Loading...
HomeMy WebLinkAboutINSPECTION REPORT 2014Underground Storage Tank Program DW Inspection Report Permission to Inspect: e BAKERSFIELD FIRE DEPARTMENT Prevention Services Division 2101 H Street Bakersfield, CA 93301 Phone: 661 - 326 -3979 Fax: 661 -852 -2171 Y tt Business Name: AT &T California - SA098 -15- 021 - 03168- Date: 11/26/2014 Address Name: 3221 S H ST- CAT080020514 Inspector Name: Shane Gardner #8248557 Inspection Type: Routine Report: Final NVO = No Violation Observed OUT = Out of Compliance NA = Not Applicable UD = Undetermined COS = Corrected On Site RPT = Repeat Violation Violation Program Requirement 46 oSOC Comments No a o O a o z O z D v W of File Review Facility Tank Information 2030021 Facility has a valid Permit Tank 1- 6000- DSL -DW to Operate from the Tank 2- CUPA - 23 CCR 16 2712(1); None Tank 3- HSC 6.7 25284 Tank 4- 2010010 UST Operating Permit Application for Facility information and Tank Noneinformation submitted /maintained - 23 CCR 16 2711; HSC 6.7 25286(a) 2010001 Current BOE number submitted to the CUPA None and /or CERS - HSC 6.7 25286(c 2030011 UST compliance statement and /or Designated Operator None current certification submitted - 23 CCR 16 2715(a), 2715(b 2030046 A complete and accurate response plan has been submitted, approved and None maintained - 23 CCR 16 2632, 2634(e), 2641(h), 2712(1 2030041 A complete and accurate plot plan has been submitted, approved and None maintained - 23 CCR 16 2632 d 1 C , 2711 a (8) 2010006 Owner /Operator has not made false statements or representation on any None required document - HSC 6.7 25299 2010003 Owner /Operator has a DO and /or informed the CUPA of any change (s) None within 30 days - 23 CCR 16 2715(a) Violation Program Requirement o SOC Comments No OO M p O a o z O z U of Testing 2030002 Owner /Operator has tested and certified leak None detection equipment annual) - 23 CCR 16 2638 2030048 Secondary containment testing conducted every 36 months in accordance None with requirements - 23 CCR 16 2637 2030055 Spill buckets have been tested annually as None required - HSC 6.7 25284.2 2010009 Secondary containment test results submitted to NonetheCUPAwithin30days after the test - 23 CCR 16 2637(e) 2030064 CUPA was poperly notified within the prescribed number of None hours prior to testing - 23 CCR 16 26370, 2638(e), 2643(g), 2644.1(x)(4) Install /Repair 2060009 Permits obtained to install, replace, repair, or None modify part of the UST system - 23 CCR 16 2712 UST System Observation General Monitoring 2030003 Leak detection system maintains continuous RD monitoring that activates oo None an audible and visual Yes alarm - 23 CCR 16 2632, 2634, 2636, 2666 2030016 The annular space of the tank, piping and sumps RD are continuously monitored and activates None the alarm - 23 CCR 16 Yes 2631(g), 2632(c)(2)(A) &(8), 2633 c , 2636 2030017 Product piping outside the UDC is fail -safe and shuts down the pump or None restricts flow - 23 CCR 16 2636(0(5) 2030018 Turbine sump monitor RD activates an audible and visual alarm or stops the El None flow of at the dispenser - Yes 23 CCR 16 2636(1)(1) Underground Storage Tank Program - DW Inspection Report v 2.0 Violation Program Requirement o SOC Comments No a o CO a CDo z O z v It Oj 2030019 Monitoring system in the UDCs activates an audible and visual alarm None or stops the flow at the UDC -23 CCR 16 2636 1 2030043 Leak detection equipment RD properly programmed or properly operated - 23 F-1 None E] CCR 16 2632, 2634, 2636, Yes 2666 2060005 System constructed with a monitoring system capable of detecting entry None into secondary containment - HSC 6.7 25291 b 2060014 Correct leak detection equipment installed for RD the type of system None present - 23 CCR 16 2638, Yes HSC 6.7 25290.1, 25290.2, 25291 2060015 Sensor located in the RD proper position /location - None 23 CCR 16 2630(d), 2641(a) Yes 2030062 Facility is in compliance RDwithnottamperingwithor disabling leak detection None devices or alarms - HSC Yes 6.7 25299 a 9 2060022 System constructed with a monitoring system capable of detecting entry Ej None into secondary containment - HSC 6.7 25290.2(d) 2030034 Tag /sticker on affixed monitoring equipment being certified, repaired, F1 None or replaced - 23 CCR 16 2638 VPH Monitoring VPH 2030065 Interstitial monitoring of RDtheannularspacesofthe UST is properly E] None El maintained - HSC 6.7 Yes 25290.1 e 2060023 System constructed with a monitoring system capable of detecting entry into secondary None containment - HSC 6.7 25290.1(d) Underground Storage Tank Program - DW Inspection Report v 2.0 Violation Program Requirement 4- 0 04) SOC Comments No 0:::. 3 a 0 L 42 (a ch"a 1 Z 1 0 A Z I D U at 05 Line Leak Detector 2060012 Line leak detector installed on pressurized RD piping system - HSC 6.7 None 25290. 1 (h), 25290.2(9)7 Yes 252910, 25292(e), 2636(0(2) 2030026 Line leak detectors detect a 3 gph leak and/or RD audible and visual alarm None function properly - 23 Yes CCR 16 2636(0(6), 2666(c) 2030027 Turbine shuts down when RDaleakisdetectedor when line leak detector is None disconnected - 23 CCR 16 Yes 2666 2030025 Pressurized piping able to detect a 3.0 gph leak RD within an hour, and None restricts the flow or Yes alarms - 23 CCR 16 2636(1) (2) Secondary Containment 2060010 UST storing a hazardous RD substance has secondary None containment - HSC 6.7 Yes 1 25292 Underground Storage Tank Program - DW Inspection Report v 2.0 Violation Program Requirement W. 00.0 SOC Comments No M a 0 CL co 0 Z 2030008 UDC, sumps, and/or other secondary containment in good 1:1 None condition and/or are free of debris/liquid - HSC 6.7 25290.1, 25290.2, 25291 2030040 Secondarily contained RD piping maintained to allow None liquid to drain into sump - Yes 23 CCR 16 2630(d), 2641 (a) 2060006 Secondary containment piping slopes back to the None collection sump m 23 CCR 16 263(c) 2030047 Secondary containment maintained tight and has been confirmed by testing El R El El None 23 CCR 16 2662, HSC 6.7 25290.1(c)(2), 25290.2(c)(2), 25291(g), 25292 2030060 Entry fittings in secondary containment for UST system maintained None tight/sealed - 23 CCR 16 2630, 2635(d), 2636(c), 2666 2060020 Spill bucket is installed RPandhasafunctionaldrain valve or other means to None remove liquid - 23 CCR 16 Yes 2635(b), 2665 2030054 Spill bucket maintained in RP good condition and free of Fj None debris and/or liquid - 23 Yes CCR 16 2635(b), 2715(c)(2 2060019 Spill bucket to has a minimum capacity of five None gallons - 23 CCR 16 2635(b), 2665 Overfill 2030035 UST system is operated RP to prevent unauthorized release, including spills 2r None and overfills - HSC 6.7 Yes 25292.1 (a) 2030036 Overfill prevention system RP has not been overridden and meets overfill Zfl I None requirements - 23 CCR 16 Yes 2635(b)(2), 2665 Underground Storage Tank Program - DW Inspection Report v 2.0 Violation Program Requirement 4- 0 0 SOC Comments No 0 a a 0 0. z 0 z On Site Records Certifications 2030023 Required designated operators or contractors maintain a proper and El El 0 None current ICC certification - 23 CCR 16 2715 2030024 Service technician, installer, and/ or employee maintain a None proper license - 23 CCR 162715 2030031 Employee or contractor obtained and maintained proper manufacturer F1 None certification - 23 CCR 16 2715 2010007 Submit/maintain current Certificate of Financial Responsibility/mechanism of financial assurance - None 23 CCR 16 2711; 23 CCR 18 2808.1, 2809-2809.2, HSC 6.7 25292.2; HSC 6.75 25299.30-25299.34 Designated Operator 2010004 Copies of DO inspections for last 12 months and list of trained employees None maintained - 23 CCR 16 2715 2030013 Designated operator properly conducted the monthly inspection and None the reports are complete - 23 CCR 16 2715 2030010 DO notified operator of any condition observed during the monthly None inspection that may require action - 23 CCR 16 2715(d) 2030012 DO employee training performed, current for at least one employee on Y F] F] F-1 r- None site, and a log kept - 23 CCR 16 2715(c)(6), 27150 Underground Storage Tank Program - DW Inspection Report v 2.0 Violation Program Requirement 4- 04) 0 SOC Comments No 0 a 0 a. 42 co Z 0 Z 3 0 Ce D > Logs 2030001 Leak detection alarm logs, maintenance and RD records of appropriate None follow-up actions Yes maintained - 23 CCR 16 2632, 2634, 2712(b) Maintenance/Tests 2010008 Monitoring, maintenance, repairs, linings, and RD upgrade records None maintained for the proper Yes time period - 23 CCR 16 2712(b) Documentation 2030033 Failure to maintain on site an approved monitoring None plan - 23 CCR 16 2632, 2634, 2711, 2712(1) 2030037 Written agreement between the tank owner and tank operator to monitor the tank system None is maintained - 23 CCR 16 2620(b); HSC 6.7 25284(a)(3) 2030061 Suspected or actual RD unauthorized release reported in appropriate El F1 None time frame - HSC 6.7 Yes 29294,29295 General Operating Requirements Permit Condition/Approval 2030039 Compliance with all operating permit None conditions - 23 CCR 16 2712, HSC 6.7 25299 2030059 UST system maintained in accordance with exclusion/exemption None 6, status - HSC 6.7 25281 .6, 25283.5 2030014 Owner/Operator received approval and has implemented a training None program at an unstaffed facility - 23 CCR 16 2715 (2 Facility exhibited that the2030015 method used to monitor the tank meets the monitoring methods in None 2643(f) - 23 CCR 16 2643 Underground Storage Tank Program - DW Inspection Report Violation Program Requirement 0.0 SOC Comments 0)o Red Tag 2030045 Red Tag information is legible and has not been n F] None tampered with - 23 CCR 2030044 Facility did not allow for deposit of petroleum into a UST that has a red tag 4 None affixed to the fill - 23 CCR 2060024 UST system is made of or lined with materials that are compatible with the EJ None substance stored - 23 CCR 16 2631.1 2060021 Striker plate installed and positioned correctly - 23 K— El F] None CCR 16 2631(c), 2662(d) ere were no violations noted for this inspection. nThis report shall serve as a "NOTICE TO COMPLY" for Minor Violations, and a "NOTICE OF VIOLATION" for Major violations. You are, hereby, ordered to correct the above noted violations within 30 days, or according to correction summaries provided. Formal enforcement and/or penalty assessment may be initiated for any violations noted, and for those not corrected in a timely manner. (NOTE: If this is a preliminary report, a final report will follow.) Inspectors Signature: Date: inspector: Enter # of Violations: RD: C2 RP: Cw- Check one box for facility Significant Operational Status (SOC) to be reported to SWRCB and US EPA: tJSOC with both Release Detection and Release Detection (Facility has no Release Prevention and no Release Prevention Violations) Not |nS(<(FacU' has both F eleaamPrevention and Release OeteoUonVlo|o ona) C vv hF `m e~eteoUon only (FaoUityhas no Release Oetec onviolations but one or more F e|emoePrevan on violations) F1 SOC with Release Prevention only (Facility has no Release Prevention violations but one or more Release Detection v2.0Underground8tnreTnobrorm-D\Ioop ct I od