HomeMy WebLinkAboutRES NO 123-16RESOLUTION NO. 123- 16
RESOLUTION OF THE CITY OF BAKERSFIELD
ADOPTING THE WEST MING - KERN RIVER CANAL
BRIDGE DISTRICT AND MAKING FINDINGS RELATIVE
THERETO. (WARD 5)
WHEREAS, by Resolution of Intention No. 1887, adopted June 8, 2016, a public
hearing was called for June 29, 2016, at the hour of 5:15 pm in the Council Chambers
in the City Hall, 1501 Truxtun Avenue, Bakersfield, California, regarding the
establishment of the West Ming - Kern River Canal Bridge District; and
WHEREAS, notice of such hearing has been given to all affected property
owners as such are shown on the latest equalized assessment roll; and,
WHEREAS, such hearing has been duly and regularly held, and all persons
interested have been given an opportunity to appear and be heard.
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Bakersfield as
follows:
The foregoing recitals are true and correct and incorporated herein by
reference.
2. The West Ming - Kern River Canal Bridge District has been identified in the
circulation element of the 2010 General Plan.
3. The West Ming - Kern River Canal Bridge District is in addition to existing
major thoroughfares serving the area.
4. No majority protest as to the formation of the West Ming - Kern River
Canal Bridge District exists.
5. The Council hereby finds that, as to the West Ming - Kern River Canal
Bridge District, as described in the plans and maps attached hereto and
incorporated herein by reference, subdivision and development of
property within each such area will require construction of facilities,
described in each such area either on the basis of benefits conferred on
property for subdivision or on the need for such facilities created by the
proposed subdivision and development of other property within such
area, and that the fees provided within the schedule attached, are fairly
apportioned.
6. The West Ming - Kern River Canal Bridge District is hereby adopted.
S: \PROJECTS \Bridge Distract \West Ming Kern River Canal Bridge District \Res est.docx
OAI"lINA1
HEREBY CERTIFY that the foregoing Resolution was passed and adopted by the
Council of the City of Bakersfield at a regular meeting thereof held on
JUN 2 9 1916 , by the following vote:
✓ ✓ ✓ ✓ ✓ ✓ ✓
A ES COUNCILMEMBER RIVERA, MAXWELL. WEIR, SMITH, HANSON, SULLIVAN. PARLIER
ES: COUNCILMEMBER IN IfO
ABSTAIN: COUNCILMEMBER fY�E
ABSENT: COUNCILMEMBER IS
�)Za l 4Y
ROBERTA GAFFORD, CMC
CITY CLERK and Ex Officio Clerk of the
Council of the City of Bakersfield
APPROVED: JUN 2 9 2616
By:
HARVEY L. HALL, Mayor
CITY OF BAKERSFIELD
APPROVED AS TO FORM:
VIRGINIA GENNARO
City Attorney
By:
ANDREW HEGLUND
Deputy City Attorney
Attachments:
Exhibit "A" Cost Estimate
Exhibit "B" Fee Schedule
Exhibit "C" Limits of Improvements
Exhibit "D" Benefit Area
S:APROJECTSVBddge DisLnc1\West Ming-Kern Rive/ Canal Bridge D¢tdci \Res est.docx
0
,1rjAL
EXHIIII
WEST MING - KERN RIVER CANAL BRIDGE DISTRICT
COST ESTIMATE
05/13/2016
Box Culvert
1.
Box Culvert
* ** KERN RIVER CANAL BRIDGE "A" * **
LS
470,000.00
/LS
470.000
Item No
Item Descriotion
Quantity Unit Unit Cost ($)
Item Cost ($)
Totals
Box Culvert
1.
Box Culvert
1
LS
470,000.00
/LS
470.000
Sub -Total Box Culvert
$
470,000
Grad109
2.
Mobilization
1
LS
5,000.00
/LS
5,000
3.
Roadway Excavation
500
cy
10.00
/cy
5,000
Sub -Total Grading
$
10,000
Street
4.
ImprovemerHS (140 LF)
0.30' Type "B" Asphalt Concrete
144
ton
77.00
/ton
11,088
5.
0.40'Aggregate Base
98
cy
58.50
/cy
5,733
6.
1.00' Compacted Subgrade
738
sy
2.40
/sy
1,771
7.
Type "B" Curb & Gutter
280
If
16.00
/H
4,480
B.
6" Thick Drive Approach
4
ea
600.00
/ea
2,400
9.
Type "M" Median Curb
280
If
16.00
/If
4,480
10.
5.5 -ft & 10 -ft Wide Sidewalks
2,170
sf
2.85
/sf
6,185
11.
Street Light
1
ea
2,100.00
lea
2,100
12.
Street Light Conduit & Conductor
140
If
4.15
/If
581
13.
Street Light Pull Box
1
ea
300.00
/ea
300
Sub -Total Street
Improvements (140 LF)
$
39,118
Water
14.
Improvements
12" Waterline w/ Canal Crossing
140
lt
150.00
/If
21,000
Sub -Total Water Improvements
$
21,000
Joint
15.
Utilities
Joint Utility Trench
140
If
35.00
/If
4,900
Sub -Total Joint Utilities
$
4,900
Miscellaneous
16.
Canal Gates
4
ea
500.00
/ea
2,000
17.
Masonry Wall
280
If
100.00
/If
28,000
18.
Median Handscaping
1,620
sf
9.50
/sf
15,390
19.
Parkway Landscaping
1,399
sf
2.75
/sf
3,847
20.
Bio Clearance Surrey
1
LS
500.00
/LS
500
Sub -Total Miscellaneous
$
49,737
Sub -Total Construction Costs:
$
594,755
KM> U., IWe&n� Il Cx s�l� - �nl&hfbma -msr 20160516 >Gvs a Page 1 4`64 �=
v
^ 11(AjAL
EXHIBIT "A"
WEST MING - KERN RIVER CANAL BRIDGE DISTRICT
COST ESTIMATE
05/13/2016
SOFT COSTS:
Utility Fees
21. Gas Main
22. PG&E Trench Inspection
City of
23.
Bakersfield Fees
Impvt. Plancheck Fees
* ** KERN RIVER CANAL BRIDGE "A" * **
Public R/W Inspection Fees
25.
Water Inspection Fees
26,
Public R/W Inspection Fees
0.50
/If 70
Item No
Item Description
Quantity Unit Unit Cost ($)
Item Cost ($)
Totals
SOFT COSTS:
Utility Fees
21. Gas Main
22. PG&E Trench Inspection
City of
23.
Bakersfield Fees
Impvt. Plancheck Fees
24.
Public R/W Inspection Fees
25.
Water Inspection Fees
26,
Public R/W Inspection Fees
Civil Design
27. Design Engineering - Culvert
28. Design Engineering & landscape Desigr
Miscellaneous
29. Construction Insp.& Contract Admin.
30. Culvert insp. & Contract Admin.
31. Preliminary Soils Report
32. Soils Texts & Final Report
33. Culvert Construction Staking
34. Construction Staking
140
If
10.80
/If 1,512
140
If
0.50
/If 70
Total Utility Fees
$
1,562
1
LS
7,999.00
/LS 7,999
1
LS
13,847.00
/LS 13,847
5.00%
of const'n 1,060
1
LS
13,847.00
/LS 8,020
Total City of Bakersfield Fees
$
30,926
1
LS
24,000.00
XS 24,000
1
LS
10 640.00
/LS 10,640
Total Civil Design
$
34,640
1
LS
4,256.00
/LS 4,256
1
LS
13,100.00
/LS 13,100
1
LS
5,000.00
/LS 5,000
3.00%
of const'n 6,384
1
LS
3,500.00
/LS 3,500
1
LS
8,512.00
/LS 8,512
Total Miscellaneous
$
40,752
Sub -Total Soft Costs:
$
107,900
01.11-1 ] r] • t
n
KM>U.IWe,, Miig fix' X951& iOg P- DiShM- FO,maGan E+"hidFA {5(£N- 2016 -05-16 >[T ?s A Page 2 of4
0
C h.'s. GI NAI
EXHIBIT "A"
WEST MING - KERN RIVER CANAL BRIDGE DISTRICT
COST ESTIMATE
05/13/2016
BOY Cul"
1.
Box Culvert
* ** KERN RIVER CANAL BRIDGE "B" * **
LS
470,000.130
Item No
Item Description
Quantity Unit Unit Cost ($)
Item Cost ($)
Totals
BOY Cul"
1.
Box Culvert
1
LS
470,000.130
/LS
470,000
Sub -Total Box Culvert
$
470,000
Grodim
2.
Mobilization
1
LS
5,000.00
/LS
5,000
3.
Roadway Excavation
500
cy
10.00
/cy
5,000
Sub -Total Grading
$
10,000
Street
4.
Imorovemerds (140 LF)
0.30'Type "B" Asphalt Concrete
144
ton
77.00
/ton
11,088
5.
0.40' Aggregate Base
98
cy
58.50
/cy
5,733
6.
1.00' Compacted Subgrade
738
sy
2.40
/sy
1,771
7.
Type W'Curb & Gutter
280
If
1&00
/If
4,480
8.
6" Thick Drive Approach
4
ea
600.00
/ea
2,400
9.
Type "M" Median Curb
280
If
16.00
/If
4,480
10.
5.5 -R & 10 -R Wide Sidewalks
2,170
sf
2.85
/sf
6,185
11.
Street Light
1
ea
2,100.00
/ea
2,100
12.
Street Light Conduit & Conductor
140
If
4.15
/If
581
13.
Street Light Pull Box
1
ea
300.00
/ea
300
Sub -Total Street
Improvements (140 LF)
$
39,118
Water
14.
Improvements
12" Waterline w/ Canal Crossing
140
If
150.00
/If
21,000
Sub -Total Water Improvements
$
21,000
Joint
15.
Utilities
Joint Utility Trench
140
If
35.00
/If
4,900
Sub -Total Joint Utilities
$
4,900
Miscellaneaus
16.
Canal Gates
4
ea
500.00
/ea
2,000
17.
Masonry Wall
280
If
100.00
/If
28,000
18.
Median Handscaping
1,620
sf
9.50
/sf
15,390
19.
Parkway Landscaping
1,399
sf
2.75
/sf
3,847
20.
Bio Clearance Survey
1
IS
500.00
/LS
500
Sub -Total Miscellaneous
$
49,737
Sub -Total Construction Casts:
$
594,755
KM� U:n'esr rouges' rossrgservegcasnrcfwma tionE+nro�ra- cosrESr- 1o16 -os -+6 �numy -e Page 3 of 4
0
EXHIBIT "A"
WEST MING - KERN RIVER CANAL BRIDGE DISTRICT
COST ESTIMATE
05/13/2016
SOFT COSTS:
Utility Fees
21. Gas Main
22. PG&E Trench Inspection
City of Bakersfield Fees
23, Impvt. Plancheck Fees
24. Public R/W Inspection Fees
25. Water Inspection Fees
26. Public R/W Inspection Fees
Civil Design
27. Design Engineering - Culvert
28. Design Engineering & Landscape Desigr
Miscellaneaus
29. Construction Insp. & Contract Admin.
30. Culvert Insp.& Contract Admin.
31. Preliminary Soils Report
32. Soils Texts & Final Report
33. Culvert Construction Staking
34. Construction Staking
140
If
* ** KERN RIVER CANAL BRIDGE "B" * **
/If 1,512
140
If
0.50
/If 70
Item No
Item Desc'ptlon
Quantity Unit Unit Cost W
Item Cost ($)
Totals
SOFT COSTS:
Utility Fees
21. Gas Main
22. PG&E Trench Inspection
City of Bakersfield Fees
23, Impvt. Plancheck Fees
24. Public R/W Inspection Fees
25. Water Inspection Fees
26. Public R/W Inspection Fees
Civil Design
27. Design Engineering - Culvert
28. Design Engineering & Landscape Desigr
Miscellaneaus
29. Construction Insp. & Contract Admin.
30. Culvert Insp.& Contract Admin.
31. Preliminary Soils Report
32. Soils Texts & Final Report
33. Culvert Construction Staking
34. Construction Staking
140
If
10.60
/If 1,512
140
If
0.50
/If 70
Total Utility Fees
$
1,562
1
IS
7,999.00
/LS 7,999
1
IS
13,847.00
/LS 13,847
5.00%
of const'n 1,060
1
LS
13 847.00
/IS 8,020
Total City of Bakersfield Fees
$
30,926
1
LS
24,000.00
/IS 24,000
1
LS
10 640.00
/LS 10,640
Total Civil Design
$
34,640
1
LS
4,256.00
/LS 4,256
1
LS
13,100.00
/IS 13,100
1
LS
5,000.00
/LS 5,000
3.00%
of const'n 6,384
1
LS
3,500.00
/LS 3,500
1
LS
9,512.00
/LS 8,512
Total Miscellaneous
$
40,752
Sub -Total Soft Costs:
$
107,900
KMs U: IWe9Mig A-CosfFx2016- 05-t6>Cws 8
Page 4 o 4
EXHIBIT "B"
WEST MING - KERN RIVER CANAL BRIDGE DISTRICT
FEE SCHEDULE
Estimated Maudmum Residential R- 11dorR
Fee Area No. 1 (North of KRC) = 1,052 DUs
Fee Area No. 2 (South of KRC) = 1,649 DUs
TOTAL PROJECT COST
Kern River Canal Bridge "A" _ $ 702,655
Kern River Canal Bridge "B" _ $ 702,655
Engineers Estimate of Total Project Cost = $ 1,405,310
05/16/2016
PROJECT COST PER EOUIVALENT DWELLING UNIT
FEE AREA No. 1 (North of KRC) _ $ 667.92 /EDU
(in 2016 dollars)
FEE AREA No. 2 (South of KRC) _ $ 426.11 /EDU
(in 2016 dollars)
Notw:
1) Fee Area No. 1 (Properties North of the KRC) shall be allocated 50% of the Total Project Cost.
2) Fee Area No. 2 (Properties South of the KRC) shall be allocated 50% of the Total Project Cost.
3) The Fee shall apply to Residential Use Properties only.
4) The Fee applied to Residential Use Property shall not exceed 4 EDUS per gross acre.
5) The Fee is to be adjusted annually per the City of Los Angeles Construction Cost Index
published by Engineering News - Record.
KM> U :e'est M/ gC mwFGOSiigsa ',d, e- Feet ?IOtb -OS 16 +C3naKiactirgs
J
k -
\ -
m
/ §2P
L zU) OVDH ViSIA
-
=± =2 -
�u
LU
/ � \ -
yCo } \(\ ~ \
$ k _
§O §; , :
ca
�
e � \
i`
\ y
A °S
I
+r
Ili
JI
MoltlJSIl1VN309
i
I
7
'Si
LL
®
Otl08 N
ny H100S
a
N
aI
Z
i_
®
y
U
Z Y
oC
W
O
o
d
LU p
Z
LU
I E
O
J
F-
Q
<
Uj
Q'
°z
z
U-
b
-
Z
U)
W
Ye
LU
W
o
Z
0!
N
cc
G
m
N
Z
N
Ln
w
9
O`
O
G
OPICI[JAL