Loading...
HomeMy WebLinkAboutAPSA 4/29/2016BAKERSFIELD FIRE DEPT. E Prevention Services FIRE 2101 H Street ARTM T Bakersfield, CA 93301 UNIFIED PROGRAM INSPECTION CHECKLIST Tel.: (661) 326 -3979 M Fax: (661) 852 -2171 Aboveground Petroleum Storage Tank Program FACILITY NAME"""" INSPECTION IJATE INSPECTION TIME ADDRESS PI��ONE NO. P NO OF EMPLOYEES FACILITY CONTACT BUSINESS ID NUMBER ONSENT TO INSPECT NAME /TITLE VL-V O1v/■'U I. ■�V■aav ■mow ..w. . w...... �....�. ..��.. -__ -_ -_____ _ _ _ . DESCRIPTION YJ N N/A COMMENTS Prepare an SPCC plan [CFR 112.3] / Review or amend SPCC plan [CFR 112.5 (a)(d) f SPCC plan available on site [CFR 112.3(e)] Conduct inspections and test in accordance with written procedures [CFR 112.7(e)] Maintain records of inspections, tests and/or procedures CFR 112.7(e)] ,t Records of inspections or tests signed by inspector CFR 112.7(e)] DESCRIPTION YJ N N/A COMMENTS Self - certification for Tier I or II facility 1112.6(a)(1),(b)(1)] / Professional engineer certification CFR112.3 d) and 112.6(b) 4 f Documentation of 5 year review and evaluation of SPCC plan CFR 112.5(b)] Amendments required within 6 months of changes/certifications CFR 112.5(a) and 112.6(a)(2), b)(4)]� Management authorization of resource commitment to implement the SPCC [CFR 112.7 & 112.6(a)' Diagram with location and contents of containers, transfer stations, connecting piping [112.7(a)(3)] Type of oil and storage capacity for each container [CFR 112.7(a)(3)] y< Discharge prevention measures and procedures for routine handling {CFR 112.7(a )(3 Countermeasures for discovery, response and clean-up [CFR112.7(a)(3) +� Ar Required contact list and phone numbers [CFR 112.7(a)(3) T", ,, VI..V / 1V ■\ V. VY ■■V ■K■ V■ VV ■mow w.. w... w..�w. ��.... �..__� _ _- ______ __ - __ -. _ DESCRIPTION Y N N/A COMMENTS Provide corrosion protection CFR 112.8(c)(4)(5), (d)(1)] �. ' Containers compatible with materials stored CFR 112.8(c)(1)] f Implement SPCC plan review changes or amendments within 6 months [CFR 112.5(a)(d)] Prepare an oil contingency plan or written control /removal commitments [CFR 112.7(4)] DESCRIPTION Y N N/A ,, COMMENTS Training program CFR 112.7(f)] �. ' Train personnel in operation and maintenance of equipment CFR 112.7(f)] f Conduct annuals ill prevention briefings CFR 112.7(f)(3)] Ai F. 9%7Mlr 1 X. !\JTOT\/ I _9'%f7Li- 4L --% , DESCRIPTION YJ N N/A COMMENTS Meet provisions of conditional exemption [H &S 25270.4.5(b)] �. ' Facility security adequate [CFR 112.7(g)] Clean-up materials readily available . CFR 112.7(c)] f Overfill protection procedures or devices in place and operative [CFR 112.8(c)(8) Portable /mobile containers positioned to prevent discharge CFR 112.8(c)(11) Loading / unloading rack drains into containment area CFR 112.7(h)] Provide appropriate containment /diversionary structures to prevent discharge [CFR 112.8(a), 112.7(c)] Secondary containment adequate to contain capacity of largest container + precipitation CFR 112.8(c)] y< Remove accumulation of oil in secondary containment [CFR 112.8(c)(10) Secondary containment valve(s) closed CFR 112.8 +� Ar Implement SPCC plan elements [CFR 112.3] T", ,, ANY HAZARDOUS WASTE ON SITE? 13YES ❑ NO Signature ofReceipt .- Explain: s ._ POST INSPECTION INSTRUCTIONS: • Refer to the back of this inspection report for re latory citations and corrective action, • Correct the violation(s) noted above by • Within 5 days of correcting all of the violations, sign and return a copy of this page to: Bakersfield Fire Dept., Prevention Services, 2101 H Street, California 93301 White - Business Copy 'Yellow - Business Copy to be Sent in after return to Compliance Signature (that all violations have been corrected as noted) Date Pink - Prevention Services Copy FD2156b (Rev 9/10)