Business Name: AT &T California - SA098 -15- 021 - 03168- Date: 11/26/2014
Address Name: 3221 S H ST- CAT080020514 Inspector Name: Shane Gardner #8248557
Inspection Type: Routine Report: Final
NVO = No Violation Observed OUT = Out of Compliance NA = Not Applicable UD = Undetermined
COS = Corrected On Site RPT = Repeat Violation
Violation Program Requirement 46 oSOC Comments
No
a o O a o
z O z D v W of
File Review
Facility Tank Information
2030021 Facility has a valid Permit Tank 1- 6000- DSL -DW
to Operate from the Tank 2-
CUPA - 23 CCR 16 2712(1); None Tank 3-
HSC 6.7 25284 Tank 4-
2010010 UST Operating Permit
Application for Facility
information and Tank
Noneinformation
submitted /maintained - 23
CCR 16 2711; HSC 6.7
25286(a)
2010001 Current BOE number
submitted to the CUPA None
and /or CERS - HSC 6.7
25286(c
2030011 UST compliance
statement and /or
Designated Operator None
current certification
submitted - 23 CCR 16
2715(a), 2715(b
2030046 A complete and accurate
response plan has been
submitted, approved and None
maintained - 23 CCR 16
2632, 2634(e), 2641(h),
2712(1
2030041 A complete and accurate
plot plan has been
submitted, approved and None
maintained - 23 CCR 16
2632 d 1 C , 2711 a (8)
2010006 Owner /Operator has not
made false statements or
representation on any None
required document - HSC
6.7 25299
2010003 Owner /Operator has a
DO and /or informed the
CUPA of any change (s) None
within 30 days - 23 CCR
16 2715(a)
Violation Program Requirement o SOC Comments
No OO M p O a o
z O z U of
Testing
2030002 Owner /Operator has
tested and certified leak None
detection equipment
annual) - 23 CCR 16 2638
2030048 Secondary containment
testing conducted every
36 months in accordance None
with requirements - 23
CCR 16 2637
2030055 Spill buckets have been
tested annually as None
required - HSC 6.7 25284.2
2010009 Secondary containment
test results submitted to
NonetheCUPAwithin30days
after the test - 23 CCR 16
2637(e)
2030064 CUPA was poperly
notified within the
prescribed number of None
hours prior to testing - 23
CCR 16 26370, 2638(e),
2643(g), 2644.1(x)(4)
Install /Repair
2060009 Permits obtained to
install, replace, repair, or None
modify part of the UST
system - 23 CCR 16 2712
UST System Observation
General Monitoring
2030003 Leak detection system
maintains continuous RD
monitoring that activates oo
None
an audible and visual Yes
alarm - 23 CCR 16 2632,
2634, 2636, 2666
2030016 The annular space of the
tank, piping and sumps RD
are continuously
monitored and activates None
the alarm - 23 CCR 16 Yes
2631(g), 2632(c)(2)(A) &(8),
2633 c , 2636
2030017 Product piping outside the
UDC is fail -safe and shuts
down the pump or None
restricts flow - 23 CCR 16
2636(0(5)
2030018 Turbine sump monitor RD
activates an audible and
visual alarm or stops the El None
flow of at the dispenser - Yes
23 CCR 16 2636(1)(1)
Underground Storage Tank Program - DW Inspection Report v 2.0
Violation Program Requirement o SOC Comments
No a o
CO a CDo
z O z v It Oj
2030019 Monitoring system in the
UDCs activates an
audible and visual alarm None
or stops the flow at the
UDC -23 CCR 16
2636 1
2030043 Leak detection equipment RD
properly programmed or
properly operated - 23 F-1 None E]
CCR 16 2632, 2634, 2636, Yes
2666
2060005 System constructed with
a monitoring system
capable of detecting entry None
into secondary
containment - HSC 6.7
25291 b
2060014 Correct leak detection
equipment installed for RD
the type of system None
present - 23 CCR 16 2638, Yes
HSC 6.7 25290.1, 25290.2,
25291
2060015 Sensor located in the RD
proper position /location - None
23 CCR 16 2630(d), 2641(a) Yes
2030062 Facility is in compliance RDwithnottamperingwithor
disabling leak detection None
devices or alarms - HSC Yes
6.7 25299 a 9
2060022 System constructed with
a monitoring system
capable of detecting entry Ej None
into secondary
containment - HSC 6.7
25290.2(d)
2030034 Tag /sticker on affixed
monitoring equipment
being certified, repaired, F1 None
or replaced - 23 CCR 16
2638
VPH Monitoring VPH
2030065 Interstitial monitoring of RDtheannularspacesofthe
UST is properly E] None El
maintained - HSC 6.7 Yes
25290.1 e
2060023 System constructed with
a monitoring system
capable of detecting entry
into secondary None
containment - HSC 6.7
25290.1(d)
Underground Storage Tank Program - DW Inspection Report v 2.0
Violation Program Requirement
4-
0 04) SOC Comments
No 0:::. 3 a 0 L
42 (a
ch"a
1
Z
1
0
A
Z
I
D U at 05
Line Leak Detector
2060012 Line leak detector
installed on pressurized RD
piping system - HSC 6.7 None
25290. 1 (h), 25290.2(9)7 Yes
252910, 25292(e),
2636(0(2)
2030026 Line leak detectors detect
a 3 gph leak and/or RD
audible and visual alarm None
function properly - 23 Yes
CCR 16 2636(0(6),
2666(c)
2030027 Turbine shuts down when RDaleakisdetectedor
when line leak detector is None
disconnected - 23 CCR 16 Yes
2666
2030025 Pressurized piping able to
detect a 3.0 gph leak RD
within an hour, and None
restricts the flow or Yes
alarms - 23 CCR 16
2636(1) (2)
Secondary Containment
2060010 UST storing a hazardous RD
substance has secondary None
containment - HSC 6.7 Yes
1 25292
Underground Storage Tank Program - DW Inspection Report v 2.0
Violation Program Requirement
W.
00.0 SOC Comments
No M a 0 CL co
0 Z
2030008 UDC, sumps, and/or
other secondary
containment in good 1:1 None
condition and/or are free
of debris/liquid - HSC 6.7
25290.1, 25290.2, 25291
2030040 Secondarily contained RD
piping maintained to allow None
liquid to drain into sump - Yes
23 CCR 16 2630(d), 2641 (a)
2060006 Secondary containment
piping slopes back to the None
collection sump m 23 CCR
16 263(c)
2030047 Secondary containment
maintained tight and has
been confirmed by testing El R El El None
23 CCR 16 2662, HSC 6.7
25290.1(c)(2), 25290.2(c)(2),
25291(g), 25292
2030060 Entry fittings in secondary
containment for UST
system maintained None
tight/sealed - 23 CCR 16
2630, 2635(d), 2636(c),
2666
2060020 Spill bucket is installed RPandhasafunctionaldrain
valve or other means to None
remove liquid - 23 CCR 16 Yes
2635(b), 2665
2030054 Spill bucket maintained in RP
good condition and free of Fj None
debris and/or liquid - 23 Yes
CCR 16 2635(b), 2715(c)(2
2060019 Spill bucket to has a
minimum capacity of five None
gallons - 23 CCR 16
2635(b), 2665
Overfill
2030035 UST system is operated RP
to prevent unauthorized
release, including spills 2r None
and overfills - HSC 6.7 Yes
25292.1 (a)
2030036 Overfill prevention system RP
has not been overridden
and meets overfill Zfl I None
requirements - 23 CCR 16 Yes
2635(b)(2), 2665
Underground Storage Tank Program - DW Inspection Report v 2.0
Violation Program Requirement
4-
0 0 SOC Comments
No 0 a a 0 0.
z 0 z
On Site Records
Certifications
2030023 Required designated
operators or contractors
maintain a proper and El El 0 None
current ICC certification -
23 CCR 16 2715
2030024 Service technician,
installer, and/ or
employee maintain a None
proper license - 23 CCR
162715
2030031 Employee or contractor
obtained and maintained
proper manufacturer F1 None
certification - 23 CCR 16
2715
2010007 Submit/maintain current
Certificate of Financial
Responsibility/mechanism
of financial assurance - None
23 CCR 16 2711; 23 CCR
18 2808.1, 2809-2809.2,
HSC 6.7 25292.2; HSC
6.75 25299.30-25299.34
Designated Operator
2010004 Copies of DO inspections
for last 12 months and list
of trained employees None
maintained - 23 CCR 16
2715
2030013 Designated operator
properly conducted the
monthly inspection and None
the reports are complete -
23 CCR 16 2715
2030010 DO notified operator of
any condition observed
during the monthly None
inspection that may
require action - 23 CCR 16
2715(d)
2030012 DO employee training
performed, current for at
least one employee on Y F] F] F-1 r- None
site, and a log kept - 23
CCR 16 2715(c)(6), 27150
Underground Storage Tank Program - DW Inspection Report v 2.0
Violation Program Requirement
4-
04) 0 SOC Comments
No 0 a 0 a.
42
co
Z 0 Z 3 0 Ce D >
Logs
2030001 Leak detection alarm
logs, maintenance and RD
records of appropriate None
follow-up actions Yes
maintained - 23 CCR 16
2632, 2634, 2712(b)
Maintenance/Tests
2010008 Monitoring, maintenance,
repairs, linings, and RD
upgrade records None
maintained for the proper Yes
time period - 23 CCR 16
2712(b)
Documentation
2030033 Failure to maintain on site
an approved monitoring None
plan - 23 CCR 16 2632,
2634, 2711, 2712(1)
2030037 Written agreement
between the tank owner
and tank operator to
monitor the tank system None
is maintained - 23 CCR 16
2620(b); HSC 6.7
25284(a)(3)
2030061 Suspected or actual RD
unauthorized release
reported in appropriate El F1 None
time frame - HSC 6.7 Yes
29294,29295
General Operating Requirements
Permit Condition/Approval
2030039 Compliance with all
operating permit None
conditions - 23 CCR 16
2712, HSC 6.7 25299
2030059 UST system maintained
in accordance with
exclusion/exemption None
6, status - HSC 6.7 25281 .6,
25283.5
2030014 Owner/Operator received
approval and has
implemented a training None
program at an unstaffed
facility - 23 CCR 16
2715 (2
Facility exhibited that the2030015
method used to monitor
the tank meets the
monitoring methods in None
2643(f) - 23 CCR 16 2643
Underground Storage Tank Program - DW Inspection Report
Violation Program Requirement 0.0 SOC Comments
0)o
Red Tag
2030045 Red Tag information is
legible and has not been n F] None
tampered with - 23 CCR
2030044 Facility did not allow for
deposit of petroleum into
a UST that has a red tag 4 None
affixed to the fill - 23 CCR
2060024 UST system is made of or
lined with materials that
are compatible with the EJ None
substance stored - 23
CCR 16 2631.1
2060021 Striker plate installed and
positioned correctly - 23 K— El F] None
CCR 16 2631(c), 2662(d)
ere were no violations noted for this inspection.
nThis report shall serve as a "NOTICE TO COMPLY" for Minor Violations, and a "NOTICE OF VIOLATION" for
Major violations. You are, hereby, ordered to correct the above noted violations within 30 days, or according to
correction summaries provided. Formal enforcement and/or penalty assessment may be initiated for any
violations noted, and for those not corrected in a timely manner. (NOTE: If this is a preliminary report, a final report
will follow.)
Inspectors Signature: Date:
inspector: Enter # of Violations: RD: C2 RP: Cw-
Check one box for facility Significant Operational Status (SOC) to be reported to SWRCB and US EPA:
tJSOC with both Release Detection and Release Detection (Facility has no Release Prevention and no Release
Prevention Violations)
Not |nS(<(FacU' has both F eleaamPrevention and Release OeteoUonVlo|o ona)
C vv hF `m e~eteoUon only (FaoUityhas no Release Oetec onviolations but one or more F e|emoePrevan on
violations)
F1 SOC with Release Prevention only (Facility has no Release Prevention violations but one or more Release Detection
v2.0Underground8tnreTnobrorm-D\Ioop ct I od