Loading...
HomeMy WebLinkAboutSPCC 8/2016aRrFm BAKERSFIELD FIRE DEPT. Prevention Services 2101 H Street Bakersfield, CA 93301 UNIFIED PROGRAM INSPECTION CHECKLIST Tel.: (661) 326 -3979 Fax: (661) 852 -2171 Aboveground Petroleum Storage Tank Program FACILITY NAME INgPECTIQN DATE jr INSPECTION TIME N/A COMMENTS Prepare an SPCC plan _[CFR 112.31 Review or amend SPCC plan [CFR 112.5 (a)(d)]R ADDRESS ${ '+sa {ys.,,`� : T3; '+ .. I PHONE NO. � r - Sid `5 ', mk 1 .�`r Aw?':,;.'4 NO OF EMPLOYEES ` FACILITY CONTACT � ` � "BUSINESS ID NUMBER CONSENT TO INSPECT NAME /TITLE' SECTION 1. Records Review: cautornla meallin & caret uoue; castu . DESCRIPTION Y N N/A COMMENTS Prepare an SPCC plan _[CFR 112.31 Review or amend SPCC plan [CFR 112.5 (a)(d)]R 1 1 SPCC plan available on site [CFR 112.3(e)] Conduct inspections and test in accordance with written procedures [CFR 112.7(e)] { Maintain records of ins ections, tests and/or procedures [CFR 1 12.7(e)] Records of ins ections or tests signed by inspector [CFR 112.7(e)] ' n. enr+1+ �!..., C1nrr�nn +�• f`nlifr%rni� Wimmlfh iL Cafcaty C_nrlr�• 2577n A -5- 25270 -12 DESCRIPTION Y N N/A COMMENTS Self- certification for Tier I or II facility [112.6(a)(1), (b)(1)] 1 1 Professional engineer certification CFR1123 {d) and 11 2.6(b) (4) Documentation of 5 year review and evaluation of SPCC plan [CFR 112.5(b)] { Amendments required within 6 months of char es /certifications [CFR 112.5(a) and 112.6(a)(2), (b)(4) Management authorization of resource commitment to im lement the SPCC [CFR 112.7 & 112.6(a) ] ' Diagram with location and contents of containers, transfer stations, connecting piping [112.7(a)(3)] Type of oil and storage capacity for each container CFR 112.7(a)(3) kj Dischar e revention measures and rocedures for routine handlin {CFR 112.7(a)(3 )]. Countermeasures for discovery, response and clean -u [CFRl 12.7(a)(3)] , Required contact list and hone numbers [CFR 112.7(a)(3)] - SECTION 3■ GenernlSPCC Requirements: California Health & Safety Code; 25270.4.5, 25270.5, 25270.12 DESCRIPTION* Y I N N/A COMMENTS Provide corrosion protection [CFR 112.8(c)(4)(5), (d)(1)] 1 1 Containers compatible with materials stored [CFR 112.8(c)(1) Implement SPCC plan review changes or amendments within 6 months CFR 112.5(a)(d)] Prepare an oil contingency plan or written control /removal commitments [CFR 112.7(d)] .+- .- .P%Ikl w_ e.nnn ni _.. :.,.... t+ Uftml +h SL Cnfn +v f'_nrin- 91;97n A 5 DESCRIPTION Y N N/A COMMENTS Training program [CFR 112.7(f)] Train personnel in operation and maintenance of equipment [CFR 112.7(f)] 1 1 Conduct annuals ill prevention briefings CFR 112.7(f)(3)] DESCRIPTION Y N N/A COMMENTS Meet provisions of conditional exemption [H &S 25270.4.5(b) 1 Facility security adequate [CFR 112.7( )] Clean-up materials readily available CFR 112.7(c)] Overfill protection procedures or devices in lace and operative [CFR 112,8(c)(8)] Portable /mobile containers positioned to prevent discharge CFR 112.8(c)(11) Loading / unloading rack drains into containment area [CFR 112.7(h) Provide appropriate containment /diversionary structures to prevent discharge [CFR 11 2.8(a), 11 2.7(c)] kj Secondary containment adequate to contain capacity of largest container + precipitation CFR 112.8(c) Remove accumulation of oil in secondary containment CFR 112.8(c)(10)] , Secondary containment valve(s) closed [CFR 112.8]` - Implement SPCC plan elements [CFR 112.31 HAZARDOUS WASTE ON SITE? ❑ YES ❑ NO Signature ofRecei t r lain F INSPECTION INSTRUCTIONS: w = t x • Refer to the back of this inspection report for regulatory citations and corrective actions • Correct the violation(s) noted above by Signature (that all violations have been corrected as noted) • Within 5 days of correcting all of the violations,, sign and return a copy of this page to: Bakersfield Fire Dept., Prevention Services, 2101 H Street, California 93301 Date White - Business Copy Yellow - Business Copy to be Sent in after return to Compliance Pink - Prevention Services Copy FD2156b (Rev 9/10)