Loading...
HomeMy WebLinkAboutAPSA Insp Form 7-8-16UNIFIED PROGRAM INSPECTION CHECKLIST Aboveground Petroleum Storage Tank Program FACILITY NAME INSPECTION DATE INSPECTION TIME a r~ 1 i i*_.eeu+✓!. f - rte" .�` Prepare an SPCC plan [CFR 112.3 ADDRESS 0 11` r= iz&S 110- .1'� PHONE NO. 6'cl - s- Pil - S NO OF EMPLOYEES � FACILITY CONTACT _ �'^ r "J !. % �5• C:.} 'ke't,,,,� 4iWs"�„�` BUSINESS ID NUMBER ^� d � .• lfJ. 't�'r. � .,_ L% f� y � .�.'+ CONSENT TO INSPECT NAME /TITLE off ; - , ,rte : ,_ V f � V • • V • i • • \ M v V • M V _ _ _ _ _ _ _ DESCRIPTION YJ N N/A COMMENTS Prepare an SPCC plan [CFR 112.3 r Review or amend SPCC plan [CFR 112.5 (a)(d)] V SPCC plan available on site [CFR 112.3(e)] Conduct inspections and test in accordance with written procedures [CFR 112.7(e)`" V Maintain records of inspections, tests and/or procedures [CFR 11 2.7 e ] t. Records of inspections or tests signed by inspector [CFR 112.7(e)] t✓' IVIV L. V• VV • ■M.■ ___ -- -- - _ _ DESCRIPTION Yj N N/A COMMENTS Self- certification for Tier I or II facility 112.6 (a)(1),(b)(1) r Professional engineer certification [CFR112.3(d ) and 112.6(b)(4) v' Documentation of 5 year review and evaluation of SPCC plan [CFR 112.5(b) ] Amendments required within 6 months of changes/certifications [CFR 112.5(a) and 112.6(a)(2), b)(4) Management authorization of resource commitment to implement the SPCC [CFR 112.7 & 112.6(a V Diagram with location and contents of containers, transfer stations, connecting piping 112.7(a)(3)] t. Type of oil and storage capacity for each container [CFR 112.7(a)(3) V Discharge prevention measures and procedures for routine handling CFR 112.7(a)(3) Countermeasures for discovery, response and clean-up [CFR1 12.7(a)(3)] Required contact list and phone numbers [CFR 112.7(a)(3)] e. 1%.R IV J. Vf.I IluI QI VI Vv ■%- w.•v... v........ �. �.... �.... _. _ _ -�____ __ _ ___ _ _ DESCRIPTION Y . NJ N/A COMMENTS Provide corrosion protection [CFR 112.8(c)(4)(5), (d)(1)] Containers compatible with materials stored CFR 112.8(c)(1) Implement SPCC plan review changes or amendments within 6 months CFR 112.5(a)(d) t' Prepare an oil contingency plan or written control /removal commitments [CFR 112.7(d)] V �7 I.V 1 IV1� R. VI VV I Iu•• • •ar�.•...■ .+.+....... ... �. ..�-.. _.. -._ ____ _ _ _ _ _.. _ DESCRIPTION Y NJ N/A COMMENTS Training program [CFR 112.7( ] Train personnel in operation and maintenance of equipment [CFR 112.7(f) Conduct annuals ill prevention briefings [CFR 112.7(f)(3) V DESCRIPTION A ^ YJ NJ N/A COMMENTS Meet provisions of conditional exemption [H &S 25270.4.5(b Facility security adequate [CFR 112.7(g)] Clean-up materials readily available CFR 112.7(c) " Overfill protection procedures or devices in place and operative [CFR 112.8(c)(8)] V Portable /mobile containers positioned to prevent discharge [CFR 112.8(c )(11) 1\/ Loading / unloading rack drains into containment area CFR 112.7(h)] V Provide appropriate containment /diversionary structures to prevent discharge [CFR 112.8(a), 112.7(c) Secondary containment adequate to contain cEacity of largest container + precipitation [CFR 112.8(c)] Remove accumulation of oil in secondary containment CFR 112.8(c)(10) Secondary containment valve(s) closed [CFR 112.8 ] V Implement SPCC plan elements [CFR 112.3 'sue ANY HAZARDOUS WASTE ON SITE? YES ❑ NO Si natureofRecei g t O Explain: coin "`: c C. `a.1�,�1✓ b r, c "�s r Ict "r U�Z" 4 f ' POST INSPECTION INSTRUCTIONS: F,,!-- oft • Refer to the back of this inspection report for regulatory citations and corrective actions • Correct the violation(s) noted above by Within 5 days of correcting all of the violations, sign and return a copy of this page to: Bakersfield Fire Dept., Prevention Services, 2101 H Street, California 93301 Date Pink - Prevention Services Copy Signature (that all violations have been corrected as noted) White - Business Copy Yellow - Business Copy to be Sent in after return to Compliance FD2156b (Rev 9/10)