Loading...
HomeMy WebLinkAboutAPSA 6/17/2015FACILITY NAME INSPECTION DATE INSPECTION TIME s COMMENTS Prepare an SPCC plan [CFR 112.3 ADDRESS PHONE NO. NO OF EMPLOYEES BUSINESS ID NUMBER FACILITY CONTACT P i CONSENT TO INSPECT NAME /TITLE V• r 0"%AI A . o....w....l- ®....:...... r-.�l�t ^rnmf l.animern 7C ..:Mrnrl/ l _nno• on" / u DESCRIPTION Y N N/A COMMENTS Prepare an SPCC plan [CFR 112.3 Review or amend SPCC plan [CFR 112.5 (a)(d)] P i SPCC plan available on site [CFR 112.3(e)] Conduct inspections and test in accordance with written procedures [CFR l 12.7(e)] Maintain records of inspections, tests and/or procedures [CFR 112.7(e)] x" Records of inspections or tests signed by inspector [CFR 112.7(e)] C�Cr�Tlrll►1 7.. CUI -r- lJlAr. L.lAP11A nTC• l-7iirr%rmmn "Aamirra w- �arAry l.(1nH- Z- 11/./t/ -4 -7- L-3 ti- DESCRIPTION Y N N/A COMMENTS Self- certification for Tier I or II facility 112.6(a)(1),(b)(1) Professional engineer certification CFR112.3(d) and 1 12.6(b)(4 P i Documentation;of 5 year review and evaluation of SPCC plan [CFR 112.5(b)] Amendments re 4 uired within 6 months of changes/certifications CFR 112.5(a) and 112.6(a)(2), (b)(4)] Management authorization of resource commitment to implement the SPCC [CFR 112.7 & 112.6(a)] x" Diagram with location and contents of containers, transfer stations, connecting piping [112.7(a)(3)] Type of oil and `Storage cap acity for each container [CFR 112.7(a)(3) ; Discharge reve tion measures and procedures for routine handling CFR 112.7(a)(3)] 1 Countermeasures for discovery, response and clean-up [CFR112.7(a)(3)] Re uired contact list and hone numbers CFR 112.7(a)(3)] SECTION 3: General SPCC Requirements: California Health & Safety Code; 25270.4.5, 25270.5, 25270.12 DESCRIPTION Y N N/A COMMENTS Provide corrosion protection [CFR 112.8(c)(4 (5), (d)(1)] Containers compatible with materials stored [CFR 112.8(c)(1) P i Implement SPCC plan review changes or amendments within 6 months CFR 112.5(a) (d)] Prepare an oil contingency plan or written control /removal commitments [CFR 112.7(d)] SECTION 4. SPCC Plan Trainin : Calitornla Heann & barez uoae; ,za1.ru.4.a DESCRIPTION Y N N/A COMMENTS Training program CFR 112.7(f)] Train personnel in operation and maintenance of equipment [CFR 112.7(f)] P i Conduct annual spill prevention briefings [CFR 112.7(f)(3) Or_e'%T1AA1 C• f'n1mfnrni!m Waial +h X Cafc&u i'-nda- 9597n A DESCRIPTION Y N N/A COMMENTS Meet provisions of conditional exemption [H &S 25270.4.5(b) Facility security adequate CFR 112.7(g)] P i Clean-up materials readily available CFR 112.7(c Overfill protection procedures or .devices in place and operative [CFR 112.8(c)(8) Portable /mobile containers positioned to prevent discharge CFR 112.8(c)(11) x" / unloading rack drains into containment area CFR 112.7(h) -Loading Provide appropriate containment /diversionary structures to prevent discharge [CFR 112.8(a), 112.7(c)] r' Second ' containmentadequate to contain capacity of largest container + preci2itation [CFR 112.8(c)] Remove accumulation of oil in secondary containment [CFR 112.8(c)(10)] Secondary containment valve(s) closed [CFR 112.81 Implement SPCC plan elements [CFR 112.31 POST INSPECTION INSTRUCTIONS: • Refer to the back of this inspection report for regulatory citations and corrective actions - • Correct the violation(s) noted above by "" Signature (that all violations have been corrected as noted) • Within 5 days of correcting all of the violations, sign and return a copy of this page to: Bakersfield Fire Dept., Prevention Services, 2101 H Street, California 93301 Date white - Business Copy Yellow - Business Copy to be Sent in after return to Compliance Pink - Prevention Services Copy FD2156b (Rev 9/10) IMP