HomeMy WebLinkAboutUPI CHECKLISTf zi
v ... m a..:x a.. a. ;. w , .:.. ... <,>*.x: ,,, .
JOINT AGENCY - MULTI- AGENCY COMPL ROUTINE COMBINED AINT ' RE- INSPECTION
POST INSPECTION INSTRUCTIONS:
Correct the violation(s) noted above by Signature (that all violations. have been corrected as noted)
Within 5 days of correcting all of the violations, sign and return a copy of this page to:
C : V C= Compliance OPERATION
V= Violation
COMMENTS '..
APPROPRIATE PERMIT ON HAND BMC: 1.5.65.080)
Business PLAN CONTACT INFORMATION ACCURATE (CCR: 2729:1)
P VISIBLE ADDRESS . CFC: 505.1, BMC: 15.52.020)
CORRECT OCCUPANCY CBC: 401)..
VERIFICATION OF INVENTORY MATERIALS CCR: 2729.3)
I VERIFICATION OF QUANTITIES CCR: 2729.4)
2- ,- VERIFICATION OF LOCATION CCR: 2729:2)
PROPER SEGREGATION OF MATERIAL CFC: 2704.1)
VERIFICATION OF MSDS AVAILABILITY CCR: 2729.2(3)(b))
VERIFICATION OF HAZ MAT TRAINING CCR: 2732)
r VERIFICATION OF ABATEMENT SUPPLIES & PROCEDURES (CCR:. 2731 {c))
C1' EMERGENCY PROCEDURES ADEQUATE CCR: 2731)
r . CONTAINERS PROPERLY LABELED CCR: 66262.34(f), CFC: 2703.5)
AD" ` HOUSEKEEPING CFC: 304.1)
FIRE PROTECTION . , CFC: 903 & 906)
p` SITE DIAGRAM ADEQUATE & ON HAND CCR: 2729.2)
ANY HAZARDOUS WASTE ON SITE? YES NO Signature ofReceipt L f
Explain; 1
POST INSPECTION INSTRUCTIONS:
Correct the violation(s) noted above by Signature (that all violations. have been corrected as noted)
Within 5 days of correcting all of the violations, sign and return a copy of this page to: