Loading...
HomeMy WebLinkAboutROI NO 1887RESOLUTION OF INTENTION NO. 1887 A RESOLUTION DECLARING INTENTION TO ESTABLISH THE WEST MING - KERN RIVER CANAL BRIDGE DISTRICT AND PRELIMINARILY APPROVING THE BOUNDARIES OF THE AREA, CONSTRUCTION COSTS, AND FEE SCHEDULE. (WARD 5) WHEREAS, Chapter 16.32.060.F of Title 16 of the Bakersfield Municipal Code and Section 66484 of the California Government Code, provides for a procedure by which the City Council may assess and collect fees for the purpose of defraying the cost of constructing bridge s or major thoroughfares identified in the transportation circulation element of the Metropolitan Bakersfield General Plan, and; WHEREAS, General Plan Amendment 03 -1544, adopted the West Ming Specific Plan, amending the Land Use, Kern River Plan Element, and Circulation Element of the Bakersfield General Plan for the West Ming Project on August 15, 2007 per Resolutions 162 -07 and 163 -07 of the City Council of the City of Bakersfield, and; WHEREAS, the developer of the West Ming Project, as a condition of approval for General Plan Amendment 03 -1544, is required to construct two local collector streets across the Kern River Canal within the West Ming Specific Plan area, and; WHEREAS the City of Bakersfield desires to aid the developer in the formation of the West Ming - Kern River Canal Bridge District to fund the required two crossings, and; WHEREAS, the City has notified all affected property owners and is proposing the formation of the West Ming - Kern River Canal Bridge District to reimburse the cost of the improvements upon subdivision or development of property within the Area. NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Bakersfield as follows: 1. The foregoing recitals are true and correct and are incorporated herein. 2. The Council hereby preliminarily approves the estimate, attached hereto as Exhibit A, the fee schedule attached hereto as Exhibit B, the limits of improvements as shown on Exhibit C and the boundary of the area benefited by the construction as described on the map attached hereto as Exhibit D, for the West Ming - Kern River Canal Bridge District. Subdivision or development of property within such Area will require payment of fees per the attached schedule. 5: \PR0JECTS \Badge Distdct \West Ming -Kern River Canal Bridge District \ROI IW7 est docx O� 9P KFy Page 1 of 3 o ORI'INA[ 3. The City Council hereby fixes Wednesday, June 29, 2016, of 5:15 PM, or as soon as thereafter as may be heard, at the Council Chambers of the City Council, 1501 Truxtun Avenue, Bakersfield, California, as the time and place for hearing protests on the following matters: • Cost Estimate- Exhibit A • Fee Schedule- Exhibit B • Limits of Improvements- Exhibit C • Benefit Area - Exhibit D S: \PROJECTS \Bridge Distrli Ming -Kern River Carrel Bridge D[dnCt \ROI 1887 est.doax Page 2 of 3 gAKF9 m v 0 0RIGINAf HEREBY CERTIFY that the foregoing Resolution was passed and adopted by the Council of the City of Bakersfield at a regular meeting thereof held on JUN 0 6 2016 , by the following vote: ✓✓ i ✓ r YES: COUNCILMEMBER / „ MAXWELL, WEIR, SMITH, HANSON, SULLIVAN, PARLIER N S: COUNCILMEMBER ABSTAIN: COUNCILMEMBER LVOq� ABSEN : COUNCILMEMBER �/QM -per `/N ROBERTA GAFFORD, qW CITY CLERK and Ex Officio Clerk of the Council of the City of Bakersfield APPROVED: JUN 0 8 2016 0 HARVEY L. HALL MAYOR of the City of Bakersfield APPROVED AS TO FORM: VIRGINIA GENNARO City Attorney By: — 0" j ANDREW HEGLUND Deputy City Attorney Attachments: Exhibit "A" Exhibit "B" Exhibit "C" Exhibit "D" S: \PROJECTS \Bridge oisfict \West Ming -Kern River Canal Bridge Di ICt\ROI 1887 est.docx Page 3 of 3 O N H fri J ORIGINAL EXHIBIT "A" 05/13/2016 WEST MING - KERN RIVER CANAL BRIDGE DISTRICT COST ESTIMATE * ** KERN RIVER CANAL BRIDGE "A" * ** Item No. Item Descriodon Quantity Unit Unit Cost ($) Item Cost ($) Totals Box Culvert 1. Box Culvert 1 LS 470,000.00 /LS 470,000 Grading Sub -Total Box Culvert $ 470,000 2. Mobilization 1 LS 5,000.00 /LS 5,000 3. Roadway Excavation 500 cy 10.00 /cy 5,000 Street Improvements (140 LF) Sub -Total Grading $ 10,000 4. 0.30' Type "B" Asphalt Concrete 144 ton 77.00 /ton 11,088 5. 0.40' Aggregate Base 98 cy 58.50 /cy 5,733 6. 1.00'Compacted Subgrade 738 sy 2.40 /sy 1,771 7. Type "B" Curb & Gutter 280 If 16.00 /If 4,480 8. 6" Thick Drive Approach 4 ea 600.00 /ea 2,400 9. Type "M" Median Curb 280 If 16.00 /If 4,480 10, 5.5- R &30 -R Wide Sidewalks 2,170 sf 2.85 /sf 6,185 11. Street Light 1 ea 2,100.00 /ea 2,100 12. Street Light Conduit & Conductor 140 If 4.15 /If 581 13. Street Light Pull Box 1 ea 300.00 /ea 300 Water Improvements Sub -Total Street Improvements (140 LF) $ 39,118 14, 12" Waterline w/ Canal Crossing 140 If 150.00 /If 21.000 loint Iltllitiec Sub -Total Water Improvements $ 21,000 15. Joint Utility Trench 140 If 35.00 /If 4,900 Miscellaneous Sub -Total Joint Utilities $ 4,900 16. Canal Gates 4 ea 500.00 /ea 2,000 17, Masonry Wall 280 If 100.00 /If 28,000 18. Median Hardscapin9 1,620 sf 9.50 /sf 15,390 19. Parkway Landscaping 1,399 sf 2.75 /sf 3,847 20. Bb Clearance Survey 1 LS 500.00 /LS 500 Sub -Total Miscellaneous $ 49,737 Sub -Total Construction Costa: $ 594,755 KM> U: I West MI,yICanN -Cros<i I&l 9e-OnYrkr- �IExMM -A -COSY 2016- 05- 16>Cry v A Page 1 �f 9AKF9� Lib` O ORIGI��InL. EXHIBIT "A" 05/13/2016 WEST MING - KERN RIVER CANAL BRIDGE DISTRICT COST ESTIMATE * ** KERN RIVER CANAL BRIDGE "A" * ** Item No. Item Description Quantity Unit Unit Cost ($) Item Cost ($) Totals SOFT COSTS: Utility Fees 21. Gas Main 22. PG &E Trench Inspection City of 23. Bakersfield Fees Impvt. Mancheck Fees 24. Public R/W Inspection Fees 25. Water Inspection Fees 26, Public R/W Inspection Fees Civil Design 27. Design Engineering - Culvert 28. Design Engineering & Landscape Desigr Miscellaneous 29. Construction Insp. & Contract Admin. 30. Culvert Insp. & Contract Admin. 31. Preliminary Soils Report 32. Soils Texts & Final Report 33. Culvert Construction Staking 34. Construction Staking 140 If 10.80 /If 1,512 140 If 0.50 /If 70 Total utility Fees $ 1,582 1 LS 7,999.00 /LS 7,999 1 LS 13,847.00 /LS 13,847 5.00% of constn 1,060 1 LS 13,847.00 /LS 8,020 Total City of Bakersfield Fees $ 30,926 1 LS 24,000.00 /LS 24,000 1 LS 10,640.00 /LS 10,640 Total Civil Design $ 34,640 1 LS 4,256.00 /LS 4,256 1 LS 13,10.00 /LS 13,100 1 LS 5,00.00 /LS 5,000 3.00% of const'n 6,384 1 LS 3,50.00 /LS 3,50 1 LS 8,512.00 /LS 8,512 Total Miscellaneous $ 40,752 Sub -Total Soft Costs: $ 107,900 KM>U: IWe #MMICan Crossg OxVe-DUhkT-kmraUOnl�M`OA -Ca &- X16- 05 -16>C% A Page 2 of 4g AKF O 9N v p ORIGINAL. EXHIBIT "A" 05/13/2016 WEST MING - KERN RIVER CANAL BRIDGE DISTRICT COST ESTIMATE * ** KERN RIVER CANAL BRIDGE "B" * ** Item No. Item Description Quantity Unit Unit Cost ($) Item Cost ($) Totals Box Culvert 1. Box Culvert i LS 470,000.00 /LS 470,000 Grad1B9 Sub-Total Box Culvert $ 470,000 2. Mobilization 1 LS 5,000.00 /LS 5,000 3. Roadway Excavation 500 ry 10.00 /cy 5,000 Street Improvements (140 LFl Sub -Total Grading $ 10,000 4. 0.30' Type "B" Asphalt Concrete 144 ton 77.00 /ton 11,088 5. 0.40' Aggregate Base 98 cy 58.50 /cy 5,733 6. 1.00' Compacted Subgrade 738 sy 2.40 /sy, 1,771 7. Type "B" Curb & Gutter 280 If 16.00 /If 4,480 8. 6" Thick Drive Approach 4 ea 600.00 /ea 2,400 9. Type "M" Median Curb 280 If 16.00 /If 4,480 10. 5.5- R &10 -ft Wide Sidewalks 2,170 sf 2.85 /sf 6,185 11. Street Hight 1 ea 2,100.00 /ea 2,100 12. Street Hight Conduit & Conductor 140 If 4.15 /If 581 13. Street Light Pull Box 1 ea 300.00 /ea 300 Water Improvements Sub -Total Street Improvements (140 LF) $ 39,118 14. 12" Waterline w/ Canal Crossing 140 If 150.00 /If 21,000 joint Utilities Sub -Total Water Improvements $ 21,000 15. Joint Utility Trench 140 If 35.00 /If 4,900 Miscellaneous Sub -Total Joint Utilities $ 4,900 16. Canal Gates 4 ea 500.00 /ea 2,000 17. Masonry Wall 280 If 100.00 /If 28,000 18. Median Hardscaping 1,620 sf 9.50 /sf 15,390 19. Parkway Landscaping 1,399 sf 2.75 /sf 3,847 20. Bic, Clearance Surrey 1 LS 500.00 /LS 500 Sub -Total Miscellaneous $ 49,737 Sub-Total Construction Costs: $ 594,755 .ra�urinwsrm�„ulcw�' -� mrle bye- oarx*- ro�arw"I mr- a- cosrES- zors- osrs�nooss�,y -e Page 3 of 4o�6AK6 U p ORIGINAL EXHIBIT "A" 05/13/2016 WEST MING - KERN RIVER CANAL BRIDGE DISTRICT COST ESTIMATE * ** KERN RIVER CANAL BRIDGE "B" * ** Item No. Item Description Quantity Unit Unit Cost ($) Item Cost ($) Totals SOFT COSTS: Utility Fees 21. Gas Main 22. PG &E Trench Inspection City of 23. Bakersfield Fees Impvt. Plancheck Fees 24. Public R/W Inspection Fees 25. Water Inspection Fees 26. Public R/W Inspection Fees Civil Design 27. Design Engineering - Culvert 28. Design Engineering & Landscape Desigr Miscellaneous 29. Construction Insp. & Contract Admin. 30. Culvert Insp. & Contract Admin. 31. Preliminary Soils Report 32. Soils Texts & Final Report 33. Culvert Construction Staking 34. Construction Staking 140 If 10.80 /If 1,512 140 If 0.50 /If 70 Total Utility Fees $ 1,582 1 LS 7,999.00 /LS 7,999 1 LS 13,847.00 /LS 13,847 5.00% of const'n 1,060 1 LS 13,847.00 /LS 8,020 Total City of Bakersfield Fees $ 30,926 1 LS 24,000.00 /LS 24,000 1 LS 10,640.00 /LS 10,640 Total Civil Design $ 34,640 1 LS 4,256.00 /LS 4,256 1 LS 13,100.00 /LS 13,100 1 LS 5,000.00 /LS 5,000 3.00% of cunst'n 6,384 1 LS 3,500.00 /LS 3,500 1 LS 8,512.00 /LS 8,512 Total Miscellaneous $ 40,752 Sub -Total Soft Casts: $ 107,900 ]Iu F,1 04 • [1 KM>U. IEr W—A {sf&201605 -15,C > B Page 4 of 4 �gAKF9 r O OP.I(iINAL EXHIBIT "B" WEST MING - KERN RIVER CANAL BRIDGE DISTRICT FEE SCHEDULE Estimated Maximum Residential Suildout Fee Area No. 1 (North of KRC) = 1,052 DUs Fee Area No. 2 (South of KRC) = 1,649 DUs 05/16/2016 Kern River Canal Bridge "A" = $ 702,655 Kern River Canal Bridge "B" = $ 702,655 Engineer's Estimate of Total Project Cost = $ 1,405,310 PROJECT COST PER EQUIVALENT DWELLING UNIT FEE AREA No. 1 (North of KRC) = $ 667.92 /EDU (in 2016 dollars) FEE AREA No. 2 (South of KRC) = $ 426.11 /EDU (in 2016 dollars) Notes, 1) Fee Area No. 1 (Properties North of the KRC) shall be allocated 50% of the Total Project Cost. 2) Fee Area No. 2 (Properties South of the KRC) shall be allocated 50% of the Total Project Cost. 3) The Fee shall apply to Residential Use Properties only. 4) The Fee applied to Residential Use Property shall not exceed 4 EDUs per gross acre. 5) The Fee Is to be adjusted annually per the City of Los Angeles Construction Cost Index published by Engineering News - Record. ��AKF KM> U: I WYMMI[3iW-C ",r�s Br e-aslmf'fnmi IExhibif -B -Fe - 2016 -05 -I6 Paga-1 oft r p 43 ORIGINnI- §« d k � \ ) \z /j // &z§\ =2 =± ~ \ d �\}\ =b y \ / §« d ORIG INP § � ) , ~ \ d / DO � \\ \\In lb , � ORIG INP § � ) , ~ \ d / DO ORIG INP § QNK n 9m m o n ORIGINAL �� uI ik;lii - i OtlO,VJSIAVN309 l 'W it . ZI ® aV08 N i1v Hinos a it N z L u z K W W O N Z 1 � ,I ZY v Z LU d� LLv Oz ,) O -- - Q I W LU Z g�V LL I >� Z� Co Y W b Z N c G m N Z N LLA O QNK n 9m m o n ORIGINAL AFFIDAVIT OF POSTING DOCUMENTS STATE OF CALIFORNIA) ) ss. County of Kern ) ROBERTA GAFFORD, being duly sworn, deposes and says: That she is the duly appointed, acting and qualified City Clerk of the City of Bakersfield; and that on the 10th day of June. 2016 she posted on the Bulletin Board at City Hall, a full, true and correct copy of the following: Resolution of Intention No. 1887 passed by the Bakersfield City Council at a meeting held on the 8th day of June 2016 and entitled: A RESOLUTION DECLARING INTENTION TO ESTABLISH THE WEST MING -KERN RIVER CANAL BRIDGE DISTRICT AND PRELIMINARILY APPROVING THE BOUNDARIES OF THE AREA, CONSTRUCTION COSTS, AND FEE SCHEDULE. (WARD 5) ROBERTA GAFFORD City Clerk and Ex Officio of the Council of the City of Bakersfield By: A DEP City lerk S OOCUMENTTORMSV OP. ROI wpd