HomeMy WebLinkAboutRES NO 123-16RESOLUTION NO. 123- 16 RESOLUTION OF THE CITY OF BAKERSFIELD ADOPTING THE WEST MING - KERN RIVER CANAL BRIDGE DISTRICT AND MAKING FINDINGS RELATIVE THERETO. (WARD 5) WHEREAS, by Resolution of Intention No. 1887, adopted June 8, 2016, a public hearing was called for June 29, 2016, at the hour of 5:15 pm in the Council Chambers in the City Hall, 1501 Truxtun Avenue, Bakersfield, California, regarding the establishment of the West Ming - Kern River Canal Bridge District; and WHEREAS, notice of such hearing has been given to all affected property owners as such are shown on the latest equalized assessment roll; and, WHEREAS, such hearing has been duly and regularly held, and all persons interested have been given an opportunity to appear and be heard. NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Bakersfield as follows: The foregoing recitals are true and correct and incorporated herein by reference. 2. The West Ming - Kern River Canal Bridge District has been identified in the circulation element of the 2010 General Plan. 3. The West Ming - Kern River Canal Bridge District is in addition to existing major thoroughfares serving the area. 4. No majority protest as to the formation of the West Ming - Kern River Canal Bridge District exists. 5. The Council hereby finds that, as to the West Ming - Kern River Canal Bridge District, as described in the plans and maps attached hereto and incorporated herein by reference, subdivision and development of property within each such area will require construction of facilities, described in each such area either on the basis of benefits conferred on property for subdivision or on the need for such facilities created by the proposed subdivision and development of other property within such area, and that the fees provided within the schedule attached, are fairly apportioned. 6. The West Ming - Kern River Canal Bridge District is hereby adopted. S: \PROJECTS \Bridge Distract \West Ming Kern River Canal Bridge District \Res est.docx OAI"lINA1 HEREBY CERTIFY that the foregoing Resolution was passed and adopted by the Council of the City of Bakersfield at a regular meeting thereof held on JUN 2 9 1916 , by the following vote: ✓ ✓ ✓ ✓ ✓ ✓ ✓ A ES COUNCILMEMBER RIVERA, MAXWELL. WEIR, SMITH, HANSON, SULLIVAN. PARLIER ES: COUNCILMEMBER IN IfO ABSTAIN: COUNCILMEMBER fY�E ABSENT: COUNCILMEMBER IS �)Za l 4Y ROBERTA GAFFORD, CMC CITY CLERK and Ex Officio Clerk of the Council of the City of Bakersfield APPROVED: JUN 2 9 2616 By: HARVEY L. HALL, Mayor CITY OF BAKERSFIELD APPROVED AS TO FORM: VIRGINIA GENNARO City Attorney By: ANDREW HEGLUND Deputy City Attorney Attachments: Exhibit "A" Cost Estimate Exhibit "B" Fee Schedule Exhibit "C" Limits of Improvements Exhibit "D" Benefit Area S:APROJECTSVBddge DisLnc1\West Ming-Kern Rive/ Canal Bridge D¢tdci \Res est.docx 0 ,1rjAL EXHIIII WEST MING - KERN RIVER CANAL BRIDGE DISTRICT COST ESTIMATE 05/13/2016 Box Culvert 1. Box Culvert * ** KERN RIVER CANAL BRIDGE "A" * ** LS 470,000.00 /LS 470.000 Item No Item Descriotion Quantity Unit Unit Cost ($) Item Cost ($) Totals Box Culvert 1. Box Culvert 1 LS 470,000.00 /LS 470.000 Sub -Total Box Culvert $ 470,000 Grad109 2. Mobilization 1 LS 5,000.00 /LS 5,000 3. Roadway Excavation 500 cy 10.00 /cy 5,000 Sub -Total Grading $ 10,000 Street 4. ImprovemerHS (140 LF) 0.30' Type "B" Asphalt Concrete 144 ton 77.00 /ton 11,088 5. 0.40'Aggregate Base 98 cy 58.50 /cy 5,733 6. 1.00' Compacted Subgrade 738 sy 2.40 /sy 1,771 7. Type "B" Curb & Gutter 280 If 16.00 /H 4,480 B. 6" Thick Drive Approach 4 ea 600.00 /ea 2,400 9. Type "M" Median Curb 280 If 16.00 /If 4,480 10. 5.5 -ft & 10 -ft Wide Sidewalks 2,170 sf 2.85 /sf 6,185 11. Street Light 1 ea 2,100.00 lea 2,100 12. Street Light Conduit & Conductor 140 If 4.15 /If 581 13. Street Light Pull Box 1 ea 300.00 /ea 300 Sub -Total Street Improvements (140 LF) $ 39,118 Water 14. Improvements 12" Waterline w/ Canal Crossing 140 lt 150.00 /If 21,000 Sub -Total Water Improvements $ 21,000 Joint 15. Utilities Joint Utility Trench 140 If 35.00 /If 4,900 Sub -Total Joint Utilities $ 4,900 Miscellaneous 16. Canal Gates 4 ea 500.00 /ea 2,000 17. Masonry Wall 280 If 100.00 /If 28,000 18. Median Handscaping 1,620 sf 9.50 /sf 15,390 19. Parkway Landscaping 1,399 sf 2.75 /sf 3,847 20. Bio Clearance Surrey 1 LS 500.00 /LS 500 Sub -Total Miscellaneous $ 49,737 Sub -Total Construction Costs: $ 594,755 KM> U., IWe&n� Il Cx s�l� - �nl&hfbma -msr 20160516 >Gvs a Page 1 4`64 �= v ^ 11(AjAL EXHIBIT "A" WEST MING - KERN RIVER CANAL BRIDGE DISTRICT COST ESTIMATE 05/13/2016 SOFT COSTS: Utility Fees 21. Gas Main 22. PG&E Trench Inspection City of 23. Bakersfield Fees Impvt. Plancheck Fees * ** KERN RIVER CANAL BRIDGE "A" * ** Public R/W Inspection Fees 25. Water Inspection Fees 26, Public R/W Inspection Fees 0.50 /If 70 Item No Item Description Quantity Unit Unit Cost ($) Item Cost ($) Totals SOFT COSTS: Utility Fees 21. Gas Main 22. PG&E Trench Inspection City of 23. Bakersfield Fees Impvt. Plancheck Fees 24. Public R/W Inspection Fees 25. Water Inspection Fees 26, Public R/W Inspection Fees Civil Design 27. Design Engineering - Culvert 28. Design Engineering & landscape Desigr Miscellaneous 29. Construction Insp.& Contract Admin. 30. Culvert insp. & Contract Admin. 31. Preliminary Soils Report 32. Soils Texts & Final Report 33. Culvert Construction Staking 34. Construction Staking 140 If 10.80 /If 1,512 140 If 0.50 /If 70 Total Utility Fees $ 1,562 1 LS 7,999.00 /LS 7,999 1 LS 13,847.00 /LS 13,847 5.00% of const'n 1,060 1 LS 13,847.00 /LS 8,020 Total City of Bakersfield Fees $ 30,926 1 LS 24,000.00 XS 24,000 1 LS 10 640.00 /LS 10,640 Total Civil Design $ 34,640 1 LS 4,256.00 /LS 4,256 1 LS 13,100.00 /LS 13,100 1 LS 5,000.00 /LS 5,000 3.00% of const'n 6,384 1 LS 3,500.00 /LS 3,500 1 LS 8,512.00 /LS 8,512 Total Miscellaneous $ 40,752 Sub -Total Soft Costs: $ 107,900 01.11-1 ] r] • t n KM>U.IWe,, Miig fix' X951& iOg P- DiShM- FO,maGan E+"hidFA {5(£N- 2016 -05-16 >[T ?s A Page 2 of4 0 C h.'s. GI NAI EXHIBIT "A" WEST MING - KERN RIVER CANAL BRIDGE DISTRICT COST ESTIMATE 05/13/2016 BOY Cul" 1. Box Culvert * ** KERN RIVER CANAL BRIDGE "B" * ** LS 470,000.130 Item No Item Description Quantity Unit Unit Cost ($) Item Cost ($) Totals BOY Cul" 1. Box Culvert 1 LS 470,000.130 /LS 470,000 Sub -Total Box Culvert $ 470,000 Grodim 2. Mobilization 1 LS 5,000.00 /LS 5,000 3. Roadway Excavation 500 cy 10.00 /cy 5,000 Sub -Total Grading $ 10,000 Street 4. Imorovemerds (140 LF) 0.30'Type "B" Asphalt Concrete 144 ton 77.00 /ton 11,088 5. 0.40' Aggregate Base 98 cy 58.50 /cy 5,733 6. 1.00' Compacted Subgrade 738 sy 2.40 /sy 1,771 7. Type W'Curb & Gutter 280 If 1&00 /If 4,480 8. 6" Thick Drive Approach 4 ea 600.00 /ea 2,400 9. Type "M" Median Curb 280 If 16.00 /If 4,480 10. 5.5 -R & 10 -R Wide Sidewalks 2,170 sf 2.85 /sf 6,185 11. Street Light 1 ea 2,100.00 /ea 2,100 12. Street Light Conduit & Conductor 140 If 4.15 /If 581 13. Street Light Pull Box 1 ea 300.00 /ea 300 Sub -Total Street Improvements (140 LF) $ 39,118 Water 14. Improvements 12" Waterline w/ Canal Crossing 140 If 150.00 /If 21,000 Sub -Total Water Improvements $ 21,000 Joint 15. Utilities Joint Utility Trench 140 If 35.00 /If 4,900 Sub -Total Joint Utilities $ 4,900 Miscellaneaus 16. Canal Gates 4 ea 500.00 /ea 2,000 17. Masonry Wall 280 If 100.00 /If 28,000 18. Median Handscaping 1,620 sf 9.50 /sf 15,390 19. Parkway Landscaping 1,399 sf 2.75 /sf 3,847 20. Bio Clearance Survey 1 IS 500.00 /LS 500 Sub -Total Miscellaneous $ 49,737 Sub -Total Construction Casts: $ 594,755 KM� U:n'esr rouges' rossrgservegcasnrcfwma tionE+nro�ra- cosrESr- 1o16 -os -+6 �numy -e Page 3 of 4 0 EXHIBIT "A" WEST MING - KERN RIVER CANAL BRIDGE DISTRICT COST ESTIMATE 05/13/2016 SOFT COSTS: Utility Fees 21. Gas Main 22. PG&E Trench Inspection City of Bakersfield Fees 23, Impvt. Plancheck Fees 24. Public R/W Inspection Fees 25. Water Inspection Fees 26. Public R/W Inspection Fees Civil Design 27. Design Engineering - Culvert 28. Design Engineering & Landscape Desigr Miscellaneaus 29. Construction Insp. & Contract Admin. 30. Culvert Insp.& Contract Admin. 31. Preliminary Soils Report 32. Soils Texts & Final Report 33. Culvert Construction Staking 34. Construction Staking 140 If * ** KERN RIVER CANAL BRIDGE "B" * ** /If 1,512 140 If 0.50 /If 70 Item No Item Desc'ptlon Quantity Unit Unit Cost W Item Cost ($) Totals SOFT COSTS: Utility Fees 21. Gas Main 22. PG&E Trench Inspection City of Bakersfield Fees 23, Impvt. Plancheck Fees 24. Public R/W Inspection Fees 25. Water Inspection Fees 26. Public R/W Inspection Fees Civil Design 27. Design Engineering - Culvert 28. Design Engineering & Landscape Desigr Miscellaneaus 29. Construction Insp. & Contract Admin. 30. Culvert Insp.& Contract Admin. 31. Preliminary Soils Report 32. Soils Texts & Final Report 33. Culvert Construction Staking 34. Construction Staking 140 If 10.60 /If 1,512 140 If 0.50 /If 70 Total Utility Fees $ 1,562 1 IS 7,999.00 /LS 7,999 1 IS 13,847.00 /LS 13,847 5.00% of const'n 1,060 1 LS 13 847.00 /IS 8,020 Total City of Bakersfield Fees $ 30,926 1 LS 24,000.00 /IS 24,000 1 LS 10 640.00 /LS 10,640 Total Civil Design $ 34,640 1 LS 4,256.00 /LS 4,256 1 LS 13,100.00 /IS 13,100 1 LS 5,000.00 /LS 5,000 3.00% of const'n 6,384 1 LS 3,500.00 /LS 3,500 1 LS 9,512.00 /LS 8,512 Total Miscellaneous $ 40,752 Sub -Total Soft Costs: $ 107,900 KMs U: IWe9Mig A-CosfFx2016- 05-t6>Cws 8 Page 4 o 4 EXHIBIT "B" WEST MING - KERN RIVER CANAL BRIDGE DISTRICT FEE SCHEDULE Estimated Maudmum Residential R- 11dorR Fee Area No. 1 (North of KRC) = 1,052 DUs Fee Area No. 2 (South of KRC) = 1,649 DUs TOTAL PROJECT COST Kern River Canal Bridge "A" _ $ 702,655 Kern River Canal Bridge "B" _ $ 702,655 Engineers Estimate of Total Project Cost = $ 1,405,310 05/16/2016 PROJECT COST PER EOUIVALENT DWELLING UNIT FEE AREA No. 1 (North of KRC) _ $ 667.92 /EDU (in 2016 dollars) FEE AREA No. 2 (South of KRC) _ $ 426.11 /EDU (in 2016 dollars) Notw: 1) Fee Area No. 1 (Properties North of the KRC) shall be allocated 50% of the Total Project Cost. 2) Fee Area No. 2 (Properties South of the KRC) shall be allocated 50% of the Total Project Cost. 3) The Fee shall apply to Residential Use Properties only. 4) The Fee applied to Residential Use Property shall not exceed 4 EDUS per gross acre. 5) The Fee is to be adjusted annually per the City of Los Angeles Construction Cost Index published by Engineering News - Record. KM> U :e'est M/ gC mwFGOSiigsa ',d, e- Feet ?IOtb -OS 16 +C3naKiactirgs J k - \ - m / §2P L zU) OVDH ViSIA - =± =2 - �u LU / � \ - yCo } \(\ ~ \ $ k _ §O §; , : ca � e � \ i` \ y A °S I +r Ili JI MoltlJSIl1VN309 i I 7 'Si LL ® Otl08 N ny H100S a N aI Z i_ ® y U Z Y oC W O o d LU p Z LU I E O J F- Q < Uj Q' °z z U- b - Z U) W Ye LU W o Z 0! N cc G m N Z N Ln w 9 O` O G OPICI[JAL