Loading...
HomeMy WebLinkAbout2016 line test modDATE: 3/25/16 BILLING: COMPLETE FUELING SLUTIONS SITE: RAMCO 12601 JASMINE AVE 2222 "F" STREET BAKERSFIELD, CA 93312 BAKERSFIELD, CA PRODUCT MECHANICAL PRODUCTS LINE TEST LEAK DETECTORS UNL -87 - .000 -PASS N/A PREM -91 - .000 -PASS N/A DIESEL - .000 -PASS N/A COMMENTS A PRECISION TEST WAS PERFORMED ON PRODUCT LINES AT THE ABOVE LOCATION USING THE ACURITE TM PIPELINE TESTER. I HAVE REVIEWED THE DATE PRODUCED IN CONJUNCTION WITH AEA PROTOCOL, AND THEREFORE SATISFYS ALL REQUIREMENTS FOR SUCH TESTING AS SET FORTH BY NFPA - 329 -92 AND USE 40 CFR PART 280. THE RESULTS OF TESTING ARE SHOWN ON THE FOLLOWING PAGE. INCLUDED WITH THE REPORT ARE REPROCUCTION OF DATA COMPILED DURING THE TEST WHICH FORMED THE BASIS FOR THESE CONCLUSIONS. THIS INFORMATION IS STORED IN A PERMANENT FILE IF FUTURE VERIFICATION OF TEST RESULTS IS NEEDED. STATE I DECLARE UNDER PENALITY OF PERJURY THAT I AM A LICENSED TANK TESTER IN THE OF CALIFORNIA AND THAT REPORT Cc Lk -1 1 r I'mm's rNfif � 1 DATE: I z5-,/ 410 W/o #: FACILITY NAME: RN/NA FACILITY ADDRESS: PRODUCT LINE TYPE: FIBERGLASS STEEL PLASTIC (CIRCLE ONE) TURBINE MANUFACTURER: PRODUCT START TIME END TIME ITEST VOLUME RESULTS GRADE INITIAL FINAL PRESS URE RATE PASS READING OO.-OO/GPH READING 00:00/GPH OR FAIL s5b pAIIIII 000 u Jib S': CPO o0o & 5-,- 04P 6'- ?ASS