HomeMy WebLinkAbout2016 line test modDATE: 3/25/16
BILLING: COMPLETE FUELING SLUTIONS SITE: RAMCO
12601 JASMINE AVE 2222 "F" STREET
BAKERSFIELD, CA 93312 BAKERSFIELD, CA
PRODUCT MECHANICAL
PRODUCTS LINE TEST LEAK DETECTORS
UNL -87
- .000 -PASS
N/A
PREM -91
- .000 -PASS
N/A
DIESEL
- .000 -PASS
N/A
COMMENTS
A PRECISION TEST WAS PERFORMED ON PRODUCT LINES AT THE ABOVE LOCATION
USING THE ACURITE TM PIPELINE TESTER. I HAVE REVIEWED THE DATE PRODUCED IN
CONJUNCTION WITH AEA PROTOCOL, AND THEREFORE SATISFYS ALL REQUIREMENTS
FOR SUCH TESTING AS SET FORTH BY NFPA - 329 -92 AND USE 40 CFR PART 280.
THE RESULTS OF TESTING ARE SHOWN ON THE FOLLOWING PAGE. INCLUDED WITH
THE REPORT ARE REPROCUCTION OF DATA COMPILED DURING THE TEST WHICH FORMED
THE BASIS FOR THESE CONCLUSIONS. THIS INFORMATION IS STORED IN A PERMANENT
FILE IF FUTURE VERIFICATION OF TEST RESULTS IS NEEDED.
STATE I DECLARE UNDER PENALITY OF PERJURY THAT I AM A LICENSED TANK TESTER
IN THE OF CALIFORNIA AND THAT
REPORT
Cc Lk -1 1 r
I'mm's rNfif � 1
DATE: I z5-,/ 410 W/o #:
FACILITY NAME: RN/NA
FACILITY ADDRESS:
PRODUCT LINE TYPE: FIBERGLASS STEEL PLASTIC (CIRCLE ONE)
TURBINE MANUFACTURER:
PRODUCT
START TIME
END TIME
ITEST
VOLUME
RESULTS
GRADE
INITIAL
FINAL
PRESS URE
RATE
PASS
READING
OO.-OO/GPH
READING
00:00/GPH
OR
FAIL
s5b pAIIIII
000
u
Jib
S': CPO
o0o
& 5-,-
04P 6'-
?ASS