Loading...
HomeMy WebLinkAbout SB989 RETEST RESULTS #721 4-29-16SWRCB, January 2002 Page ____ of ____ Secondary Containment Testing Report Form This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the appropriate pages of this form to report results for all components tested. The completed form, written test procedures, and printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. 1.FACILITY INFORMATION Facility Name: Date of Testing: Facility Address: Facility Contact: Phone: Date Local Agency Was Notified of Testing : Name of Local Agency Inspector (if present during testing): 2.TESTING CONTRACTOR INFORMATION Company Name: Technician Conducting Test: Credentials: CSLB Licensed Contractor SWRCB Licensed Tank Tester License Type: License Number: Manufacturer Training ManufacturerComponent(s)Date TrainingExpires 3.SUMMARY OF TEST RESULTS ComponentPassFail Not Tested Repairs Made ComponentPassFail Not Tested Repairs Made If hydrostatic testing was performed, describe what was done with the water after completion of tests: CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements Technician’s Signature:________________________________________________ Date:_________________________ $POGJEFODF6454FSWJDFT *OD ")B[ $% 11 #7721/Fastrip#22(North)04/29/2016 4013SouthHStreet,Bakersfield,CA93304 OmeroGarcia(661)393-7000 ShaneGardner CameronMason ✔ ICC USTInstaller/Retrofitter 12/03/2016 INCON ST-STS 04/14/2018 UDC 9-10 ✔ UDC 11-12 ✔ UDC 13-14 ✔ UDC 15-16 ✔ Water was returned to test trailer. 04/29/2016 SWRCB, January 2002 Page ____ of ____ 7.UNDER-DISPENSER CONTAINMENT (UDC) TESTING Test Method Developed By: UDC Manufacturer Industry Standard Professional Engineer Other (Specify) Test Method Used: Pressure Vacuum Hydrostatic Other (Specify) Test Equipment Used: Equipment Resolution: UDC # UDC # UDC # UDC # UDC Manufacturer: UDC Material: UDC Depth: Height from UDC Bottom to Top of Highest Piping Penetration: Height from UDC Bottom to Lowest Electrical Penetration: Condition of UDC prior to testing: Portion of UDC Tested1 Does turbine shut down when UDC sensor detects liquid (both product and water)?* Yes No NA Yes No NA Yes No NA Yes No NA Turbine shutdown response time Is system programmed for fail- safe shutdown?* Yes No NA Yes No NA Yes No NA Yes No NA Was fail-safe verified to be operational?* Yes No NA Yes No NA Yes No NA Yes No NA Wait time between applying pressure/vacuum/water and starting test Test Start Time: Initial Reading (RI): Test End Time: Final Reading (RF): Test Duration: Change in Reading (RF-RI): Pass/Fail Threshold or Criteria: Test Result: Pass Fail Pass Fail Pass Fail Pass Fail Was sensor removed for testing? Yes No NA Yes No NA Yes No NA Yes No NA Was sensor properly replaced and verified functional after testing? Yes No NA Yes No NA Yes No NA Yes No NA Comments – (include information on repairs made prior to testing, and recommended follow-up for failed tests) 1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an asterisk (*) is “NO” or “NA”, the entire UDC must be tested. (See SWRCB LG-160) See Incon Results 12 ✔ ✔ TS-STS 0.00" 9-10 A.P.P. Clean 4.00" 12.00" 29.00" Plastic Environ ✔ N/A ✔ ✔ ✔ ✔ ✔ 11-12 N/A ✔ ✔ ✔ ✔ A.P.P. Clean 4.00" 10.00" 29.00" Plastic Environ ✔ ✔ 13-1415-16 Environ Environ Plastic Plastic 29.00"29.00" 10.00"10.75" 4.00"4.00" Clean Clean A.P.P.A.P.P. ✔✔ ✔ ✔ ✔ ✔ N/AN/A ✔✔ ✔✔ ✔✔