HomeMy WebLinkAboutCalARP 9/13/2016)QJU_D
Street Address
Cj_3),
r
A
City State Zip
Consent to Inspect C_ P",
BAKERSFIELD FIRE DEPT.
Prevention Services
2101 H Street
Bakersfield, CA 93301
Tel.: (661) 326-3979
Fax: (661) 852-2171
DATE: \3N \\ �
Comments:
A A i)
� T'C__
11) P 4 Iz- Ai—j 6 C)pa
1 1,9116
1-?
'E62--
-Has-it
Violbtibn.
CERS
CCR Section
ation
ioh
YES::,
-NO
NW
�.-Minor,l 2
CaIARP Program Management
5010004
2735.5(a)
-F-affnre-of the owner or operator of a stationary source to closely
coordinate with the administering agency to implement the
requirements to determine the appropriate level of
documentation required for a Risk Management Plan.
5010005-
2735.5(b)(1)(d)
The RMP shall include all requirements of the covered
processes.
5010035
2750.3
Analyze the worst case release scenario for the process(es);
document that the nearest receptor is beyond the distance to a
toxic or flammable end point.
5010006
2735.5(d)(3)
Ensure that response actions have been coordinated with local
emergency planning and response agencies.
5010036
2735.4(c)(1)
Certify in the RMP that within the past five (5) years the
'releases
process(es) have had no accidental that cause an
offsite impact.
5010023.
2745.3
The owner or operator shall provide.in the RMP, an executive
summary that includes: a) the accidental release prevention and
emergency response policies at the stationary source; b) the
stationary source and regulated substances handled. c) general
accidental release prevention and chemical specific prevention
steps; d) the five year accident history; e) the emergency
response program; f) planned changes to improve safety.
5020001
2755.3
Failure to ensure that each employee presently operating a
process has been trained or tested competent in the operating
procedures of that process.
5010049
2755.3
The owner or operator shall prepare written operating
procedures that provide clear instructions or steps for safely
conducting activities associated with each process.
5030002
2755.5(d)
The owner or operator shall perform inspections and tests on
process equipment that follow recognized and generally
accepted good engineering practices.
Comments:
A A i)
� T'C__
11) P 4 Iz- Ai—j 6 C)pa
1 1,9116
1-?
'E62--