Loading...
HomeMy WebLinkAbout3360 panama ln cupa report 12-23-15_2-8Violation Program Requirement ° o SOC Comments No Oj M Q o O a M ., m o z O z M V �� 2010003 Owner /Operator has a DO and /or informed the CUPA of any change (s) ® ❑ ❑ ❑ ❑ ❑ None within 30 days - 23 CCR 16 2715(a) Testing 2030002 Owner /Operator has tested and certified leak ® ❑ ❑ ❑ ❑ ❑ None detection equipment annual) - 23 CCR 16 2638 2030048 Secondary containment testing conducted every 36 months in accordance ® ❑ ❑ ❑ ❑ ❑ None with requirements - 23 CCR 16 2637 2030055 Spill buckets have been tested annually as ® ❑ ❑ ❑ ❑ ❑ None required - HSC 6.7 25284.2 2010009 Secondary containment test results submitted to the CUPA within 30 days ® ❑ ❑ ❑ ❑ ❑ None after the test - 23 CCR 16 2637(e) 2030064 CUPA was poperly notified within the prescribed number of ® ❑ ❑ ❑ ❑ ❑ None hours prior to testing - 23 CCR 16 26370, 2638(e), 2643(g), 2644.1 (a)(4) Install /Repair 2060009 Permits obtained to install, replace, repair, or ❑ ❑ ❑ ❑ ❑ None modify part of the UST system - 23 CCR 16 2712 UST System Observation General Monitoring 2030003 Leak detection system maintains continuous RD monitoring that activates ® ❑ ❑ ❑ ❑ ❑ None ❑ an audible and visual Yes alarm - 23 CCR 16 2632, 2634, 2636, 2666 2030016 The annular space of the tank, piping and sumps are continuously RD monitored and activates ® ❑ ❑ ❑ ❑ ❑ None ❑ the alarm - 23 CCR 16 Yes 2631(8), 2632(c)(2)(A) &(B), 2633(c), 2636 2030017 Product piping outside the UDC is fail -safe and shuts down the pump or ® ❑ ❑ ❑ ❑ ❑ None restricts flow - 23 CCR 16 2636(0(5) Underground Storage Tank Program - DW Inspection Report v 2.0