1. GENERAL:
CONTRACTOR WILL FURNISH ALL MATERIALS, TOOLS, LABOR, EQUIPMENT AND
SUPERVISION NECESSARY TO COMPLETE INSTALLATION.
2. PVC PIPE INSTALLATION:
MATERIALS: PIPE AND FITTINGS SHALL MEET THE REQUIREMENTS OF THE CURRENT
ASTM SPECIFICATION D -3034 FOR SDR35. PIPE AND FITTINGS SHALL BE
HOMOGENEOUS THROUGHOUT AND FREE FROM CRACKS, HOLES, FOREIGN INCLUSIONS
OR OTHER INJURIOUS DEFECTS. FITTINGS SHALL BE INJECTION MOLDED AND
SHALL BE INSTALLED INLINE ON NEW PIPELINES; CUT IN FITTINGS ARE NOT
PERMITTED.
JOINTS: USE ONLY ELASTOMETRIC GASKET JOINTS. THE ASSEMBLY OF JOINTS
SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATION. WHERE
PVC PIPE CONNECTS TO VCP PIPE, USE COUPLINGS APPROVED BY THE CITY OF
BAKERSFIELD.
INSTALLATION: PIPE AND FITTINGS SHALL BE INSTALLED IN ACCORDANCE WITH
THE CURRENT ASTM SPECIFICATION D -2321. ONLY CLASS 1, 11 AND III
EMBEDMENT MATERIALS WILL BE CONSIDERED SUITABLE.
3. SYSTEM TESTING:
A PRESSURE TEST AND MANDRELL TEST SHALL BE PERFORMED ON INSTALLED PIPE
IN ACCORDANCE WITH THE CITY OF BAKERSFIELD DESIGN MANUAL CHAPTER 1.3 AND
THE RECOMMENDATION OF THE MANUFACTURER.
4. FOR P.V.C. WYE FITTINGS SHALL BE INJECTION MOLDED INLINE FOR ALL LATERAL
CONNECTIONS AND BE ROTATED A MINIMUM OF 23 DEGREES ABOVE THE HORIZONTAL
PLANE RUNNING THROUGH THE CENTERLINE OF THE MAIN.
5. ALL SEWER STUBS SHALL BE CLOSED WITH A STANDARD PLASTIC PLUG, SOLVENT WELDED.
6. ALL MANHOLES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CITY OF
BAKERSFIELD STANDARD DRAWINGS SW -4, SW -5, AND SECTION 70 -1.02H
OF THE STANDARD SPECIFICATIONS OF THE STATE OF CALIFORNIA,
DEPARTMENT OF TRANSPORTATION, CURRENT EDITION. ALL CLEANOUTS SHALL BE
CONSTRUCTED IN ACCORDANCE WiTH THE CITY OF BAKERSFIELD STANDARD DRAWING
SW -6.
7. BACKFILL AND COMPACTION OF TRENCHES SHALL BE IN ACCORDANCE WITH THE CITY
OF BAKERSFIELD STANDARD DRAWING ST -22 EXCEPT AS NOTED ON PLANS.
8. COMPACTION TESTS WILL BE THE SUBDIVIDERS RESPONSIBILITY. THE NUMBER
AND LOCATIONS OF THE TESTS SHALL BE DETERMINED BY THE CITY ENGINEER.
9. ALL EXISTING IMPROVEMENTS (CURB, GUTTER, SIDEWALK, CROSS GUTTER, FENCING
ETC.) THAT ARE REMOVED, DAMAGED OR UNDERCUT SHALL BE REPAIRED OR
REPLACED AS DIRECTED BY THE CITY ENGINEER.
10. ALL EXISTING PAVING AND SURFACING REMOVED, DAMAGED OR UNDERCUT SHALL BE
REPLACED IN ACCORDANCE WITH THE CITY OF BAKERSFIELD STANDARD DRAWING SW -3,
EXCEPT AS NOTED ON PLANS.
11. ALL LATERALS SHALL BE 4" IN DIAMETER, EXCEPT AS NOTED ON PLANS, AND EXTENDED
4' BEYOND R/W LiNE.
12. SURFACE MARKERS FOR SEWER LATERALS SHALL BE INSTALLED AT THE PROPERTY
LINE IN ACCORDANCE WITH CiTY OF BAKERSFIELD STANDARD DRAWING SW -1.
13. WATER JETTING AND FLOODING SHALL NOT BE USED FOR BACKFILL COMPACTION
FOR FLEXIBLE PiPE.
14. MANHOLES SHALL BE TYPE "A" FOR PIPES UNDER 48" IN DIAMETER AND TYPE "B"
FOR PIPES 48" IN DIAMETER OR LARGER, UNLESS NOTED OTHERWISE.
15. UNDERGROUND SERVICE ALERT (USA) SHALL BE NOTIFIED AT LEAST 2 WORKING
DAYS BEFORE CONSTRUCTION. TELEPHONE 1- 800 -642 -2444.
16. PRIOR TO THE START OF ANY PHASE OF CONSTRUCTION A 24 HOUR NOTICE TO
THE CITY CONSTRUCTION INSPECTION SECTION IS REQUIIRED FOR INSPECTION AND
TESTING. TELEPHONE 326 -3049.
17. SEWER LATERALS SHALL BE A MINIMUM OF 2.25' DEEP AT PROPERTY LINE AND
A MINIMUM OF 2.50' DEEP AND 7.00' MAXIMUM AT FLOWLINE.
18. VIDEO INSPECTION:
PRIOR TO FINAL ACCEPTANCE ALL SEWER LINES SHALL BE INSPECTED WITH VIDEO EQUIPMENT
DESIGNED FOR THE PURPOSE. THE TELEVISION CAMERA SHALL HAVE THE CAPABILITY OF ROTATING
360', IN ORDER TO VIEW & RECORD THE TOP AND SIDES OF THE PIPE, AS REQUIRED. THE VIDEO
INSPECTION SHALL BE WITNESSED BY THE CITY'S CONSTRUCTION INSPECTOR, WHO WILL ALSO INITIAL
AND DATE THE "CHAIN OF CUSTODY" FORM. THE SUBDIVIDER SHALL IMMEDIATELY NOTIFY THE CITY OF
ANY PIPELINE LOCATIONS REVEALED TO BE NOT IN COMPLIANCE WITH THE SPECIFICATIONS. A RECORDED
VIDEO CASSETTE, THE COMPLETED "CHAIN OF CUSTODY" FORM AND A WRITTEN LOG WHICH INCLUDES
THE STATIONING, BASED ON THE STATIONING OF THE APPROVED PLANS, OF ALL CON ECTED LATERALS)
OF THE INSPECTION SHALL BE PROVIDED FOR VIEWING, AND SHALL BE APPROVED BY THE CITY ENGINEER
PRIOR TO ACCEPTANCE. AFTER ACCEPTANCE, THE VIDEO CASSETTE SHALL BECOME THE PROPERTY OF THE CITY.
19. AN OPEN STREET PERMIT SHALL BE OBTAINED FROM THE CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT
FOR ANY WORK PERFORMED WITHIN EXISTING ACCEPTED STREET RIGHT -OF -WAY. UNLESS SECURED BY A
SUBDIVISION AGREEMENT, SECURITY BASED ON AN APPROVED ENGINEER'S ESTIMATE FOR THE WORK
PERFORMED WITHIN THE RIGHT -OF -WAY AND INSURANCE AS REQUIRED SHALL BE PROVIDED PRIOR TO
ISSUANCE OF A BUILDING PERMIT.
20. CLASS 1 BEDDING AND EMBANKMENT IS REQUIRED WITHIN THE PiPE ZONE FOR ALL PVC SEWER PIPE.
21. REINFORCED CONCRETE PIPE SHALL BE CLASS III WITH RUBBER GASKET JOINTS PER A.S.T.M. C 76 & C 443 .
GENERAL NOTES
1. CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE
RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF
CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND
PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT
BE LIMITED TO NORMAL WORKING HOURS, AND THAT THE CONTRACTOR SHALL
DEFEND, INDEMNIFY AND HOLD THE OWNER AND THE ENGINEER HARMLESS
FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH
THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR THE
LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR THE
ENGINEER.
2. NO PIPELINE SHALL BE LAID WITHOUT PRIOR APPROVAL BY THE ENGINEER.
3. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CITY OF BAKERSFIELD STDS.
4. ALL STATIONING IS ALONG THE CENTERLINE OF STREET. ALL ELEVATIONS
ARE BASED ON U.S.G.S. DATUM.
5. THE STAKING AND MARKING OF THE PROJECT SHALL BE DONE ONCE BY
THE OWNER AND ALL RESTAKING OR REMARKING SHALL BE AT THE EXPENSE
OF THE CONTRACTOR.
6. THE CONTRACTOR SHALL PROVIDE THE ENGINEER WITH "AS- BUILT"
PLANS UPON COMPLETION OF THE WORK.
7. EXISTING UNDERGROUND LINES HAVE BEEN SHOWN ON THIS PLAN
ACCORDING TO AVAILABLE RECORDS. THE ENGINEER IS NOT RESPONSIBLE
FOR POSSIBLE ERRORS OR OMISSIONS AND IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO VERIFY LINES IN THE FIELD PRIOR TO
CONSTRUCTION.
SEC. 1. 3.1 CLEANING
PRIOR TO THE ACCEPTANCE OF ANY SEWER LINE BY THE CITY, THE CONTRACTOR
SHALL , CLEAN ALL LINES WITH A WAYNE -TYPE SEWER CLEANING BALL UNDER
HYDROSTATIC PRESSURE. ANY STOPPAGE, DIRT OR FOREIGN MATTER SHALL
BE REMOVED FROM THE LINES. ALL CLEANING AND TESTING OF SEWER LINES
SHALL TAKE PLACE AFTER ALL CONSTRUCTION WORK IS COMPLETED AND ANY
DAMAGE TO THE STSTEM DURING FINAL PAVING AND CLEANUP WILL BE CORRECTED
BEFORE APPROVAL.
SEC. 1.3.2 TESTING
1.3.2.1 MANDREL TEST OF PVC PIPE
FOLLOWING THE PLACEMENT AND DENSIFICATION OF BACKFILL AND PRIOR TO THE
PLACING OF PERMANENT PAVEMENT, ALL MAINLINE PIPE SHALL BE CLEANED AND
THEN MANDRELLED TO MEASURE FOR OBSTRUCTIONS (DEFLECTIONS, JOINT OFFSETS
AND LATERAL PiPE INTRUSIONS). A RiGID MANDREL, WITH A CIRCULAR CROSS
SECTION CERTIFIED AS HAVING A DIAMETER CONFORMING TO THE TABLE BELOW,
SHALL BE PULLED THROUGH THE PiPE BY HAND. THE MINIMUM LENGTH OF THE
CIRCULAR PORTION OF THE MANDREL SHALL BE EQUAL TO THE NOMINAL DIAMETER
OF THE PIPE. THE MANDREL SHALL HAVE AN ODD NUMBER OF RIBS, NUMBERING
NO LESS THAN NINE (9), SPACED EVENLY AROUND THE MANDREL.
IF PIPE DOES NOT MEET MANDREL TEST, VIBRATORY MEANS OF CORRECTING IS
ALLOWED PROVIDED PIPE HAS NOT BEEN CRUSHED AND VIBRATORY METHOD WILL
NOT DISRUPT ADJACENT PROPERTY.
D R A H IVII 11 11-D\1 V 11 V 11
S H 01 11-Z N-.1
D S
0 -3 A__K_
co 1 J1��'Y C A �I�'0 ��A
MH #21
Co #z
Co #1
LEGEND
MH SEWER MANHOLE
SDMH STORM DRAIN MANHOLE
CO CLEANOUT
CB CATCH BASIN
1;1 1 ki 0 10 101 -
1. R/W ON PLANS INDICATE PROPOSED RIGHT -OF -WAY
2. DEPRESSED FLOWLINES AT ALL CATCH BASINS
ARE 2" (0.17') BELOW NORMAL FLOWLINE.
z
J
�L
i
0
0
Iz
GROUND 4'
2 "x4 "x 12" REDWOOD STAKE
14 GAUGE WIRE
F111=41
SEWER LATERAL,--
SEWER LATERAL MARKER" DETAIL
N.T.S.
MANDREL TABLE
NOMINAL DIAMETER MANDREL DIAMETER
6" 5.47"
8" 7.27„
10" 9.07"
1.3.2.2 PRESSURE TEST
PRIOR TO FINAL APPROVAL ALL SEWER LINES SHALL BE TESTED FOR LEAKAGE BY
STANDARD HYDROSTATIC OR LOW PRESSURE AIR TEST.
TESTING OF THE SEWER LINE SHALL BE CONDUCTED FROM MANHOLE TO MANHOLE
IN ACCORDANCE WITH THE UNIFORM PLUMBING CODE AIR TEST METHOD
(UPC SEC. 318 -b(4) 1985 EDITION OR LATER EQUIVALENT).
1 F4,9 00CFAE'v, F21 -7
SAMAN STREET
AH #2
4H #1
1" = 200'
f SITE MH #8A
am:l
SHEET
DESCRIPTION
1.
TITLE
2.
EAST PANAMA LANE
PAVEMENT PATCHES
SUMP
3.
SPARKS STREET
FRAMES & COVERS
SAMAN STREET
4.
ESTAVEZ STREET
HOUSE CONNECTION
ALMAGRO STREET
5.
CANDIA AVENUE
STANDARD DRAINAGE BASIN
VEGA STREET
6.
CORREGIDORA AVENUE
7.
SALAZAR AVENUE
CITY OF BAKERSFIELD
STANDARD DRAWINGS APPLICABLE
FOR THIS PROJECT ARE:
STD. N0.
DESCRIPTION
(09m) bgMd back of curb, excluding
SW -1
SEWER LATERAL MARKER
SW -3
PAVEMENT PATCHES
SW -4
MANHOLE TYPE "A"
SW -5
FRAMES & COVERS
SW -6
6" CLEANOUT
SW -7
HOUSE CONNECTION
ST -22
TRENCH BACKFILL & COMPACTION
S -9
STANDARD DRAINAGE BASIN
S -10
STANDARD CHAIN LINK FENCE
W
z
H
W
W
Ems-+
U)
EAST FAIRVIEW ROAD
U)
TRACT 6865 -1
EAST PANAMA LANE
VICINITY MAP
N.T.S.
O
A
0
z
O
Ems-+
O
Pavement
i E I ffjM11,L\ R)
Backfdl compacted to 957 relative
compaction in roadway areas from 3.0'
(09m) bgMd back of curb, excluding
INDTH
all but the outer 1.0' (03m) of the
_
median areas, and in alleys, within
Ilk
the existing, accepted roadway
OR SLURRY
improvements
_
Backf4l compacted to 9091, relative
in
- .c
compaction all other areas
a,
1.0'(0. Jm) up
jj
6.0" (0.15m) wider
-'
Barkflf in pipe zone compacted
both sides
to 907' relative compaction.
Td4e
Bockbll material within the pipe
Q,
zone to confoma to notes 1, 2
both sides
and 3.*
1
For public utilities , construction
requirements as per the Public
= i,
Utilities Commission General Orders
6.0" (0.15m
Bedding Material for -
H STM Dp2321 s per
NZ7TES
L BackAl for Rigid Pipe
Backfdl material within the pipe zone shall be free of
deleterious material and shall have a Sand Equivalent of not
less than 20 and shall conform to the following grading:
Sieve Size Percentage passing
3/4° (20mm) 100
No. 4 35 -100
No. 30 20-100
This backfr7l material shall be placed in not to exceed one
foot (1.0' loose)(0,3m) layers, simultaneously on each side of the
pipe in such a manner as not to damage or disturb the pipe on
its alignment and grade. Each layer shall be thoroughly comp-
acted by mechanical tamping. Backfrll material shall be
properly compacted to springline prior to proceeding.
2. Backfill for flexible pipe.
Pipe and nrttings shall be installed in accordance with the
current ASTM Tecifrcation D -2321. Only Class l and 11
embedment materials within the pipe zone will be considered
suitable. Wthin the pipe zone, water flooding and jetting shall
not be used for backlii l compaction for flexible pipe. The
bedding and haunching shall be hand placed to the . Spring line
of the pipe and properly compacted. For sewer mains, Class 1
bedding is required for bedding and haunching. Care shall be
taken not to "didocate the pipe. The remaining backfill in the
pipe zone Mull be hand placed and compacted in lifts not to
exceed 6.0" (0.15m) thickness Bockh7l material shall be
properly compacted to springline prior to proceeding.
3. BackRll material above the pipe zone shall be free
of deleterious material and lumps or stones exceeding
4.0' (75mm) in greatest dimension and shall be
placed in not to exceed one foot (1.0' loose) (03m)
layers and each layer shall be thoroughly compacted
by mechanical tamping.
;i o0in :4
1.
REVIEWED BY ASST. PUBLIC WORKS DIRECTOR
ENGINEER'S STATEMENT
finish Grade
Depth varies depending on the
street's Traffic Index (T.I.). See
Table "B' below
Street
Zane TABLE 'B°
TRAFRC INDEX DEPTH
3.0 - 50 1.2' (03m)
VI 55-65 1.5' (0.45m)
70-80 2.0' (0.6m)
8.5 OR MORE 2.5' (0.75m)
Backfll compacted to 9091,
�) relotive compaction
Sae Ta* ,A / Upper limit of pipe zone shall be 1.0' (03m)
above top of pipe bell or the outside diameter
of plain end pipe.
Hounching
�, J;� =_v
"Pipe or conduit
4. Testing of backfill materials shall be in accordance with the
tests listed in Section 6 -3.01 of the Standard Specifications,
(or ASTM D1557, Method 'C °) for trench width greater than LO' (0.3m)
If trench width is less than 1.0'(0.3n), backfril with 2 sack slurry.
5 Compaction tests will be required and shall be the respons-
ibility of the Developer / Subdivider / Contractor. The number
and location of the tests shall be determined by the City
Engineer: The tests Mull be in accordance with the tests
listed in Section 6 -3.01 of the Standard Specifications, (or
ASTM D1557, Method 1C7.
6 Each layer of backRl material shall meet the compaction,
sand equivalent and gradation requirements before the next
layer is placed.
7. For pavement patches within paved areas, see standard
drawing ST-12 in this design manual.
TA BL E "A h
The followin
g shall apply for trench widths.
PIPE
INDTH
IN GREG TEST
TAMPING
CLASS 1 BEDDING
DIMENSION
DRAIN
OR SLURRY
1.0'(O. Jm) or less
1.0(0. Jm) wider
4.0" (75mm) wider
777
both sides
both sides
1.0'(0. Jm) up
1.0'(0. Jm) wider
6.0" (0.15m) wider
to 2.0' 0 6m
both sides
both sides
2.0'(0.6m) or more
1.5(0.45m) wider
1.0'(0 Jm) wider
631
both sides
both sides
rim
FILENAME: ST -13REV
STANDARD MAWJC,99
TRENCH BACKFILL «�� U
AND COMPACTION BEM. SHAW
REQUIREMENTS N.T.S.
SHEET NM
C" OF BAKEF�EL.D ST-22
CAUFOFNA
PUBLIC WORKS DEPARTMENT
Mmf
Z -t 7 -�0/(0
THESE PLANS AND SPECIFICATIONS WERE PREPARED BY ME OR UNDER MY DIRECTION
AND TO THE BEST OF MY KNOWLEDGE AND BELIEF COMPLY WITH CITY OF BAKERSFIELD
ORDINANCES, STANDARDS AND DESIGN CRITERIA, AND INCLUDE ALL IMPROVEMENT
�QRof ,Ss /oa9 REQUIREMENTS OF THE ADVISORY AGENCY OR OTHER REVIEW BOARDS.
°f(leyc ANY ERRORS, OMISSIONS, OR OTHER VIOLATIONS OF THOSE ORDINANCES, STANDARDS OR
DESIGN CRITERIA ENCOUNTERED DURING CONSTRUCTION SHALL BE CORRECTED AND
a No.nss4 SUCH CORRECTIONS REFLECTED ON CORRECTED PLANS SUBMITTED TO THE CITY ENGINEER.
�91F CIVIL ����� �j
OF CAL- �,
ES K. DELMARTER R.C.E. 17564 DATE
J
STORM DRAIN MANHOLE
12
EA
18 R.C.P. STORM
DRAIN
1025
LF
24 R.C.P. STORM
DRAIN
1297
LF
30 R.C.P. STORM
DRAIN
777
LF
CATC H BAS I N
10
EA
OUTLET STRUCTURE
1
EA
CHAIN LINK FENCE
m�
631
LF
16' DOUBLE DRIVE
GATE
1
EA
SEWER
�STIMATED OUANTITIES
SEWER MANHOLE
13
EA
CLEANOUT
2
EA
8" SEWER MAIN
4211
LF
6" SEWER MAIN
279
LF
4" SEWER LATERAL
2659
LF
TRACT
NO. 6865
PHASE
1 :SOILs ON
SANITATION == _
SEWER
& STORM
DRAIN
- sTriucTURAL•� �=
PLANS CIVIL UCU RA
ENGINEERS :F�ioATnoris
� ,fted
DELMARTER AND ASSOC.
®A �; 11- -20 -15
m�
2019 %ESiWIND DRIVE STE. -C° BAKERSFIELD, CA. 93301
PHONE No. 14091 B
327 -1486 FAX 327 -1452
DRWIG B':
J.K.D
_- LAND PLANNING. SURVEYORS
-.LAND LEVELING:
.PROPERTY UNE- SHEET 1 OF 7
=nnAL- it
DRMWM A(E, GATEWAY
1.2 -6865 Ph 1
W
2M Bill
a_
Jp
z*Cl2—
10- 17 +74.35
17 +00 —\ 18 +00
LLJ
Lli Lo
ry
!� Li1
V l LLI
Q0
q
W W
5'
i
2
3
§
O
N
O
�� II
Zlo
<r
0-O
`-M
000
O co
"' 4
<Z 2
v(n
om�
LL.
Lo
0<0
N U z
r--- -A
5
23.82 LF 18" RCP 0 0.11%
— 2
OX
>�3S M
y FOG LINE 11' -14' NORTH SO�y 000
'2 —
19 +00 20 +00 A 21 +00
CAN DI A STREET
SEE SHEET 5
6 I 7
LOT E
1 �
to
2�•
i�
00
8 to
12'
R /W
EAST PANAMA LANE
S89'31'21TE— 22 +00 23 +00
SD MANHOLE #13_
INVERT = 350.30
co
d'
vi
M
R 128.
24 +00
W
N F—
W w
Lli
Q V)
1 �-
i� Lo
W V)
5'
5'
N 57.45' �
34.31'
12' N
co
r
r r
co
r
23.42 LF 30" RCP
0 0.12 %1
TYPE "A" CATCH BASIN
#12 NORM F/L – 358.6513
BOTTOM = 350.08
OUTLET STRUCTURE
PER C.O.B. S -9
INV 30" = 347.10
°40.15 LF 30" RCP
0 7.42%
12'
TYPE "A" CATCH BASIN
#11 NORM FA– 358.68
s # # f STUB & PLUd
BOTTOM = 354.28
B
07.427.
l�
€
13.42 LF 18" RCP 0 31.07%
OVEREXCAVATE SUMP TO A DEPTH OF 29 FEET BELOW
SD MANHOLE #14 --
EXISTING GRADE (EL. 331.45) AND BACKFILL TO ELEV.
INVERT = 350.11
346.85 WITH CLEAN COHESIONLESS SAND CLASSIFIED
__ _ «.__._ __ _.
AS SP OR SW IN THE UNIFIED SOILS CLASSIFICATION
SYSTEM TO ENSURE ADEQUARE PERMEABILITY FOR
WATER TOP DRAIN IN SEVEN DAYS OR LESS. A SOILS
B -B E
ENGINEER IS REQUIRED TO BE ON SITE DURING
TOP SUMP = 360.05
HIGH WATER = 356.35
CONSTRUCT 6' CHAIN LINK FENCE
BOTTOM SUMP = 346.85
w/ REDWOOD SLATS & 6 "x6" CURB
REQUIRED VOLUME = 5.81 AF
ON WEST, NORTHWEST, & NORTH
PROVIDED VOLUME = 5.84 AF
PROPERTY LINES. TIE IN TO MASONRY
WALL. PROVIDE 16' WIDE DOUBLE DRIVE
SUMP SHALL CONFORM TO C.O.B.
GATE & DRIVEWAY 0 RAMP
STANDARDS D -11, D -12 & D -13 (NEW)
23.82 LF 18" RCP 0 0.11%
— 2
OX
>�3S M
y FOG LINE 11' -14' NORTH SO�y 000
'2 —
19 +00 20 +00 A 21 +00
CAN DI A STREET
SEE SHEET 5
6 I 7
LOT E
1 �
to
2�•
i�
00
8 to
12'
R /W
EAST PANAMA LANE
S89'31'21TE— 22 +00 23 +00
SD MANHOLE #13_
INVERT = 350.30
co
d'
vi
M
R 128.
24 +00
W
N F—
W w
Lli
Q V)
1 �-
i� Lo
W V)
5'
5'
N 57.45' �
34.31'
12' N
co
r
r r
co
r
23.42 LF 30" RCP
0 0.12 %1
TYPE "A" CATCH BASIN
#12 NORM F/L – 358.6513
BOTTOM = 350.08
OUTLET STRUCTURE
PER C.O.B. S -9
INV 30" = 347.10
°40.15 LF 30" RCP
0 7.42%
12'
'sue
op
l g3 -�1 6
L 693.
9 SUMP
171.92'
X166
rl
h
r
12'
N
N
N
12'
N 201.87' /
T_
MASONRY WALL
1
I__
Li
LLl
fy
(n W
v W
fy (
Q
n w
i/-
J
J
Q
z
O
t!!
d
25 +00 26 +00
1
EDGE EXIST. PAVING EXISTING CURB & GUTTER SCALES-
STORM H O R I i: 5 O DRAIN PIPE LENGTHS ARE CENTER y — ^
TO CENTER OF MANHOLES AND CENTER OF 6�,,
MANHOLE 'M INSIDE FACE OF CATCH BASIN •
17 18 19 20 21 22 23 24 25 26
N N i
364
INSTALL 174.35 LF 18" i RCP STORM DRAIN i INSTALL 175.65 # LF 18" RCP STORM DRAIN
[
. 364 ..a
358 r
.. _358
m m m
w w w
Id_ U— ,
£ # s £ # # C> U V LL.
f
362
€ i # "£
i ,
i r
r0 1
t # i � Q t
E }
t s } # r D
} 4 E i i
# # E
E }
E
} i ,
�•
�...... _. _.._ � M..._..___ _._._ __.._ ._ �.__.._ _µ.. _.. _._.___._.___ _.. �. __ti_ __..___. � _ _.�_ _...w__.__.._ _ __..........t_.___._- __... _. _� _:.._.--- __..._.__..... __._...._ _.�.___.._ _«. _....__._. _ _. _ � ._�:_ __;_ ._.. __._ __._ .__ _._ _.___.._.. . _..__ ._ _._ 362 356 356
NORTH GUTtE2 PROFILE �pQ # # € NORTH GUTTER PROFILE i i – i ,�'y �,# J , , z z z ! "
•3fo � �jfo I ! # 3 a #
.COQ ! E i } i i # f E } 3 # ,�QQ } } `#• `SSl <n
V"60 €
N
3 1 1
i
1
i R i
# t }
i 3 €
# E 1
# !
7 € I
r# � 4 � _z --,_. .�._.. _ � _.. _...._�w ___.. _._«. __.«..�....__- � - #___. _«.�, _._....._ _._-� __. � �- __..._. _. «....__ �:� -___ _ �._«_.._... ___.. �._.36 �_._... _.._...«.354_.._. __ ; «_.._ _..n.___._. _ _. .�.... _.. w . ._.._.. _...._354._._...
N E 1 1 ,
O
€ E
t r
> t ! i 1
t s £ v'
358 _ .. _... _........_. _... «.._...._.. _...._ _ >. «w_.._.«... _._.._ _.. _.._ __ ...« _. _....«. __ . �... .. ..� .. .« .« «. _._ .._.. ..« .. __ _ .._ _....,... «........_._. . _.. _....� _... «.L ._._.. _.. _ 358
_.«..._ _. �.., __..... ... »_ _...._ ._. _._.� -_ ,._ �. _._..... _._ �.�.__. _._. «...__.... _...__..._ _.....,.._.__ .._._ _ _ .. _.. .t_ _...�._..._ _...,_ _....._ .,_.._ ._,..«. _...._.. _ -. ..�_..__...__._. _ .._ . .,.. �;..... __._.. _..a....._ .... ...._ -_. #m_ _._. __. ».._......_ _«. _.I _ _. __.�. _ _..._ 3 52 352
t ! # f # € # 0 1 F ! i ! j } € 3s6 '� € 0 31.} 7L� 18" RCP \��
f O E
r �G
04 Ir
'y� �� �0 0�ti E 'S�
,.E„ w. 1-
} I\ 1X # 2 } { f ! i ! # € i ? € S € 7 i S E E 0• # �O D
5� �
_.._.�..�.�._._ __._..._ _ «.__.. «.._.___...._...__..«... _,.__._._ «._. __... �.. «.._ ____ __..._.«__.. _.,..._._.._..__._._ .�. _.._. __. _ _ _..... ._«._. __ .«..r„ _M __ __..__. -_.. �..... ««. �,_ ....»..,._.m_..__._._. .�.' . _ «...«. . �- _... «._. «..�. «, . . ; �
..._
.....«... _.. J�. _--0 -4-1 �% ............ .. _...� _.. _.. _...._. ep._. _r� y .�. cn
058% 23.42 LF 30" RP ;C356 � 356 350 .�
_....._.._. __ «.._ �. -«.... «. 350 _.«___ � ,LE 1$; «_ �Cn _ _ _ r ...____
n
.J
s # # f STUB & PLUd
40.15 LF 30 RC�
# I I f € # # SECTION; A— A # "
07.427.
_N
€
�' rn
'sue
op
l g3 -�1 6
L 693.
9 SUMP
171.92'
X166
rl
h
r
12'
N
N
N
12'
N 201.87' /
T_
MASONRY WALL
1
I__
Li
LLl
fy
(n W
v W
fy (
Q
n w
i/-
J
J
Q
z
O
t!!
d
25 +00 26 +00
1
EDGE EXIST. PAVING EXISTING CURB & GUTTER SCALES-
STORM H O R I i: 5 O DRAIN PIPE LENGTHS ARE CENTER y — ^
TO CENTER OF MANHOLES AND CENTER OF 6�,,
MANHOLE 'M INSIDE FACE OF CATCH BASIN •
17 18 19 20 21 22 23 24 25 26
N N i
364
INSTALL 174.35 LF 18" i RCP STORM DRAIN i INSTALL 175.65 # LF 18" RCP STORM DRAIN
[
. 364 ..a
358 r
.. _358
m m m
w w w
Id_ U— ,
£ # s £ # # C> U V LL.
f
362
€ i # "£
i ,
i r
r0 1
t # i � Q t
E }
t s } # r D
} 4 E i i
# # E
E }
E
} i ,
�•
�...... _. _.._ � M..._..___ _._._ __.._ ._ �.__.._ _µ.. _.. _._.___._.___ _.. �. __ti_ __..___. � _ _.�_ _...w__.__.._ _ __..........t_.___._- __... _. _� _:.._.--- __..._.__..... __._...._ _.�.___.._ _«. _....__._. _ _. _ � ._�:_ __;_ ._.. __._ __._ .__ _._ _.___.._.. . _..__ ._ _._ 362 356 356
NORTH GUTtE2 PROFILE �pQ # # € NORTH GUTTER PROFILE i i – i ,�'y �,# J , , z z z ! "
•3fo � �jfo I ! # 3 a #
.COQ ! E i } i i # f E } 3 # ,�QQ } } `#• `SSl <n
V"60 €
N
3 1 1
i
1
i R i
# t }
i 3 €
# E 1
# !
7 € I
r# � 4 � _z --,_. .�._.. _ � _.. _...._�w ___.. _._«. __.«..�....__- � - #___. _«.�, _._....._ _._-� __. � �- __..._. _. «....__ �:� -___ _ �._«_.._... ___.. �._.36 �_._... _.._...«.354_.._. __ ; «_.._ _..n.___._. _ _. .�.... _.. w . ._.._.. _...._354._._...
N E 1 1 ,
O
€ E
t r
> t ! i 1
t s £ v'
358 _ .. _... _........_. _... «.._...._.. _...._ _ >. «w_.._.«... _._.._ _.. _.._ __ ...« _. _....«. __ . �... .. ..� .. .« .« «. _._ .._.. ..« .. __ _ .._ _....,... «........_._. . _.. _....� _... «.L ._._.. _.. _ 358
_.«..._ _. �.., __..... ... »_ _...._ ._. _._.� -_ ,._ �. _._..... _._ �.�.__. _._. «...__.... _...__..._ _.....,.._.__ .._._ _ _ .. _.. .t_ _...�._..._ _...,_ _....._ .,_.._ ._,..«. _...._.. _ -. ..�_..__...__._. _ .._ . .,.. �;..... __._.. _..a....._ .... ...._ -_. #m_ _._. __. ».._......_ _«. _.I _ _. __.�. _ _..._ 3 52 352
t ! # f # € # 0 1 F ! i ! j } € 3s6 '� € 0 31.} 7L� 18" RCP \��
f O E
r �G
04 Ir
'y� �� �0 0�ti E 'S�
,.E„ w. 1-
} I\ 1X # 2 } { f ! i ! # € i ? € S € 7 i S E E 0• # �O D
5� �
_.._.�..�.�._._ __._..._ _ «.__.. «.._.___...._...__..«... _,.__._._ «._. __... �.. «.._ ____ __..._.«__.. _.,..._._.._..__._._ .�. _.._. __. _ _ _..... ._«._. __ .«..r„ _M __ __..__. -_.. �..... ««. �,_ ....»..,._.m_..__._._. .�.' . _ «...«. . �- _... «._. «..�. «, . . ; �
..._
.....«... _.. J�. _--0 -4-1 �% ............ .. _...� _.. _.. _...._. ep._. _r� y .�. cn
058% 23.42 LF 30" RP ;C356 � 356 350 .�
_....._.._. __ «.._ �. -«.... «. 350 _.«___ � ,LE 1$; «_ �Cn _ _ _ r ...____
QRI�I: Essroa
K. Dfl,�9� �y
co
ui No. 17564
C! V Ix.
OF CAI.xi
7
w
Q
I.L.
W 348
I
TRACT N0. 6865 PHASE 2
EXHIBIT "E" —SEWER &STORM DRAIN PLANS &PROFILES
DRAWN BY : J.K.D. DATE : 11 -20 -15
EAST PANAMA LANE
SUMP
"_ SHEET 2
ANiTATI�t�_
CIVIL .STRUCV RA= OF 7
ENGINEERS ���.=
DELMARTER & ASSOC.
2019 WESTIMND DRIVE STE "C" BAKERSFIELD, CA. 93301
PHONE 327 -1485 FAX 327 -1452
+_a " °PU��I "INC SURVEYORS
JOB N 0. 14091 B
1.2 -6865 Ph 1
0-0.11%
s # # f STUB & PLUd
40.15 LF 30 RC�
# I I f € # # SECTION; A— A # "
07.427.
€
E E
_ .. _. _ _ ..__ _ ._.. _. _ « _ .. _._ _. w ._.. _ .. _ _ _ ._ _ _ _. _ _ _ _ _._ __. _ . «.. .� .__ _. _ _.. _ _ _._ . __.._ .. _.« . w_ ._. _ _ _ ._. __. __ __.._ _ __ _ _ __ _ . �. _. __
.._. __._. _. __. _
_ _w _._. _ _ . _.. _ _ _ ._. _ _ _
_ _ _ _ .� _ ._.. ._..._ .__ _ ._. __ ..
_ _ _ _ _ } _ __ __ _ _ _ _ __._ __ __ _« _� __ _ _. -- ----- _ _.__ _«
__ _ «.__._ __ _.
# # f # I f f # # E # # } # f f SECTION
B -B E
: : f
QRI�I: Essroa
K. Dfl,�9� �y
co
ui No. 17564
C! V Ix.
OF CAI.xi
7
w
Q
I.L.
W 348
I
TRACT N0. 6865 PHASE 2
EXHIBIT "E" —SEWER &STORM DRAIN PLANS &PROFILES
DRAWN BY : J.K.D. DATE : 11 -20 -15
EAST PANAMA LANE
SUMP
"_ SHEET 2
ANiTATI�t�_
CIVIL .STRUCV RA= OF 7
ENGINEERS ���.=
DELMARTER & ASSOC.
2019 WESTIMND DRIVE STE "C" BAKERSFIELD, CA. 93301
PHONE 327 -1485 FAX 327 -1452
+_a " °PU��I "INC SURVEYORS
JOB N 0. 14091 B
1.2 -6865 Ph 1
DELWTER & ASSOC
LL1
z
Q
N
Lli _j Li
LL1 V) Lli
LL! W �-- N = O o 1lELr4ARTER &ASSN. w
0
Q N F— _ d 010 V)
Q � W It N Lj w wpm Ito
>ZW z= C1) >= Lij o0) V_
�- � �- Q Q Q cn M �� Q I-
Qw aCw tnw <Zz n Lli
w co � cn Q_._ 0_ LLJ cn � m < cn
9 SUMP — SEE SHEET 2 10 11 N_m-
._ ._.._...._ .M __ _._ .M_. .. ___ __ r ..__._ ..._ ...,._ ....w_ .. ... . ___t ' # f # } '• ! 3 tt € I t ! # I Ii t 1 # . , I ' I I } z I ii i ! i I # # I I# # I # I # ! # c i £ ! i # f , t 1 - _ # I I # { i .
i i . # `# s t ' "s } t # , I S € . . __ _._ ... . _._.__ __ . .. _..- _. ...__ _. . . .._.__.. . .... _. .__._..._.____. _ _ ___... . .___ _... ..___ __. __ _ . . . w _ { I I a i i # } i a i ? # I ; '} 1 ! t7t ! i ` I a 3 , i i i 3 3 i # €� } a x # . . ry __ _ . ._ _ __ _.___ . _ - _.. _ ._ _. ._ _._ _. _ .._ _ .. ._ _ . _._ _ _d I ; i I � s 1 i t E t = } i '; • i ; ? i { : i i z t 1 € i ; i i 1 - . _ __ ._ . _ __. ... __ __ . _ _ _ __ _ _ __...__ . .__ _ _ _.___ ..__ s s I 3 L ; I : J # i # I i # i i # I I ; # J I f i i # # I i I i € } j j j = _ _ ._ .-. ...___ . _ _..._ __ ._ .. ..__ ._. _ _ __ _ ...._._ _._ _.. _ . -_ __.__ ._ ._ .._# .# I s ; .i t 1 ? I = ! i . I i iI I € I �t # s i # [ t s i i . _ _ __ _ ._ .. .. . .__. _ ._ ._ . ._.. . _ __ . - _ ..__..... _ _ _ .__ ._ _ _I i # 1 I ! ± # i i i i { I # i I i l r} # r i i _ i a } # � # # I I i ? # I i # �? i ! 1 — / _ _. _%s_ z ' � .. _ _ �to_ Sy oO� , '_ Q )S_' D� . \ _ .c �. � ... _ '_ it'� p ' i# ; I I ' ; i i s i �
_
-__ _ .. -_ - .__ -.- _ _, i i } I # # I i �i s f # i 1 I i , i 1 I i I I i # i i } t i I ( t i i I # # . i ; i I # I ? I I } # I � � I # `s # I ► _ _. . _ _ _ _ - ....._ . - -.._.. w _ _ __ _ _ .___.w .. . __ a . _ . . .__ . . __; I ! I r i I i ? i 1 I # . i i ' € i I I = i i I i I # i i i ! I I i I i I I # I i # i I I i I I I ' ,! i ? # I _ _ \ ti _._ p _: ' ._ __ Q `. . s _ _c _9 _ . _ _"..i�
_ . ._ .__ # I I i I t ' I t ; I I i i ! •s I i
o _ _ ` S . 6__� � 2 .' _ . _ _I I i 7 = i # I I i 3 , i I } ( I i I i ( i j i i € # { � I I ! ! I j i i i l i I # i i i i � i i S i € i I - �-t,o� z o O o O _y o_.yQ h. _O _ ' °X �,. •� s �, �� �_� � jo
1
_2 12 <o 32 _ .. . w .
-L 0.OT _ F ±
5 5' A RAW
Of
15.42 LF 18" RCP @ 20.75%
_
i
_ o R/W
S89'31 '28"E
2+01.91
z 1 +p0
? t r , i i i i i i �
L •` - . Q o � � _ _�(.. n _ 1 j
f �
O Q 190 �j'0 � `1\s2 �
�C S
ry TQ
U�.. J ' B
G I # ? # # I I t ' s t I ! i I f ! I i 3 } z 1 } I 9 I r !
CL z & LOT E P_. _ L- U_G _ .s ._ _ _
_. P V_ _ . C
LOT F 0 +00 � 5' EAST ®0.35%
o
wt ,� SPARKS STREET SAM AN STREET
W
° 6 +35.00 7 +25.00 RAW 15'
w 0 +00 1 +00 2 +00 3 +00 4 +00 5 +00 6 +00 7 +00 5' A
N00'25'13 "E 31
SEE OFFSITE in 44! SEWER PLANS ,2 ? 919 z LOT E
j 2 4p
X 's r
i # } I �
i I i i # I
i I i i ) # 1 i i
SCALES
HORIZ_._.. _ _ .
I"_50'
O
STORM DRAIN PIPE LENGTHS ARE CENTER
TO CENTER OF MANHOLES AND CENTER OF VERT: 1 2
MANHOLE TO INSIDE FACE OF CATCH BASIN 0 2 3 4 5 6 % O 2 3
NSTALL 45.25 LF
OF 24" RCP INSTALL 171.66 LF OF 24 " RC STORM DRAIN STORM DRAIN_
WET GUTTER PROFILE o
m 358
Lt-
s 606 0 ------
NORTH GUTTER PROFILE} t
w co
to
LLJ
V) p 3 56
_ 3 5 v - C" - 7 w
0 U to i i
N O
w #
LL_ N 354 354
z 15.42 LF! 18 " RCP 3 G
co c z # 020.75 i I #
v
+ N c0 " M N 0.34% 352
+ _ _ N +
'SECTION i A— A o
350-.--
_ ._
_
_ . 350 + N
w U
C) to
_ + 348
348 ' � B &PLUG PLUG TUB 346 346 35%
0.35% INSTALL 211.91 LF #OF 8" PVC SENER# MAIN _ _
# 0.35 I
INSTALL 100.01 LF OF #
INSTALL 292.D1 LF OF $ " PVC ;SEWER M INSTALL 3b7.99 LF OF 8" P C SEWER MAIN 8" VC SEWER MAIN RACT NO. 6865 PRASE 1
EXHIBIT "E" SEWER & STORM DRAIN PLANS & PROFILES
ANITATiOSHEET 3
DRAWN BY J.K.D. DATE 11 -20 -15
QR°FESSi CIVIL OF 7
K Ti�
S
ELMARTER & ASSOC. SPARKS STREET
Lu DELMARTER 8 ASSOC. " 17564 S A M A N STREET 2019 WESTWIND DRIVE STE "C BAKERSFIELD, CA. 93301
BY: PHONE 327 -1486 FAX 327 -1452
JAMES K. DELMARTER SURVEYOR
1Y11 R.0 564 ND LEVEIN
\F - PROPERTY LIW
DATE: SQL �
°
�
s2 _
OC W� suaolvlsio�i
`DRAFTING JOB N 0. 14091 B
1.2 -6865 Ph 1
W
I
6 x�.�h
�' o
7+00
�N
z
w
¢J
W
w o
x
0 ��•
II
Q LCD
00
F' 10
°
Q W
zoo
_ _ =
w m
V)
n.
°0<0
z
Q W
1 06
M qlz:M
W
to
Z z
�---
N
10 11
U)m�
ti
N
5'
5'
to
+¢0
MUz
W
I '. SEE SHEET 2
io 13.42 LF 18" RCP 0 31.07% �xFj��,
2 +00.00 3 +00 �'� 4 +00 4 +8
I to - 23.42 LF 30" RCP 0 0.12%
9 SUMP — SEE SHEET 2
STORM DRAIN PIPE LENGTHS ARE CENTER
TO CENTER OF MANHOLES AND CENTER OF
MANHOLE TO INSIDE FACE OF CATCH BASIN
! X40.15 LF 30" RCP 0 7.42%
SEE SHEET 2
m
0
¢ate
a pM
wq II
��m
1 O
Z <F-
0
w ® m
a
O m to
tU-) N CO
vi on
<( 2
�m�
N S
+Q0
M U Z
W
z
W
�C
Q
iy
0
o�
C� W
W W
V)
Iy W
0 w
U
-51
R/W
ESTAVEZ STREET
+00 00 6 +00
I
6 x�.�h
�' o
7+00
/
N00'28'32 "E
pp
I N 6 +20.00
z
x
0 ��•
in
Q
to R/W M
o
ry
m
to>
F-
00
W
to
,
� 5
� 5,
�---
N
10 11
12
W
m
{)
W
<
Q
c
a
Q-
z
W
W
Q0
�(�'
"`�.
W
uj
V)
W
D
z
Q
ry
�
N=
W
W W
CJi
V J
Vim'( /
Q
W
)
"'`
c/) Z Z
n In
8 +00
M
W
w
LLJ
Q�
QW
U)
W
Q (w
.0
5'
LO
N
" M
w0 11
k-- 00
Z J �
0
wWm
O O ttA
00 n
M
to
-� z
to mes
VUZ
R/W
0
W
Z
W
Q
Q
ry
0
o F_
(
V W
W r
ry (f)
Iy W
0 �
U
23.42 LF 18" RCP 0 2.05%
U)
1+00 1 2-1.00 2 +80.00
4
13.42 LF 18" RCP 0 3.58% • Spey >S
R/W A
U to
F- cV
:yam
M
a-0 b, Q
o I O
zJI
w0
u-
° M
;try
U J
Inm�
c+V0Z
'-
N
QJ
to
M
o it
, m
010
Z J F-
wu-m
001
in co t`
M Ott j
<Z z
toM�
N w
5' dory
M U Z
B
23.42 LF 18" RCP 0 2.73%
io
3 +00 4 +00 N40.28'32 "E 5 +00 5 +60.0(
x2p�i0 13.42 LF 18" RCP 0 2.91% ALMAGRO STREET
yak ,
}o II
�C�
o;o
ZJF~-
0
aim
000)
U-) to �
eri �M
�N 2
to mes
N =
ci +ao
M U Z
W
D
z
LLJ
n' F-
< W
N r
Q (1)
Q W
(,() U)
1�
SCALES
HO RIZ: Y' =50'
VERT: 1 "= 2'1
2 3 4 5 6 7 8 0 1 2 3 4 5
# f INSTALL 157.25 LF OF 30" RCR STORM DRAIN il. I INSTALL 272.25 LF OF 24" RCP STORM DRAIN
# { f } { T INSTALL 80.50 L�
O OF 24" RCP I € # { € # {
# 3 { { _ f } .lye 'S OQ € € 01 .� y } i € INSTALL 244.75 LF 24" RCP STORM► DRAIN f { STORM DRAIN { } INSTALL 244.75 LF 24" RCP STORM DRAIN f € }
360 I _... _t_.. -__... '� __._ __I..__ »_____.__ ___ _.__...___..___ ____.__..__ __ _..__..__.___....--- ..._ -- _..____...._.__.___. _.__...__..------- .-- _..._._._. _.. .� _.___.._ _.___..---- ..___.._� ..._._- ...____...__.... �_.._____....___. ; _ 360
ulklir ,yy°''
EAST GUTTER PROFILE
#
�
# f f s f } € € { € � { �g1'� �, { } # s �,'�'�� # �,�'�� f # # # 'COQ` { ��' �•�`�'
358 _ _ 1___._,__._..___ _ € 9 358
_ __. _. _ _ w _. _ - -. _ ._ 0 04` EASE GUFfEf� PReFiifl_ __ _ . _. _
} 4 f € } M = } # I f { 00 } r o0 # : { } } € # I f { } f m 4 V
o # _ ! ? ! i # s € { { _ } { { i # # 1 to U f m { Li
{k # € f i i a0 I # i = # ? i ! { { ! f { f € } ° # { { { # Z U ; °
356 } f f { } f { _ - i w _ # 'O # im _ # m •- - _... ! m ..__ .. - f _ _ _ _ __ ,_ I _ _. _ ._ _..__ _ _ ' _.. _ _ _ { _ ._ _.. _ _ . -. f _ { ._. » _. _ __ . _» f { € { ° { w
f to z s s Ui t� } LL f LL { } } € 1 _ _ F' _ r { { } _..{ - # o ¢
# N f t ° s I i 1 z O # { w 1 1 1 ° z }° ! # i s to # f Z } f { o t¢ 3 Lsl = �-
z
F- # O f # {n # I N } O v Z .° F- O U c
f I U t z} Z i La.t ° } W { l € i O } { U € } } W ' ¢ f Q
z 3 # o € t O1 ILV f Q { Q z # ! { i 1 v ' i } { ! } -1- ° x J �`" N f cn
O E # Z # { f € s I U; 's { LZ f LIL ° f # € to i € # } f } a
# U f o f O 4 # f ; i N I i a# f °o f } U€ # } # { # f I f } �ySi to Z �` q {z
U O f € I �ci + ; { 0I [ri ! ° f o o , ; { ai } } } f } { L S}�, - �' in t J
O 1 + , i :
+ m f
# to
f i
O
f ( N { { N i # s ` S {� \ �9 i Z { Z h O� p # t # N # # M 60 { # f i { X00 \O'C% 00 . 354 �.. _ __.._ _ � I _.. 3 _... _ _._ _ �... _ __ _ __ _ _._ _N_ _. __ _.._ _....... ___ �.._.__ __._ ___ _ _�_ __. ____._.. _�l..w..i_.. _ __._.__ _.. __..»..� __ .__ _._ _ ._.__._. _..._ .._ __ _.. _ ._ _._ __..._ __�_... _ _._ _.._ _._._. _...._..._ _.._.._ __ _.. _. ________._.._ w._.___. �. s__ � 1.._ _ __ _- _.__ _ _.�. _ __.� _._ _.._ _ » �, ._ _. _.. _ _.. _ _.__._ � _... _ �.._. _._ _ -_.. _ .�._ __».. ».. _ _ _.�..___ _._ _. _ _ _.._.� .� .._. _ _ _.. __ .�
354
._ ._ _. _ _ _.._ .... _. _. # + _... --- . ; -- �- { h`V.� i y`1% O a { _ { i # ; c�,• f aj`t f ' ._ }__ - ; _ ...� „�,. - ._ -- __ ._ �- __ ._ _..
f r i i # i �1 # � �� o E �� i i s f i a'�, ; a�. ; f 0.37% i " - 353.24} INV
1 # i \ { # # { } \� # { 15.42 LF 18 CP - BO OM I
�C. 0.16% �, f
i { # 00.11%
'!� {
23.42 LF 1f RCP 13.42 LF 18" RCP f \� { i 0.31% j { } { { { € # 23.42 { 18 RCP "
i 13.42 LF 18 RC
0 2.05% { 04.58% { } f € i i f } { 0 2.73 #
I S 02.91%
>
i
} I #
s {
f i {
t 1 1 f
352 ' __.__..______ ___.___ ______.__ _ __.__ _ __.__.____ -- - _____..__ ___.._..._ ____.___..____.. _.___._____. _ _.__ .._.__.____ _._____._.__ __ _�______
# p�y �� } f s s
\� t _ _ - zi _ _SECTION A A ^SECTION �� —B
0.38% t € o s
# -0.12% of f { ; f f { 1 f { f { { # { # > lb
01 1
to
€ z € { f { { ? t f to
350 _ __._ _ _ . --- _M..__..__._ _._ ...._ _.. � _ .._...__ _ _ w.. �� _ _ .�._. _.. _ w » _ __ ._ __.._ __ _ _ m_ _ �_.w ... __ _ _ _. _ ..__ ».._._. -... _._ _ - _ - - - _. �.._._.._ _ _ _ __.__ _. _._ _ _. _ _...._. _... _ ___ w _.. _.�___. _. _ ...._._..__ ._. _
_ �..._ _.._.. �. __.. »...... _._ � _... _ _..._.:�w _. _. �. _.._.... ».._.. _...w.. �.. w_.._...__._ _.. _. _..._. .�.». w_f_ _�- _ ;_ _;.» _{ _ .�. _i _� _ � . _ {_. _ f Y _ {w �. _.. ._.. _ _. __ _. _. . _ __._ _...w_ _..._ .�..__ __.». _ �._._. __......». _._. � _.._.._ _...». _ _...__ _.. _ _._.._._.. __- _.. __.. _.. _. .._..._ ___...350 ._.._ ._
# �q• JG t ;
yS f f €
i E
1 {
348 ._ ^.�_ ._.....�_�_...�.._._..._._ {M . ,_ ........�,_. �..�...�..�...� _.__ �__ _.. �.n.r.._ .f...__.__.� ._.Y .� __ _._- ....._ ____ _.. _ . _ _ -_ m . __ M ,. � ___ �._ _ _ _.. _..f._ ... _ .�. _ _.._ . _ .__ _.. _ _ -_ __ w__. �. _...._...._- __......_ _�__ _...___....__- _.. __ �. - im...� M.. _ TM....._.._.__..�.�.�.,�..ww.. _,.� �.........�_f_w..M. _ . _ � 348
_.., w.. -.... _,.........� _..._� _ .._ _...... >...^ �...... ..., .� ._.. _ w.,. f # € � i� i € f 1 f I I ► f f : i � .., ..., �,. ,... M. w.....,> .... ,..... # ........�. _.,. __..,.. ......_ } ... �... _.._., �..._ _. _. __.. t i ._ .� M......._. _._ _..._ .-. , ; _.. __..._. m_. ._.. _...._ w ._ ._. '... _.. .._ _...
Dc1
4 00
346 _ ,._ _ _. _ _. _ . __ .._ _ __...__._ _ _ ._.____ _ _.._. _._..._. -- _...._. _.. w __ .._
_ __ _ _ .__._. -__ _ __ _ __.__._ _ . ._ _ __.___ __ _ _ ._.,._ _ __ _ _ -_ .__ __.._. _. ___ __. �__ __ _._ _ __._ _ _._ _ . w _5 ._ _ _ __ _ _0 :5 %- ,�_ _.{ - iO..3_. 34 6 �.
INSTALL 48.00 'LF
OF 6 PVC I t # s { € { { # { # { { €
344 ( s { INSTALL 280.00 LF OF 8" PVCs' SEWER MAIN # f INSTALL 130.00 LF OF 8" PVC SEWER MAIN INSTALL 140.00 LF OF 8" Pk SEINER MAIN # SEWER MAIN } } # 4 { { { { # { } { 344
Is
#
TRACT NO. 6865 PHASE I
EXHIBIT "E" — SEWER & STORM DRAIN PLANS & PROFILES
SHEET 4
DRAWN BY J.K.D. DATE 11 -20 -15 AaLTA�loar
�0 4RKf ESS HYDRAUUC3 ==
. DQ aa4� CIVIL sip- u�ruRAE= _ OF 7
�'� Fw 2 ELMARTER & ASSOC. ENGINEERS
��' y`' ESTAVEZ STREET
w No.175s4 DELMARTER & ASSOC.
BY: A L M A G R 0 STREET 2019 WESTVAND DRIVE STE 'C' BAKERSFIELD, CA. 93301
* PHONE 327 -1486 FAX 327 -1452
JAMES K. DELMARTER
sr - _-- — SURVEYORS
9 CIVt� �� R.C.E.. 7564 = _= LAiJD�LEVEUNG:
lF OF CA01 ... ® =PROPER__ u-
DATE: V SUBDIVISI
DRAF?! c JOB NO. 14091 B
1.2 -6865 Ph 1
IDELMARTER & ASSN ^ ��'"i�•'� --
W
z
<t
W F— —I
W w Q Ld
�-- DELMARTER & ASMC. ry
z
`tcv >w
OW NW QW QV)
W W �_ >_ � r Qcn
Cn U} Q V) <C U)
Q Q �w c�nLu <� •Q Lu
_ _ < � 70 69 68 67 � 66 65 64 W �' w � � �,
74 I 73 72 71 63 62 61 IQ
z
5'
•a- 5,
� o n M
04 5 u�i N m cv CID to 000 rn + + + + +
d � to co /W 00 00 00
5'
z R/W
O 9 c�
hx�'•� CAN DI A AVENUE �,� oo � �° VEGA STREET
+96.7 4 +91.73 1100 6 +00 7 +00 7 +29.93 8 +00 +00 70 10 +0 11 +00 12 +00 12 +96.23 D 0 +00 1 +00 2 +00 2 +15.00
c0
S89 31 28 E
�9 S'� `38 S00'28'32" W ppp1
ti8 yam, ,,ti o� �y oo �x���
7 z , 8 50
R W
to to Lo R/W to cn Lo to to / a to � to x R/W
N 00 d o o o to .- r- M rn to W f
+ + + + + + + + + + + -I- it
�r d- L to m r 0o rn rn o 0 138'
INSTALL LATERALS TO 5'
4 FUTURE LOTS
1 2 3 4 5 6 7 8 9 SUMP
W W W Lu
ry
U) U)
< Q cn
n n Ow
W LEI
> �
SCALES-
HO RIZ: 1" = 5 0'
STORM DRAIN PIPE LENGTHS ARE CENTER
TO CENTER OF MANHOLES AND CENTER OF VERT: 1 " MANHOLE TO INSIDE FACE OF CATCH BASIN 2
3 4 5 6 7 8 9 10 11 12 13 0 1 2
# { # ? } { # # € } # # # } { { # } # i INSTALL 172.00 LF 18" RCR STORM DRAIN } $ }
s # { } { INSTALL 238.20 LF 24" RCP STORM DRAIN } # # INSTALL 556.31 LF $30" RCP STORM BRAIN # # { $ $ # } r
X14\ GUTTER PROFILE € h x3\ } t
360 } { { { € t ' €. { } NO RTH GUTTER PROFILE $ { { t3s ? _ } # ! t £
# $ $ $ lye $ # { # #
358 _ _. _. ...... _... _ _
_._. _. �._ . _..._ .._ �.__... ...,� a q.. f . _ ,... µ. _ .. _ _._.. .._ ._._ ._..�.._..__, _w M_ _�.. 358
in 0
N
_-
f =
o { }
$ } ?
I3 zf � lu # } Q } { � $ ..... _... ..... , # .. ...... . ....... { ............. ._........ �_�,. ..a . _....� r ... ._..._.- ._.. _.. ; ... � £ Q { F F �♦ € } , ... $ G € .._. ,.......... ....,. _........ ..._ .... ... _ ..,....,.. _...._. _, ..... __........... _.....
{ j N ? i # # 1 N { C { # j V# F # lQ S {
! } of # o '`� } # # { p i } # f £ } i } o # #
£ # +1 { i # to ! € j ? = O ; i : # ? # € # # # # £ # { 1+ # £
cj• t
} 3 r
{
# # #
t i
i t r
+.� 354
f #
352 t
V
i
'S h
5
: f # {
t #
.. _ _.._.�..._..._........._. _...__ �..�..� _._._..... _ _ _ _ __. �__.__._.... ,.... w _. _...._ _........ a -_. _�._ ,_. _ _ w. _._ W_ .. _ ._. __._. w«. _. _.. . __...� .._ _. �.._ _. _..w _�. »«. ._. _ 352
.�,. _. .w .... f . ... #., .. }. a ,.y ,,„ \fit . },. . $. �_. .. . {. .,�, .i . .....,i ... .,,.,. � �f. _ .. i .$.., ....F._. ..�. ..§._ .» _.» ..�...n ..,i _., _., ._.,.._ .._....._ ........_. _.,, «_...�, ...,..._...__ -._ __ _... ,..... .._. �....,.. ,. ��.«..«., .,,..... ._. _ -...__ .,.. ,._......,» _..,. » ...._.. ,......_ ,...._...,.......... ......_ ..._ .__ _.. M ....... .......... __. .
} 0.12/0 } } } # # # # € }
t } ? 009
# i i
t
J # "i # E £ I
s i ��•.
E 3 � f # ! 5 # 3 t11 i 5 } f £ .• # } t •• f E •-• $ •• ._ t } # {$ t i f ^ # i
:0.35q #
Y i
4 $
i ? s
F f }
R
i t i I i
i
# i
t
th f
f
}
348
.�� _r. •� �, ., €w., _ �... . �_ _ _ � �_. .,. ,�. #. �. _ {_ _ _ .� _.. w_�..� __ �_._. __»._ M._.,..�_ .�_.�.__.__ _..._... �._....,.,.__._.;___.. _. _ ._ ___... __.._._..- � _._._.__...___,___... ». __.__ __,�_.._._..� _.. � .___..�.�.. _.._.. __.___..�.__ »..�. _M __._. ___M__.._ .....__....__ 348 .�.�,.
li VIP
# € { # } {
? { { # {
346 $ # INSTALL 183.00 LF OF 6 PVC SEWER MAIN i t INSTALL 364100 LF OF 8" PVC. SEWER MAIN :(( # # INSTALL 363.23 LF OF 8 PVC SEWER MAIN } 'w__ _.---.___•._.__•# E-____._._____ __.__.._;__.___._____.._._.__._ S..______.____.__ ..___i..___.____..__.._______.. __.____. w. ___._--- .__. €_...______.______. _____,_._ .__.____#._._______...______._. €_____.__._____.__ _ __ _.346- _
TRACT NO. 6865 P 1
EXHIBIT "E" — SEWER 8c STORM DRAIN PLANS & PROFILES
SHEET 5
DRAWN BY : J.K.D. DATE 1i- -ZO -1S `- ANITA'iION�
vvrj ESStpa NYDR'AUUCS-
. o q� CIVIL sr�ucT -7i RAL~� OF 7
� S �' ELM ARTER 8c ASSOC. C /-� j� [} I A AVENUE ENGINEERS ��i��_
wy � DELMARTER & ASSOC.
No. 17564 BY: V E V A STREET 2019 WESIWIND DRIVE STE "C' BAKERSRELO. CA. 93301
* JAMES K. DELMARTER PRONE 327 -1486 FAX 327 -1452
ctvt� o��`e R.C. .• 17564 SURVEYORS
"�.A_ND _LEVELING:
OF CAt.1F v �� PROPERTY UNE:
DATE: su DIwsio�i
JOB NO. 14091 B
1.2 -6865 Ph 1
DELMiARTER & ASSN
Ld
W L
W Z
LLJ W
I-- DEL14ARTER & ASSN
W
>
Q
N O w N I- �
Iz ww Qw
W W Q F >� N-r W W
U� C� < Q Q u' U) U)
< ``� _Iw (mow < Q Q
Z Z `[ v' W U' �
46 45 44 43 42 41 40 39 38 37 36 35 34 33
ca M m t0 N rn to to m m r
�5.
C� M O M O? Nt O CO r 1- M 00 d O
N co + + + + + + + + + + + ' 5 ' —'
+ + + ° O r N N M M d- d- in co S
R/W r r r RAW
O O
o I
O O 6X
oXs °•oo
to 10 �°` �� N �' ''y #8' 9 .o �, Pi ZARRO STREET to
#2
81-00 ( 9 +00 10 1 +00 12 +0 13 +00 �' 14 +00 15 +00 16 00 y `s 0 +00 1+00 1 +45.00 h
1rp�o N00'28'32 "E
7 +66.59 8 ±61.59_ N89`31'28"W 16 +66.09
CORREGIDORA AVENUE 0 _ o
�5 M �
N
N °° M + to + + + + + R/W ib o N� ^RAW
+ + + p O ± N N M M d �I to c+0 I + a-
° ±
N �-- 47 48 49 50 51 52 53 54 55 56 57 58 59 60 13 14 N
W W W W
U) U) U) U?
Z � Z Z
n n n p_
SCALES.
HORIZ: 1 VERT: 1 = 2
7 8 9 10 11 12 13 14 15 16 17 0 1 2
S f 4 }
1
} 1 i
36 0 __..__. __....._._.._ _ _ _.. _ __. __ _ .._ _ _.. _ __.._._..._. __. _. _ _...__ ..._ _ _.. _ __ ..__ _._... _ _..._ _.__ _ _. _ _ -. - -__. _ .
f ? S _ } f }
_ _..._ i. �._ �._ _�. ...� _ #._ �._ _�. __ -_ _�. 360
SOUTH GU R PROFILE
EAST GOTTER PROFILE {
# f GO t1`� ftt i i #
Vol
! € .COQ _ # #
358 _..._ _..__. - _ _ __.__ _.. __ _ ._.__.__ ..« ____ . _ _ .____- _ ._
# i # I # 358
#
# #
,
356 _.__ .. _.. __ __._ .__.___ ___ .. __.__ _ »_ »._... __ _..__..___ _..._. _. _..._._.._..__.. __.__ _ __ _ _. _ -T T
# { ! #
354 € # U { ! # i _ ._. ` __ ..._ _.. __ _ _ € ._ _. _ __ _...._ .i_ . __. __ ._ _ ..» ._. .. _..._ __ _.. __ _ _ { _ _ _ _._ _ = t ... _ __ _ ._ ._ ..M _ ? _. _ _ __ .._ .. w_ _ i i # # # # # { 3 # i �, { t ; v
_ ._ __....w._.._ _._ _ _ _._ _ ._ _ _..�.._..__.. _ ._._ #� . _ ___...�. r._.� _ �°c - . _ . _ _.. _w _ _ _ a = _ i- w _ _i _ i _ . _ _. w . _ . _.__...w _ #_._ ___..._ ;.M._.__ _ ._ ._ _..._- # _ _. _ i._ ___.. z _ .. _ 1 .__ _ _ ._.__ _ _ _.- _w #_ _ _ » ._. 354
? # Z # i # # I z € s # ! # # O i { i # # i 1 p # # # i # O # i # # ° #
o i i # # # # O ( # i i i # + °
co
f i # # �,
to 0 T l + # 3 { 4 '
3 t ( f 5
i
,
Z '
#
i 35
350 # �'` # ► # # _ ..._ __ _ _...._ _.. ».. € . _._ »_ __.___. __ .__ w_ »_ __v _ _._ __ ; .. _.._. _ ._ ._....» ___ # _. _ I »_ __._._ .. _ ._ _. # . i # ? I # # E �' ��'
_�.. _. €.� .� Y .� w_ }_,. �. #. 1 .� #�. .�_ _,_w i .i_ _�.� ;. -f- -� � ;_ �. � ..____�..�..�.�.�.._ .�. �.._.._._�.. �. .�......._�.._... �..__.�_.._.�..�._�...»._ �� �..�.�.«.._� .._�.�..�..._......��. 350 -�..
{ # #_... f i t— _i. `i '�
0.35%
348 .. _... _ «. _.. _... _. ` _. # € i { # # # #
..__... __... �. �._ _ _._ _. _ _ _...._ .._ _..... __ .. __ ____ _. �.._. �. __. _.. __.__ �......_._t_ _. ..._._..._._ _x _.__. _ _. _..__.�.._ ...__ _ _...i.._ __._. w...,. _�.,_._ .,_�..�. __.�. _. _ �., �,..�.. _.. _ _ + 348
r t
3
346 I i INSTALL 20.00 LF OF 8" PVC SEWER MAIN # # INSTALL 335.00 LF OF 8" PVC SEWER {MAIN f I i i i 8" i i
INSTALL 16 .00 LF OF PV SEWER MAIN 3q-6
3 44 # ? I i # # { € _ _. _ __ _.. # _ _. w __ ._.._ ._. _ __ _.... __ __ _. # ._ __.._ _ »_ # INSTALL 336.09 LF OF $ PVC SEiRi'ER MAIN # i # I I # ,
._. _ .._ _____ ___� ._._ _ _. _ -_ _. f _ .._._ _ _ _. _ _..
# # } f t 1
TRACT NO. 6885 PHASE 1
EXHIBIT "E" — • SEWER & STORM DRAIN PLANS & PROFILES
SHEET 6
:SANITATION=
OVtOFESS�pa` DRAWN BY J.K.D. DATE 11- -20 -15 _
CIVIL s cn��A� OF 7
��5�' OF�,��y� ENGINEERS
�Q �� RELMARTER & ASSOC. CORREGIDORA AVENUE DELMARTER 8c ASSOC.
uj No. "�4
BY. P I Z A R R 0 STREET 2019 WESTWIND DRIVE STE 'C' BAKERSFiELD, CA. 93301
* PHONE 327 -1486 FAX 327 -1452
r JAMES K. DELMARTER NINE SURVEYORS
s j CIS 1� � R.C.E.. 7564 = uwo ND - �LLANN LING:
£ t7f CAi -�F� DATE: ®C �'PR�RTY ONE
�SUBDI�ASION
oAFnac. JOB NO. 14091 e
1.2 -6865 Ph 1
Lli
::D
0
0
C*4 N
u� n Lli — Ld
z
Li >
La ^0 DELMARTER & ASSM 0
af, to <
c� Ld _0 0
F- 00 (J,)
c� ii
co <
N_ z <�- _M CN Lli
2 0 0 1- -5 1 p
Ltj LL_ Ld z _j F-
a- z 4;z,- 0
0 0 04 of Lij W M Lli
LL] Li-i 0) ry a- ry ry
io to r-z ood-
U) cf) ti :444u,) < iot V) (f) cf) :D
< � N Lu o6
< < ti <
U) Ld
–<_j n co
to <z
(n
18 c� 17 16 15 0 < tL LL
n a Lo 0:2 p, in n n
04
+ -cc 0 to INSTALL 48.00 LF INSTALL 48.00 LF
00 0 z
0 w OF 6" PVC SEWER
04 - +<O MAIN 0 1% & PLUG OF 6" PVC SEWER
o) u') + �oz MAIN 0 1% & PLUG
+ + + + 5" a—
r- 00 00 0) A R/W
SEE SHEET
10. 13.42 LF 18" RCP 00.11% 11 x 13.42 LF 18" RCP 01.12% V 5`4'
7 +69.9 8+60.95 10+75.02 Al W� 13+71.02 16+65.45
j 8+00 9+00 10+00. 11+00 05 12+00 13+00 14+00 15+00 16+00
— — — I — i N89*311'28"W N89-31'281W
b
SALAZAR AVENUE w L SALAZAR AVENUE 0
oi to
A NJ
RAW 0, - r" 8
04 It V) 0 (6 to CD _T
00 to 0) to 0 0 04 r__ n
4* 00 NO PHASE 2
+ + + + + + + + CL
+ + 5 + + cl C-4 to to
0') 0)
INSTALL LATERALS TO PHASE 1
2 FUTURE LOTS 19 20 21 22 23 24 25 26 27 28 29 30 31 32
Lij
Lli
Ld III
cf) cf)
< <
ryW
(-) L.Li
n n r
LLJ
LLJ
< V)
SCALES
STORM DRAIN PIPE LENGTHS ARE CENTER HORIZ: 1 "=50'
TO CENTER OF MANHOLES AND CENTER OF 2) 1
MANHOLE TO INSIDE FACE OF CATCH BASIN VERT: 1 2
7 8 9 10 12 13 14 15 16 17
'1 7—
INSTA IL 100.95 LF OF
INSTALL' 249.32 LF 18" RGP STORM DRAIN
18' R�P STORM DRAIN
4-
4 4- 4 - - -- ---- — — — — — — — — —
k-ay
t � l i � 'S�� � i 4 � 'y ,�h���� I �4a���� F i # t 3 # ! .�- t # 3 f t 3€ �$��� #
SOUTH GUTTER PROOILE
t
358
_T 358
T_ T_ T_ --F 7_ _T
i 0 u')
M
lk
3: LLj
LL-
(n
0
356 0
__.L 356
<
0
1 0 i 0 w
N w
0 0
to 16
u
0
0) + i M z
+ I (-)
t6
p
(.0
C14 +
0
+ 00 0 w
0.11%
354
354
4-
TUB &i PLUG 1,3.42 LF 18" RCP
@
o
M
SECTION A—A
0
z
0
352
352
T_ "T T_ T_ T_ --------
04 (n
C)
+ z
O 0
+
C> to
d
+
co
350
-0.
tK
348
-0.35%
INSTALL 360.02 LF OF PVC SEWER MAIN
INSTAL! 296.00 LF OF 8' �VC SEWER MAIN
T
346 346
T_ --I— _T _T -T- _T
INSTALL 294.4,3,LF OF 8" PVC SEWER MAIN
m
TRACT NO. o"865 PHASE I
EXHIBIT "E" SEWER & STORM DRAIN PLANS & PROFILES
SHEET 7
qtfjfESS/ DRAWN BY J.K.D. DATE 9-09-15
o CIVIL YDRAUUCS-------. OF 7
DQ
< "N't ENGINEERS
co D LIVIARTER & ASSOC.
SALAZAR AVENUE
D ELM ARTER & ASSOC.
w No. 17564 rn
BY: 2019 AESTVAND DRIVE STE *C" BAKERSnELD, CA. 93301
4 PHONE 327-14M FAX 327-1452
JAMES K. DELMARTER ND PLANNIN *
—SURVEYOR
Clvl\, R.C. 64 ND LEVELIN
PROPERTY N
6
i
Z�'lk
WTER & AS�SW_
F=
xsd�
C3 )o
x x
-----------
7,
0
0
CF CALF DATE: �C®°
JOB NO. 14091 B
1.2-6865 Ph 1