Loading...
HomeMy WebLinkAboutPM 12023 Sewer StudyPage 1 of 7 Sewer System Study For McCutchen Commerce Center Bakersfield, California April 6, 2016 Prepared For Beech A/C Properties, LLC c/o JB Consulting Services 9519 Lake Superior Drive Bakersfield, CA 93312 Submitted By Engineering Solutions 31600 Railroad Canyon Rd, Suite J Canyon Lake, CA 92587 T (951) 333-1001 Page 2 of 7 INTRODUCTION This report has been prepared at the request of Jack Brey of JB Consulting Services who represents the owner of the subject property, Beech A/C Properties, LLC. The project is a proposed industrial project located at McCutchen Road and Reliance Drive in Bakersfield, California. The property consists of approximately 40.0 acres. The proposed development will consist of approximately 28 buildings with a total of approximately 88 suites of office/industrial space of varying sizes. The project will be built in phases of 1- 4 buildings each. This report accompanies the first building phase, which consists of just one building. Because the proposed sewer system must also take into consideration future development, this report also takes into account the sewer demands for a potential future multi-family development on the 40 acres north of the subject property. These two 40-acre parcels are all that remains in the sewer study area that do not already have sewer service dependent on other systems, and are therefore considered to contribute the total potential future sewer demand for this system. The subject property is extremely flat, and because of this fact, together with the limited depth of existing sewer lines, conventional gravity sewer lines alone cannot feasibly provide sewer service to all portions of the proposed development. The objectives of this sewer study are to determine the location and number of individual sewer grinder pumps for clusters of buildings for ultimate buildout of the industrial park, and determine the proper pipe diameter for the force mains as they accumulate flow from increasing numbers of grinder pumps. The study is also for the purpose of discussion with the city, and ultimately to serve as a design report to accompany the improvement plans. Page 3 of 7 Design Concept The current design concept evolved first from the idea of a single lift station large enough to accommodate most of the flow from the individual units, to the idea of a single grinder pump for each suite, based on the basic development concept of the project. The project consists of multiple buildings, most of which consist of up to 4 suites such that individual suites or entire buildings may be sold or leased to tenants. The idea that each suite could have its own grinder pump with each suite owner responsible for its own pump seems a feasible alternative to collecting all sewers into a single lift station. However, since a single grinder pump can serve more than the volume of sewage produced by one suite, or even one building, it seems more logical to serve clusters of suites with each grinder pump. A standard 4” gravity sewer lateral serves each suite in a cluster, and laterals are collected by a trunk which flows into the grinder pump. The outflow piping from each pump discharges into a force main that begins as a 1 ¼“ PVC pipe and increases in diameter as more force mains join it on the way to the ultimate discharge into the existing gravity sewer. The design of the system begins with determining the estimated flow volume from each suite which is based on the assumptions and calculations presented in Table 1, wherein each suite is determined to produce a peak demand flow equivalent to 14.5 fixture units. Since the conversion from fixture units to gallons per minute is not a linear function, Table 2 was prepared to show the accumulated flow rate in gallons per minute in increments of 14.5 fixture units. Table 3 was prepared to assist in choosing the number of units necessary to combine for a given pipe diameter at a given slope to maintain the required minimum velocity of 2.0 feet per second for gravity sewer pipes. The force main piping is sized by use of proprietary software provided by E- One, a manufacturer of grinder pumps of the type to be used in this project. The sizes of all proposed gravity mains and force mains are indicated on Exhibit A. Table 4, which is based on Exhibit A, indicates the number of suites contributing to each grinder pump zone, the accumulated number of units at each junction point, the corresponding peak flow rate in gpm and in cfs, the diameter of pipe from one node to the next, and the velocity in feet per second. Page 4 of 7 Table 1 Fixture Unit Count Fixture Fixtures/Suite F.U. Equiv. Fixture Units Toilets 3 3.0 9.0 Urinal 1 1.5 1.5 Lavatory 2 1.0 2.0 Bar Sink 1 1.0 1.0 Floor Drain 2 0.5 1.0 Total per Suite 14.5 Table 2 Fixture Unit/Flow Rate Conversion No. Suites Fixture Units Equiv. Flow Rate (gpm) 1 14.5 18.8 2 29.0 24.3 3 43.5 27.8 4 58.0 31.9 6 87.0 39.6 8 116.0 46.9 10 145.0 54.0 12 174.0 61.1 14 203.0 67.8 20 290.0 87.7 26 377.0 94.3 28 406.0 114.1 30 435.0 120.7 36 522.0 140.5 38 551.0 148.3 42 609.0 164.0 46 667.0 175.7 52 754.0 193.3 88 1276.0 330.4 Page 5 of 7 Table 3 Gravity Pipe Flow Capacity/Velocity Pipe Dia. Slope % Flow Depth Q (gpm) V (fps) Suites Served 4 “ 2.00% 80 142 4.24 4 “ 2.00% 70 122 4.16 4 “ 2.00% 60 98 3.99 4 “ 2.00% 50 73 3.72 16 4 “ 2.00% 40 49 3.35 10 4 “ 2.00% 30 29 2.88 4 4 “ 2.00% 20 13 2.29 1 6” 1.00% 90 324 3.87 6” 1.00% 80 59 2.67 12 6” 1.00% 18 23 2.00 2 8” 0.52 25 60 2.00 13 8” 0.60 21 47 2.00 9 8” 0.70 18 39 2.00 7 8” 0.80 16 34 2.00 5 8” 0.85 15.6 31 2.00 3 8” 0.90 15 30 2.00 3 McCutchen Commerce Center Table 4 1811646.911646.9 1.250.10450.00912.3 21217461.129087.7 2.000.19540.0229.0 3811646.9406114.1 2.500.25420.0347.5 4811646.9522140.5 2.500.31300.0349.2 51014554.0667175.7 2.500.39150.03411.5 6811646.911646.9 1.250.10450.00912.3 768739.620367.8 1.500.15110.01212.3 81217461.137794.3 2.000.21010.0229.6 945831.9435120.7 2.500.26890.0347.9 10811646.9551148.3 2.500.33040.0349.7 1145831.9609175.7 2.500.39150.03411.5 1246667175.71276330.4 4.000.73610.0878.4 Future Multi Family 384.0664384.0 4.000.85560.0879.8 Flow Rate  (CFS) X‐Section  Area (SF) Sewer Flow Rate (Demand) By Zone and Accumulative Zone Units/ Zone Flow Rate  (gpm) Accumulative  Flow (gpm) Force Main  Dia. (inches) Velocity (feet  per second)EDU Accumu‐ lative EDU SEWER CALCULATIONS Site Location: McCutchen Commerce Center cfs =cubic feet per second fps =velocity in feet per second GA =gross acres DV = design volume GPD =gallons per day MGD =million gallons per day Note: Residential The average family unit shall be 3.01 persons per single family residential unit and 2.77 persons per multi family residential unit. The average daily discharge of domestic sewage shall be 100 gallons per day per person. Design discharge per the following formula: Design Discharge = Peak Factor x Average Discharge Formula Ave. Discharge Units where:Peak Factor =2.54 x(Ave. Discharge)-0.1 (MGD) Peak Factor =2.65 x(Ave. Discharge)-0.1 (cfs) Land Use Peak Discharge Rate Peak Factor Commercial -0.012cfs/GA (6,460 GPD/GA)1.8 Industrial0.015cfs/GA (9,695 GPD/GA)2.0 Gross Acres = 40.32 Sewer Pipe Sizing Formula:Design Volume = (GA) x (0.010 cfs/GA) x (Peak) = cfs Commercial:0.8709cfs Design Volume = 40.32 x0.4838x1.8 = Industrial:1.2096cfs Design Volume = 40.32 x0.6048x2.0 = Residential: Single Family No. of Units =0.00 People/DU =3.01 Average Daily Discharge Total Persons =0.000 ÷ 1,000,000 =3E-09mgd Gal/day/person=100 Peak Factor 18.07 Total gpd =02.54 x (Ave.Discharge)-0.1 =peak factor = Design Discharge Peak Factor x Average Ddaily Discharge 18.07 x 0.0000 =0.000mgd =0gpd Peak Inflow Into Sewer Pipe =0gpm Peak Inflow Into Sewer Pipe =0.0000cfs Residential: Multi - Family No. of Units =664 People/DU =2.77 Average Daily Discharge Total Persons =1839.28183,928 ÷ 1,000,000 =0.18393mgd Gal/day/person=100 Peak Factor Total gpd =183,9282.54 x (Ave.Discharge)-0.1 =peak factor =3.01 Design Discharge SEWER CALCULATIONS Site Location: McCutchen Commerce Center Peak Factor x Average Ddaily Discharge 3.01 x 0.1839 =0.553mgd =553371gpd Peak Inflow Into Sewer Pipe =384gpm Peak Inflow Into Sewer Pipe =0.8562cfs Note: Trunk and Main sewers may be designed to flow full however; under no conditions may a gravity sewer be designed to flow under head pressure. Minimum Velocity in sewer is 2 fps SEWER CALCULATIONS Site Location: McCutchen Commerce Center 2.1.1 Average Daily Discharge Sewage flow is calculated per person, per land use. The following assumptions are based on District and City criteria: 100 gallons per day per person (City Standards) 2.77 persons per dwelling unit (COB Standards - proposed, Section 2.2.1.1a) 664DU *2.77person/DU = 1,839persons 1,839persons *100gpd/person = 183,928gpd =0.183928MGD Average Daily Discharge = 0.183928MGD 2.1.2 Peak Factor Peak sewage flow is calculated using the peak factor calculated in City Manual Section 2.2.1.1b(1). Peak Factor = 2.54 x (Average Daily Discharge) -0.1 Peak Factor = 2.54 * (0.183928 MGD) -0.1 =3.01 Peak Factor = 3.01 2.1.3 Design Discharge Design Discharge =Peak Factor x Average Discharge (§2.2.1.1b) 3.01*0.183928MGD =0.553MGD Design Discharge = 0.553MGD 2.1.4 Peak Flow The peak flow for the sewer pipe shall be equal to the design discharge. 0.553MGD =553,371gpd 553,371 gpd ÷  24 hr/d  ÷  60 min/hr  =384gpm Peak Flow =384gpm =0.8562cfs 2.1.5 Pipe Capacity Proposed Pipe Diameter =10inch Proposed Slope =0.0400% Proposed Pipe Material =SDR 35 n - value =0.013 The following calculations assume the pipe is flowing full, but unpressurized: Flow Area =0.54sq.ft. Wetted Perimeter =1.30ft Velocity =8.01ft/s (from Manning's equation) Flow Capacity =4.34cfs = 1946gpm 2.1.6 Peak Flow Including McCutchen Commerce Center Peak flow, Future MF384gpm0.8562cfs Peak flow, Office/Ind.542gpm1.2096cfs Combined Peak Flow926gpm2.0635cfs SEWER CALCULATIONS Site Location: McCutchen Commerce Center 384gpm =0.8562cfs Hydraulic Calculations: Pipe Analysis for L.F. of 10 " PVC Pipe 1 invert elevation in- Q=2.0635 cfs Props'd Pipe(feet)0.83 Proposed Slope 0.0400 n factor 0.013 (SDR 35 or equal) Q = A(1.486/n)(R2/3*S1/2) A=0.541062 1.486/n=114.3077 R2/3=0.350493 S1/2=0.2 Q= (capacity)4.335cfs =48% full invert elevation out-----------343.50 Velocity V = (1.486*R2/3*S1/2)/n constant1.486 R2/3=0.350493 S1/2=0.200000 Velocity=8.01fps Conclusion: Pipe ok