Loading...
HomeMy WebLinkAboutSB989 2016SWRCB, January 2002 Page ____ of ____ Secondary Containment Testing Report Form This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the appropriate pages of this form to report results for all components tested. The completed form, written test procedures, and printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. 1.FACILITY INFORMATION Facility Name: Date of Testing: Facility Address: Facility Contact: Phone: Date Local Agency Was Notified of Testing : Name of Local Agency Inspector (if present during testing): 2.TESTING CONTRACTOR INFORMATION Company Name: Technician Conducting Test: Credentials: CSLB Licensed Contractor SWRCB Licensed Tank Tester License Type: License Number: Manufacturer Training ManufacturerComponent(s)Date TrainingExpires 3.SUMMARY OF TEST RESULTS ComponentPassFail Not Tested Repairs Made ComponentPassFail Not Tested Repairs Made If hydrostatic testing was performed, describe what was done with the water after completion of tests: CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements Technician’s Signature:________________________________________________ Date:_________________________ $POGJEFODF6454FSWJDFT *OD ")B[ $% 19 Jaco#9933/Fastrip 05/06/2016 4800Fairfax Bakersfield,CA Omero Garcia (661) 393-7000 Shane Gardner Bryan Self ✔ ICC UST Installer/Retrofitter 05/12/2016 INCON TS-STS 08/11/2017 87 Annular ✔Diesel STP 91 Annular ✔ Diesel Annular ✔ 87 secondary ✔ 91 secondary ✔ Diesel secondary ✔ 87 vent ✔ Diesel vent ✔ Vapor Return ✔ 87 STP ✔ 91 STP ✔ 91 vent ✔ ✔ UDC 1-2 ✔ UDC 3-4 ✔ UDC 5-6 ✔ UDC 7-8 ✔ UDC 9-10 ✔ UDC 11-12 ✔ 87 Fill ✔ 91 Fill ✔ Diesel Fill ✔ 87 vapor bucket ✔ 91 vapor bucket ✔ Everything that was tested on 5/6/16 passed we could not test the UDC's because BFD could not stay past 5:00 pm. 5/9/16 all UDC's passed and everything was signed off by the BFD. 05/06/2016 SWRCB, January 2002 Page ____ of ____ 4.TANK ANNULAR TESTING Test Method Developed By: Tank Manufacturer Industry Standard Professional Engineer Other (Specify) Test Method Used: Pressure Vacuum Hydrostatic Other (Specify) Test Equipment Used: Equipment Resolution: Tank # Tank # Tank # Tank # Is Tank Exempt From Testing?1 Yes No Yes No Yes No Yes No Tank Capacity: Tank Material: Tank Manufacturer: ProductStored: Wait time between applying pressure/vacuum/water and starting test: Test Start Time: Initial Reading (RI): Test End Time: Final Reading (RF): TestDuration: Change in Reading (RF-RI): Pass/Fail Threshold or Criteria: Test Result: Pass Fail Pass Fail Pass Fail Pass Fail Was sensor removed for testing? Yes No NA Yes No NA Yes No NA Yes No NA Was sensor properly replaced and verified functional after testing? Yes No NA Yes No NA Yes No NA Yes No NA Comments – (include information on repairs made prior to testing, and recommended follow-up for failed tests) 1 Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment testing. {California Code of Regulations, Title 23, Section 2637(a)(6)} 29 ✔ ✔ Calibrated Gauges 0.001" 87 ✔ 12,000 FRP Unknown 87 5 Mins 0.00" 1 Hour -10.00" Hg 2:05 pm -10.00" Hg 1:05 pm 0.00 ✔ ✔ ✔ 91 ✔✔ 12,000 FRP Unknown 91 5 Mins 1:05 pm -10.00" Hg 2:05 pm -10.00" Hg 1 Hour 0.00 0.00 ✔ ✔ ✔ Diesel ✔ 12,000 FRP Unknown Diesel 5 Mins 1:05 pm -10.00" Hg 2:05 pm -10.00" Hg 1 Hour 0.00 0.00 ✔ ✔ ✔ SWRCB, January 2002 Page ____ of ____ 5.SECONDARY PIPE TESTING Test Method Developed By: Piping Manufacturer Industry Standard Professional Engineer Other (Specify) Test Method Used: Pressure Vacuum Hydrostatic Other (Specify) Test Equipment Used: Equipment Resolution: Piping Run # Piping Run # Piping Run # Piping Run # PipingMaterial: Piping Manufacturer: PipingDiameter: Length of Piping Run: ProductStored: Method and location of piping-run isolation: Wait time between applying pressure/vacuum/water and starting test: Test Start Time: Initial Reading (RI): Test End Time: Final Reading (RF): TestDuration: Change in Reading (RF-RI): Pass/Fail Threshold or Criteria: Test Result: Pass Fail Pass Fail Pass Fail Pass Fail Comments – (include information on repairs made prior to testing, and recommended follow-up for failed tests) 39 ✔ ✔ Calibrated Gauges 0.001" 87 FRP Smith 3.00" 180' 87 Test Boot 5 Mins 11:00 am 5.00" PSI 12:00 pm 5.00" PSI 1 Hour 0.00" 0.00" ✔ 91 FRP Smith 3.00" 190' 91 Test Boot 5 Mins 11:00 am 5.00" PSI 12:00 pm 5.00" PSI 1 Hour 0.00" 0.00" ✔ Diesel FRP Smith 3.00" 200' Diesel Test Boot 5 Mins 11:00 am 5.00" PSI 12:00 pm 5.00" PSI 1 Hour 0.00" 0.00" ✔ VR FRP Smith 3.00" 180' Vapor Test Boot 5 Mins 11:00 am 5.00" PSI 12:00 pm 5.00" PSI 1 Hour 0.00" 0.00" ✔ SWRCB, January 2002 Page ____ of ____ 5.SECONDARY PIPE TESTING Test Method Developed By: Piping Manufacturer Industry Standard Professional Engineer Other (Specify) Test Method Used: Pressure Vacuum Hydrostatic Other (Specify) Test Equipment Used: Equipment Resolution: Piping Run # Piping Run # Piping Run # Piping Run # PipingMaterial: Piping Manufacturer: PipingDiameter: Length of Piping Run: ProductStored: Method and location of piping-run isolation: Wait time between applying pressure/vacuum/water and starting test: Test Start Time: Initial Reading (RI): Test End Time: Final Reading (RF): TestDuration: Change in Reading (RF-RI): Pass/Fail Threshold or Criteria: Test Result: Pass Fail Pass Fail Pass Fail Pass Fail Comments – (include information on repairs made prior to testing, and recommended follow-up for failed tests) 49 ✔ ✔ Calibrated Gauges 0.001" 87 vent FRP Smith 3.00" 100' 87 vent Test Boot 5 Mins 11:00 am 5.00" PSI 12:00 pm 5.00" PSI 1 Hour 0.00" 0.00" ✔ 91 vent FRP Smith 3.00" 100' 91 vent Test Boot 5 Mins 11:00 am 5.00" PSI 12:00 pm 5.00" PSI 1 Hour 0.00" 0.00" ✔ DSL vent FRP Smith 3.00" 100' Diesel vent Test Boot 5 Mins 11:00 am 5.00" PSI 12:00 pm 5.00" PSI 1 Hour 0.00" 0.00" ✔ SWRCB, January 2002 Page ____ of ____ 6.PIPING SUMP TESTING Test Method Developed By: Sump Manufacturer Industry Standard Professional Engineer Other (Specify) Test Method Used: Pressure Vacuum Hydrostatic Other (Specify) Test Equipment Used: Equipment Resolution: Sump # Sump # Sump #Sump # Sump Diameter: Sump Depth: Sump Material: Height from Tank Top to Top of Highest Piping Penetration: Height from Tank Top to Lowest Electrical Penetration: Condition of sump prior to testing: Portion of Sump Tested1 Does turbine shut down when sump sensor detects liquid (both product and water)?* Yes No NA Yes No NA Yes No NA Yes No NA Turbine shutdown response time Is system programmed for fail-safe shutdown?* Yes No NA Yes No NA Yes No NA Yes No NA Was fail-safe verified to be operational?* Yes No NA Yes No NA Yes No NA Yes No NA Wait time between applying pressure/vacuum/water and starting test: Test Start Time: Initial Reading (RI): Test End Time: Final Reading (RF): Test Duration: Change in Reading (RF-RI): Pass/Fail Threshold or Criteria: Test Result: Pass Fail Pass Fail Pass Fail Pass Fail Was sensor removed for testing? Yes No NA Yes No NA Yes No NA Yes No NA Was sensor properly replaced and verified functional after testing? Yes No NA Yes No NA Yes No NA Yes No NA Comments – (include information on repairs made prior to testing, and recommended follow-up for failed tests) 1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an asterisk (*) is “NO” or “NA”, the entire sump must be tested. (See SWRCB LG-160) See Incon results 5 9 ✔ ✔ Incon TS-STS .002" Regular 43.50" 61.50" FRP 14.00" 15.00" Clean & Dry Pipe Penetration ✔ 5 Sec ✔ ✔ 5 Mins ✔ ✔ ✔ Super 43.50" 61.50" FRP 14.00" 15.00" Clean & Dry Pipe Penetration ✔ 5 Sec ✔ ✔ 5 Mins ✔ ✔ ✔ Diesel 43.50" Pipe Penetration 5 Sec 5 Mins ✔ ✔ ✔ ✔ ✔ ✔ Clean & Dry 15.00" 14.00" FRP 61.50" SWRCB, January 2002 Page ____ of ____ 7.UNDER-DISPENSER CONTAINMENT (UDC) TESTING Test Method Developed By: UDC Manufacturer Industry Standard Professional Engineer Other (Specify) Test Method Used: Pressure Vacuum Hydrostatic Other (Specify) Test Equipment Used: Equipment Resolution: UDC # UDC # UDC # UDC # UDC Manufacturer: UDC Material: UDC Depth: Height from UDC Bottom to Top of Highest Piping Penetration: Height from UDC Bottom to Lowest Electrical Penetration: Condition of UDC prior to testing: Portion of UDC Tested1 Does turbine shut down when UDC sensor detects liquid (both product and water)?* Yes No NA Yes No NA Yes No NA Yes No NA Turbine shutdown response time Is system programmed for fail- safe shutdown?* Yes No NA Yes No NA Yes No NA Yes No NA Was fail-safe verified to be operational?* Yes No NA Yes No NA Yes No NA Yes No NA Wait time between applying pressure/vacuum/water and starting test Test Start Time: Initial Reading (RI): Test End Time: Final Reading (RF): Test Duration: Change in Reading (RF-RI): Pass/Fail Threshold or Criteria: Test Result: Pass Fail Pass Fail Pass Fail Pass Fail Was sensor removed for testing? Yes No NA Yes No NA Yes No NA Yes No NA Was sensor properly replaced and verified functional after testing? Yes No NA Yes No NA Yes No NA Yes No NA Comments – (include information on repairs made prior to testing, and recommended follow-up for failed tests) 1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an asterisk (*) is “NO” or “NA”, the entire UDC must be tested. (See SWRCB LG-160) See Incon results 6 9 ✔ ✔ Incon TS-STS .002" 1/2 Pipe Penetration Clean & Dry Bottom Bottom 10.00" FRP Bravo 5 Sec 5 Mins ✔ ✔ ✔ ✔ ✔ ✔ 3/4 5 Sec ✔ 5 Mins ✔ ✔ ✔ Pipe Penetration Clean & Dry Bottom Bottom 10.00" FRP Bravo ✔ ✔ 5/67/8 Bravo Bravo FRP FRP 10.00"10.00" Bottom Bottom Bottom Bottom Clean & Dry Clean & Dry Pipe Penetration Pipe Penetration ✔✔ ✔✔ ✔✔ 5 Sec 5 Sec ✔✔ ✔✔ 5 Mins 5 Mins ✔✔ SWRCB, January 2002 Page ____ of ____ 7.UNDER-DISPENSER CONTAINMENT (UDC) TESTING Test Method Developed By: UDC Manufacturer Industry Standard Professional Engineer Other (Specify) Test Method Used: Pressure Vacuum Hydrostatic Other (Specify) Test Equipment Used: Equipment Resolution: UDC # UDC # UDC # UDC # UDC Manufacturer: UDC Material: UDC Depth: Height from UDC Bottom to Top of Highest Piping Penetration: Height from UDC Bottom to Lowest Electrical Penetration: Condition of UDC prior to testing: Portion of UDC Tested1 Does turbine shut down when UDC sensor detects liquid (both product and water)?* Yes No NA Yes No NA Yes No NA Yes No NA Turbine shutdown response time Is system programmed for fail- safe shutdown?* Yes No NA Yes No NA Yes No NA Yes No NA Was fail-safe verified to be operational?* Yes No NA Yes No NA Yes No NA Yes No NA Wait time between applying pressure/vacuum/water and starting test Test Start Time: Initial Reading (RI): Test End Time: Final Reading (RF): Test Duration: Change in Reading (RF-RI): Pass/Fail Threshold or Criteria: Test Result: Pass Fail Pass Fail Pass Fail Pass Fail Was sensor removed for testing? Yes No NA Yes No NA Yes No NA Yes No NA Was sensor properly replaced and verified functional after testing? Yes No NA Yes No NA Yes No NA Yes No NA Comments – (include information on repairs made prior to testing, and recommended follow-up for failed tests) 1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an asterisk (*) is “NO” or “NA”, the entire UDC must be tested. (See SWRCB LG-160) See Incon results 79 ✔ ✔ Incon TS-STS .002" 9/10 FRP Pipe Penetration Clean & Dry 12.00" 14.00" 36.00" FRP Bravo 5 Sec 5 Mins ✔ ✔ ✔ ✔ ✔ ✔ 11/12 5 Sec ✔ 5 Mins ✔ ✔ ✔ Pipe Penetration Clean & Dry 12.00" 14.00" 36.00" Bravo ✔ ✔ SWRCB, January 2002 Page ____ of ____ 8.FILL RISER CONTAINMENT SUMP TESTING Facility is Not Equipped With Fill Riser Containment Sumps Fill Riser Containment Sumps are Present, but were Not Tested Test Method Developed By: Sump Manufacturer Industry Standard Professional Engineer Other (Specify) Test Method Used: Pressure Vacuum Hydrostatic Other (Specify) Test Equipment Used: Equipment Resolution: Fill Sump # Fill Sump # Fill Sump # Fill Sump # Sump Diameter: Sump Depth: Height from Tank Top to Top of Highest Piping Penetration: Height from Tank Top to Lowest Electrical Penetration: Condition of sump prior to testing: Portion of Sump Tested Sump Material: Wait time between applying pressure/vacuum/water and starting test: Test Start Time: Initial Reading (RI): Test End Time: Final Reading (RF): TestDuration: Change in Reading (RF-RI): Pass/Fail Threshold or Criteria: Test Result: Pass Fail Pass Fail Pass Fail Pass Fail Is there a sensor in the sump? Yes No Yes No Yes No Yes No Does the sensor alarm when either product or water is detected? Yes No NA Yes No NA Yes No NA Yes No NA Was sensor removed for testing? Yes No NA Yes No NA Yes No NA Yes No NA Was sensor properly replaced and verified functional after testing? Yes No NA Yes No NA Yes No NA Yes No NA Comments – (include information on repairs made prior to testing, and recommended follow-up for failed tests) See Incon results 8 9 ✔ ✔✔ Incon TS-STS .002" 87 91Diesel 42.50"42.50"42.50 58.00"58.00"58.00" 18.00"18.00"17.00" 18.00"19.00"16.00" Clean & Dry Clean & Dry Clean & Dry Pipe Penetration Pipe Penetration Pipe Penetration FRPFRPFRP 5 Mins.5 Mins5 Mins ✔✔✔ ✔✔✔ ✔✔✔ ✔✔✔ ✔✔✔ SWRCB, January 2002 Page ____ of ____ 9.SPILL/OVERFILL CONTAINMENT BOXES Facility is Not Equipped With Spill/Overfill Containment Boxes Spill/Overfill Containment Boxes are Present, but were Not Tested Test Method Developed By: Spill Bucket Manufacturer Industry Standard Professional Engineer Other (Specify) Test Method Used: Pressure Vacuum Hydrostatic Other (Specify) Test Equipment Used: Equipment Resolution: Spill Box # Spill Box # Spill Box # Spill Box # BucketDiameter: BucketDepth: Wait time between applying pressure/vacuum/water and starting test: Test Start Time: Initial Reading (RI): Test End Time: Final Reading (RF): TestDuration: Change in Reading (RF-RI): Pass/Fail Threshold or Criteria: Test Result: Pass Fail Pass Fail Pass Fail Pass Fail Comments – (include information on repairs made prior to testing, and recommended follow-up for failed tests) 10:00 am 9 9 ✔ ✔ Lake Test 0.00625" 87 91 12.00" 12.00" 12.00"12.00" 5 Mins 5 Mins 10:00 am 11.25"11.25" 0.00" 11:00 am 11:00 am 11.25"11.25" 1 Hour 1 Hour 0.00" 0.0625 0.0625 ✔✔