HomeMy WebLinkAboutAPSA 4/26/2016r
A BAKERSFIELD FIRE DEPT.
�.. K y ._>...;��` Prevention Services
.
ART fM a 2101 H Street
Bakersfield, CA 93301
UNIFIED PROGRAM INSPECTION CHECKLIST Tel.: (661) 326 -3979
Fax: (661) 852 -2171
Aboveground Petroleum Storage Tank Program
l
FACILITY NAME
INSPECTION DATE
INSPECTION TIME
N/A
COMMENTS
Prepare an SPCC plan [CFR 112.3]
ADDRESS
� � •� � �r
PHONE NO.
NO OF EMPLOYEES
FACILITY CONTACT
BUSINESS ID NUMBER
CONSENT TO INSPECT NAME /TITLE
r%r-r+ O%Ikl . rM_. _...1., Its.. f% Uo% -m1 #4, SL Cafnt%i f`nrin- 9r%97n
DESCRIPTION
Y
N
N/A
COMMENTS
Prepare an SPCC plan [CFR 112.3]
i
Review or amend SPCC plan [CFR 112.5 (a)(d)]
SPCC plan available on site CFR 112.3(e)]"
a
�'
Conduct inspections and test in accordance with written procedures [CFR 112.7(e)]
Maintain records of inspections, tests and/or procedures CFR 112.7(e)] f'
Records of inspections or tests signed by inspector [CFR 112.7(e)]
' m
\ /vV ■ ■Y.w r.
DESCRIPTION
Y
N
N/A
COMMENTS
Self- certification for Tier I or II facili [ 1 12.6(a)(1),(b)(1)]
Professional engineer certification CFR112.3(d) and 112.6(b) 4
Documentation of 5 year review and evaluation of SPCC plan CFR 112.5(b)]
a
�'
Amendments required within 6 months of than es /certifications [CFR 112.5(a) and 112.6(a)(2), b)(4)
Management authorization of resource commitment to implement the SPCC [CFR 112.7 & 11 2.6(a)
Diagram with location and contents of containers, transfer stations, connecting piping [112.7(a)(3)]
01 X 1 .;
Type ,of oil and storage ca acity for each container [CFR 112.7(a)(3)]
Discharge prevention measures and procedures for routine handling CFR 112.7(a)(3)
=J
Countermeasures for discovery, response and clean-up [CFR112.7(a)(3)]
Required contact list and hone numbers [CFR 112.7(a)(3)]
•,
DESCRIPTION
Y
N
N/A .
COMMENTS
Provide corrosion protection [CFR 112.8(c)(4) (5), (d)(1)]
Containers compatible with materials stored [CFR 112.8(c)(1)]
Irn lement SPCC lan review than es or amendments within 6 months [CFR 112.5(a)(d)]
5rV
�M
*1 "J"
Prepare an oil contingency plan or written control /removal commitments [CFR 112.7(d)]
@Cr% if% AI A. 00f'f' Dl -mri Tr�:■�inrY� f'n1ifnrnin 1-Inalfh fL Cafmht Ctnrlr�- 9597n _a_5
DESCRIPTION
Y
NJ
N/A
COMMENTS
Training program [CFR 1123(
Train personnel in operation and maintenance of equipment [CFR 112.7(f)]
Conduct annuals ill prevention briefings [CFR 112.7(f)(3)]
0 f"T1^k1 G. 0n^:1:4v' f'snlifr■rn;n 4lnalfh iZ Cafofv f�Arlca• 9_77n A A
Secondary containment valve(s) closed [CFR 112:8]
DESCRIPTION Y N N/A COMMENTS
Meet provisions of conditional `exemption H &S 25270.4.5(b)
Facility security adequate [CFR 112.7(g)]-
Clean-up materials readil available CFR 112.7(c)
Overfill protection procedures or devices in lace and operative [CFR 112.8(c)(8)]
Portable /mobile containers positioned to prevent discharge [CFR .112.8(c)(11) '
Loading / unloading rack drains into containment area [CFR 112.7(h) ] '
Provide appropriate containment /diversionary structures to prevent discharge [CFR 112.8(a), 112.7(c)]
Second containment adequate to contain capacity of largest container + precipitation [CFR 112.8(c)
Remove accumulation of oil in second containment [CFR 112.8(c)(10)]
Implement SPCC plan
• Refer to the back of this inspection report for r�egl}latory citations and corrective actions
• Correct the violation(s) noted above by a x r Signature (that all violations have been corrected as noted)
• Within 5 days of correcting all of the violations, sign and return a copy of this page to:
Bakersfield Fire Dept., Prevention Services, 2101 H Street, California 93301
Date
White - Business Copy Yellow - Business Copy to be Sent in after return to Compliance Pink- Prevention Services Copy FD2156b (Rev 9/10)
elements [CFR 112.3
Secondary containment valve(s) closed [CFR 112:8]
DESCRIPTION Y N N/A COMMENTS
Meet provisions of conditional `exemption H &S 25270.4.5(b)
Facility security adequate [CFR 112.7(g)]-
Clean-up materials readil available CFR 112.7(c)
Overfill protection procedures or devices in lace and operative [CFR 112.8(c)(8)]
Portable /mobile containers positioned to prevent discharge [CFR .112.8(c)(11) '
Loading / unloading rack drains into containment area [CFR 112.7(h) ] '
Provide appropriate containment /diversionary structures to prevent discharge [CFR 112.8(a), 112.7(c)]
Second containment adequate to contain capacity of largest container + precipitation [CFR 112.8(c)
Remove accumulation of oil in second containment [CFR 112.8(c)(10)]
Implement SPCC plan
• Refer to the back of this inspection report for r�egl}latory citations and corrective actions
• Correct the violation(s) noted above by a x r Signature (that all violations have been corrected as noted)
• Within 5 days of correcting all of the violations, sign and return a copy of this page to:
Bakersfield Fire Dept., Prevention Services, 2101 H Street, California 93301
Date
White - Business Copy Yellow - Business Copy to be Sent in after return to Compliance Pink- Prevention Services Copy FD2156b (Rev 9/10)