HomeMy WebLinkAboutAPSA 5/31/2016DEP
BAKERSFIELD FIRE T.
aRrtPrevention Services
FIR 2101 H Street
Bakersfield, CA 93301
UNIFIED PROGRAM INSPECTION CHECKLIST Tel.: (661) 326 - 3979
Fax: (661) 852 -2171
Aboveground Petroleum Storage Tank Program
FACILITY NAME INSPECTION DATE INSPECTION TIME
4.
PHONE NO. NO OF EMPLOYEES
ADDRESS
FACILITY CONTACT BUSINESS ID NUMBER
CONSENT TO INSPECT NAME /TITLE
- - -- -- - .. - ■'r- -- - cI__l.LV O
JCVIIVIV 1. F%w%,Ulbl.3 cvwrr. v" 91%19M I" ■■vu..... - _ _ ---_, ____
Y
__F
N
N/A
COMMENTS
Pre are an SPCC plan [CFR 112.3]
F
Review or amend SPCC plan [CFR 112.5 (a)(d)]
SPCC plan available on site [CFR 112.3(e)]
s
Amendments required within 6.months of changes/certifications CFR 112.5(a) and 112.6(a)(2), b)(4)�
Conduct inspections and test in accordance with written pro cedures [CFR 112.7(e)]
A .r
Management, authorization of resource commitment to implement the SPCC [CFR 112.7 & 112.6(a)]
Diagram with location and contents of containers, transfer stations, connecting piping [112.7(a )(3)]:r,
Maintain records of inspections, tests and/or proce dures [CFR 112.7(e)]
`
`d ° �- • -'�r �� t' - 1
Type of oil and storage ca acity for each container CFR 112.7(a)(3)]
Records of inspections or tests signed by inspector [CFR 112.7(e)]
Discharge prevention measures and procedures for routine handling CFR 112.7(a)(3)]
�7Clr I IV1r L. .7r vv r lal/ `■G■�t�■■w. van ■,.......... .... „.�.. _. _�- -- - - - - -. -
DESCRIPTION
Y
N
,
N/A
COMMENTS
Self - certification for Tier I or Il facility 112.6 (a)(1),(b)(1)
Professional engineer certification CFR11233 (d) and 112.6(b)(4)
Documentation of 5 year review and evaluation of SPCC plan [CFR 112.5(b)]
implement SPCC plan review changes or amendments within 6 months [CFR 112.5(a)(d)]
�
Amendments required within 6.months of changes/certifications CFR 112.5(a) and 112.6(a)(2), b)(4)�
Prepare, an oil contingency ° plan or written control /removal commitments [CFR 1,12.7(d)]
A .r
Management, authorization of resource commitment to implement the SPCC [CFR 112.7 & 112.6(a)]
Diagram with location and contents of containers, transfer stations, connecting piping [112.7(a )(3)]:r,
Portable /mobile containers positioned to prevent discharge CFR 112.8(c)(11)
`d ° �- • -'�r �� t' - 1
Type of oil and storage ca acity for each container CFR 112.7(a)(3)]
/ unloading rack drains into containment area [CFR 112.7(h)
Discharge prevention measures and procedures for routine handling CFR 112.7(a)(3)]
-Loading
Provide appropriate containment /diversionary structures to prevent discharge CFR 112.8(a), 112.7(c)
's
Countermeasures for discovery, response and clean-up [CFRI 12.7(a)(3)]
Secondary containment adequate to contain capacity of largest container + precipitation CFR 112.8(c)
Required contact list and phone numbers CFR 112.7(a)(3) ]
.7Gtr I IVIV +7. VCIIVIal yr vv .�� a■ ■ ■V ■ ■lV ■ ■iv. V4....v....v ...w.. -- - -- -
DESCRIPTION
Y
N
N/A
COMMENTS
Provide corrosion rotection [CFR 112.8(c)(4)(5), (d)(1)]
Containers compatible with materials stored [CFR 112:8(c 1)]
implement SPCC plan review changes or amendments within 6 months [CFR 112.5(a)(d)]
�
Prepare, an oil contingency ° plan or written control /removal commitments [CFR 1,12.7(d)]
A .r
a7GV 1 IV19 `t. V� vv o ■u■■ ■ ■a.■■.■■■ v.,,....,,�....,,. .....,.._.. � ��--- - - ---.
DESCRIPTION
Y
NJ
N/A
COMMENTS
Training program. CFR 112.7(f)
Train personnel in operation and maintenance of equipment [CFR 112.7(f)
Conduct annuals ill prevention briefings [CFR 112.7(f)(3)
V LVIIV1� J.■ aV■■■a ■■■.7 VVa■v.■■. vw■.. v.. � -_ - _ ___ -_ ___
DESCRIPTION
Y
N
N/A
COMMENTS
Meet provisions of conditional exemption [H &S 25270.4.5(b)
Facility security adequate [CFR 112.7(g)]
Clean-up materials readily available CFR 112.7 c
Overfill protection procedures or devices Lin place and operative [CFR 112.8(c)(8)]
Portable /mobile containers positioned to prevent discharge CFR 112.8(c)(11)
/ unloading rack drains into containment area [CFR 112.7(h)
-Loading
Provide appropriate containment /diversionary structures to prevent discharge CFR 112.8(a), 112.7(c)
's
Secondary containment adequate to contain capacity of largest container + precipitation CFR 112.8(c)
Remove accumulation of oil in secondary containment CFR 112.8(c)(10)'
Secondary containment valve(s) closed [CFR 112.8]
Implement SPCC plan elements [CFR 11231
1
NY HAZARDOUS WASTE ON. SITE? El YES ❑ NO Si natureofRecei t
Explain`.
rte• .,
nncT rNCVTJ`!''TinN TNCT72TTf TTnNC• _._
• Refer to the back of this inspection report for regulatory citations and corrective actions .-•'' "`�Y�
• Correct the violation(s) noted above by v Signature (that all violations have been corrected as noted)
• Within 5 days of correcting all of the violations, sign d return a copy of this page to:
Bakersfield Fire Dept., Prevention Services, 2101-H Street, California 93301
Date
White -Business Copy Yellow - Business Copy to be Sent in after return to Compliance Pink - Prevention Services Copy FD2156b (Rev 9/10)