Loading...
HomeMy WebLinkAbout1.8-6419 Ph 1E m c 0 n J W Z - 10' J w PAD - MOUNTED EQUIPMENT Z W U SUBSURFACE ENCLOSURE 2 10' PUE -� 2, TRENCH CENTERLINE TYPI CAL INTERIOR STREET NO SCALE (TRENCH IN REAR OF PUE) 3 M 5 X LOT LINE LOTS 12 AND 35 LOT LINE LOT LINE 1' -6" +- 3' - w GSTC STUB FT - D EEa WATER METER MAIN TRENCH � W 7 a o LOT LINE TYPICAL INTERIOR STUB INSTALLATION 3 a o 9' a_ W WALL z z Of 16' - I 1, z 6' U U; PAD - MOUNTED --' EQUIPMENT 0 0 SUBSURFACE ENCLOSURE STORM DRAIN LINE TRENCH � CENTERLINE GALLOWAY DRIVE SECTION NO SCALE NOTE: ALL SERVICES AND SUB — STRUCTURES ARE NOT TO SCALE FOR CLARITY. ALL COMPONENTS SHALL FIT WITHIN THE PUE OR FRANCHISE AREA UNLESS OTHERWISE NOTED. REFER TO DETAILS FOR LOCATIONS. AL 811 SUBSTRUCTURE VERIFICATION STAMP DEVELOPER PLEASE NOTE AND SIGN ALL P.G.& E. ENCLOSURES AND BOXES HAVE BEEN SET TO GRADE ACCORDING TO GRADE STAKES PROVIDED BY DEVELOPERS ENGINEER. ALL COSTS TO RELOCATE OR RE- ADJUST BOXES AT A LATER DATE WILL BE BILLED TO THE DEVELOPER. PLEASE HAVE YOUR JOB SUP. VERIFY THE CORRECTED GRADE OF ALL ENCLOSURES AND BOXES. AND SIGN AND DATE DRAWING. THANK YOU SIGNED DATE WALL L MAINTAIN TRENCH TRENCH UNDER BACK OF WALK CENTERLINE ETCHART ROAD SECTION NO SCALE THIS CROSS SECTION IS REPRESENTATIONAL ONLY. ANY PARTY EXCEEDING ITS SPACE ALLOTMENT SHOULD MAKE ARRANGEMENTS TO ENSURE THAT THE TRENCH WILL ACCOMMODATE THE ADDED CONDUITS OR DUCTS. 24" GAS TO GO ON SIDE OF FINISH GRADE 24" MIN. TRENCH NEAREST THE CURB. 18" f- Z 7-�--12" VIN. 42" MIN. BOTTOM OF GAS MAIN TO BE ABOVE TOP OF N O. ' a N TRENCH Y OTHER CONDUIT /DUCT coo 1. PROVIDE 2" SAND SHADING ABOVE AND T C BELOW GAS FACILITIES (MINIMUM) + 2. PROVIDE 4" SAND SHADING ABOVE AND a ■ MINIMUM COVER FOR ANY PARTY 12" MIN. BELOW ELECTRIC FACILITIES (MINIMUM) P S.. IN THE STREET AREA IS 30" (EXCEPT STREELIGHTS) z 6" MIN. TYPICAL DISTRIBUTION TRENCH (SO —CAL GAS AREAS) NO SCALE NO SCALE 7 R/W O CD R/W JOINT TRENCH RECAP - RULE 15 TRENCH OCCUPANTS TRENCH OCCUPANTS DISTRIBUTION OR SERVICE TRENCH SIZE DEPTH FOOTAGE BACKFILL SURFACE GSTC DIST 24" x 59" 655' SPREAD DIRT GPTC DIST 24" x 59" 437' SPREAD DIRT GPSTC DIST 24" x 59" 1,615' SPREAD DIRT GTC DIST 24" x 59" 7' SPREAD DIRT G DIST 24" x 59" 36' SPREAD DIRT S DIST 24" _x5 9 " 89' SPREAD DIRT GSTC SERV FRANCH 18" x 46" 739' SPREAD DIRT GSTC SERV PRIVATE 18" x 46" 1 290' SPREAD DIRT JOINT TRENCH RECAP - RULE 20 TRENCH OCCUPANTS DISTRIBUTION OR SERVICE TRENCH SIZE DEPTH FOOTAGE BACKFILL SURFACE PSTC DIST 24" x 59" 435 SPREAD DIRT PC DIST 24" x 59" 1,050' SPREAD DIRT P DIST 24" x 59" 520' SPREAD DIRT 18' MIN FINISH GRADE oar o0 6" MIN. (D o® MINIMUM COVER AND CLEARANCES` NON PG &E STREETLIGHTS WILL BE CONSIDERED SECOND ELECT. FACILITIES. CITY ST. LITE FACILITIES MAY NOT BE PLACED AT THE GAS OR PG &E ELECT. SUPPLY LEVEL OF ANY TRENCH 1) 2" SAND SHADING AROUND GAS & ELECTRIC IF NATIVE SOIL IS NOT ROCK FREE. 2) SEE OTHER DETAIL IF NON -PG &E STREETLIGHT IS IN TRENCH 3) ONLY PARTIES PARTICIPATING IN U.S.A. ARE ALLOWED IN THIS TRENCH 2" SHADING TYPICAL SERVICE TRENCH NO SCALE VICINITY MAP NOTE: DO NOT USE THIS DRAWING FOR STAKING. REFER TO APPROVED ELECTRICAL DRAWINGS FOR ELECTRIC FACILITY PLACEMENT, DETAILS, AND CLEARANCES. lei 9 I 10 GENERAL NOTES: 1. DEVELOPER TO DO ALL TRENCHING, SHADING, AND BACKFILLING. PER UO STANDARD S -5453. 2. PHONE AND CABLE TV FACILITIES ARE SUBJECT TO CHANGE AT THE DISCRETION OF THOSE COMPANIES. 3. PADS, BOXES AND OTHER FACILITIES ARE NCI SHOWN TO SCALE. 4. GAS AND ELECTRIC FACILITIES WILL REQUIRE SAND SHADING IF NATIVE SOIL IS NOT ROCK -FREE. PG &E WILL INSPECT BACKFILL MATERIAL. TEL AND /OR CATV MAY ALSO REQUIRE 12" OF SAND BACKFILL. 5. GROUND TO BE WITHIN .2 FT OF FINISH GRADE PRIOR TO TRENCHING. 6. GAS AND ELECTRIC FACILITES REQUIRE AT LEAST 3' OF SEPARATION (1' UNDISTURBED SOIL) FROM PARALLEL RUNS OF WATER, SEWER, OR STORM DRAIN. 7. PRE - CONSTRUCTION MEETING REQUIRED TWO WEEKS PRIOR TO THE START OF INSTALLATION. 8. CALL U.S.A. AT LEAST 48 HOURS PRIOR TO TRENCHING (DIAL 811) 9. THE GAS COMPANY WILL ASSIST IN LOCATING ENDS OF EXISTING GAS MAINS. 10. DEVELOPER IS RESPONSIBLE FOR OBTAINING ENCROACHMENT PERMITS.. 11. STREETLIGHT LOCATIONS MAY HAVE CHANGED. REFER TO THE APPROVED STREETLIGHT IMPROVEMENT PLAN FOR STREETLIGHT INSTALLATION. 12. DEVELOPER SHALL CONTACT ALL INVOLVED PARTIES PRIOR TO MAKING ANY CHANGES FROM THIS DRAWING. 13. REFER TO EACH PARTY'S INSTALLATION INSTRUCTIONS FOR MORE PRECISE DESCRIPTION OF SUBSTRUCTURES AND OTHER REQUIREMENTS. LEGEND: G T IC IS IP COVER GAS - 12 "12" C 6" 12" 24" 30" IN STREET TELE. 12" - 1 "12 "12" EXISTING UNDERGROUND FACILITY 24",30" STREET CAN 12" 1" - 12"12" PROPOSED #3 (24" x 36" x 18 ") ELECTRIC SPLICE BOX 18" ELEC. SEC:. 6" 2" 12" - 3 24 ",30" STREET 30" IN STREET ELEC. PRI. 12 12 "12" PROPOSED CABLE SPLICE BOX 3" - 30 "36" STREET STREETLIC'.HT 6" i 12"112"1 ;� - -- 1" 3" SEE EX.B FIG.1 NON PG &E STREETLIGHTS WILL BE CONSIDERED SECOND ELECT. FACILITIES. CITY ST. LITE FACILITIES MAY NOT BE PLACED AT THE GAS OR PG &E ELECT. SUPPLY LEVEL OF ANY TRENCH 1) 2" SAND SHADING AROUND GAS & ELECTRIC IF NATIVE SOIL IS NOT ROCK FREE. 2) SEE OTHER DETAIL IF NON -PG &E STREETLIGHT IS IN TRENCH 3) ONLY PARTIES PARTICIPATING IN U.S.A. ARE ALLOWED IN THIS TRENCH 2" SHADING TYPICAL SERVICE TRENCH NO SCALE VICINITY MAP NOTE: DO NOT USE THIS DRAWING FOR STAKING. REFER TO APPROVED ELECTRICAL DRAWINGS FOR ELECTRIC FACILITY PLACEMENT, DETAILS, AND CLEARANCES. lei 9 I 10 GENERAL NOTES: 1. DEVELOPER TO DO ALL TRENCHING, SHADING, AND BACKFILLING. PER UO STANDARD S -5453. 2. PHONE AND CABLE TV FACILITIES ARE SUBJECT TO CHANGE AT THE DISCRETION OF THOSE COMPANIES. 3. PADS, BOXES AND OTHER FACILITIES ARE NCI SHOWN TO SCALE. 4. GAS AND ELECTRIC FACILITIES WILL REQUIRE SAND SHADING IF NATIVE SOIL IS NOT ROCK -FREE. PG &E WILL INSPECT BACKFILL MATERIAL. TEL AND /OR CATV MAY ALSO REQUIRE 12" OF SAND BACKFILL. 5. GROUND TO BE WITHIN .2 FT OF FINISH GRADE PRIOR TO TRENCHING. 6. GAS AND ELECTRIC FACILITES REQUIRE AT LEAST 3' OF SEPARATION (1' UNDISTURBED SOIL) FROM PARALLEL RUNS OF WATER, SEWER, OR STORM DRAIN. 7. PRE - CONSTRUCTION MEETING REQUIRED TWO WEEKS PRIOR TO THE START OF INSTALLATION. 8. CALL U.S.A. AT LEAST 48 HOURS PRIOR TO TRENCHING (DIAL 811) 9. THE GAS COMPANY WILL ASSIST IN LOCATING ENDS OF EXISTING GAS MAINS. 10. DEVELOPER IS RESPONSIBLE FOR OBTAINING ENCROACHMENT PERMITS.. 11. STREETLIGHT LOCATIONS MAY HAVE CHANGED. REFER TO THE APPROVED STREETLIGHT IMPROVEMENT PLAN FOR STREETLIGHT INSTALLATION. 12. DEVELOPER SHALL CONTACT ALL INVOLVED PARTIES PRIOR TO MAKING ANY CHANGES FROM THIS DRAWING. 13. REFER TO EACH PARTY'S INSTALLATION INSTRUCTIONS FOR MORE PRECISE DESCRIPTION OF SUBSTRUCTURES AND OTHER REQUIREMENTS. LEGEND: COMPANY G GAS P ELECTRIC PRIMARY S ELECTRIC SECONDARY T TELEPHONE C CABLE TV / SLASH INDICATES CHANGE IN OCCUPANCY — — — — — PROPOSED SERVICE TRENCH — — PROPOSED MAIN LINE TRENCH 4. LUIS OCHOA EXISTING UNDERGROUND FACILITY (661) L?J PROPOSED #2 (17" x 30" x 18 ") ELECTRIC SPLICE BOX [2E] PROPOSED #2E (17" x 30" x 26 ") ELECTRIC SPICE BOX [3� PROPOSED #3 (24" x 36" x 18 ") ELECTRIC SPLICE BOX [3E] PROPOSED #3E (24" x 36" x 26 ") ELECTRIC SPICE BOX [5] PROPOSED #5 (3' x 5' x 3' -6 ") SUB - SURFACE ENCLOSURE L?J PROPOSED #7 (4' -6" x 8' -6" x 7') SUB - SURFACE PRIMARY ENCL. LL1_LJ� PROPOSED PMHI PADMOUNT SWITCH / INTERRUPTER LT_J PROPOSED TELEPHONE PEDESTAL \SPLICE BOX � C� PROPOSED CABLE SPLICE BOX 6ci PROPOSED CABLE POWER SUPPLY 5C PROPOSED PAD MOUNTED TRANSFORMER cPSrc INDICATES TRENCH FOOTAGE & OCCUPANCY ;� - -- PROPOSED LS 2A STREET LIGHT LOCATION (SEE NOTE 11) a v PROPOSED SERVICE LOCATION FOR TRENCH N'-'-DPECT ON 0 CALL (559) 263 -7312 N b ANY CHANGES TO THIS DESIGN MUST JOINT TRENCH COMPOSITE APPROVED BY: FIRST BE APPROVED BY PG &E. � 0 W GAS ADE: GAS ADE: 4 � Q ELECT ADE: PHONE: U CJ 0 DATE: O `L' 7TH STANDARD ROAD Q 0 ETCHART ROAD Ld J W 1 �L Q Li 0 PROJECT SITE SNOW ROAD N TS I \ CL O N LLJ J U W J Lij Cn CD Z_ W CD 0 a W LL ~ O 0 LL_ LL O W (n W Q m W Cn W O U Cn , I--a- W O O L) H� 7� W E-4 N w I W W COMPANY TELEPHONE 1. LES INGLE P G & E (661) 398 -5975 2. BRIAN FRANZ ATT (661) 631 -3492 w 3. MARK BAIZE BRIGHTHOUSE (661) 634 -2296 U 4. LUIS OCHOA THE GAS COMPANY (661) 393 -1457 M `L' 7TH STANDARD ROAD Q 0 ETCHART ROAD Ld J W 1 �L Q Li 0 PROJECT SITE SNOW ROAD N TS I \ CL O N LLJ J U W J Lij Cn CD Z_ W CD 0 a W LL ~ O 0 LL_ LL O W (n W Q m W Cn W O U Cn , I--a- W O O L) H� 7� W E-4 N w I W W LLJ 0 0 z Z Q E w = Co o U N V N C M CV COV L.i in C U O = 0 rn an _i V7 m Z o 0 $11 o ¢ Q a a = a v cl- w 0 Q N b c c- O O � 0 W 4 � Q U U CJ 0 O rn 1 co � N rn Lo Lo E_ y � U O Go to ►1 N z ul E­ w Lo r W Z o G� _ DCL ■ U LLJ 0 0 z Z Q E w = zz o U O cc V N C CV L.i in C U C" Ln Lei = 0 rn an _i V7 m Z m W 0 $11 o ¢ Q a a = a v cl- w 0 Q N cl� � 0 W 4 � Q U M 1 Q LLJ 0 0 z 6 5 4 3 2 1 INCH 0 x U Z Z Q w = o U W in U O CC ¢ W Ln cl� � 0 W � Q U M 6 5 4 3 2 1 INCH 0 x U Z E N X TIE INTO PRIMARY AND CATV.-.- RISER POLE RISER QUAD PC 10' RULE 20 5_6„ P RISER 146' RULE 20 QUAD TIE INTO RISER: POLE CL ........... 2 MATCH LINE SEE SHEET- 3 3 5 I rA rol we MATCH LINE 10 • C.) Z CD SEE SHEET 3 CN CD N E - STUB 5 PAST Z Lo Lo IMPROVEMENTS IRRIGATION 15 P CONTROL METER co CAN POWER SUPPLY 00 00 L) I .......... .. . ......... IM ...... .. . ...... ... . .......... ---------- . . . . ............ . .... ......... . ..... lul L 3 4 Z Lr) E- 46 47 4 49 50 0. 52 51 5 6 T 1 2 10' PUE FUTURE w 60 lo' PUE 00 3; SERVICE PST C) 16' SHORT 16' SHORT 0 36' SIDE SERVICE GSTC SIDE SERVICE _R\ 16' SHORT Z: /PST PST 168 68' MAINTAIN 70 SIDE SERVICE 16, SHORT \�9_9 / I 'fp-s �T _J: SIDE GSTC STUB 5' PAST PUE MAINTAIN 1 16' SHORT 25 1' DE SERVICE 3' FROM FH SHORT _J: 16' SHORT lo' 79' SIDE SERVICE 71 C SIDE SERVICE IMPROVEMENTS INI – SIDE SERVICE 3' FROM FH 16' ILO C — — — — M C - - - - - - - - / I I _L� - - - 77-hlr-'-, - - I - PUE SHORT T uj C L J TC . . . . .. SIDE SERVICE A -wl u') 1041 cr c SHORT SERVICE MR SHORT SERVICE ER CE c" P7 . . ........ .... ...... ........... En .. ..... ....... . ... . ..... ..... 61 -- -- ---­------- - ............ .............. RANCHO VIEJO—' 3 .......... .... . an - ------- — - ---------------- -- - ---- %:'�: GTc ........ - - - ------------ f-- -------------- --------- .. ............. ......... :bRIV 69 U .......... 0 RAN 3 E _V33 ---- - - --- ------------------- a) .................... . i ' 7 ; ....... . . . . ......... ----------------- .......... . . . ..... . ............... ............ .......... . . . ......... --- — - ------------- . ...... ......... . . . .. .......... :--(IE .......... .. 39 .......... ............. - — ----------_--- . ......... ......... .............. io 3p _AN 0 ........... pf _p j 1-111111 -- — – --------- !VE . . ........ .. ............. . . ...... ........... - - ----- y ............ Ln ...... ...... ....... . ............. .. . ........ I—— s� .......... . ......... . 3"" u ...................... ------ -------- . .............. .. . ....... . ........... ......... .. — — — — — — — — --- — 7� -i - 7 -`�'J- JcL ............ . .... . ......... LLJ . .......... . . .... ......... . 64' LONG C L _j —16' SERVICE — — — --- — — — — — — — y L N . .. . ............. LLJ SIDE SERVICE 10' �7LO_ — — — — — — C------------ = =2 �r L__J rx� L rn SIDE: SERVICE 16' SERVICE - — — — — — — — — — — — — — — — — — PSTC PUE GSTC L7 0N(5— "ol cx_ C.) i o' _j SERVICE 279 SIDE SERVICE 48' GSTC PUE c ' m :RULE 20 lull L J ­4 6' ou 10' PUE L Nt . . .... ....... . . . . ....... . ............ ...... ..... . .. . . ...... .. 45 10' PUE 44 43 42 41 40 1 1 s U c -------- 10 9 8 7 6 -- -- -- - -- I �' i 3 Z 32 5 C= ....... ..... CJ 33 TIE INTO EXISTING 3 35 36 37 1 38 39 GAS MAIN (VERIFY LOCATION) I Ic' I 12 1.3 15 iek NOTE: USE CAUTION CROSSING 10 EXISTING EQUILON 3: OIL LINE cc 33 0 0 M MAINTAIN 3' GPTC FROM FH 310, 1 MAINTAIN 3' L FROM FH PST 2' SHORN 83' SIDE SERVICE 2' SHORT\ 10' SIDE SERVICE 2' SHORT\ V) SIDE SERVICE PUE 2= 2' SHORT GSTC 2' 264 2' SHORT -7 — — — — — --- — — — — — — . .......... PU L I 2 ' SHORT SIDE SERVI A, C", L 10' L ------- -7c 10 2' SHORT\ 7c r SIDE SERVICE SHORT T iclil -7 SIDE SERVICE SIDE SERVICE w >. F -- — — — — — U L _j L 2.j— C I _ --r-- - - —L SIDE SERVICE cN c' c cN C r-rl - - - - - - — L__j L Ti 1 c9l 6; 7T IERRA:VISTA LANE I ............. . 69 ------ ---- — ----- __ : . .. . .......... . ............ sn 10 3' 1 TIE 0 3 — _�7_ I ------------------ RRA !VISTA - — ---------- .1� ­­­ .­_._l._. . ........... . ...... I __ . .......... LAN I I ...... ..... . ... ...... ------- :-'� . ..... ............ . ............. .............. .. . ............. L ........... t� 0 : __ ____u ...... . . ...... ............ ........... . . ..... . . ............. /__ -11 . ..... —_ - ---------------- I 1 ­.1­111 .... ...... . ...... . ........ �ss­.­ ..... ...... . ...... ":—* ........... . w . ............. ­­­ e . I I — to ................ ... . .......... - --- ------------ ..... ------- . . ......... .............. ....... . .... --- - - ­-­------ - - ---------- ........... . ... .. ­ F . .. . .............. .. ................ ........... . ............. --------- - ----- - ---- - ------------- ................... . .................. . . .......... — — — — — — — — — — — — — — — — — — — — — — — — .............. 78' LONG . ............ -_ JE I — — — — — — — — — — — — — — — — — — — — — — — I/ —1 —78' LONG LONG SIDE SERVICE SIDE SERVICE 78' LONG - -- — — — — — — — — — — — — — — — — — — — — — — — — 10' 1 SIDE SERVICE 78' LONG SIDE SERVICE SIDE SERVICE 78' LONG — -- — — — — — — — — PUE SIDE SERVICE 711 LONG SIDE SERVICE 10' PUE 99 101' LONG IDE SERVICE F_ CIO 0 CIO 00 30 29 00 31 28 27 213 25 24 RULE 20 ZJ .2 21 20 1 19 18 17' FROM C/L uj 5' FROM EOP RISER QUAD Ul TIE INTO NEW PRIMARY RISER POLE NOTE-, ALL SERVICES AND SUB-STRUCTURES ARE NOT TO SCALE FOR CLARITY. ALL COMPONENTS SHALL FIT WITHIN THE PUE OR FRANCHISE AREA UNLESS OTHERWISE NOTED. REFER TO DETAILS FOR LOCATIONS. NOTE: DO NOT USE THIS DRAWING FOR STAKING. REFER TO APPROVED ELECTRICAL DRAWINGS FOR ELECTRIC FACILITY PLACEMENT, DETAILS, AND CLEARANCES. 6 5 4 TV 3 E-1 IN.—Al L) 2 I­__) t.0 CN C14 N c" r-_ O CD CN c:) coo Ln E_ CD C) c:) M • C.) Z CD SEE SHEET 3 CN CD N E - STUB 5 PAST Z Lo Lo IMPROVEMENTS IRRIGATION 15 P CONTROL METER co CAN POWER SUPPLY 00 00 L) I .......... .. . ......... IM ...... .. . ...... ... . .......... ---------- . . . . ............ . .... ......... . ..... lul L 3 4 Z Lr) E- 46 47 4 49 50 0. 52 51 5 6 T 1 2 10' PUE FUTURE w 60 lo' PUE 00 3; SERVICE PST C) 16' SHORT 16' SHORT 0 36' SIDE SERVICE GSTC SIDE SERVICE _R\ 16' SHORT Z: /PST PST 168 68' MAINTAIN 70 SIDE SERVICE 16, SHORT \�9_9 / I 'fp-s �T _J: SIDE GSTC STUB 5' PAST PUE MAINTAIN 1 16' SHORT 25 1' DE SERVICE 3' FROM FH SHORT _J: 16' SHORT lo' 79' SIDE SERVICE 71 C SIDE SERVICE IMPROVEMENTS INI – SIDE SERVICE 3' FROM FH 16' ILO C — — — — M C - - - - - - - - / I I _L� - - - 77-hlr-'-, - - I - PUE SHORT T uj C L J TC . . . . .. SIDE SERVICE A -wl u') 1041 cr c SHORT SERVICE MR SHORT SERVICE ER CE c" P7 . . ........ .... ...... ........... En .. ..... ....... . ... . ..... ..... 61 -- -- ---­------- - ............ .............. RANCHO VIEJO—' 3 .......... .... . an - ------- — - ---------------- -- - ---- %:'�: GTc ........ - - - ------------ f-- -------------- --------- .. ............. ......... :bRIV 69 U .......... 0 RAN 3 E _V33 ---- - - --- ------------------- a) .................... . i ' 7 ; ....... . . . . ......... ----------------- .......... . . . ..... . ............... ............ .......... . . . ......... --- — - ------------- . ...... ......... . . . .. .......... :--(IE .......... .. 39 .......... ............. - — ----------_--- . ......... ......... .............. io 3p _AN 0 ........... pf _p j 1-111111 -- — – --------- !VE . . ........ .. ............. . . ...... ........... - - ----- y ............ Ln ...... ...... ....... . ............. .. . ........ I—— s� .......... . ......... . 3"" u ...................... ------ -------- . .............. .. . ....... . ........... ......... .. — — — — — — — — --- — 7� -i - 7 -`�'J- JcL ............ . .... . ......... LLJ . .......... . . .... ......... . 64' LONG C L _j —16' SERVICE — — — --- — — — — — — — y L N . .. . ............. LLJ SIDE SERVICE 10' �7LO_ — — — — — — C------------ = =2 �r L__J rx� L rn SIDE: SERVICE 16' SERVICE - — — — — — — — — — — — — — — — — — PSTC PUE GSTC L7 0N(5— "ol cx_ C.) i o' _j SERVICE 279 SIDE SERVICE 48' GSTC PUE c ' m :RULE 20 lull L J ­4 6' ou 10' PUE L Nt . . .... ....... . . . . ....... . ............ ...... ..... . .. . . ...... .. 45 10' PUE 44 43 42 41 40 1 1 s U c -------- 10 9 8 7 6 -- -- -- - -- I �' i 3 Z 32 5 C= ....... ..... CJ 33 TIE INTO EXISTING 3 35 36 37 1 38 39 GAS MAIN (VERIFY LOCATION) I Ic' I 12 1.3 15 iek NOTE: USE CAUTION CROSSING 10 EXISTING EQUILON 3: OIL LINE cc 33 0 0 M MAINTAIN 3' GPTC FROM FH 310, 1 MAINTAIN 3' L FROM FH PST 2' SHORN 83' SIDE SERVICE 2' SHORT\ 10' SIDE SERVICE 2' SHORT\ V) SIDE SERVICE PUE 2= 2' SHORT GSTC 2' 264 2' SHORT -7 — — — — — --- — — — — — — . .......... PU L I 2 ' SHORT SIDE SERVI A, C", L 10' L ------- -7c 10 2' SHORT\ 7c r SIDE SERVICE SHORT T iclil -7 SIDE SERVICE SIDE SERVICE w >. F -- — — — — — U L _j L 2.j— C I _ --r-- - - —L SIDE SERVICE cN c' c cN C r-rl - - - - - - — L__j L Ti 1 c9l 6; 7T IERRA:VISTA LANE I ............. . 69 ------ ---- — ----- __ : . .. . .......... . ............ sn 10 3' 1 TIE 0 3 — _�7_ I ------------------ RRA !VISTA - — ---------- .1� ­­­ .­_._l._. . ........... . ...... I __ . .......... LAN I I ...... ..... . ... ...... ------- :-'� . ..... ............ . ............. .............. .. . ............. L ........... t� 0 : __ ____u ...... . . ...... ............ ........... . . ..... . . ............. /__ -11 . ..... —_ - ---------------- I 1 ­.1­111 .... ...... . ...... . ........ �ss­.­ ..... ...... . ...... ":—* ........... . w . ............. ­­­ e . I I — to ................ ... . .......... - --- ------------ ..... ------- . . ......... .............. ....... . .... --- - - ­-­------ - - ---------- ........... . ... .. ­ F . .. . .............. .. ................ ........... . ............. --------- - ----- - ---- - ------------- ................... . .................. . . .......... — — — — — — — — — — — — — — — — — — — — — — — — .............. 78' LONG . ............ -_ JE I — — — — — — — — — — — — — — — — — — — — — — — I/ —1 —78' LONG LONG SIDE SERVICE SIDE SERVICE 78' LONG - -- — — — — — — — — — — — — — — — — — — — — — — — — 10' 1 SIDE SERVICE 78' LONG SIDE SERVICE SIDE SERVICE 78' LONG — -- — — — — — — — — PUE SIDE SERVICE 711 LONG SIDE SERVICE 10' PUE 99 101' LONG IDE SERVICE F_ CIO 0 CIO 00 30 29 00 31 28 27 213 25 24 RULE 20 ZJ .2 21 20 1 19 18 17' FROM C/L uj 5' FROM EOP RISER QUAD Ul TIE INTO NEW PRIMARY RISER POLE NOTE-, ALL SERVICES AND SUB-STRUCTURES ARE NOT TO SCALE FOR CLARITY. ALL COMPONENTS SHALL FIT WITHIN THE PUE OR FRANCHISE AREA UNLESS OTHERWISE NOTED. REFER TO DETAILS FOR LOCATIONS. NOTE: DO NOT USE THIS DRAWING FOR STAKING. REFER TO APPROVED ELECTRICAL DRAWINGS FOR ELECTRIC FACILITY PLACEMENT, DETAILS, AND CLEARANCES. 6 5 4 TV 3 E-1 IN.—Al L) 2 0 1 INCH 0 c:) coo Ln E_ C—) c:) E — cn 0 1 INCH 0 I I CA RULE 20 RU INTERSET NEW #7 BOX IN EXISTING PRIMARY RUN k, V 5 STUB PRIMARY AND CATV DUCTS PC A TIE INTO NEW RISER POLE ELA LE 20 CHERVON OIL LINE ETCHART ROAD 0 RULE 20 61 ........ ...... T T .. ............ ...... . ..... 0 1 L ........ OILL F INTO L) I TING LJ TIE INTO NEW GARY RISER POLE: DIGIT RULE 20 QUAD II 1 00 EM PC 663' RULE 20 4 ss m PRADO DEL REY DR. I ............ Ld > < 0 _ € < < <zF Of LLJ < ry LLJ 4 15 MATCH LINE SEE SHEET 2 NOTE: ALL SERVICES AND SUB—STRUCTURES ARE NOT TO SCALE FOR CLARITY, ALL COMPONENTS SHALL FIT WITHIN THE PUE OR FRANCHISE AREA UNLESS OTHERWISE NOTED. REFER TO DETAILS FOR LOCATIONS. 5 ss i . ............ ................ - ----- ---------------- ................... T OIL S S5 ------------ .. .............. ------------------ -------------- . .............. .......... . . ..... ............. . ... ............. ss ss S RIVEIRA DEL SOL DRIVE MATCH LINE SEE SHEET 2 01 NOTE: DO NOT USE THIS DRAWING FOR STAKING. REFER TO APPROVED ELECTRICAL DRAWINGS FOR ELECTRIC FACILITY PLACEMENT, DETAILS, AND CLEARANCES. I I I 6 5 4 ' ' 10 f tl I c ) 5 LJ RULE V) w RULE 20 F-- CHERVON OIL LINE ETCHART ROAD 0 RULE 20 61 ........ ...... T T .. ............ ...... . ..... 0 1 L ........ OILL F INTO L) I TING LJ TIE INTO NEW GARY RISER POLE: DIGIT RULE 20 QUAD II 1 00 EM PC 663' RULE 20 4 ss m PRADO DEL REY DR. I ............ Ld > < 0 _ € < < <zF Of LLJ < ry LLJ 4 15 MATCH LINE SEE SHEET 2 NOTE: ALL SERVICES AND SUB—STRUCTURES ARE NOT TO SCALE FOR CLARITY, ALL COMPONENTS SHALL FIT WITHIN THE PUE OR FRANCHISE AREA UNLESS OTHERWISE NOTED. REFER TO DETAILS FOR LOCATIONS. 5 ss i . ............ ................ - ----- ---------------- ................... T OIL S S5 ------------ .. .............. ------------------ -------------- . .............. .......... . . ..... ............. . ... ............. ss ss S RIVEIRA DEL SOL DRIVE MATCH LINE SEE SHEET 2 01 NOTE: DO NOT USE THIS DRAWING FOR STAKING. REFER TO APPROVED ELECTRICAL DRAWINGS FOR ELECTRIC FACILITY PLACEMENT, DETAILS, AND CLEARANCES. I I I 6 5 4 m O T 2 CD LLJ C) 10 V) w F-- L.Li Ln M U F-- :a CID Cc Lo Cm L_ C) Ln L! p C) C) C> cn cl- co 1 ce) cz) to C*4 E­4 �4 m ny Lo Lo E- >< Cc O C> L) co 00 rn E-1 C*4 Z Lo E — C> a- E CC C, C-! 00 cn 00 a.) o C-4 m U-) v (co c:j M 11 LL1 cl: C) Q < cl- = = C3- C-) 0- LLJ i m O T 2 CD LLJ C) I 2 llo INCH 0 F-- L.Li Ln M U F-- :a Cc Lo C) Ln E— co I 2 llo INCH 0