STRUCTURE AA SCALE: NONE 4 36 "0 GROUT fV �j RGJ -RCP DRAIN PIPE SEE STORM DRAIN PLAN VARIES f- DRAIN SHALL BE CLEANED AFTER TEMPORARY INLET IS REMOVED. R ,BUILDER FENCE 2' I F 2% LOT ELEVATION EXISTING GROUND 2: 1 FILL SLOPE SECTION G SCALE: NONE 4 R BUILDER FENCE 2' 2' PAD ELEVA77ON--,, I PAD ELEVATION SECTION J SCALE: NONE 4 EXISTING GROUND FUTURE PAD ELEVA TION - DIG AIXRT Call: TOLL FREE 1- 800 - 227 -2600 AT LEAST TWO DAYS BEFORE YOU DIG UNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA G.P. N0. 14- 40000024 rn 0 rn M H Ql a oz00 Z OL I Q J J Q Ld W U 00 0 W w 00 N �- N W w Y Q m Im J > U c a 0 N M \ O rn M � a \ z 0 0 :3 D Z uj m 2 O 0 a J 00 cl) Li 1= :�i Z m a m o Lu Lu o to CE O s U M J > U c a 0 W 0 N co � a z Lu y :3 D uj in 2 z 0 a S 00 cl) Li 1= :�i Z o� s ° a Z Lu Lu o to ca M M U � Q 0 � Ili U Z z 1- M O M 0 6 v 0 W 0