HomeMy WebLinkAbout3360 panama ln cupa report 12-23-15_8-8Violation
Program Requirement
4-
0
0
SOC
Comments
No
a
0
a.
Wa
z
0
z
D
0
W
4)
>
Red Tag
2030045
Red Tag information is
legible and has not been
r-1
F-1
1:1
F-1
None
tampered with - 23 CCR
16 2717.1(
2030044
Facility did not allow for
deposit of petroleum into
a UST that has a red tag
❑
1:1
❑
None
affixed to the fill - 23 CCR
16 2717.1(0
Install/Repair
2060024
UST system is made of or
lined with materials that
are compatible with the
None
substance stored - 23
CCR 16 2631.1
2060021
Striker plate installed and
positioned correctly - 23
None
CCR 16 2631(c), 2662(d)
F-1 There were no violations noted for this inspection.
SThis report shall serve as a "NOTICE TO COMPLY" for Minor Violations, and a "NOTICE OF VIOLATION" for
Major violations. You are, hereby, ordered to correct the above noted violations within 30 days, or according to
correction summaries provided. Formal enforcement and/or penalty assessment may be initiated for any
violations noted, and for those not corrected in a timely manner. (NOTE: If this is a preliminary report, a final report
will follow.)
Inspectors Signature:
Date:
Inspector: Enter # of Violations: RD: RP:
Check one box for facility Significant Operational Status (SOC) to be reported to SWRCB and US EPA:
r-1 SOC with both Release Detection and Release Detection (Facility has no Release Prevention and no Release
Prevention Violations)
r-1 Not in SOC (Facility has both Release Prevention and Release Detection Violations)
❑SOC with Release Detection only (Facility has no Release Detection violations but one or more Release Prevention
violations)
❑ SOC with Release Prevention only (Facility has no Release Prevention violations but one or more Release Detection
violations)
Underground Storage Tank Program - DW Inspection Report v 2.0