Loading...
HomeMy WebLinkAbout3360 panama ln cupa report 12-23-15_8-8Violation Program Requirement 4- 0 0 SOC Comments No a 0 a. Wa z 0 z D 0 W 4) > Red Tag 2030045 Red Tag information is legible and has not been r-1 F-1 1:1 F-1 None tampered with - 23 CCR 16 2717.1( 2030044 Facility did not allow for deposit of petroleum into a UST that has a red tag ❑ 1:1 ❑ None affixed to the fill - 23 CCR 16 2717.1(0 Install/Repair 2060024 UST system is made of or lined with materials that are compatible with the None substance stored - 23 CCR 16 2631.1 2060021 Striker plate installed and positioned correctly - 23 None CCR 16 2631(c), 2662(d) F-1 There were no violations noted for this inspection. SThis report shall serve as a "NOTICE TO COMPLY" for Minor Violations, and a "NOTICE OF VIOLATION" for Major violations. You are, hereby, ordered to correct the above noted violations within 30 days, or according to correction summaries provided. Formal enforcement and/or penalty assessment may be initiated for any violations noted, and for those not corrected in a timely manner. (NOTE: If this is a preliminary report, a final report will follow.) Inspectors Signature: Date: Inspector: Enter # of Violations: RD: RP: Check one box for facility Significant Operational Status (SOC) to be reported to SWRCB and US EPA: r-1 SOC with both Release Detection and Release Detection (Facility has no Release Prevention and no Release Prevention Violations) r-1 Not in SOC (Facility has both Release Prevention and Release Detection Violations) ❑SOC with Release Detection only (Facility has no Release Detection violations but one or more Release Prevention violations) ❑ SOC with Release Prevention only (Facility has no Release Prevention violations but one or more Release Detection violations) Underground Storage Tank Program - DW Inspection Report v 2.0