Loading...
HomeMy WebLinkAboutAPSA 4/21/2016 RTCaBAKERSFIELD FIRE DEPT. ] revention Services 2101 H Street Bakersfield, CA 93301 UNIFIED PROGRAM INSPECTION CHECKLIST Tel.: (661) 326 -3979 Fax: (661) 852 -2171 Aboveground Petroleum Storage Tank Program FACILITY NAME Y INSPECTION DATE INSPECTION TIME ADDRESS A) e- A IL A4 PHONE NO. NO OF EMPLOYEES FACILITY CONTACT BUSINESS ID NUMBER CONSENT TO INSPECT NAME /TITLE QPr'Tlrlkl 7 • Pa/rnrefa PaViaw- ralitnrnin Health X SatAtV CndP' 152711 DESCRIPTION Y N N/A COMMENTS Prepare an SPCC plan [CFR 112.3] ' Review or amend SPCC plan [CFR 112.5 (a)(d)] SPCC plan available on site [CFR 112.3(e)] -` ' � = } �y "" '- Conduct inspections and test in accordance with written procedures CFR 112.7(e)] ` Maintain records of inspections, tests and/or procedures [CFR 11 2.7(e)] Records of inspections or tests signed by inspector CFR 112.7(e)] A C1=r'_T1r1A1 7- CPr_ _ Plan Flamantc• [:a1itnrn1a HP_alth & matetV 0000! Z5ZIU.4.5. ZOZIU.1Z DESCRIPTION Y N N/A COMMENTS Self - certification for Tier I or H facility [112.6(a)(1),(b) (1)] ' Professional engineer certification [CFR112.3(d) and 1 12.6(b) (4) Documentation of 5 year review and evaluation of SPCC plan [CFR 112.5(b)] -` ' � = } �y "" '- Amendments required within 6 months of changes/certifications [CFR 112.5(a) and 112.6(a)(2), (b)(4 - Management authorization of resource commitment to implement the SPCC CFR 112.7 & 112.6(a) Diagram with location and contents of containers, transfer stations, connecting piping [112.7(a)(3) Type of oil and storage capacity for each container [CFR 112.7(a)(3) Discharge prevention measures and procedures for routine handling {CFR 112.7(a)(3 Countermeasures for discovery, response and clean-up [CFR112.7(a)(3)] Required contact list and phone numbers [CFR 112.7(a)(3)] c=r• --r1n1k1 7- l2on®r�1 %.Uf -f- raoninramante• 1_21ITnrnla manirn &% NATPTV d_nnP- LnL /U -0- LOL /U_ 1L DESCRIPTION Y N N/A COMMENTS Provide corrosion protection [CFR 112.8(c)(4)(5), (d)(1)] ' Containers compatible with materials stored [CFR 112.8(c)(1)] Implement SPCC plan review changes or amendments within 6 months CFR 112.5 (a)(d) -` ' � = } �y "" '- Prepare an oil contingency plan or written control /removal commitments CFR 112.7(d)] - C=f""r1 1A1 A• CDr'(- Dlnn Trmininn• ('21itr%m12 HPAItn X< SgTP_TV (:nCIP" Z_0%Z 1U_4_n DESCRIPTION YJ N N/A COMMENTS Training program CFR 112.7(f) ' Train personnel in operation and maintenance of equipment CFR 112.7(f)] Conduct annuals ill prevention briefings [CFR 112.7(f)(3)] -` ' � = } �y "" '- CCt`71r1A1 G• C -2ni1iiw Incnnrtinn• (!mHtnrnia Haalth Xr SaTPTV 1 :M10' DESCRIPTION YJ N N/A COMMENTS Meet provisions of conditional exemption [H &S 25270.4.5(b)] "" Facility security adequate [CFR 112.7(g)] Clean-up materials readily available CFR 112.7(c) Overfill protection procedures or devices in place and operative [CFR 112.8(c)(8)] - Portable /mobile containers positioned to prevent discharge [CFR 112.8(c )(11) - Loading / unloading rack drains into containment area [CFR 112.7(h)] Provide appropriate containment /diversionary structures to prevent dischar e [CFR 112.8(a), 112.7(c)] Secondary containment adequate to contain capacity of largest container + precipitation [CFR 112.8(c) ] Remove accumulation of oil in secondary containment CFR 112.8(c)(10)] Secondary containment valve(s) closed CFR 112.81 Implement SPCC plan elements [CFR 112.3]' :... -`_. ANY HAZARDOUS WASTE ON SITE? 1YES ❑ NO jSignatureofReceiot `> Explain: w t "1, POST INSPECTION INSTRUCTIONS: • Refer to the back of this inspection report for re ulatory citations and corrective actions • Correct the violation(s) noted above by 1 I • Within 5 days of correcting all of the violations; sign and return'?a copy of this page to: Bakersfield Fire Dept., Prevention Services, 2101 H Street, California 93301 Signature (that all violations have been corrected as noted) 1*1 Date White - Business Copy Yellow - Business Copy to be Sent in after return to Compliance Pink -prevention Services Copy FD2156b (Rev 9/10)