HomeMy WebLinkAboutSB989 2016SWRCB, January 2002 Page ____ of ____
Secondary Containment Testing Report Form
This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the
appropriate pages of this form to report results for all components tested. The completed form, written test procedures, and
printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency.
1.FACILITY INFORMATION
Facility Name: Date of Testing:
Facility Address:
Facility Contact: Phone:
Date Local Agency Was Notified of Testing :
Name of Local Agency Inspector (if present during testing):
2.TESTING CONTRACTOR INFORMATION
Company Name:
Technician Conducting Test:
Credentials: CSLB Licensed Contractor SWRCB Licensed Tank Tester
License Type: License Number:
Manufacturer Training
ManufacturerComponent(s)Date TrainingExpires
3.SUMMARY OF TEST RESULTS
ComponentPassFail Not
Tested
Repairs
Made ComponentPassFail Not
Tested
Repairs
Made
If hydrostatic testing was performed, describe what was done with the water after completion of tests:
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements
Technician’s Signature:________________________________________________ Date:_________________________
$POGJEFODF6454FSWJDFT
*OD
")B[
$%
19
Jaco#9933/Fastrip 05/06/2016
4800Fairfax Bakersfield,CA
Omero Garcia (661) 393-7000
Shane Gardner
Bryan Self
✔
ICC UST Installer/Retrofitter 05/12/2016
INCON TS-STS 08/11/2017
87 Annular ✔Diesel STP
91 Annular ✔
Diesel Annular ✔
87 secondary ✔
91 secondary ✔
Diesel secondary ✔
87 vent ✔
Diesel vent ✔
Vapor Return ✔
87 STP ✔
91 STP ✔
91 vent ✔
✔
UDC 1-2 ✔
UDC 3-4 ✔
UDC 5-6 ✔
UDC 7-8 ✔
UDC 9-10 ✔
UDC 11-12 ✔
87 Fill ✔
91 Fill ✔
Diesel Fill ✔
87 vapor bucket ✔
91 vapor bucket ✔
Everything that was tested on 5/6/16 passed we could not test the UDC's because BFD could not stay past 5:00 pm.
5/9/16 all UDC's passed and everything was signed off by the BFD.
05/06/2016
SWRCB, January 2002 Page ____ of ____
4.TANK ANNULAR TESTING
Test Method Developed By: Tank Manufacturer Industry Standard Professional Engineer
Other (Specify)
Test Method Used: Pressure Vacuum Hydrostatic
Other (Specify)
Test Equipment Used: Equipment Resolution:
Tank # Tank # Tank # Tank #
Is Tank Exempt From Testing?1
Yes No Yes No Yes No Yes No
Tank Capacity:
Tank Material:
Tank Manufacturer:
ProductStored:
Wait time between applying
pressure/vacuum/water and
starting test:
Test Start Time:
Initial Reading (RI):
Test End Time:
Final Reading (RF):
TestDuration:
Change in Reading (RF-RI):
Pass/Fail Threshold or Criteria:
Test Result: Pass Fail Pass Fail Pass Fail Pass Fail
Was sensor removed for testing? Yes No NA Yes No NA Yes No NA Yes No NA
Was sensor properly replaced and
verified functional after testing? Yes No NA Yes No NA Yes No NA Yes No NA
Comments – (include information on repairs made prior to testing, and recommended follow-up for failed tests)
1 Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary
containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment
testing. {California Code of Regulations, Title 23, Section 2637(a)(6)}
29
✔
✔
Calibrated Gauges 0.001"
87
✔
12,000
FRP
Unknown
87
5 Mins
0.00"
1 Hour
-10.00" Hg
2:05 pm
-10.00" Hg
1:05 pm
0.00
✔
✔
✔
91
✔✔
12,000
FRP
Unknown
91
5 Mins
1:05 pm
-10.00" Hg
2:05 pm
-10.00" Hg
1 Hour
0.00
0.00
✔
✔
✔
Diesel
✔
12,000
FRP
Unknown
Diesel
5 Mins
1:05 pm
-10.00" Hg
2:05 pm
-10.00" Hg
1 Hour
0.00
0.00
✔
✔
✔
SWRCB, January 2002 Page ____ of ____
5.SECONDARY PIPE TESTING
Test Method Developed By: Piping Manufacturer Industry Standard Professional Engineer
Other (Specify)
Test Method Used: Pressure Vacuum Hydrostatic
Other (Specify)
Test Equipment Used: Equipment Resolution:
Piping Run # Piping Run # Piping Run # Piping Run #
PipingMaterial:
Piping Manufacturer:
PipingDiameter:
Length of Piping Run:
ProductStored:
Method and location of
piping-run isolation:
Wait time between applying
pressure/vacuum/water and
starting test:
Test Start Time:
Initial Reading (RI):
Test End Time:
Final Reading (RF):
TestDuration:
Change in Reading (RF-RI):
Pass/Fail Threshold or
Criteria:
Test Result: Pass Fail Pass Fail Pass Fail Pass Fail
Comments – (include information on repairs made prior to testing, and recommended follow-up for failed tests)
39
✔
✔
Calibrated Gauges 0.001"
87
FRP
Smith
3.00"
180'
87
Test Boot
5 Mins
11:00 am
5.00" PSI
12:00 pm
5.00" PSI
1 Hour
0.00"
0.00"
✔
91
FRP
Smith
3.00"
190'
91
Test Boot
5 Mins
11:00 am
5.00" PSI
12:00 pm
5.00" PSI
1 Hour
0.00"
0.00"
✔
Diesel
FRP
Smith
3.00"
200'
Diesel
Test Boot
5 Mins
11:00 am
5.00" PSI
12:00 pm
5.00" PSI
1 Hour
0.00"
0.00"
✔
VR
FRP
Smith
3.00"
180'
Vapor
Test Boot
5 Mins
11:00 am
5.00" PSI
12:00 pm
5.00" PSI
1 Hour
0.00"
0.00"
✔
SWRCB, January 2002 Page ____ of ____
5.SECONDARY PIPE TESTING
Test Method Developed By: Piping Manufacturer Industry Standard Professional Engineer
Other (Specify)
Test Method Used: Pressure Vacuum Hydrostatic
Other (Specify)
Test Equipment Used: Equipment Resolution:
Piping Run # Piping Run # Piping Run # Piping Run #
PipingMaterial:
Piping Manufacturer:
PipingDiameter:
Length of Piping Run:
ProductStored:
Method and location of
piping-run isolation:
Wait time between applying
pressure/vacuum/water and
starting test:
Test Start Time:
Initial Reading (RI):
Test End Time:
Final Reading (RF):
TestDuration:
Change in Reading (RF-RI):
Pass/Fail Threshold or
Criteria:
Test Result: Pass Fail Pass Fail Pass Fail Pass Fail
Comments – (include information on repairs made prior to testing, and recommended follow-up for failed tests)
49
✔
✔
Calibrated Gauges 0.001"
87 vent
FRP
Smith
3.00"
100'
87 vent
Test Boot
5 Mins
11:00 am
5.00" PSI
12:00 pm
5.00" PSI
1 Hour
0.00"
0.00"
✔
91 vent
FRP
Smith
3.00"
100'
91 vent
Test Boot
5 Mins
11:00 am
5.00" PSI
12:00 pm
5.00" PSI
1 Hour
0.00"
0.00"
✔
DSL vent
FRP
Smith
3.00"
100'
Diesel vent
Test Boot
5 Mins
11:00 am
5.00" PSI
12:00 pm
5.00" PSI
1 Hour
0.00"
0.00"
✔
SWRCB, January 2002 Page ____ of ____
6.PIPING SUMP TESTING
Test Method Developed By: Sump Manufacturer Industry Standard Professional Engineer
Other (Specify)
Test Method Used: Pressure Vacuum Hydrostatic
Other (Specify)
Test Equipment Used: Equipment Resolution:
Sump # Sump # Sump #Sump #
Sump Diameter:
Sump Depth:
Sump Material:
Height from Tank Top to Top of
Highest Piping Penetration:
Height from Tank Top to Lowest
Electrical Penetration:
Condition of sump prior to testing:
Portion of Sump Tested1
Does turbine shut down when
sump sensor detects liquid (both
product and water)?* Yes No NA Yes No NA Yes No NA Yes No NA
Turbine shutdown response time
Is system programmed for fail-safe
shutdown?* Yes No NA Yes No NA Yes No NA Yes No NA
Was fail-safe verified to be
operational?* Yes No NA Yes No NA Yes No NA Yes No NA
Wait time between applying
pressure/vacuum/water and starting
test:
Test Start Time:
Initial Reading (RI):
Test End Time:
Final Reading (RF):
Test Duration:
Change in Reading (RF-RI):
Pass/Fail Threshold or Criteria:
Test Result: Pass Fail Pass Fail Pass Fail Pass Fail
Was sensor removed for testing? Yes No NA Yes No NA Yes No NA Yes No NA
Was sensor properly replaced and
verified functional after testing? Yes No NA Yes No NA Yes No NA Yes No NA
Comments – (include information on repairs made prior to testing, and recommended follow-up for failed tests)
1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an
asterisk (*) is “NO” or “NA”, the entire sump must be tested. (See SWRCB LG-160)
See Incon results
5 9
✔
✔
Incon TS-STS .002"
Regular
43.50"
61.50"
FRP
14.00"
15.00"
Clean & Dry
Pipe Penetration
✔
5 Sec
✔
✔
5 Mins
✔
✔
✔
Super
43.50"
61.50"
FRP
14.00"
15.00"
Clean & Dry
Pipe Penetration
✔
5 Sec
✔
✔
5 Mins
✔
✔
✔
Diesel
43.50"
Pipe Penetration
5 Sec
5 Mins
✔
✔
✔
✔
✔
✔
Clean & Dry
15.00"
14.00"
FRP
61.50"
SWRCB, January 2002 Page ____ of ____
7.UNDER-DISPENSER CONTAINMENT (UDC) TESTING
Test Method Developed By: UDC Manufacturer Industry Standard Professional Engineer
Other (Specify)
Test Method Used: Pressure Vacuum Hydrostatic
Other (Specify)
Test Equipment Used: Equipment Resolution:
UDC # UDC # UDC # UDC #
UDC Manufacturer:
UDC Material:
UDC Depth:
Height from UDC Bottom to Top
of Highest Piping Penetration:
Height from UDC Bottom to
Lowest Electrical Penetration:
Condition of UDC prior to
testing:
Portion of UDC Tested1
Does turbine shut down when
UDC sensor detects liquid (both
product and water)?*
Yes No NA Yes No NA Yes No NA Yes No NA
Turbine shutdown response time
Is system programmed for fail-
safe shutdown?* Yes No NA Yes No NA Yes No NA Yes No NA
Was fail-safe verified to be
operational?* Yes No NA Yes No NA Yes No NA Yes No NA
Wait time between applying
pressure/vacuum/water and
starting test
Test Start Time:
Initial Reading (RI):
Test End Time:
Final Reading (RF):
Test Duration:
Change in Reading (RF-RI):
Pass/Fail Threshold or Criteria:
Test Result: Pass Fail Pass Fail Pass Fail Pass Fail
Was sensor removed for testing? Yes No NA Yes No NA Yes No NA Yes No NA
Was sensor properly replaced and
verified functional after testing? Yes No NA Yes No NA Yes No NA Yes No NA
Comments – (include information on repairs made prior to testing, and recommended follow-up for failed tests)
1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an
asterisk (*) is “NO” or “NA”, the entire UDC must be tested. (See SWRCB LG-160)
See Incon results
6 9
✔
✔
Incon TS-STS .002"
1/2
Pipe Penetration
Clean & Dry
Bottom
Bottom
10.00"
FRP
Bravo
5 Sec
5 Mins
✔
✔
✔
✔
✔
✔
3/4
5 Sec
✔
5 Mins
✔
✔
✔
Pipe Penetration
Clean & Dry
Bottom
Bottom
10.00"
FRP
Bravo
✔
✔
5/67/8
Bravo Bravo
FRP FRP
10.00"10.00"
Bottom Bottom
Bottom Bottom
Clean & Dry Clean & Dry
Pipe Penetration Pipe Penetration
✔✔
✔✔
✔✔
5 Sec 5 Sec
✔✔
✔✔
5 Mins 5 Mins
✔✔
SWRCB, January 2002 Page ____ of ____
7.UNDER-DISPENSER CONTAINMENT (UDC) TESTING
Test Method Developed By: UDC Manufacturer Industry Standard Professional Engineer
Other (Specify)
Test Method Used: Pressure Vacuum Hydrostatic
Other (Specify)
Test Equipment Used: Equipment Resolution:
UDC # UDC # UDC # UDC #
UDC Manufacturer:
UDC Material:
UDC Depth:
Height from UDC Bottom to Top
of Highest Piping Penetration:
Height from UDC Bottom to
Lowest Electrical Penetration:
Condition of UDC prior to
testing:
Portion of UDC Tested1
Does turbine shut down when
UDC sensor detects liquid (both
product and water)?*
Yes No NA Yes No NA Yes No NA Yes No NA
Turbine shutdown response time
Is system programmed for fail-
safe shutdown?* Yes No NA Yes No NA Yes No NA Yes No NA
Was fail-safe verified to be
operational?* Yes No NA Yes No NA Yes No NA Yes No NA
Wait time between applying
pressure/vacuum/water and
starting test
Test Start Time:
Initial Reading (RI):
Test End Time:
Final Reading (RF):
Test Duration:
Change in Reading (RF-RI):
Pass/Fail Threshold or Criteria:
Test Result: Pass Fail Pass Fail Pass Fail Pass Fail
Was sensor removed for testing? Yes No NA Yes No NA Yes No NA Yes No NA
Was sensor properly replaced and
verified functional after testing? Yes No NA Yes No NA Yes No NA Yes No NA
Comments – (include information on repairs made prior to testing, and recommended follow-up for failed tests)
1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an
asterisk (*) is “NO” or “NA”, the entire UDC must be tested. (See SWRCB LG-160)
See Incon results
79
✔
✔
Incon TS-STS .002"
9/10
FRP
Pipe Penetration
Clean & Dry
12.00"
14.00"
36.00"
FRP
Bravo
5 Sec
5 Mins
✔
✔
✔
✔
✔
✔
11/12
5 Sec
✔
5 Mins
✔
✔
✔
Pipe Penetration
Clean & Dry
12.00"
14.00"
36.00"
Bravo
✔
✔
SWRCB, January 2002 Page ____ of ____
8.FILL RISER CONTAINMENT SUMP TESTING
Facility is Not Equipped With Fill Riser Containment Sumps
Fill Riser Containment Sumps are Present, but were Not Tested
Test Method Developed By: Sump Manufacturer Industry Standard Professional Engineer
Other (Specify)
Test Method Used: Pressure Vacuum Hydrostatic
Other (Specify)
Test Equipment Used: Equipment Resolution:
Fill Sump # Fill Sump # Fill Sump # Fill Sump #
Sump Diameter:
Sump Depth:
Height from Tank Top to Top of
Highest Piping Penetration:
Height from Tank Top to Lowest
Electrical Penetration:
Condition of sump prior to
testing:
Portion of Sump Tested
Sump Material:
Wait time between applying
pressure/vacuum/water and
starting test:
Test Start Time:
Initial Reading (RI):
Test End Time:
Final Reading (RF):
TestDuration:
Change in Reading (RF-RI):
Pass/Fail Threshold or Criteria:
Test Result: Pass Fail Pass Fail Pass Fail Pass Fail
Is there a sensor in the sump? Yes No Yes No Yes No Yes No
Does the sensor alarm when
either product or water is
detected?
Yes No NA Yes No NA Yes No NA Yes No NA
Was sensor removed for testing? Yes No NA Yes No NA Yes No NA Yes No NA
Was sensor properly replaced and
verified functional after testing? Yes No NA Yes No NA Yes No NA Yes No NA
Comments – (include information on repairs made prior to testing, and recommended follow-up for failed tests)
See Incon results
8 9
✔
✔✔
Incon TS-STS .002"
87 91Diesel
42.50"42.50"42.50
58.00"58.00"58.00"
18.00"18.00"17.00"
18.00"19.00"16.00"
Clean & Dry Clean & Dry Clean & Dry
Pipe Penetration Pipe Penetration Pipe Penetration
FRPFRPFRP
5 Mins.5 Mins5 Mins
✔✔✔
✔✔✔
✔✔✔
✔✔✔
✔✔✔
SWRCB, January 2002 Page ____ of ____
9.SPILL/OVERFILL CONTAINMENT BOXES
Facility is Not Equipped With Spill/Overfill Containment Boxes
Spill/Overfill Containment Boxes are Present, but were Not Tested
Test Method Developed By: Spill Bucket Manufacturer Industry Standard Professional Engineer
Other (Specify)
Test Method Used: Pressure Vacuum Hydrostatic
Other (Specify)
Test Equipment Used: Equipment Resolution:
Spill Box # Spill Box # Spill Box # Spill Box #
BucketDiameter:
BucketDepth:
Wait time between applying
pressure/vacuum/water and
starting test:
Test Start Time:
Initial Reading (RI):
Test End Time:
Final Reading (RF):
TestDuration:
Change in Reading (RF-RI):
Pass/Fail Threshold or
Criteria:
Test Result: Pass Fail Pass Fail Pass Fail Pass Fail
Comments – (include information on repairs made prior to testing, and recommended follow-up for failed tests)
10:00 am
9 9
✔
✔
Lake Test 0.00625"
87 91
12.00" 12.00"
12.00"12.00"
5 Mins 5 Mins
10:00 am
11.25"11.25"
0.00"
11:00 am 11:00 am
11.25"11.25"
1 Hour 1 Hour
0.00"
0.0625 0.0625
✔✔