Loading...
HomeMy WebLinkAboutAPSA RTC 4/22/2016UNIFIED PROGRAM INSPECTION CHECKLIST Aboveground Petroleum Storage Tank Program aJRr;T BAKERSFIELD FIRE DEPT. Prevention Services 2101 H Street Bakersfield, CA 93301 Tel.: (661) 326 -3979 Fax: (661) 852 -2171 FACILITY NAME Y rya INSPECTION DATE pc. f a..i INSPECTION TIME ADDRESS y+.y A� l PHONE NO. y��^¢ p 0. 1 NO OF EMPLOYEES `°- FACILITY CONTACT BUSINESS ID NUMBER CONSENT TO INSPECT NAME /TITLE V■ w V ■■ V■ V - DESCRIPTION Y N N/A COMMENTS Prepare an SPCC plan [CFR 112.3] Review or amend SPCC plan [CFR 112.5 (a)(d)] SPCC plan available on site [CFR 112.3(e)] Conduct inspections and test in accordance with written procedures [CFR 112.7(e)]� y: Maintain records of inspections, tests and/or procedures [CFR 112.7(e)] Records of inspections or tests signed by inspector [CFR 112.7(e)] Al Q 1. A.,4 aN.Ay 1 A,' 5 47 3t' ";-t 41a =' k CT I - r -'ut ^rnv�n P4dmnirn x. 1mir=T \/ It - (1(:1P" /"%Z f II " __2 /_7L/ U_ I L - DESCRIPTION YJ NJ N/A COEfii Self- certification for Tier I or II facility [112.6(a)(1),(b)(1)] Professional engineer certification [CFR 112.3 d) and 112.6(b)(4) Documentation of 5 year review and evaluation of SPCC plan [CFR 112.5(b) Amendments required within 6 months of changes/certifications [CFR 112.5(a), and* 112.6(a)(2), (b)(4)] NJ 1"'xz 1 r; PC Management authorization of resource commitment to implement the SPCC CFR 112.7 & 112.6(a) Diagram with location and contents of containers, transfer stations, connecting piping [112.7(a)(3)] Type of oil and storage capacity for each container [CFR 112.7(a)(3)] Al Q 1. A.,4 aN.Ay 1 A,' 5 47 3t' ";-t 41a =' k Discharge prevention measures and procedures for routine handling {CFR 112.7(a)(3)] - _._ w Countermeasures for discovery, response and clean-up [CFR112.7(a)(3)] Required contact list and phone numbers [CFR 112.7(a)(3)] DESCRIPTION Y NJ N/A COMMENTS Provide corrosion protection [CFR 112.8(c)(4)(5), (d)(1)] Containers compatible with materials stored CFR 112.8(c)(1)] Implement SPCC plan review changes or amendments within 6 months [CFR 112.5 (a)(d) Prepare an oil contingency plan or written control /removal commitments [CFR 112.7(d)] NJ 1"'xz 1 r; PC ccr-TIr_1 wI n cor -r- ur.%r% I r•�■n■nn r -2nr^rni� Mnnirn x. _�. =rnry o _nnc\ i!\i Ian ca DESCRIPTION Y N N/A COMMENTS Training program [CFR 112.7(f) Train personnel in operation and maintenance of equipment [CFR 112.7(f)] Conduct annuals ill prevention briefings [CFR 112.7(f)(3)] cGrT�rl1U V%• G -mr►Mav 1ncnnr•tsnn• r- nutnrnea H021rn &% 1aTPTV [.nnp_' DESCRIPTION YJ N N/A COMMENTS Meet provisions of conditional exemption [H &S 25270.4.5(b)] Facility security adequate [CFR 112.7( )] Clean-up materials readily available CFR 112.7(c)] Overfill protection procedures or devices in place and operative [CFR 112.8(c)(8)] Portable /mobile containers positioned to prevent discharge CFR 112.8(c)(1 1) Loading / unloading rack drains into containment area [CFR 112.7(h)] Provide approp riate containment /diversionary structures to prevent discharge [CFR 112.8(a), 112.7(c)] Secondary containment adequate to contain capacity of largest container + precipitation [CFR 112.8(c) Remove accumulation of oil in secondary containment CFR 112.8(c)(10) Secondary containment valve(s) closed [CFR 112.8] Implement SPCC plan elements [CFR 112.3] NY HAZARDOUS WASTE ON SITE? l YES ❑ NO Explain: POST INSPECTION INSTRUCTIONS: • Refer to the back of this inspection report for regulatory citations and corrective actions r' • Correct the violation(s) noted above by Si�riature, ( at all violations have been corrected as noted) • Within 5 days of correcting all of the violations, sign and return a copy of this page to: 4 Bakersfield Fire Dept., Prevention Services, 2101 H Street, California 933011 Date White - Business Copy Yellow - Business Copy to be Sent in after return to Compliance Pink -Prevention Services Copy FD2156b (Rev 9/10) ri