HomeMy WebLinkAboutROI NO 1887RESOLUTION OF INTENTION NO. 1887
A RESOLUTION DECLARING INTENTION TO ESTABLISH
THE WEST MING - KERN RIVER CANAL BRIDGE
DISTRICT AND PRELIMINARILY APPROVING THE
BOUNDARIES OF THE AREA, CONSTRUCTION COSTS,
AND FEE SCHEDULE. (WARD 5)
WHEREAS, Chapter 16.32.060.F of Title 16 of the Bakersfield Municipal Code and
Section 66484 of the California Government Code, provides for a procedure by which
the City Council may assess and collect fees for the purpose of defraying the cost of
constructing bridge s or major thoroughfares identified in the transportation circulation
element of the Metropolitan Bakersfield General Plan, and;
WHEREAS, General Plan Amendment 03 -1544, adopted the West Ming Specific
Plan, amending the Land Use, Kern River Plan Element, and Circulation Element of the
Bakersfield General Plan for the West Ming Project on August 15, 2007 per Resolutions
162 -07 and 163 -07 of the City Council of the City of Bakersfield, and;
WHEREAS, the developer of the West Ming Project, as a condition of approval for
General Plan Amendment 03 -1544, is required to construct two local collector streets
across the Kern River Canal within the West Ming Specific Plan area, and;
WHEREAS the City of Bakersfield desires to aid the developer in the formation of
the West Ming - Kern River Canal Bridge District to fund the required two crossings, and;
WHEREAS, the City has notified all affected property owners and is proposing the
formation of the West Ming - Kern River Canal Bridge District to reimburse the cost of the
improvements upon subdivision or development of property within the Area.
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Bakersfield as
follows:
1. The foregoing recitals are true and correct and are incorporated herein.
2. The Council hereby preliminarily approves the estimate, attached hereto as
Exhibit A, the fee schedule attached hereto as Exhibit B, the limits of improvements as
shown on Exhibit C and the boundary of the area benefited by the construction as
described on the map attached hereto as Exhibit D, for the West Ming - Kern River
Canal Bridge District. Subdivision or development of property within such Area will
require payment of fees per the attached schedule.
5: \PR0JECTS \Badge Distdct \West Ming -Kern River Canal Bridge District \ROI IW7 est docx O� 9P KFy
Page 1 of 3
o
ORI'INA[
3. The City Council hereby fixes Wednesday, June 29, 2016, of 5:15 PM, or as soon as
thereafter as may be heard, at the Council Chambers of the City Council, 1501 Truxtun
Avenue, Bakersfield, California, as the time and place for hearing protests on the
following matters:
• Cost Estimate- Exhibit A
• Fee Schedule- Exhibit B
• Limits of Improvements- Exhibit C
• Benefit Area - Exhibit D
S: \PROJECTS \Bridge Distrli Ming -Kern River Carrel Bridge D[dnCt \ROI 1887 est.doax
Page 2 of 3
gAKF9
m
v 0
0RIGINAf
HEREBY CERTIFY that the foregoing Resolution was passed and adopted
by the Council of the City of Bakersfield at a regular meeting thereof held on
JUN 0 6 2016 , by the following vote:
✓✓ i ✓ r
YES: COUNCILMEMBER /
„ MAXWELL, WEIR, SMITH, HANSON, SULLIVAN, PARLIER
N S: COUNCILMEMBER
ABSTAIN: COUNCILMEMBER LVOq�
ABSEN : COUNCILMEMBER �/QM -per
`/N
ROBERTA GAFFORD, qW
CITY CLERK and Ex Officio Clerk of the
Council of the City of Bakersfield
APPROVED: JUN 0 8 2016
0
HARVEY L. HALL
MAYOR of the City of Bakersfield
APPROVED AS TO FORM:
VIRGINIA GENNARO
City Attorney
By: — 0" j
ANDREW HEGLUND
Deputy City Attorney
Attachments: Exhibit "A"
Exhibit "B"
Exhibit "C"
Exhibit "D"
S: \PROJECTS \Bridge oisfict \West Ming -Kern River Canal Bridge Di ICt\ROI 1887 est.docx
Page 3 of 3
O N
H fri
J
ORIGINAL
EXHIBIT "A" 05/13/2016
WEST MING - KERN RIVER CANAL BRIDGE DISTRICT
COST ESTIMATE
* ** KERN RIVER CANAL BRIDGE "A" * **
Item No. Item Descriodon Quantity Unit Unit Cost ($) Item Cost ($) Totals
Box Culvert
1.
Box Culvert
1
LS
470,000.00
/LS 470,000
Grading
Sub -Total Box Culvert
$
470,000
2.
Mobilization
1
LS
5,000.00
/LS 5,000
3.
Roadway Excavation
500
cy
10.00
/cy 5,000
Street
Improvements (140 LF)
Sub -Total Grading
$
10,000
4.
0.30' Type "B" Asphalt Concrete
144
ton
77.00
/ton 11,088
5.
0.40' Aggregate Base
98
cy
58.50
/cy 5,733
6.
1.00'Compacted Subgrade
738
sy
2.40
/sy 1,771
7.
Type "B" Curb & Gutter
280
If
16.00
/If 4,480
8.
6" Thick Drive Approach
4
ea
600.00
/ea 2,400
9.
Type "M" Median Curb
280
If
16.00
/If 4,480
10,
5.5- R &30 -R Wide Sidewalks
2,170
sf
2.85
/sf 6,185
11.
Street Light
1
ea
2,100.00
/ea 2,100
12.
Street Light Conduit & Conductor
140
If
4.15
/If 581
13.
Street Light Pull Box
1
ea
300.00
/ea 300
Water
Improvements
Sub -Total Street Improvements (140 LF)
$
39,118
14,
12" Waterline w/ Canal Crossing
140
If
150.00
/If 21.000
loint Iltllitiec
Sub
-Total Water Improvements
$
21,000
15.
Joint Utility Trench
140
If
35.00
/If 4,900
Miscellaneous
Sub -Total Joint Utilities
$
4,900
16.
Canal Gates
4
ea
500.00
/ea 2,000
17,
Masonry Wall
280
If
100.00
/If 28,000
18.
Median Hardscapin9
1,620
sf
9.50
/sf 15,390
19.
Parkway Landscaping
1,399
sf
2.75
/sf 3,847
20.
Bb Clearance Survey
1
LS
500.00
/LS 500
Sub -Total Miscellaneous
$
49,737
Sub -Total Construction Costa:
$
594,755
KM> U: I West MI,yICanN -Cros<i I&l 9e-OnYrkr- �IExMM -A -COSY 2016- 05- 16>Cry v A Page 1 �f 9AKF9�
Lib` O
ORIGI��InL.
EXHIBIT "A" 05/13/2016
WEST MING - KERN RIVER CANAL BRIDGE DISTRICT
COST ESTIMATE
* ** KERN RIVER CANAL BRIDGE "A" * **
Item No. Item Description Quantity Unit Unit Cost ($) Item Cost ($) Totals
SOFT COSTS:
Utility Fees
21. Gas Main
22. PG &E Trench Inspection
City of
23.
Bakersfield Fees
Impvt. Mancheck Fees
24.
Public R/W Inspection Fees
25.
Water Inspection Fees
26,
Public R/W Inspection Fees
Civil Design
27. Design Engineering - Culvert
28. Design Engineering & Landscape Desigr
Miscellaneous
29. Construction Insp. & Contract Admin.
30. Culvert Insp. & Contract Admin.
31. Preliminary Soils Report
32. Soils Texts & Final Report
33. Culvert Construction Staking
34. Construction Staking
140
If
10.80
/If 1,512
140
If
0.50
/If 70
Total utility Fees
$
1,582
1
LS
7,999.00
/LS 7,999
1
LS
13,847.00
/LS 13,847
5.00%
of constn 1,060
1
LS
13,847.00
/LS 8,020
Total City of Bakersfield Fees
$
30,926
1
LS
24,000.00
/LS 24,000
1
LS
10,640.00
/LS 10,640
Total Civil Design
$
34,640
1
LS
4,256.00
/LS 4,256
1
LS
13,10.00
/LS 13,100
1
LS
5,00.00
/LS 5,000
3.00%
of const'n 6,384
1
LS
3,50.00
/LS 3,50
1
LS
8,512.00
/LS 8,512
Total Miscellaneous
$
40,752
Sub -Total Soft Costs:
$
107,900
KM>U: IWe #MMICan Crossg OxVe-DUhkT-kmraUOnl�M`OA -Ca &- X16- 05 -16>C% A Page 2 of 4g AKF
O 9N
v p
ORIGINAL.
EXHIBIT "A" 05/13/2016
WEST MING - KERN RIVER CANAL BRIDGE DISTRICT
COST ESTIMATE
* ** KERN RIVER CANAL BRIDGE "B" * **
Item No. Item Description Quantity Unit Unit Cost ($) Item Cost ($) Totals
Box Culvert
1.
Box Culvert
i
LS
470,000.00
/LS 470,000
Grad1B9
Sub-Total Box Culvert
$
470,000
2.
Mobilization
1
LS
5,000.00
/LS 5,000
3.
Roadway Excavation
500
ry
10.00
/cy 5,000
Street
Improvements (140 LFl
Sub -Total Grading
$
10,000
4.
0.30' Type "B" Asphalt Concrete
144
ton
77.00
/ton 11,088
5.
0.40' Aggregate Base
98
cy
58.50
/cy 5,733
6.
1.00' Compacted Subgrade
738
sy
2.40
/sy, 1,771
7.
Type "B" Curb & Gutter
280
If
16.00
/If 4,480
8.
6" Thick Drive Approach
4
ea
600.00
/ea 2,400
9.
Type "M" Median Curb
280
If
16.00
/If 4,480
10.
5.5- R &10 -ft Wide Sidewalks
2,170
sf
2.85
/sf 6,185
11.
Street Hight
1
ea
2,100.00
/ea 2,100
12.
Street Hight Conduit & Conductor
140
If
4.15
/If 581
13.
Street Light Pull Box
1
ea
300.00
/ea 300
Water
Improvements
Sub -Total Street Improvements (140 LF)
$
39,118
14.
12" Waterline w/ Canal Crossing
140
If
150.00
/If 21,000
joint
Utilities
Sub -Total Water Improvements
$
21,000
15.
Joint Utility Trench
140
If
35.00
/If 4,900
Miscellaneous
Sub -Total Joint Utilities
$
4,900
16.
Canal Gates
4
ea
500.00
/ea 2,000
17.
Masonry Wall
280
If
100.00
/If 28,000
18.
Median Hardscaping
1,620
sf
9.50
/sf 15,390
19.
Parkway Landscaping
1,399
sf
2.75
/sf 3,847
20.
Bic, Clearance Surrey
1
LS
500.00
/LS 500
Sub -Total Miscellaneous
$
49,737
Sub-Total Construction Costs:
$
594,755
.ra�urinwsrm�„ulcw�' -� mrle bye- oarx*- ro�arw"I mr- a- cosrES- zors- osrs�nooss�,y -e Page 3 of 4o�6AK6
U p
ORIGINAL
EXHIBIT "A" 05/13/2016
WEST MING - KERN RIVER CANAL BRIDGE DISTRICT
COST ESTIMATE
* ** KERN RIVER CANAL BRIDGE "B" * **
Item No. Item Description Quantity Unit Unit Cost ($) Item Cost ($) Totals
SOFT COSTS:
Utility Fees
21. Gas Main
22. PG &E Trench Inspection
City of
23.
Bakersfield Fees
Impvt. Plancheck Fees
24.
Public R/W Inspection Fees
25.
Water Inspection Fees
26.
Public R/W Inspection Fees
Civil Design
27. Design Engineering - Culvert
28. Design Engineering & Landscape Desigr
Miscellaneous
29. Construction Insp. & Contract Admin.
30. Culvert Insp. & Contract Admin.
31. Preliminary Soils Report
32. Soils Texts & Final Report
33. Culvert Construction Staking
34. Construction Staking
140
If
10.80
/If 1,512
140
If
0.50
/If 70
Total Utility Fees
$
1,582
1
LS
7,999.00
/LS 7,999
1
LS
13,847.00
/LS 13,847
5.00%
of const'n 1,060
1
LS
13,847.00
/LS 8,020
Total City of Bakersfield Fees
$
30,926
1
LS
24,000.00
/LS 24,000
1
LS
10,640.00
/LS 10,640
Total Civil Design
$
34,640
1
LS
4,256.00
/LS 4,256
1
LS
13,100.00
/LS 13,100
1
LS
5,000.00
/LS 5,000
3.00%
of cunst'n 6,384
1
LS
3,500.00
/LS 3,500
1
LS
8,512.00
/LS 8,512
Total Miscellaneous
$
40,752
Sub -Total Soft Casts:
$
107,900
]Iu F,1 04 • [1
KM>U. IEr W—A {sf&201605 -15,C > B
Page 4 of 4
�gAKF9
r
O
OP.I(iINAL
EXHIBIT "B"
WEST MING - KERN RIVER CANAL BRIDGE DISTRICT
FEE SCHEDULE
Estimated Maximum Residential Suildout
Fee Area No. 1 (North of KRC) = 1,052 DUs
Fee Area No. 2 (South of KRC) = 1,649 DUs
05/16/2016
Kern River Canal Bridge "A" =
$ 702,655
Kern River Canal Bridge "B" =
$ 702,655
Engineer's Estimate of Total Project Cost =
$ 1,405,310
PROJECT COST PER EQUIVALENT DWELLING UNIT
FEE AREA No. 1 (North of KRC) =
$ 667.92 /EDU
(in 2016 dollars)
FEE AREA No. 2 (South of KRC) =
$ 426.11 /EDU
(in 2016 dollars)
Notes,
1) Fee Area No. 1 (Properties North of the KRC) shall be allocated 50% of the Total Project Cost.
2) Fee Area No. 2 (Properties South of the KRC) shall be allocated 50% of the Total Project Cost.
3) The Fee shall apply to Residential Use Properties only.
4) The Fee applied to Residential Use Property shall not exceed 4 EDUs per gross acre.
5) The Fee Is to be adjusted annually per the City of Los Angeles Construction Cost Index
published by Engineering News - Record.
��AKF
KM> U: I WYMMI[3iW-C ",r�s Br e-aslmf'fnmi IExhibif -B -Fe - 2016 -05 -I6 Paga-1 oft r
p 43
ORIGINnI-
§«
d
k
�
\
)
\z
/j
//
&z§\
=2
=±
~
\
d
�\}\
=b
y
\
/
§«
d
ORIG INP §
�
)
,
~
\
d
/
DO
�
\\
\\In
lb
,
�
ORIG INP §
�
)
,
~
\
d
/
DO
ORIG INP §
QNK
n 9m
m
o n
ORIGINAL
�� uI
ik;lii
-
i
OtlO,VJSIAVN309
l
'W it
.
ZI
®
aV08 N
i1v Hinos
a
it
N
z
L
u
z
K
W
W
O
N
Z
1 �
,I
ZY
v Z LU
d� LLv
Oz
,)
O --
-
Q
I
W
LU
Z g�V
LL
I
>�
Z�
Co
Y
W
b
Z
N
c
G
m
N
Z
N
LLA
O
QNK
n 9m
m
o n
ORIGINAL
AFFIDAVIT OF POSTING DOCUMENTS
STATE OF CALIFORNIA)
) ss.
County of Kern )
ROBERTA GAFFORD, being duly sworn, deposes and says:
That she is the duly appointed, acting and qualified City Clerk of the City of Bakersfield;
and that on the 10th day of June. 2016 she posted on the Bulletin Board at City Hall, a
full, true and correct copy of the following: Resolution of Intention No. 1887 passed by
the Bakersfield City Council at a meeting held on the 8th day of June 2016 and entitled:
A RESOLUTION DECLARING INTENTION TO ESTABLISH THE WEST MING -KERN
RIVER CANAL BRIDGE DISTRICT AND PRELIMINARILY APPROVING THE
BOUNDARIES OF THE AREA, CONSTRUCTION COSTS, AND FEE SCHEDULE.
(WARD 5)
ROBERTA GAFFORD
City Clerk and Ex Officio of the
Council of the City of Bakersfield
By: A
DEP City lerk
S OOCUMENTTORMSV OP. ROI wpd