Loading...
HomeMy WebLinkAboutAST INSP 8/16/2016UNIFIED PROGRAM INSPECTION CHECKLIST Aboveground Petroleum Storage Tank Program FACILITY NAME INSPECTI N DATE INSPECTION TIME ADDRESS A% ,,,�?. PHO IE . O. �.4 ' 60 414 U NO OF EMPLOYEES FACILITY CONTACT 5 BUSINESS ID NUMBER CONSENT TO INSPECT NAME /TITLE MI I.► V■► vAW ONE MISS . -9 =Mna6h�.at.XTAItArarISw•:II Ito Ido r -S- IIr r.IrTAIIrT: IMMENSENESS DESCRIPTION Y N N/A COMMENTS Prepare an SPCC plan [CFR 112.3] 7� Review or amend SPCC plan [CFR 112.5 (a)(d)] `! L SPCC plan available on site CFR 112.3(e)] +, Conduct inspections and test in accordance with written procedures [CFR 112.7(e)] y Maintain records of inspections, tests and/or procedures [CFR 112.7(e)] Records of inspections or tests signed by inspector CFR 112.7(e)] J CI.. I IL-JIM L= :.]f l.►. r1a11 I.AIITr7rn I= M=MITn JIL x7rnry I -nnn• -i s,. -min n h 7 1 DESCRIPTION YJ NJ N/A COMMENTS Self- certification for Tier I or H facility 112.6(a)(1),(b)(1)] 7� Professional engineer certification [CFR112.3 (d) and 112.6(b)(4)] L Documentation of 5 year review and evaluation of SPCC plan [CFR 112.5(b)]s ; Amendments required within 6 months of changes/certifications [CFR 112.5(a) and 112.6(a)(2), (b)(4)]� y Management authorization of resource commitment to implement the SPCC CFR 112.7 & 112.6(a)] Diagram with location and contents of containers, transfer stations, connecting piping [1 12.7(a)(3)] Type of oil and storage capacity for each container CFR 112.7(a)(3)] Discharge prevention measures and procedures for routine handling CFR 112.7(a) (3)] a Countermeasures for discovery, response and clean-up [CFR112.7(a)(3)] Required contact list and phone numbers [CFR 112.7(a)(3)] " aC41 ILAM 6: veneral Nwuu KP_rllllrP_mP_nrc' c.awnrnia HAaltn k m2taty u nrin• 7ri77n d R 7r77n ti 7 =77n 47 DESCRIPTION Y NJ N/A COMMENTS Provide corrosion protection [CFR 112.8(c)(4)(5), (d)(1)] CJ Containers compatible with materials stored CFR 112.8(c)(1)] Implement SPCC plan review changes or amendments within 6 months [CFR 112.5(a)(d) ; Prepare an oil contingency plan or written control /removal commitments [CFR 112.7(d)] y e•] -Luz ■i j►ILIM.Iu.i�J V. II=■ f. 11aIIiI.MW:nrt.'lri IF, A:rx-1 1i E-3ON K.T:r3►L.wjiIWAa. DESCRIPTION Y N N/A COMMENTS Training program [CFR 112.7(f)],. CJ Train personnel in operation and maintenance of equipment [CFR 112.7(f) Conduct annuals ill prevention briefings CFR 112.7(f)(3)] ; R7 IN1 W71► a► l+ M Edr. I" IIII•TMII&N61:.IMI4U7IMli:llI Ile] 41111'. 0: r :i:lir.r.'l.�Y_iraiVt'K.T.rt�. A.-VAMiW.�. DESCRIPTION Y N N/A COMMENTS Meet provisions of conditional exemption [H &S 25270.4.5(b)] CJ Facility security adequate [CFR 112.7(g)] Clean-Lip materials readily available CFR 112.7(c)] Overfill protection procedures or devices in place and operative [CFR 112.8(c)(8)] y Portable /mobile containers positioned to prevent discharge [CFR 112.8(c)(11) Loading / unloading rack drains into containment area [CFR 112.7(h) Provide appropriate containment /diversionary structures to prevent discharge [CFR 112.8(a), 112.7(c)] Secondary containment adequate to contain capacity of largest container + precipitation [CFR 112.8(c)] a Remove accumulation of oil in secondary containment CFR 112.8(c)(10)] Secondary containment valve(s) closed [CFR 112.8] " Im lement SPCC plan elements [CFR 112.3] ANY HAZARDOUS WASTE ON SITE? Q. YES ❑ NO Signature ofRecei t� V Explain:` - YVJ1 11VlYL+k:11VA 11Vl1KUk.11V1Va: • Refer to the back of this inspection report for regulatory citations and corrective actions • Correct the violation(s) noted above by • Within 5 days of correcting all of the violations, sign and return a copy of this page to: Bakersfield Fire Dept., Prevention Services, 2101 H Street, California 93301 Signature (that all violations have been corrected as noted) Date White - Business Copy Yellow - Business Copy to be Sent in after return to Compliance Pink -Prevention Services Copy FD2156b (Rev 9/10)