Loading...
HomeMy WebLinkAboutTract 7240 Basin B Sump Construction Letter 4729 W. Jacquelyn Avenue Fresno, California 93722 (559) 271-9700 Office (559) 275-0827 Fax SAN JOSE, CA | STOCKTON, CA | FRESNO, CA | BAKERSFIELD, CA | RANCHO CUCAMONGA, CA DALLAS, TX | DENVER, CO | CHARLESTON, SC May 24, 2016 Project No. 2-213-0562 Mr. Matthew Smith Woodside 06N, LP 7675 N. Ingram Avenue, Suite 104 Fresno, CA 93711 RE: Drainage Basin Absorption Evaluation Letter Proposed Stockdale River Ranch – Tract 7240 Stockdale Highway and Claudia Autumn Drive Bakersfield, California Dear Mr. Smith: At your request and authorization, Salem Engineering Group, Inc. (SALEM) had previously conducted a geotechnical engineering investigation as well as compaction testing during construction of the drainage basin. Recently, SALEM performed a double-ring infiltrometer test within the bottom of the basin at the site. The infiltration test was conducted in accordance with ASTM Test Method D3385-09. Based upon the proposed drainage basin volume and the data collected during our most recent investigation, and from a geotechnical engineering standpoint, it is our opinion that the drainage basin will drain its design volume within 7 days or less. If you have any questions, or if we may be of further assistance, please do not hesitate to contact our office at (559) 271-9700. Respectfully Submitted, SALEM ENGINEERING GROUP, INC. Waseal K. Nagi, MS, EIT R. Sammy Salem, MS, PE, GE Geotechnical Project Engineer Principal Engineer Central / Northern California RCE 52762 / RGE 2549