Loading...
HomeMy WebLinkAboutAPSA 3/24/2015r i UNIFIED PROGRAM INSPECTION CHECKLIST Aboveground Petroleum Storage Tank Program FACILITY NAME K . X INSPECTION, DATE INSPECTION TIME ADDRESS » Prepare an SPCC plan [CFR 112.3] PHONE NO NO OF EMPLOYEES FACILITY CONTACT BUSINESS ID NUMBER CONSENT TO INSPECT NAME /TITLE . s� Q=f'T1f'1K1 1• Qne +nrria IRn\ /in %A /• (- !nHtnrnia 14anith X Nntdaty (:nfla• 797f11 DESCRIPTION Y N N/A COMMENTS Prepare an SPCC plan [CFR 112.3] Review or amend SPCC plan [CFR 112.5 (a)(d)] . s� SPCC plan available on site CFR 112.3(e)] Conduct inspections and test in accordance with written procedures [CFR 112.7(e)] Maintain records of inspections, tests and/or procedures [CFR 112.7(e)] �- Records of inspections or tests signed by inspector [CFR 112.7(e)] >, 1ZF'f'-r1n1U 7- CP('( Plan Flamante, c_mlitnrnia HAaltn K. `iarPry l:nr1P_1 Z!IZIU_4_n_ ZnZ[U. 'IL DESCRIPTION `Y N N/A COMMENTS Self- certification for Tier I or II facility [112.6(a)(1),(b)(1) Professional engineer certification CFR112.3 d and 112.6(b)(4) . s� Documentation of 5 year review and evaluation of SPCC plan [CFR 112.5(b)] Amendments required within 6 months of changes/certifications [CFR 112.5(a ) and 112.6(a)(2), (b)(4)] Management authorization of resource commitment to implement the SPCC [CFR 112.7 & 112.6(a) Diagram with location and contents of containers, transfer stations, connecting piping 112.7(a)(3)] Type of oil and storage capacity for each container [CFR 112.7(a)(3)] ` Discharge prevention measures and procedures for routine handling {CFR 11 2.7(a)(3) Countermeasures for discovery, response and clean-up CFR112.7(a)(3)] s, Required contact list and phone numbers [CFR 112.7(a)(3)], CFf'T1f1R1 'z• f- nnnral CP['(' Wari tlramanfc, [:autnrnia HPaltn I4 saTPTV UnnP' ZSZfU_4=5. ZnZIU.3. LOLfU.IL DESCRIPTION Y NJ N/A COMMENTS Provide corrosion protection [CFR 112.8(c)(4)(5), (d)(1)] Containers compatible with materials stored, [CFR 112.8(c)(1) s� Implement SPCC plan review changes or amendments within 6 months [CFR 112.5(a)(d) Prepare an oil contingency plan or written control /removal commitments [CFR 112.7(d)] CFU'TIrIN 4• NP('C_ Plan Ira(ninn• [:alitnrnlA Haa1Tn & %igTP_Tv [:nnP" L!1Lf11.4.5 a' DESCRIPTION Y NJ N/A '/'COMMENTS Training program [CFR 112.7(f)] Train personnel in operation and maintenance of equipment [CFR 112.7(f)]' s� Conduct annuals ill prevention briefings [CFR 112.7(f)(3)] C1=f_T1(1K1 S- Farilifw Incnafrtinn- r..alitnrnia 14aalth X Sataty C:nr1P• 7577n_a_5 DESCRIPTION Y N NIA 9x COMMENTS Meet provisions of conditional exemption [H &S 25270.4.5(b) Facility security adequate [CFR 112.7(g)] s� Clean-up materials readily available CFR 112.7(c)] Overfill protection procedures or devices in place and operative [CFR 112.8(c)(8)] Portable /mobile containers positioned to prevent discharge CFR 112.8(c)(11)' Loading / unloading rack drains into containment area CFR 112.7(h)" Provide appropriate containment /diversionary structures to prevent discharge [CFR 112.8(a), 112.7(c)] Secondary containment adequate to contain capacity of largest container + precipitation CFR 112.8(c Remove accumulation of oil in secondary containment [CFR 112.8(c)(10)] Secondary containment valve(s) closed [CFR 112.8 Implement SPCC plan elements [CFR 112.3] NY HAZARDOUS WASTE ON SITE? ❑ YES ❑ NO ISignature of] ecei t xplain: 1101 tS .d POST INSPECTION INSTRUCTIONS: • Refer to the back of this inspection report for regulatory citations and corrective actions • Correct the violation(s) noted above by • Within 5 days of correcting all of the violations;rsign and retl rn a copy of this page to: Bakersfield Fire Dept., Prevention Services, 2101 H Street, California 93301 White - Business Copy Yellow - Business Copy to be Sent in after return to Compliance Signature (that all violations have been corrected as noted) Date Pink - Prevention Services Copy FD2156b (Rev 9/10)