Loading...
HomeMy WebLinkAbout1.2-6865 Phase 1MCA" FDM IZI r*_ S- h I - h I - It W11 II_D\� 1. GENERAL: CONTRACTOR WILL FURNISH ALL MATERIALS, TOOLS, LABOR, EQUIPMENT AND SUPERVISION NECESSARY TO COMPLETE INSTALLATION. 2. PVC PIPE INSTALLATION: MATERIALS: PIPE AND FITTINGS SHALL MEET THE REQUIREMENTS OF THE CURRENT ASTM SPECIFICATION D -3034 FOR SDR35. PIPE AND FITTINGS SHALL BE HOMOGENEOUS THROUGHOUT AND FREE FROM CRACKS, HOLES, FOREIGN INCLUSIONS OR OTHER INJURIOUS DEFECTS. FITTINGS SHALL BE INJECTION MOLDED AND SHALL BE INSTALLED INLINE ON NEW PIPELINES; CUT IN FITTINGS ARE NOT PERMITTED. JOINTS: USE ONLY ELASTOMETRIC GASKET JOINTS. THE ASSEMBLY OF JOINTS SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATION. WHERE PVC PIPE CONNECTS TO VCP PIPE, USE COUPLINGS APPROVED BY THE CITY OF BAKERSFIELD. INSTALLATION: PIPE AND FITTINGS SHALL BE INSTALLED IN ACCORDANCE WITH THE CURRENT ASTM SPECIFICATION D -2321. ONLY CLASS 1, 11 AND III EMBEDMENT MATERIALS WILL BE CONSIDERED SUITABLE. 3. SYSTEM TESTING: A PRESSURE TEST AND MANDRELL TEST SHALL BE PERFORMED ON INSTALLED PIPE IN ACCORDANCE WITH THE CITY OF BAKERSFIELD DESIGN MANUAL CHAPTER 1.3 AND THE RECOMMENDATION OF THE MANUFACTURER. 4. FOR P.V.C. WYE FITTINGS SHALL BE INJECTION MOLDED INLINE FOR ALL LATERAL CONNECTIONS AND BE ROTATED A MINIMUM OF 23 DEGREES ABOVE THE HORIZONTAL PLANE RUNNING THROUGH THE CENTERLINE OF THE MAIN. 5. ALL SEWER STUBS SHALL BE CLOSED WITH A STANDARD PLASTIC PLUG, SOLVENT WELDED. 6. ALL MANHOLES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CITY OF BAKERSFIELD STANDARD DRAWINGS SW -4, SW -5, AND SECTION 70 -1.02H OF THE STANDARD SPECIFICATIONS OF THE STATE OF CALIFORNIA, DEPARTMENT OF TRANSPORTATION, CURRENT EDITION. ALL CLEANOUTS SHALL BE CONSTRUCTED IN ACCORDANCE WiTH THE CITY OF BAKERSFIELD STANDARD DRAWING SW -6. 7. BACKFILL AND COMPACTION OF TRENCHES SHALL BE IN ACCORDANCE WITH THE CITY OF BAKERSFIELD STANDARD DRAWING ST -22 EXCEPT AS NOTED ON PLANS. 8. COMPACTION TESTS WILL BE THE SUBDIVIDERS RESPONSIBILITY. THE NUMBER AND LOCATIONS OF THE TESTS SHALL BE DETERMINED BY THE CITY ENGINEER. 9. ALL EXISTING IMPROVEMENTS (CURB, GUTTER, SIDEWALK, CROSS GUTTER, FENCING ETC.) THAT ARE REMOVED, DAMAGED OR UNDERCUT SHALL BE REPAIRED OR REPLACED AS DIRECTED BY THE CITY ENGINEER. 10. ALL EXISTING PAVING AND SURFACING REMOVED, DAMAGED OR UNDERCUT SHALL BE REPLACED IN ACCORDANCE WITH THE CITY OF BAKERSFIELD STANDARD DRAWING SW -3, EXCEPT AS NOTED ON PLANS. 11. ALL LATERALS SHALL BE 4" IN DIAMETER, EXCEPT AS NOTED ON PLANS, AND EXTENDED 4' BEYOND R/W LiNE. 12. SURFACE MARKERS FOR SEWER LATERALS SHALL BE INSTALLED AT THE PROPERTY LINE IN ACCORDANCE WITH CiTY OF BAKERSFIELD STANDARD DRAWING SW -1. 13. WATER JETTING AND FLOODING SHALL NOT BE USED FOR BACKFILL COMPACTION FOR FLEXIBLE PiPE. 14. MANHOLES SHALL BE TYPE "A" FOR PIPES UNDER 48" IN DIAMETER AND TYPE "B" FOR PIPES 48" IN DIAMETER OR LARGER, UNLESS NOTED OTHERWISE. 15. UNDERGROUND SERVICE ALERT (USA) SHALL BE NOTIFIED AT LEAST 2 WORKING DAYS BEFORE CONSTRUCTION. TELEPHONE 1- 800 -642 -2444. 16. PRIOR TO THE START OF ANY PHASE OF CONSTRUCTION A 24 HOUR NOTICE TO THE CITY CONSTRUCTION INSPECTION SECTION IS REQUIIRED FOR INSPECTION AND TESTING. TELEPHONE 326 -3049. 17. SEWER LATERALS SHALL BE A MINIMUM OF 2.25' DEEP AT PROPERTY LINE AND A MINIMUM OF 2.50' DEEP AND 7.00' MAXIMUM AT FLOWLINE. 18. VIDEO INSPECTION: PRIOR TO FINAL ACCEPTANCE ALL SEWER LINES SHALL BE INSPECTED WITH VIDEO EQUIPMENT DESIGNED FOR THE PURPOSE. THE TELEVISION CAMERA SHALL HAVE THE CAPABILITY OF ROTATING 360', IN ORDER TO VIEW & RECORD THE TOP AND SIDES OF THE PIPE, AS REQUIRED. THE VIDEO INSPECTION SHALL BE WITNESSED BY THE CITY'S CONSTRUCTION INSPECTOR, WHO WILL ALSO INITIAL AND DATE THE "CHAIN OF CUSTODY" FORM. THE SUBDIVIDER SHALL IMMEDIATELY NOTIFY THE CITY OF ANY PIPELINE LOCATIONS REVEALED TO BE NOT IN COMPLIANCE WITH THE SPECIFICATIONS. A RECORDED VIDEO CASSETTE, THE COMPLETED "CHAIN OF CUSTODY" FORM AND A WRITTEN LOG WHICH INCLUDES THE STATIONING, BASED ON THE STATIONING OF THE APPROVED PLANS, OF ALL CON ECTED LATERALS) OF THE INSPECTION SHALL BE PROVIDED FOR VIEWING, AND SHALL BE APPROVED BY THE CITY ENGINEER PRIOR TO ACCEPTANCE. AFTER ACCEPTANCE, THE VIDEO CASSETTE SHALL BECOME THE PROPERTY OF THE CITY. 19. AN OPEN STREET PERMIT SHALL BE OBTAINED FROM THE CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT FOR ANY WORK PERFORMED WITHIN EXISTING ACCEPTED STREET RIGHT -OF -WAY. UNLESS SECURED BY A SUBDIVISION AGREEMENT, SECURITY BASED ON AN APPROVED ENGINEER'S ESTIMATE FOR THE WORK PERFORMED WITHIN THE RIGHT -OF -WAY AND INSURANCE AS REQUIRED SHALL BE PROVIDED PRIOR TO ISSUANCE OF A BUILDING PERMIT. 20. CLASS 1 BEDDING AND EMBANKMENT IS REQUIRED WITHIN THE PiPE ZONE FOR ALL PVC SEWER PIPE. 21. REINFORCED CONCRETE PIPE SHALL BE CLASS III WITH RUBBER GASKET JOINTS PER A.S.T.M. C 76 & C 443 . GENERAL NOTES 1. CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS, AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE OWNER AND THE ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR THE LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR THE ENGINEER. 2. NO PIPELINE SHALL BE LAID WITHOUT PRIOR APPROVAL BY THE ENGINEER. 3. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CITY OF BAKERSFIELD STDS. 4. ALL STATIONING IS ALONG THE CENTERLINE OF STREET. ALL ELEVATIONS ARE BASED ON U.S.G.S. DATUM. 5. THE STAKING AND MARKING OF THE PROJECT SHALL BE DONE ONCE BY THE OWNER AND ALL RESTAKING OR REMARKING SHALL BE AT THE EXPENSE OF THE CONTRACTOR. 6. THE CONTRACTOR SHALL PROVIDE THE ENGINEER WITH "AS- BUILT" PLANS UPON COMPLETION OF THE WORK. 7. EXISTING UNDERGROUND LINES HAVE BEEN SHOWN ON THIS PLAN ACCORDING TO AVAILABLE RECORDS. THE ENGINEER IS NOT RESPONSIBLE FOR POSSIBLE ERRORS OR OMISSIONS AND IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY LINES IN THE FIELD PRIOR TO CONSTRUCTION. SEC. 1. 3.1 CLEANING PRIOR TO THE ACCEPTANCE OF ANY SEWER LINE BY THE CITY, THE CONTRACTOR SHALL , CLEAN ALL LINES WITH A WAYNE -TYPE SEWER CLEANING BALL UNDER HYDROSTATIC PRESSURE. ANY STOPPAGE, DIRT OR FOREIGN MATTER SHALL BE REMOVED FROM THE LINES. ALL CLEANING AND TESTING OF SEWER LINES SHALL TAKE PLACE AFTER ALL CONSTRUCTION WORK IS COMPLETED AND ANY DAMAGE TO THE STSTEM DURING FINAL PAVING AND CLEANUP WILL BE CORRECTED BEFORE APPROVAL. SEC. 1.3.2 TESTING 1.3.2.1 MANDREL TEST OF PVC PIPE FOLLOWING THE PLACEMENT AND DENSIFICATION OF BACKFILL AND PRIOR TO THE PLACING OF PERMANENT PAVEMENT, ALL MAINLINE PIPE SHALL BE CLEANED AND THEN MANDRELLED TO MEASURE FOR OBSTRUCTIONS (DEFLECTIONS, JOINT OFFSETS AND LATERAL PiPE INTRUSIONS). A RiGID MANDREL, WITH A CIRCULAR CROSS SECTION CERTIFIED AS HAVING A DIAMETER CONFORMING TO THE TABLE BELOW, SHALL BE PULLED THROUGH THE PiPE BY HAND. THE MINIMUM LENGTH OF THE CIRCULAR PORTION OF THE MANDREL SHALL BE EQUAL TO THE NOMINAL DIAMETER OF THE PIPE. THE MANDREL SHALL HAVE AN ODD NUMBER OF RIBS, NUMBERING NO LESS THAN NINE (9), SPACED EVENLY AROUND THE MANDREL. IF PIPE DOES NOT MEET MANDREL TEST, VIBRATORY MEANS OF CORRECTING IS ALLOWED PROVIDED PIPE HAS NOT BEEN CRUSHED AND VIBRATORY METHOD WILL NOT DISRUPT ADJACENT PROPERTY. D R A H IVII 11 11-D\1 V 11 V 11 S H 01 11-Z N-.1 D S 0 -3 A__K_ co 1 J1��'Y C A �I�'0 ��A MH #21 Co #z Co #1 LEGEND MH SEWER MANHOLE SDMH STORM DRAIN MANHOLE CO CLEANOUT CB CATCH BASIN 1;1 1 ki 0 10 101 - 1. R/W ON PLANS INDICATE PROPOSED RIGHT -OF -WAY 2. DEPRESSED FLOWLINES AT ALL CATCH BASINS ARE 2" (0.17') BELOW NORMAL FLOWLINE. z J �L i 0 0 Iz GROUND 4' 2 "x4 "x 12" REDWOOD STAKE 14 GAUGE WIRE F111=41 SEWER LATERAL,-- SEWER LATERAL MARKER" DETAIL N.T.S. MANDREL TABLE NOMINAL DIAMETER MANDREL DIAMETER 6" 5.47" 8" 7.27„ 10" 9.07" 1.3.2.2 PRESSURE TEST PRIOR TO FINAL APPROVAL ALL SEWER LINES SHALL BE TESTED FOR LEAKAGE BY STANDARD HYDROSTATIC OR LOW PRESSURE AIR TEST. TESTING OF THE SEWER LINE SHALL BE CONDUCTED FROM MANHOLE TO MANHOLE IN ACCORDANCE WITH THE UNIFORM PLUMBING CODE AIR TEST METHOD (UPC SEC. 318 -b(4) 1985 EDITION OR LATER EQUIVALENT). 1 F4,9 00CFAE'v, F21 -7 SAMAN STREET AH #2 4H #1 1" = 200' f SITE MH #8A am:l SHEET DESCRIPTION 1. TITLE 2. EAST PANAMA LANE PAVEMENT PATCHES SUMP 3. SPARKS STREET FRAMES & COVERS SAMAN STREET 4. ESTAVEZ STREET HOUSE CONNECTION ALMAGRO STREET 5. CANDIA AVENUE STANDARD DRAINAGE BASIN VEGA STREET 6. CORREGIDORA AVENUE 7. SALAZAR AVENUE CITY OF BAKERSFIELD STANDARD DRAWINGS APPLICABLE FOR THIS PROJECT ARE: STD. N0. DESCRIPTION (09m) bgMd back of curb, excluding SW -1 SEWER LATERAL MARKER SW -3 PAVEMENT PATCHES SW -4 MANHOLE TYPE "A" SW -5 FRAMES & COVERS SW -6 6" CLEANOUT SW -7 HOUSE CONNECTION ST -22 TRENCH BACKFILL & COMPACTION S -9 STANDARD DRAINAGE BASIN S -10 STANDARD CHAIN LINK FENCE W z H W W Ems-+ U) EAST FAIRVIEW ROAD U) TRACT 6865 -1 EAST PANAMA LANE VICINITY MAP N.T.S. O A 0 z O Ems-+ O Pavement i E I ffjM11,L\ R) Backfdl compacted to 957 relative compaction in roadway areas from 3.0' (09m) bgMd back of curb, excluding INDTH all but the outer 1.0' (03m) of the _ median areas, and in alleys, within Ilk the existing, accepted roadway OR SLURRY improvements _ Backf4l compacted to 9091, relative in - .c compaction all other areas a, 1.0'(0. Jm) up jj 6.0" (0.15m) wider -' Barkflf in pipe zone compacted both sides to 907' relative compaction. Td4e Bockbll material within the pipe Q, zone to confoma to notes 1, 2 both sides and 3.* 1 For public utilities , construction requirements as per the Public = i, Utilities Commission General Orders 6.0" (0.15m Bedding Material for - H STM Dp2321 s per NZ7TES L BackAl for Rigid Pipe Backfdl material within the pipe zone shall be free of deleterious material and shall have a Sand Equivalent of not less than 20 and shall conform to the following grading: Sieve Size Percentage passing 3/4° (20mm) 100 No. 4 35 -100 No. 30 20-100 This backfr7l material shall be placed in not to exceed one foot (1.0' loose)(0,3m) layers, simultaneously on each side of the pipe in such a manner as not to damage or disturb the pipe on its alignment and grade. Each layer shall be thoroughly comp- acted by mechanical tamping. Backfrll material shall be properly compacted to springline prior to proceeding. 2. Backfill for flexible pipe. Pipe and nrttings shall be installed in accordance with the current ASTM Tecifrcation D -2321. Only Class l and 11 embedment materials within the pipe zone will be considered suitable. Wthin the pipe zone, water flooding and jetting shall not be used for backlii l compaction for flexible pipe. The bedding and haunching shall be hand placed to the . Spring line of the pipe and properly compacted. For sewer mains, Class 1 bedding is required for bedding and haunching. Care shall be taken not to "didocate the pipe. The remaining backfill in the pipe zone Mull be hand placed and compacted in lifts not to exceed 6.0" (0.15m) thickness Bockh7l material shall be properly compacted to springline prior to proceeding. 3. BackRll material above the pipe zone shall be free of deleterious material and lumps or stones exceeding 4.0' (75mm) in greatest dimension and shall be placed in not to exceed one foot (1.0' loose) (03m) layers and each layer shall be thoroughly compacted by mechanical tamping. ;i o0in :4 1. REVIEWED BY ASST. PUBLIC WORKS DIRECTOR ENGINEER'S STATEMENT finish Grade Depth varies depending on the street's Traffic Index (T.I.). See Table "B' below Street Zane TABLE 'B° TRAFRC INDEX DEPTH 3.0 - 50 1.2' (03m) VI 55-65 1.5' (0.45m) 70-80 2.0' (0.6m) 8.5 OR MORE 2.5' (0.75m) Backfll compacted to 9091, �) relotive compaction Sae Ta* ,A / Upper limit of pipe zone shall be 1.0' (03m) above top of pipe bell or the outside diameter of plain end pipe. Hounching �, J;� =_v "Pipe or conduit 4. Testing of backfill materials shall be in accordance with the tests listed in Section 6 -3.01 of the Standard Specifications, (or ASTM D1557, Method 'C °) for trench width greater than LO' (0.3m) If trench width is less than 1.0'(0.3n), backfril with 2 sack slurry. 5 Compaction tests will be required and shall be the respons- ibility of the Developer / Subdivider / Contractor. The number and location of the tests shall be determined by the City Engineer: The tests Mull be in accordance with the tests listed in Section 6 -3.01 of the Standard Specifications, (or ASTM D1557, Method 1C7. 6 Each layer of backRl material shall meet the compaction, sand equivalent and gradation requirements before the next layer is placed. 7. For pavement patches within paved areas, see standard drawing ST-12 in this design manual. TA BL E "A h The followin g shall apply for trench widths. PIPE INDTH IN GREG TEST TAMPING CLASS 1 BEDDING DIMENSION DRAIN OR SLURRY 1.0'(O. Jm) or less 1.0(0. Jm) wider 4.0" (75mm) wider 777 both sides both sides 1.0'(0. Jm) up 1.0'(0. Jm) wider 6.0" (0.15m) wider to 2.0' 0 6m both sides both sides 2.0'(0.6m) or more 1.5(0.45m) wider 1.0'(0 Jm) wider 631 both sides both sides rim FILENAME: ST -13REV STANDARD MAWJC,99 TRENCH BACKFILL «�� U AND COMPACTION BEM. SHAW REQUIREMENTS N.T.S. SHEET NM C" OF BAKEF�EL.D ST-22 CAUFOFNA PUBLIC WORKS DEPARTMENT Mmf Z -t 7 -�0/(0 THESE PLANS AND SPECIFICATIONS WERE PREPARED BY ME OR UNDER MY DIRECTION AND TO THE BEST OF MY KNOWLEDGE AND BELIEF COMPLY WITH CITY OF BAKERSFIELD ORDINANCES, STANDARDS AND DESIGN CRITERIA, AND INCLUDE ALL IMPROVEMENT �QRof ,Ss /oa9 REQUIREMENTS OF THE ADVISORY AGENCY OR OTHER REVIEW BOARDS. °f(leyc ANY ERRORS, OMISSIONS, OR OTHER VIOLATIONS OF THOSE ORDINANCES, STANDARDS OR DESIGN CRITERIA ENCOUNTERED DURING CONSTRUCTION SHALL BE CORRECTED AND a No.nss4 SUCH CORRECTIONS REFLECTED ON CORRECTED PLANS SUBMITTED TO THE CITY ENGINEER. �91F CIVIL ����� �j OF CAL- �, ES K. DELMARTER R.C.E. 17564 DATE J STORM DRAIN MANHOLE 12 EA 18 R.C.P. STORM DRAIN 1025 LF 24 R.C.P. STORM DRAIN 1297 LF 30 R.C.P. STORM DRAIN 777 LF CATC H BAS I N 10 EA OUTLET STRUCTURE 1 EA CHAIN LINK FENCE m� 631 LF 16' DOUBLE DRIVE GATE 1 EA SEWER �STIMATED OUANTITIES SEWER MANHOLE 13 EA CLEANOUT 2 EA 8" SEWER MAIN 4211 LF 6" SEWER MAIN 279 LF 4" SEWER LATERAL 2659 LF TRACT NO. 6865 PHASE 1 :SOILs ON SANITATION == _ SEWER & STORM DRAIN - sTriucTURAL•� �= PLANS CIVIL UCU RA ENGINEERS :F�ioATnoris � ,fted DELMARTER AND ASSOC. ®A �; 11- -20 -15 m� 2019 %ESiWIND DRIVE STE. -C° BAKERSFIELD, CA. 93301 PHONE No. 14091 B 327 -1486 FAX 327 -1452 DRWIG B': J.K.D _- LAND PLANNING. SURVEYORS -.LAND LEVELING: .PROPERTY UNE- SHEET 1 OF 7 =nnAL- it DRMWM A(E, GATEWAY 1.2 -6865 Ph 1 W 2M Bill a_ Jp z*Cl2— 10- 17 +74.35 17 +00 —\ 18 +00 LLJ Lli Lo ry !� Li1 V l LLI Q0 q W W 5' i 2 3 § O N O �� II Zlo <r 0-O `-M 000 O co "' 4 <Z 2 v(n om� LL. Lo 0<0 N U z r--- -A 5 23.82 LF 18" RCP 0 0.11% — 2 OX >�3S M y FOG LINE 11' -14' NORTH SO�y 000 '2 — 19 +00 20 +00 A 21 +00 CAN DI A STREET SEE SHEET 5 6 I 7 LOT E 1 � to 2�• i� 00 8 to 12' R /W EAST PANAMA LANE S89'31'21TE— 22 +00 23 +00 SD MANHOLE #13_ INVERT = 350.30 co d' vi M R 128. 24 +00 W N F— W w Lli Q V) 1 �- i� Lo W V) 5' 5' N 57.45' � 34.31' 12' N co r r r co r 23.42 LF 30" RCP 0 0.12 %1 TYPE "A" CATCH BASIN #12 NORM F/L – 358.6513 BOTTOM = 350.08 OUTLET STRUCTURE PER C.O.B. S -9 INV 30" = 347.10 °40.15 LF 30" RCP 0 7.42% 12' TYPE "A" CATCH BASIN #11 NORM FA– 358.68 s # # f STUB & PLUd BOTTOM = 354.28 B 07.427. l� € 13.42 LF 18" RCP 0 31.07% OVEREXCAVATE SUMP TO A DEPTH OF 29 FEET BELOW SD MANHOLE #14 -- EXISTING GRADE (EL. 331.45) AND BACKFILL TO ELEV. INVERT = 350.11 346.85 WITH CLEAN COHESIONLESS SAND CLASSIFIED __ _ «.__._ __ _. AS SP OR SW IN THE UNIFIED SOILS CLASSIFICATION SYSTEM TO ENSURE ADEQUARE PERMEABILITY FOR WATER TOP DRAIN IN SEVEN DAYS OR LESS. A SOILS B -B E ENGINEER IS REQUIRED TO BE ON SITE DURING TOP SUMP = 360.05 HIGH WATER = 356.35 CONSTRUCT 6' CHAIN LINK FENCE BOTTOM SUMP = 346.85 w/ REDWOOD SLATS & 6 "x6" CURB REQUIRED VOLUME = 5.81 AF ON WEST, NORTHWEST, & NORTH PROVIDED VOLUME = 5.84 AF PROPERTY LINES. TIE IN TO MASONRY WALL. PROVIDE 16' WIDE DOUBLE DRIVE SUMP SHALL CONFORM TO C.O.B. GATE & DRIVEWAY 0 RAMP STANDARDS D -11, D -12 & D -13 (NEW) 23.82 LF 18" RCP 0 0.11% — 2 OX >�3S M y FOG LINE 11' -14' NORTH SO�y 000 '2 — 19 +00 20 +00 A 21 +00 CAN DI A STREET SEE SHEET 5 6 I 7 LOT E 1 � to 2�• i� 00 8 to 12' R /W EAST PANAMA LANE S89'31'21TE— 22 +00 23 +00 SD MANHOLE #13_ INVERT = 350.30 co d' vi M R 128. 24 +00 W N F— W w Lli Q V) 1 �- i� Lo W V) 5' 5' N 57.45' � 34.31' 12' N co r r r co r 23.42 LF 30" RCP 0 0.12 %1 TYPE "A" CATCH BASIN #12 NORM F/L – 358.6513 BOTTOM = 350.08 OUTLET STRUCTURE PER C.O.B. S -9 INV 30" = 347.10 °40.15 LF 30" RCP 0 7.42% 12' 'sue op l g3 -�1 6 L 693. 9 SUMP 171.92' X166 rl h r 12' N N N 12' N 201.87' / T_ MASONRY WALL 1 I__ Li LLl fy (n W v W fy ( Q n w i/- J J Q z O t!! d 25 +00 26 +00 1 EDGE EXIST. PAVING EXISTING CURB & GUTTER SCALES- STORM H O R I i: 5 O DRAIN PIPE LENGTHS ARE CENTER y — ^ TO CENTER OF MANHOLES AND CENTER OF 6�,, MANHOLE 'M INSIDE FACE OF CATCH BASIN • 17 18 19 20 21 22 23 24 25 26 N N i 364 INSTALL 174.35 LF 18" i RCP STORM DRAIN i INSTALL 175.65 # LF 18" RCP STORM DRAIN [ . 364 ..a 358 r .. _358 m m m w w w Id_ U— , £ # s £ # # C> U V LL. f 362 € i # "£ i , i r r0 1 t # i � Q t E } t s } # r D } 4 E i i # # E E } E } i , �• �...... _. _.._ � M..._..___ _._._ __.._ ._ �.__.._ _µ.. _.. _._.___._.___ _.. �. __ti_ __..___. � _ _.�_ _...w__.__.._ _ __..........t_.___._- __... _. _� _:.._.--- __..._.__..... __._...._ _.�.___.._ _«. _....__._. _ _. _ � ._�:_ __;_ ._.. __._ __._ .__ _._ _.___.._.. . _..__ ._ _._ 362 356 356 NORTH GUTtE2 PROFILE �pQ # # € NORTH GUTTER PROFILE i i – i ,�'y �,# J , , z z z ! " •3fo � �jfo I ! # 3 a # .COQ ! E i } i i # f E } 3 # ,�QQ } } `#• `SSl <n V"60 € N 3 1 1 i 1 i R i # t } i 3 € # E 1 # ! 7 € I r# � 4 � _z --,_. .�._.. _ � _.. _...._�w ___.. _._«. __.«..�....__- � - #___. _«.�, _._....._ _._-� __. � �- __..._. _. «....__ �:� -___ _ �._«_.._... ___.. �._.36 �_._... _.._...«.354_.._. __ ; «_.._ _..n.___._. _ _. .�.... _.. w . ._.._.. _...._354._._... N E 1 1 , O € E t r > t ! i 1 t s £ v' 358 _ .. _... _........_. _... «.._...._.. _...._ _ >. «w_.._.«... _._.._ _.. _.._ __ ...« _. _....«. __ . �... .. ..� .. .« .« «. _._ .._.. ..« .. __ _ .._ _....,... «........_._. . _.. _....� _... «.L ._._.. _.. _ 358 _.«..._ _. �.., __..... ... »_ _...._ ._. _._.� -_ ,._ �. _._..... _._ �.�.__. _._. «...__.... _...__..._ _.....,.._.__ .._._ _ _ .. _.. .t_ _...�._..._ _...,_ _....._ .,_.._ ._,..«. _...._.. _ -. ..�_..__...__._. _ .._ . .,.. �;..... __._.. _..a....._ .... ...._ -_. #m_ _._. __. ».._......_ _«. _.I _ _. __.�. _ _..._ 3 52 352 t ! # f # € # 0 1 F ! i ! j } € 3s6 '� € 0 31.} 7L� 18" RCP \�� f O E r �G 04 Ir 'y� �� �0 0�ti E 'S� ,.E„ w. 1- } I\ 1X # 2 } { f ! i ! # € i ? € S € 7 i S E E 0• # �O D 5� � _.._.�..�.�._._ __._..._ _ «.__.. «.._.___...._...__..«... _,.__._._ «._. __... �.. «.._ ____ __..._.«__.. _.,..._._.._..__._._ .�. _.._. __. _ _ _..... ._«._. __ .«..r„ _M __ __..__. -_.. �..... ««. �,_ ....»..,._.m_..__._._. .�.' . _ «...«. . �- _... «._. «..�. «, . . ; � ..._ .....«... _.. J�. _--0 -4-1 �% ............ .. _...� _.. _.. _...._. ep._. _r� y .�. cn 058% 23.42 LF 30" RP ;C356 � 356 350 .� _....._.._. __ «.._ �. -«.... «. 350 _.«___ � ,LE 1$; «_ �Cn _ _ _ r ...____ n .J s # # f STUB & PLUd 40.15 LF 30 RC� # I I f € # # SECTION; A— A # " 07.427. _N € �' rn 'sue op l g3 -�1 6 L 693. 9 SUMP 171.92' X166 rl h r 12' N N N 12' N 201.87' / T_ MASONRY WALL 1 I__ Li LLl fy (n W v W fy ( Q n w i/- J J Q z O t!! d 25 +00 26 +00 1 EDGE EXIST. PAVING EXISTING CURB & GUTTER SCALES- STORM H O R I i: 5 O DRAIN PIPE LENGTHS ARE CENTER y — ^ TO CENTER OF MANHOLES AND CENTER OF 6�,, MANHOLE 'M INSIDE FACE OF CATCH BASIN • 17 18 19 20 21 22 23 24 25 26 N N i 364 INSTALL 174.35 LF 18" i RCP STORM DRAIN i INSTALL 175.65 # LF 18" RCP STORM DRAIN [ . 364 ..a 358 r .. _358 m m m w w w Id_ U— , £ # s £ # # C> U V LL. f 362 € i # "£ i , i r r0 1 t # i � Q t E } t s } # r D } 4 E i i # # E E } E } i , �• �...... _. _.._ � M..._..___ _._._ __.._ ._ �.__.._ _µ.. _.. _._.___._.___ _.. �. __ti_ __..___. � _ _.�_ _...w__.__.._ _ __..........t_.___._- __... _. _� _:.._.--- __..._.__..... __._...._ _.�.___.._ _«. _....__._. _ _. _ � ._�:_ __;_ ._.. __._ __._ .__ _._ _.___.._.. . _..__ ._ _._ 362 356 356 NORTH GUTtE2 PROFILE �pQ # # € NORTH GUTTER PROFILE i i – i ,�'y �,# J , , z z z ! " •3fo � �jfo I ! # 3 a # .COQ ! E i } i i # f E } 3 # ,�QQ } } `#• `SSl <n V"60 € N 3 1 1 i 1 i R i # t } i 3 € # E 1 # ! 7 € I r# � 4 � _z --,_. .�._.. _ � _.. _...._�w ___.. _._«. __.«..�....__- � - #___. _«.�, _._....._ _._-� __. � �- __..._. _. «....__ �:� -___ _ �._«_.._... ___.. �._.36 �_._... _.._...«.354_.._. __ ; «_.._ _..n.___._. _ _. .�.... _.. w . ._.._.. _...._354._._... N E 1 1 , O € E t r > t ! i 1 t s £ v' 358 _ .. _... _........_. _... «.._...._.. _...._ _ >. «w_.._.«... _._.._ _.. _.._ __ ...« _. _....«. __ . �... .. ..� .. .« .« «. _._ .._.. ..« .. __ _ .._ _....,... «........_._. . _.. _....� _... «.L ._._.. _.. _ 358 _.«..._ _. �.., __..... ... »_ _...._ ._. _._.� -_ ,._ �. _._..... _._ �.�.__. _._. «...__.... _...__..._ _.....,.._.__ .._._ _ _ .. _.. .t_ _...�._..._ _...,_ _....._ .,_.._ ._,..«. _...._.. _ -. ..�_..__...__._. _ .._ . .,.. �;..... __._.. _..a....._ .... ...._ -_. #m_ _._. __. ».._......_ _«. _.I _ _. __.�. _ _..._ 3 52 352 t ! # f # € # 0 1 F ! i ! j } € 3s6 '� € 0 31.} 7L� 18" RCP \�� f O E r �G 04 Ir 'y� �� �0 0�ti E 'S� ,.E„ w. 1- } I\ 1X # 2 } { f ! i ! # € i ? € S € 7 i S E E 0• # �O D 5� � _.._.�..�.�._._ __._..._ _ «.__.. «.._.___...._...__..«... _,.__._._ «._. __... �.. «.._ ____ __..._.«__.. _.,..._._.._..__._._ .�. _.._. __. _ _ _..... ._«._. __ .«..r„ _M __ __..__. -_.. �..... ««. �,_ ....»..,._.m_..__._._. .�.' . _ «...«. . �- _... «._. «..�. «, . . ; � ..._ .....«... _.. J�. _--0 -4-1 �% ............ .. _...� _.. _.. _...._. ep._. _r� y .�. cn 058% 23.42 LF 30" RP ;C356 � 356 350 .� _....._.._. __ «.._ �. -«.... «. 350 _.«___ � ,LE 1$; «_ �Cn _ _ _ r ...____ QRI�I: Essroa K. Dfl,�9� �y co ui No. 17564 C! V Ix. OF CAI.xi 7 w Q I.L. W 348 I TRACT N0. 6865 PHASE 2 EXHIBIT "E" —SEWER &STORM DRAIN PLANS &PROFILES DRAWN BY : J.K.D. DATE : 11 -20 -15 EAST PANAMA LANE SUMP "_ SHEET 2 ANiTATI�t�_ CIVIL .STRUCV RA= OF 7 ENGINEERS ���.= DELMARTER & ASSOC. 2019 WESTIMND DRIVE STE "C" BAKERSFIELD, CA. 93301 PHONE 327 -1485 FAX 327 -1452 +_a " °PU��I "INC SURVEYORS JOB N 0. 14091 B 1.2 -6865 Ph 1 0-0.11% s # # f STUB & PLUd 40.15 LF 30 RC� # I I f € # # SECTION; A— A # " 07.427. € E E _ .. _. _ _ ..__ _ ._.. _. _ « _ .. _._ _. w ._.. _ .. _ _ _ ._ _ _ _. _ _ _ _ _._ __. _ . «.. .� .__ _. _ _.. _ _ _._ . __.._ .. _.« . w_ ._. _ _ _ ._. __. __ __.._ _ __ _ _ __ _ . �. _. __ .._. __._. _. __. _ _ _w _._. _ _ . _.. _ _ _ ._. _ _ _ _ _ _ _ .� _ ._.. ._..._ .__ _ ._. __ .. _ _ _ _ _ } _ __ __ _ _ _ _ __._ __ __ _« _� __ _ _. -- ----- _ _.__ _« __ _ «.__._ __ _. # # f # I f f # # E # # } # f f SECTION B -B E : : f QRI�I: Essroa K. Dfl,�9� �y co ui No. 17564 C! V Ix. OF CAI.xi 7 w Q I.L. W 348 I TRACT N0. 6865 PHASE 2 EXHIBIT "E" —SEWER &STORM DRAIN PLANS &PROFILES DRAWN BY : J.K.D. DATE : 11 -20 -15 EAST PANAMA LANE SUMP "_ SHEET 2 ANiTATI�t�_ CIVIL .STRUCV RA= OF 7 ENGINEERS ���.= DELMARTER & ASSOC. 2019 WESTIMND DRIVE STE "C" BAKERSFIELD, CA. 93301 PHONE 327 -1485 FAX 327 -1452 +_a " °PU��I "INC SURVEYORS JOB N 0. 14091 B 1.2 -6865 Ph 1 DELWTER & ASSOC LL1 z Q N Lli _j Li LL1 V) Lli LL! W �-- N = O o 1lELr4ARTER &ASSN. w 0 Q N F— _ d 010 V) Q � W It N Lj w wpm Ito >ZW z= C1) >= Lij o0) V_ �- � �- Q Q Q cn M �� Q I- Qw aCw tnw <Zz n Lli w co � cn Q_._ 0_ LLJ cn � m < cn 9 SUMP — SEE SHEET 2 10 11 N_m- ._ ._.._...._ .M __ _._ .M_. .. ___ __ r ..__._ ..._ ...,._ ....w_ .. ... . ___t ' # f # } '• ! 3 tt € I t ! # I Ii t 1 # . , I ' I I } z I ii i ! i I # # I I# # I # I # ! # c i £ ! i # f , t 1 - _ # I I # { i . i i . # `# s t ' "s } t # , I S € . . __ _._ ... . _._.__ __ . .. _..- _. ...__ _. . . .._.__.. . .... _. .__._..._.____. _ _ ___... . .___ _... ..___ __. __ _ . . . w _ { I I a i i # } i a i ? # I ; '} 1 ! t7t ! i ` I a 3 , i i i 3 3 i # €� } a x # . . ry __ _ . ._ _ __ _.___ . _ - _.. _ ._ _. ._ _._ _. _ .._ _ .. ._ _ . _._ _ _d I ; i I � s 1 i t E t = } i '; • i ; ? i { : i i z t 1 € i ; i i 1 - . _ __ ._ . _ __. ... __ __ . _ _ _ __ _ _ __...__ . .__ _ _ _.___ ..__ s s I 3 L ; I : J # i # I i # i i # I I ; # J I f i i # # I i I i € } j j j = _ _ ._ .-. ...___ . _ _..._ __ ._ .. ..__ ._. _ _ __ _ ...._._ _._ _.. _ . -_ __.__ ._ ._ .._# .# I s ; .i t 1 ? I = ! i . I i iI I € I �t # s i # [ t s i i . _ _ __ _ ._ .. .. . .__. _ ._ ._ . ._.. . _ __ . - _ ..__..... _ _ _ .__ ._ _ _I i # 1 I ! ± # i i i i { I # i I i l r} # r i i _ i a } # � # # I I i ? # I i # �? i ! 1 — / _ _. _%s_ z ' � .. _ _ �to_ Sy oO� , '_ Q )S_' D� . \ _ .c �. � ... _ '_ it'� p ' i# ; I I ' ; i i s i � _ -__ _ .. -_ - .__ -.- _ _, i i } I # # I i �i s f # i 1 I i , i 1 I i I I i # i i } t i I ( t i i I # # . i ; i I # I ? I I } # I � � I # `s # I ► _ _. . _ _ _ _ - ....._ . - -.._.. w _ _ __ _ _ .___.w .. . __ a . _ . . .__ . . __; I ! I r i I i ? i 1 I # . i i ' € i I I = i i I i I # i i i ! I I i I i I I # I i # i I I i I I I ' ,! i ? # I _ _ \ ti _._ p _: ' ._ __ Q `. . s _ _c _9 _ . _ _"..i� _ . ._ .__ # I I i I t ' I t ; I I i i ! •s I i o _ _ ` S . 6__� � 2 .' _ . _ _I I i 7 = i # I I i 3 , i I } ( I i I i ( i j i i € # { � I I ! ! I j i i i l i I # i i i i � i i S i € i I - �-t,o� z o O o O _y o_.yQ h. _O _ ' °X �,. •� s �, �� �_� � jo 1 _2 12 <o 32 _ .. . w . -L 0.OT _ F ± 5 5' A RAW Of 15.42 LF 18" RCP @ 20.75% _ i _ o R/W S89'31 '28"E 2+01.91 z 1 +p0 ? t r , i i i i i i � L •` - . Q o � � _ _�(.. n _ 1 j f � O Q 190 �j'0 � `1\s2 � �C S ry TQ U�.. J ' B G I # ? # # I I t ' s t I ! i I f ! I i 3 } z 1 } I 9 I r ! CL z & LOT E P_. _ L- U_G _ .s ._ _ _ _. P V_ _ . C LOT F 0 +00 � 5' EAST ®0.35% o wt ,� SPARKS STREET SAM AN STREET W ° 6 +35.00 7 +25.00 RAW 15' w 0 +00 1 +00 2 +00 3 +00 4 +00 5 +00 6 +00 7 +00 5' A N00'25'13 "E 31 SEE OFFSITE in 44! SEWER PLANS ,2 ? 919 z LOT E j 2 4p X 's r i # } I � i I i i # I i I i i ) # 1 i i SCALES HORIZ_._.. _ _ . I"_50' O STORM DRAIN PIPE LENGTHS ARE CENTER TO CENTER OF MANHOLES AND CENTER OF VERT: 1 2 MANHOLE TO INSIDE FACE OF CATCH BASIN 0 2 3 4 5 6 % O 2 3 NSTALL 45.25 LF OF 24" RCP INSTALL 171.66 LF OF 24 " RC STORM DRAIN STORM DRAIN_ WET GUTTER PROFILE o m 358 Lt- s 606 0 ------ NORTH GUTTER PROFILE} t w co to LLJ V) p 3 56 _ 3 5 v - C" - 7 w 0 U to i i N O w # LL_ N 354 354 z 15.42 LF! 18 " RCP 3 G co c z # 020.75 i I # v + N c0 " M N 0.34% 352 + _ _ N + 'SECTION i A— A o 350-.-- _ ._ _ _ . 350 + N w U C) to _ + 348 348 ' � B &PLUG PLUG TUB 346 346 35% 0.35% INSTALL 211.91 LF #OF 8" PVC SENER# MAIN _ _ # 0.35 I INSTALL 100.01 LF OF # INSTALL 292.D1 LF OF $ " PVC ;SEWER M INSTALL 3b7.99 LF OF 8" P C SEWER MAIN 8" VC SEWER MAIN RACT NO. 6865 PRASE 1 EXHIBIT "E" SEWER & STORM DRAIN PLANS & PROFILES ANITATiOSHEET 3 DRAWN BY J.K.D. DATE 11 -20 -15 QR°FESSi CIVIL OF 7 K Ti� S ELMARTER & ASSOC. SPARKS STREET Lu DELMARTER 8 ASSOC. " 17564 S A M A N STREET 2019 WESTWIND DRIVE STE "C BAKERSFIELD, CA. 93301 BY: PHONE 327 -1486 FAX 327 -1452 JAMES K. DELMARTER SURVEYOR 1Y11 R.0 564 ND LEVEIN \F - PROPERTY LIW DATE: SQL � ° � s2 _ OC W� suaolvlsio�i `DRAFTING JOB N 0. 14091 B 1.2 -6865 Ph 1 W I 6 x�.�h �' o 7+00 �N z w ¢J W w o x 0 ��• II Q LCD 00 F' 10 ° Q W zoo _ _ = w m V) n. °0<0 z Q W 1 06 M qlz:M W to Z z �--- N 10 11 U)m� ti N 5' 5' to +¢0 MUz W I '. SEE SHEET 2 io 13.42 LF 18" RCP 0 31.07% �xFj��, 2 +00.00 3 +00 �'� 4 +00 4 +8 I to - 23.42 LF 30" RCP 0 0.12% 9 SUMP — SEE SHEET 2 STORM DRAIN PIPE LENGTHS ARE CENTER TO CENTER OF MANHOLES AND CENTER OF MANHOLE TO INSIDE FACE OF CATCH BASIN ! X40.15 LF 30" RCP 0 7.42% SEE SHEET 2 m 0 ¢ate a pM wq II ��m 1 O Z <F- 0 w ® m a O m to tU-) N CO vi on <( 2 �m� N S +Q0 M U Z W z W �C Q iy 0 o� C� W W W V) Iy W 0 w U -51 R/W ESTAVEZ STREET +00 00 6 +00 I 6 x�.�h �' o 7+00 / N00'28'32 "E pp I N 6 +20.00 z x 0 ��• in Q to R/W M o ry m to> F- 00 W to , � 5 � 5, �--- N 10 11 12 W m {) W < Q c a Q- z W W Q0 �(�' "`�. W uj V) W D z Q ry � N= W W W CJi V J Vim'( / Q W ) "'` c/) Z Z n In 8 +00 M W w LLJ Q� QW U) W Q (w .0 5' LO N " M w0 11 k-- 00 Z J � 0 wWm O O ttA 00 n M to -� z to mes VUZ R/W 0 W Z W Q Q ry 0 o F_ ( V W W r ry (f) Iy W 0 � U 23.42 LF 18" RCP 0 2.05% U) 1+00 1 2-1.00 2 +80.00 4 13.42 LF 18" RCP 0 3.58% • Spey >S R/W A U to F- cV :yam M a-0 b, Q o I O zJI­ w0 u- ° M ;try U J Inm� c+V0Z '- N QJ to M o it , m 010 Z J F- wu-m 001 in co t` M Ott j <Z z toM� N w 5' dory M U Z B 23.42 LF 18" RCP 0 2.73% io 3 +00 4 +00 N40.28'32 "E 5 +00 5 +60.0( x2p�i0 13.42 LF 18" RCP 0 2.91% ALMAGRO STREET yak , }o II �C� o;o ZJF~- 0 aim 000) U-) to � eri �M �N 2 to mes N = ci +ao M U Z W D z LLJ n' F- < W N r Q (1) Q W (,() U) 1� SCALES HO RIZ: Y' =50' VERT: 1 "= 2'1 2 3 4 5 6 7 8 0 1 2 3 4 5 # f INSTALL 157.25 LF OF 30" RCR STORM DRAIN il. I INSTALL 272.25 LF OF 24" RCP STORM DRAIN # { f } { T INSTALL 80.50 L� O OF 24" RCP I € # { € # { # 3 { { _ f } .lye 'S OQ € € 01 .� y } i € INSTALL 244.75 LF 24" RCP STORM► DRAIN f { STORM DRAIN { } INSTALL 244.75 LF 24" RCP STORM DRAIN f € } 360 I _... _t_.. -__... '� __._ __I..__ »_____.__ ___ _.__...___..___ ____.__..__ __ _..__..__.___....--- ..._ -- _..____...._.__.___. _.__...__..------- .-- _..._._._. _.. .� _.___.._ _.___..---- ..___.._� ..._._- ...____...__.... �_.._____....___. ; _ 360 ulklir ,yy°'' EAST GUTTER PROFILE # � # f f s f } € € { € � { �g1'� �, { } # s �,'�'�� # �,�'�� f # # # 'COQ` { ��' �•�`�' 358 _ _ 1___._,__._..___ _ € 9 358 _ __. _. _ _ w _. _ - -. _ ._ 0 04` EASE GUFfEf� PReFiifl_ __ _ . _. _ } 4 f € } M = } # I f { 00 } r o0 # : { } } € # I f { } f m 4 V o # _ ! ? ! i # s € { { _ } { { i # # 1 to U f m { Li {k # € f i i a0 I # i = # ? i ! { { ! f { f € } ° # { { { # Z U ; ° 356 } f f { } f { _ - i w _ # 'O # im _ # m •- - _... ! m ..__ .. - f _ _ _ _ __ ,_ I _ _. _ ._ _..__ _ _ ' _.. _ _ _ { _ ._ _.. _ _ . -. f _ { ._. » _. _ __ . _» f { € { ° { w f to z s s Ui t� } LL f LL { } } € 1 _ _ F' _ r { { } _..{ - # o ¢ # N f t ° s I i 1 z O # { w 1 1 1 ° z }° ! # i s to # f Z } f { o t¢ 3 Lsl = �- z F- # O f # {n # I N } O v Z .° F- O U c f I U t z} Z i La.t ° } W { l € i O } { U € } } W ' ¢ f Q z 3 # o € t O1 ILV f Q { Q z # ! { i 1 v ' i } { ! } -1- ° x J �`" N f cn O E # Z # { f € s I U; 's { LZ f LIL ° f # € to i € # } f } a # U f o f O 4 # f ; i N I i a# f °o f } U€ # } # { # f I f } �ySi to Z �` q {z U O f € I �ci + ; { 0I [ri ! ° f o o , ; { ai } } } f } { L S}�, - �' in t J O 1 + , i : + m f # to f i O f ( N { { N i # s ` S {� \ �9 i Z { Z h O� p # t # N # # M 60 { # f i { X00 \O'C% 00 . 354 �.. _ __.._ _ � I _.. 3 _... _ _._ _ �... _ __ _ __ _ _._ _N_ _. __ _.._ _....... ___ �.._.__ __._ ___ _ _�_ __. ____._.. _�l..w..i_.. _ __._.__ _.. __..»..� __ .__ _._ _ ._.__._. _..._ .._ __ _.. _ ._ _._ __..._ __�_... _ _._ _.._ _._._. _...._..._ _.._.._ __ _.. _. ________._.._ w._.___. �. s__ � 1.._ _ __ _- _.__ _ _.�. _ __.� _._ _.._ _ » �, ._ _. _.. _ _.. _ _.__._ � _... _ �.._. _._ _ -_.. _ .�._ __».. ».. _ _ _.�..___ _._ _. _ _ _.._.� .� .._. _ _ _.. __ .� 354 ._ ._ _. _ _ _.._ .... _. _. # + _... --- . ; -- �- { h`V.� i y`1% O a { _ { i # ; c�,• f aj`t f ' ._ }__ - ; _ ...� „�,. - ._ -- __ ._ �- __ ._ _.. f r i i # i �1 # � �� o E �� i i s f i a'�, ; a�. ; f 0.37% i " - 353.24} INV 1 # i \ { # # { } \� # { 15.42 LF 18 CP - BO OM I �C. 0.16% �, f i { # 00.11% '!� { 23.42 LF 1f RCP 13.42 LF 18" RCP f \� { i 0.31% j { } { { { € # 23.42 { 18 RCP " i 13.42 LF 18 RC 0 2.05% { 04.58% { } f € i i f } { 0 2.73 # I S 02.91% > i } I # s { f i { t 1 1 f 352 ' __.__..______ ___.___ ______.__ _ __.__ _ __.__.____ -- - _____..__ ___.._..._ ____.___..____.. _.___._____. _ _.__ .._.__.____ _._____._.__ __ _�______ # p�y �� } f s s \� t _ _ - zi _ _SECTION A A ^SECTION �� —B 0.38% t € o s # -0.12% of f { ; f f { 1 f { f { { # { # > lb 01 1 to € z € { f { { ? t f to 350 _ __._ _ _ . --- _M..__..__._ _._ ...._ _.. � _ .._...__ _ _ w.. �� _ _ .�._. _.. _ w » _ __ ._ __.._ __ _ _ m_ _ �_.w ... __ _ _ _. _ ..__ ».._._. -... _._ _ - _ - - - _. �.._._.._ _ _ _ __.__ _. _._ _ _. _ _...._. _... _ ___ w _.. _.�___. _. _ ...._._..__ ._. _ _ �..._ _.._.. �. __.. »...... _._ � _... _ _..._.:�w _. _. �. _.._.... ».._.. _...w.. �.. w_.._...__._ _.. _. _..._. .�.». w_f_ _�- _ ;_ _;.» _{ _ .�. _i _� _ � . _ {_. _ f Y _ {w �. _.. ._.. _ _. __ _. _. . _ __._ _...w_ _..._ .�..__ __.». _ �._._. __......». _._. � _.._.._ _...». _ _...__ _.. _ _._.._._.. __- _.. __.. _.. _. .._..._ ___...350 ._.._ ._ # �q• JG t ; yS f f € i E 1 { 348 ._ ^.�_ ._.....�_�_...�.._._..._._ {M . ,_ ........�,_. �..�...�..�...� _.__ �__ _.. �.n.r.._ .f...__.__.� ._.Y .� __ _._- ....._ ____ _.. _ . _ _ -_ m . __ M ,. � ___ �._ _ _ _.. _..f._ ... _ .�. _ _.._ . _ .__ _.. _ _ -_ __ w__. �. _...._...._- __......_ _�__ _...___....__- _.. __ �. - im...� M.. _ TM....._.._.__..�.�.�.,�..ww.. _,.� �.........�_f_w..M. _ . _ � 348 _.., w.. -.... _,.........� _..._� _ .._ _...... >...^ �...... ..., .� ._.. _ w.,. f # € � i� i € f 1 f I I ► f f : i � .., ..., �,. ,... M. w.....,> .... ,..... # ........�. _.,. __..,.. ......_ } ... �... _.._., �..._ _. _. __.. t i ._ .� M......._. _._ _..._ .-. , ; _.. __..._. m_. ._.. _...._ w ._ ._. '... _.. .._ _... Dc1 4 00 346 _ ,._ _ _. _ _. _ . __ .._ _ __...__._ _ _ ._.____ _ _.._. _._..._. -- _...._. _.. w __ .._ _ __ _ _ .__._. -__ _ __ _ __.__._ _ . ._ _ __.___ __ _ _ ._.,._ _ __ _ _ -_ .__ __.._. _. ___ __. �__ __ _._ _ __._ _ _._ _ . w _5 ._ _ _ __ _ _0 :5 %- ,�_ _.{ - iO..3_. 34 6 �. INSTALL 48.00 'LF OF 6 PVC I t # s { € { { # { # { { € 344 ( s { INSTALL 280.00 LF OF 8" PVCs' SEWER MAIN # f INSTALL 130.00 LF OF 8" PVC SEWER MAIN INSTALL 140.00 LF OF 8" Pk SEINER MAIN # SEWER MAIN } } # 4 { { { { # { } { 344 Is # TRACT NO. 6865 PHASE I EXHIBIT "E" — SEWER & STORM DRAIN PLANS & PROFILES SHEET 4 DRAWN BY J.K.D. DATE 11 -20 -15 AaLTA�loar �0 4RKf ESS HYDRAUUC3 == . DQ aa4� CIVIL sip- u�ruRAE= _ OF 7 �'� Fw 2 ELMARTER & ASSOC. ENGINEERS ��' y`' ESTAVEZ STREET w No.175s4 DELMARTER & ASSOC. BY: A L M A G R 0 STREET 2019 WESTVAND DRIVE STE 'C' BAKERSFIELD, CA. 93301 * PHONE 327 -1486 FAX 327 -1452 JAMES K. DELMARTER sr - _-- — SURVEYORS 9 CIVt� �� R.C.E.. 7564 = _= LAiJD�LEVEUNG: lF OF CA01 ... ® =PROPER__ u- DATE: V SUBDIVISI DRAF?! c JOB NO. 14091 B 1.2 -6865 Ph 1 IDELMARTER & ASSN ^ ��'"i�•'� -- W z <t W F— —I W w Q Ld �-- DELMARTER & ASMC. ry z `tcv >w OW NW QW QV) W W �_ >_ � r Qcn Cn U} Q V) <C U) Q Q �w c�nLu <� •Q Lu _ _ < � 70 69 68 67 � 66 65 64 W �' w � � �, 74 I 73 72 71 63 62 61 IQ z 5' •a- 5, � o n M 04 5 u�i N m cv CID to 000 rn + + + + + d � to co /W 00 00 00 5' z R/W O 9 c� hx�'•� CAN DI A AVENUE �,� oo � �° VEGA STREET +96.7 4 +91.73 1100 6 +00 7 +00 7 +29.93 8 +00 +00 70 10 +0 11 +00 12 +00 12 +96.23 D 0 +00 1 +00 2 +00 2 +15.00 c0 S89 31 28 E �9 S'� `38 S00'28'32" W ppp1 ti8 yam, ,,ti o� �y oo �x��� 7 z , 8 50 R W to to Lo R/W to cn Lo to to / a to � to x R/W N 00 d o o o to .- r- M rn to W f + + + + + + + + + + + -I- it �r d- L to m r 0o rn rn o 0 138' INSTALL LATERALS TO 5' 4 FUTURE LOTS 1 2 3 4 5 6 7 8 9 SUMP W W W Lu ry U) U) < Q cn n n Ow W LEI > � SCALES- HO RIZ: 1" = 5 0' STORM DRAIN PIPE LENGTHS ARE CENTER TO CENTER OF MANHOLES AND CENTER OF VERT: 1 " MANHOLE TO INSIDE FACE OF CATCH BASIN 2 3 4 5 6 7 8 9 10 11 12 13 0 1 2 # { # ? } { # # € } # # # } { { # } # i INSTALL 172.00 LF 18" RCR STORM DRAIN } $ } s # { } { INSTALL 238.20 LF 24" RCP STORM DRAIN } # # INSTALL 556.31 LF $30" RCP STORM BRAIN # # { $ $ # } r X14\ GUTTER PROFILE € h x3\ } t 360 } { { { € t ' €. { } NO RTH GUTTER PROFILE $ { { t3s ? _ } # ! t £ # $ $ $ lye $ # { # # 358 _ _. _. ...... _... _ _ _._. _. �._ . _..._ .._ �.__... ...,� a q.. f . _ ,... µ. _ .. _ _._.. .._ ._._ ._..�.._..__, _w M_ _�.. 358 in 0 N _- f = o { } $ } ? I3 zf � lu # } Q } { � $ ..... _... ..... , # .. ...... . ....... { ............. ._........ �_�,. ..a . _....� r ... ._..._.- ._.. _.. ; ... � £ Q { F F �♦ € } , ... $ G € .._. ,.......... ....,. _........ ..._ .... ... _ ..,....,.. _...._. _, ..... __........... _..... { j N ? i # # 1 N { C { # j V# F # lQ S { ! } of # o '`� } # # { p i } # f £ } i } o # # £ # +1 { i # to ! € j ? = O ; i : # ? # € # # # # £ # { 1+ # £ cj• t } 3 r { # # # t i i t r +.� 354 f # 352 t V i 'S h 5 : f # { t # .. _ _.._.�..._..._........._. _...__ �..�..� _._._..... _ _ _ _ __. �__.__._.... ,.... w _. _...._ _........ a -_. _�._ ,_. _ _ w. _._ W_ .. _ ._. __._. w«. _. _.. . __...� .._ _. �.._ _. _..w _�. »«. ._. _ 352 .�,. _. .w .... f . ... #., .. }. a ,.y ,,„ \fit . },. . $. �_. .. . {. .,�, .i . .....,i ... .,,.,. � �f. _ .. i .$.., ....F._. ..�. ..§._ .» _.» ..�...n ..,i _., _., ._.,.._ .._....._ ........_. _.,, «_...�, ...,..._...__ -._ __ _... ,..... .._. �....,.. ,. ��.«..«., .,,..... ._. _ -...__ .,.. ,._......,» _..,. » ...._.. ,......_ ,...._...,.......... ......_ ..._ .__ _.. M ....... .......... __. . } 0.12/0 } } } # # # # € } t } ? 009 # i i t J # "i # E £ I s i ��•. E 3 � f # ! 5 # 3 t11 i 5 } f £ .• # } t •• f E •-• $ •• ._ t } # {$ t i f ^ # i :0.35q # Y i 4 $ i ? s F f } R i t i I i i # i t th f f } 348 .�� _r. •� �, ., €w., _ �... . �_ _ _ � �_. .,. ,�. #. �. _ {_ _ _ .� _.. w_�..� __ �_._. __»._ M._.,..�_ .�_.�.__.__ _..._... �._....,.,.__._.;___.. _. _ ._ ___... __.._._..- � _._._.__...___,___... ». __.__ __,�_.._._..� _.. � .___..�.�.. _.._.. __.___..�.__ »..�. _M __._. ___M__.._ .....__....__ 348 .�.�,. li VIP # € { # } { ? { { # { 346 $ # INSTALL 183.00 LF OF 6 PVC SEWER MAIN i t INSTALL 364100 LF OF 8" PVC. SEWER MAIN :(( # # INSTALL 363.23 LF OF 8 PVC SEWER MAIN } 'w__ _.---.___•._.__•# E-____._._____ __.__.._;__.___._____.._._.__._ S..______.____.__ ..___i..___.____..__.._______.. __.____. w. ___._--- .__. €_...______.______. _____,_._ .__.____#._._______...______._. €_____.__._____.__ _ __ _.346- _ TRACT NO. 6865 P 1 EXHIBIT "E" — SEWER 8c STORM DRAIN PLANS & PROFILES SHEET 5 DRAWN BY : J.K.D. DATE 1i- -ZO -1S `- ANITA'iION� vvrj ESStpa NYDR'AUUCS- . o q� CIVIL sr�ucT -7i RAL~� OF 7 � S �' ELM ARTER 8c ASSOC. C /-� j� [} I A AVENUE ENGINEERS ��i��_ wy � DELMARTER & ASSOC. No. 17564 BY: V E V A STREET 2019 WESIWIND DRIVE STE "C' BAKERSRELO. CA. 93301 * JAMES K. DELMARTER PRONE 327 -1486 FAX 327 -1452 ctvt� o��`e R.C. .• 17564 SURVEYORS "�.A_ND _LEVELING: OF CAt.1F v �� PROPERTY UNE: DATE: su DIwsio�i JOB NO. 14091 B 1.2 -6865 Ph 1 DELMiARTER & ASSN Ld W L W Z LLJ W I-- DEL14ARTER & ASSN W > Q N O w N I- � Iz ww Qw W W Q F >� N-r W W U� C� < Q Q u' U) U) < ``� _Iw (mow < Q Q Z Z `[ v' W U' � 46 45 44 43 42 41 40 39 38 37 36 35 34 33 ca M m t0 N rn to to m m r �5. C� M O M O? Nt O CO r 1- M 00 d O N co + + + + + + + + + + + ' 5 ' —' + + + ° O r N N M M d- d- in co S R/W r r r RAW O O o I O O 6X oXs °•oo to 10 �°` �� N �' ''y #8' 9 .o �, Pi ZARRO STREET to #2 81-00 ( 9 +00 10 1 +00 12 +0 13 +00 �' 14 +00 15 +00 16 00 y `s 0 +00 1+00 1 +45.00 h 1rp�o N00'28'32 "E 7 +66.59 8 ±61.59_ N89`31'28"W 16 +66.09 CORREGIDORA AVENUE 0 _ o �5 M � N N °° M + to + + + + + R/W ib o N� ^RAW + + + p O ± N N M M d �I to c+0 I + a- ° ± N �-- 47 48 49 50 51 52 53 54 55 56 57 58 59 60 13 14 N W W W W U) U) U) U? Z � Z Z n n n p_ SCALES. HORIZ: 1 VERT: 1 = 2 7 8 9 10 11 12 13 14 15 16 17 0 1 2 S f 4 } 1 } 1 i 36 0 __..__. __....._._.._ _ _ _.. _ __. __ _ .._ _ _.. _ __.._._..._. __. _. _ _...__ ..._ _ _.. _ __ ..__ _._... _ _..._ _.__ _ _. _ _ -. - -__. _ . f ? S _ } f } _ _..._ i. �._ �._ _�. ...� _ #._ �._ _�. __ -_ _�. 360 SOUTH GU R PROFILE EAST GOTTER PROFILE { # f GO t1`� ftt i i # Vol ! € .COQ _ # # 358 _..._ _..__. - _ _ __.__ _.. __ _ ._.__.__ ..« ____ . _ _ .____- _ ._ # i # I # 358 # # # , 356 _.__ .. _.. __ __._ .__.___ ___ .. __.__ _ »_ »._... __ _..__..___ _..._. _. _..._._.._..__.. __.__ _ __ _ _. _ -T T # { ! # 354 € # U { ! # i _ ._. ` __ ..._ _.. __ _ _ € ._ _. _ __ _...._ .i_ . __. __ ._ _ ..» ._. .. _..._ __ _.. __ _ _ { _ _ _ _._ _ = t ... _ __ _ ._ ._ ..M _ ? _. _ _ __ .._ .. w_ _ i i # # # # # { 3 # i �, { t ; v _ ._ __....w._.._ _._ _ _ _._ _ ._ _ _..�.._..__.. _ ._._ #� . _ ___...�. r._.� _ �°c - . _ . _ _.. _w _ _ _ a = _ i- w _ _i _ i _ . _ _. w . _ . _.__...w _ #_._ ___..._ ;.M._.__ _ ._ ._ _..._- # _ _. _ i._ ___.. z _ .. _ 1 .__ _ _ ._.__ _ _ _.- _w #_ _ _ » ._. 354 ? # Z # i # # I z € s # ! # # O i { i # # i 1 p # # # i # O # i # # ° # o i i # # # # O ( # i i i # + ° co f i # # �, to 0 T l + # 3 { 4 ' 3 t ( f 5 i , Z ' # i 35 350 # �'` # ► # # _ ..._ __ _ _...._ _.. ».. € . _._ »_ __.___. __ .__ w_ »_ __v _ _._ __ ; .. _.._. _ ._ ._....» ___ # _. _ I »_ __._._ .. _ ._ _. # . i # ? I # # E �' ��' _�.. _. €.� .� Y .� w_ }_,. �. #. 1 .� #�. .�_ _,_w i .i_ _�.� ;. -f- -� � ;_ �. � ..____�..�..�.�.�.._ .�. �.._.._._�.. �. .�......._�.._... �..__.�_.._.�..�._�...»._ �� �..�.�.«.._� .._�.�..�..._......��. 350 -�.. { # #_... f i t— _i. `i '� 0.35% 348 .. _... _ «. _.. _... _. ` _. # € i { # # # # ..__... __... �. �._ _ _._ _. _ _ _...._ .._ _..... __ .. __ ____ _. �.._. �. __. _.. __.__ �......_._t_ _. ..._._..._._ _x _.__. _ _. _..__.�.._ ...__ _ _...i.._ __._. w...,. _�.,_._ .,_�..�. __.�. _. _ �., �,..�.. _.. _ _ + 348 r t 3 346 I i INSTALL 20.00 LF OF 8" PVC SEWER MAIN # # INSTALL 335.00 LF OF 8" PVC SEWER {MAIN f I i i i 8" i i INSTALL 16 .00 LF OF PV SEWER MAIN 3q-6 3 44 # ? I i # # { € _ _. _ __ _.. # _ _. w __ ._.._ ._. _ __ _.... __ __ _. # ._ __.._ _ »_ # INSTALL 336.09 LF OF $ PVC SEiRi'ER MAIN # i # I I # , ._. _ .._ _____ ___� ._._ _ _. _ -_ _. f _ .._._ _ _ _. _ _.. # # } f t 1 TRACT NO. 6885 PHASE 1 EXHIBIT "E" — • SEWER & STORM DRAIN PLANS & PROFILES SHEET 6 :SANITATION= OVtOFESS�pa` DRAWN BY J.K.D. DATE 11- -20 -15 _ CIVIL s cn��A� OF 7 ��5�' OF�,��y� ENGINEERS �Q �� RELMARTER & ASSOC. CORREGIDORA AVENUE DELMARTER 8c ASSOC. uj No. "�4 BY. P I Z A R R 0 STREET 2019 WESTWIND DRIVE STE 'C' BAKERSFiELD, CA. 93301 * PHONE 327 -1486 FAX 327 -1452 r JAMES K. DELMARTER NINE SURVEYORS s j CIS 1� � R.C.E.. 7564 = uwo ND - �LLANN LING: £ t7f CAi -�F� DATE: ®C �'PR�RTY ONE �SUBDI�ASION oAFnac. JOB NO. 14091 e 1.2 -6865 Ph 1 Lli ::D 0 0 C*4 N u� n Lli — Ld z Li > La ^0 DELMARTER & ASSM 0 af, to < c� Ld _0 0 F- 00 (J,) c� ii co < N_ z <�- _M CN Lli 2 0 0 1­- -5 1 p Ltj LL_ Ld z _j F- a- z 4;z,- 0 0 0 04 of Lij W M Lli LL] Li-i 0) ry a- ry ry io to r-z ood- U) cf) ti :444u,) < iot V) (f) cf) :D < � N Lu o6 < < ti < U) Ld –<_j n co to <z (n 18 c� 17 16 15 0 < tL LL n a Lo 0:2 p, in n n 04 + -cc 0 to INSTALL 48.00 LF INSTALL 48.00 LF 00 0 z 0 w OF 6" PVC SEWER 04 - +<O MAIN 0 1% & PLUG OF 6" PVC SEWER o) u') + �oz MAIN 0 1% & PLUG + + + + 5" ­a— r- 00 00 0) A R/W SEE SHEET 10. 13.42 LF 18" RCP 00.11% 11 x 13.42 LF 18" RCP 01.12% V 5`4' 7 +69.9 8+60.95 10+75.02 Al W� 13+71.02 16+65.45 j 8+00 9+00 10+00. 11+00 05 12+00 13+00 14+00 15+00 16+00 — — — I — i N89*311'28"W N89-31'281W b SALAZAR AVENUE w L SALAZAR AVENUE 0 oi to A NJ RAW 0, - r" 8 04 It V) 0 (6 to CD _T 00 to 0) to 0 0 04 r__ n 4* 00 NO PHASE 2 + + + + + + + + CL + + 5 + + cl C-4 to to 0') 0) INSTALL LATERALS TO PHASE 1 2 FUTURE LOTS 19 20 21 22 23 24 25 26 27 28 29 30 31 32 Lij Lli Ld III cf) cf) < < ryW (-) L.Li n n r LLJ LLJ < V) SCALES STORM DRAIN PIPE LENGTHS ARE CENTER HORIZ: 1 "=50' TO CENTER OF MANHOLES AND CENTER OF 2) 1 MANHOLE TO INSIDE FACE OF CATCH BASIN VERT: 1 2 7 8 9 10 12 13 14 15 16 17 '1 7— INSTA IL 100.95 LF OF INSTALL' 249.32 LF 18" RGP STORM DRAIN 18' R�P STORM DRAIN 4- 4 4- 4 - - -- ---- — — — — — — — — — k-ay t � l i � 'S�� � i 4 � 'y ,�h���� I �4a���� F i # t 3 # ! .�- t # 3 f t 3€ �$��� # SOUTH GUTTER PROOILE t 358 _T 358 T_ T_ T_ --F 7_ _T i 0 u') M lk 3: LLj LL- (n 0 356 0 __.L 356 < 0 1 0 i 0 w N w 0 0 to 16 u 0 0) + i M z + I (-) t6 p (.0 C14 + 0 + 00 0 w 0.11% 354 354 4- TUB &i PLUG 1,3.42 LF 18" RCP @ o M SECTION A—A 0 z 0 352 352 T_ "T T_ T_ T_ -------- 04 (n C) + z O 0 + C> to d + co 350 -0. tK 348 -0.35% INSTALL 360.02 LF OF PVC SEWER MAIN INSTAL! 296.00 LF OF 8' �VC SEWER MAIN T 346 346 T_ --I— _T _T -T- _T INSTALL 294.4,3,LF OF 8" PVC SEWER MAIN m TRACT NO. o"865 PHASE I EXHIBIT "E" SEWER & STORM DRAIN PLANS & PROFILES SHEET 7 qtfjfESS/ DRAWN BY J.K.D. DATE 9-09-15 o CIVIL YDRAUUCS-------. OF 7 DQ < "N't ENGINEERS co D LIVIARTER & ASSOC. SALAZAR AVENUE D ELM ARTER & ASSOC. w No. 17564 rn BY: 2019 AESTVAND DRIVE STE *C" BAKERSnELD, CA. 93301 4 PHONE 327-14M FAX 327-1452 JAMES K. DELMARTER ND PLANNIN * —SURVEYOR Clvl\, R.C. 64 ND LEVELIN PROPERTY N 6 i Z�'lk WTER & AS�SW_ F= xsd� C3 )o x x ----------- 7, 0 0 CF CALF DATE: �C®° JOB NO. 14091 B 1.2-6865 Ph 1