HomeMy WebLinkAbout2630 Mt Vernon - Drainage Study                                  15‐056 Mount Vernon Market  SPR #: 15‐526  2630 Mount Vernon Avenue  Bakersfield, CA     Drainage  Calculations Prepared By:  Civil Design Studio, Inc.  Robert Winslow, PE  P.O. Box 199  Cambria, Ca 93428  805.706.0401  15‐056 Mt Vernon Market  Drainage Calculations  Page | 1       Attn: Manny Behl  City of Bakersfield  Department of Public Works  1501 Truxton Avenue  Bakersfield, Ca 93301  Subject: Mount Vernon Market  Re:  Drainage Calculations    John:  Please find enclosed the Drainage Calculations for the above referenced project.  The study calculations were prepared using the Rational Method and Mannings Equation.  Please contact me for any clarifications or supporting information you need with reference to  this report.    Regards,      Robert Winslow, PE     15‐056 Mt Vernon Market  Drainage Calculations  Page | 2     Contents  Introduction .................................................................................................................................................. 3  Project Location ........................................................................................................................................ 3  Proposed Project ....................................................................................................................................... 4  Drainage Calculations ................................................................................................................................... 5  Rational Method Inputs ............................................................................................................................ 5  Proposed Site Hydrology ........................................................................................................................... 5  Proposed Site Runoff ................................................................................................................................ 6  Future Site Runoff ..................................................................................................................................... 6  Pipe Analysis ............................................................................................................................................. 6  Catch Basin Analysis .................................................................................................................................. 7  Report Conclusion ..................................................................................................................................... 8  Supporting Documents ................................................................................................................................. 9  NOAA Atlas 14 Point Precipitation Frequency Rainfall Intensity .............................................................. 9  Drainage Area Map ................................................................................................................................. 10  Drainage Inlet Detail ............................................................................................................................... 11       15‐056 Mt Vernon Market  Drainage Calculations  Page | 3     Introduction  Project Location  The proposed project is located in the city of Bakersfield, county of Kern, state of California. The site is  bordered by Mount Vernon Avenue to the east, commercial development to the north, empty lot to the  west, and residential to the south. The site is an undeveloped lot.     Figure 1: Project Location     15‐056 Mt Vernon Market  Drainage Calculations  Page | 4     Proposed Project  The proposed project consists of renovating the existing Sizzler parking lot, construction of a new  building, parking lot, and trash enclosures (see civil improvement plans).     Figure 2: Proposed Project   15‐056 Mt Vernon Market  Drainage Calculations  Page | 5     Drainage Calculations  Rational Method Inputs  The Rational Method will be utilized to calculate the anticipated runoff for the proposed development.  Inputs for the rational method equation include the following:  A weighted “C” calculation will be utilized to determine the “C” value for pervious and impervious areas,  for post development.  The site area tributary to the existing storm drain system has been measured at 5.75 acres. This includes  the property being improved and the tributary parking lots/buildings to the north. See attached  Drainage Area Map.  The rainfall intensity is determined from a figure (included) provided by the NOAA Hydrometeorological  Design Studies Center, Atlas 14 Point Precipitation Frequency Estimates: CA. The value used for this  calculation is for a 10 year 24 hour storm. This value is 1.74 inches.    Proposed Site Hydrology  The proposed site consists of renovating the existing Sizzler parking lot, construction of a new building,  parking lot, and trash enclosures. The following table shows how the weighted “C” value was calculated.     Weighted “C” Value – Area “A”  Area Description Area, ac "C”  Value  Product of “C”  and Area  Impervious 0.8 0.9 0.72  Pervious 1.4 0.3 0.42  Totals 2.2 n/a 1.14  Weighted "C" 0.52      Weighted “C” Value – Area “B”  Area Description Area, ac "C”  Value  Product of “C”  and Area  Impervious 1.5 0.9 1.35  Pervious 0.1 0.3 0.09  Totals 1.6 n/a 1.44  Weighted "C" 0.90    15‐056 Mt Vernon Market  Drainage Calculations  Page | 6     Weighted “C” Value – Area “C”  Area Description Area, ac "C”  Value  Product of “C”  and Area  Impervious 1.1 0.9 0.99  Pervious 0.8 0.3 0.24  Totals 1.9 n/a 3.79  Weighted "C" 0.65    Proposed Site Runoff  The proposed site runoff is collected via concrete curb and gutter and v‐gutter improvements and  directed to an existing storm drain system that discharges into a basin to the north.  Q (Site Peak Flow Rate) = C (Runoff Coefficient) * I (Rainfall intensity) * A (Site Area)  QArea A = 0.52 * (1.74 in) * 2.2 acres = 2.0 cfs  QArea B = 0.90 * (1.74 in) * 1.6 acres = 2.5 cfs  QArea C = 0.65 * (1.74 in) * 1.9 acres = 2.2 cfs    Future Site Runoff  Although the empty lot to the west hasn’t been developed yet, calculations for that runoff need to be  calculated in order to make sure the existing 21” line can handle the future flow. Assuming the future  development will connect to the existing 21” line (downstream of the proposed improvements), and  have a “C”‐Value of 0.90, the total expected stormwater runoff will be  Q (Site Peak Flow Rate) = C (Runoff Coefficient) * I (Rainfall intensity) * A (Site Area)  QTotal = 0.90 * (1.74 in) * 5.75 acres = 9.0 cfs    Pipe Analysis  Using Mannings Equation, each of the pipes maximum flowrates were calculated to make sure they can  handle the design flowrates. The maximum flowrates each pipe can handle are:  Proposed 6” PVC SDR 35 @ 1% min = 0.73 cfs  Proposed 12” HDPE Double Wall @ 0.5% = 3.28 cfs  Proposed 18” HDPE Double Wall @ 0.5% = 9.66 cfs    15‐056 Mt Vernon Market  Drainage Calculations  Page | 7     Catch Basin Analysis  Since Area “B” has the highest flowrate of stormwater runoff, it will be analyzed to make sure the Mid  State Concrete Go Curb Inlet (see attached) can handle the design storm. To include a safety factor, the  catch basins were analyzed assuming they were 50% clogged with debris. Autodesk Storm and Sanitary  Analysis 2015 was used for the calculations. See below:  Autodesk Storm and Sanitary Analysis 2015  Drainage of Highway Pavements  ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐  Date: 11/28/2016    Input Data  ‐‐‐‐‐‐‐‐‐‐  Inlet Type: Combinational Inlet Type  Inlet Location: On Sag  Combinational Inlet Type: Curb Opening & Grate  Curb Opening & Grate Type: Equal Length Inlet  Grate Type: Parallel Bar P‐1‐1/8    Cross Slope                        L. Depression  Pavement Cross Slope (ft/ft)       0.0200  Manning's Coefficient              0.0110  Gutter Cross Slope (ft/ft)         0.0110  Gutter Width (ft)                  2.0000  Gutter Depression (ft)             0.1700  Discharge (cfs)                    2.5000  Grate Length (ft)                  3.00  Grate Width (ft)                   2.00  Curb‐Opening Length (ft)           3.00  Curb‐Opening Height (ft)           0.50    Output Data  ‐‐‐‐‐‐‐‐‐‐‐  Gutter Spread (ft)                 12.9914  Depth of Flow (ft)                 0.325  Depth at Curb (ft)                 0.430  Intercepted Flow (cfs)             2.500  Inlet Intercepted Flow (%)         100.00     15‐056 Mt Vernon Market  Drainage Calculations  Page | 8     Report Conclusion  The proposed storm drain infrastructure can handle the runoff from the proposed development.      15‐056 Mt Vernon Market  Drainage Calculations  Page | 9     Supporting Documents  NOAA Atlas 14 Point Precipitation Frequency Rainfall Intensity  Latitude: 35.3932o         Longitude: ‐118.9689o         Elevation: 606.44 ft         15‐056 Mt Vernon Market  Drainage Calculations  Page | 10     Drainage Area Map     SSSS SS S S W E L E C S D E L E C CL E A N A I R VE H I C L E CL E A N A I R VE H I C L E CL E A N A I R VE H I C L E CL E A N A I R VE H I C L E SD > > > > >> N O P A R K I N G N O P A R K I N G CL E A N A I R VE H I C L E CL E A N A I R VE H I C L E CL E A N A I R VE H I C L E CL E A N A I R VE H I C L E DRAINAGE AREA MAP PROJECT LOCATION: DOLLINGER PROPERTIES 555 TWIN DOLPHIN DRIVE SUITE 600 REDWOOD CITY, CA 94065 2630 MOUNT VERNON AVENUE BAKERSFIELD, CA 93306 PROJECT OWNER: C D S J O B # : S C A L E : 1 5 - 0 5 6 A S S H O W N D A T E : 1 1 / 2 8 / 1 6 P R E P A R E D B Y : M M M R D W R E V I E W E D B Y : S H E E T 1 O F 1 S H E E T S M T V E R N O N A V E N U E H I G H W A Y 1 7 8F L O R A L D R I V E R O L L O R A V I N E L E G E N D P E R V I O U S A R E A S 1 0 0 5 0 0 7 5 S C A L E : 1 " = 1 0 0 ' 1 0 0 (E) 21" RCP(N) 6" SDR 35 (N) 1 2 " S D R 3 5 (N) 18" HDPE(N) 1 2 " S D R 3 5 (E) OUTLETAREA "A"2.2 ACRES A R E A " B " 1 . 6 A C R E S AREA "C"1.9 ACRES C B " A " C B " C " C B " B " D R A I N A G E A R E A B O R D E R (A) 12" HDPE I N D I C A T E S E X I S T I N G ( E ) I N D I C A T E S N E W ( N ) I N D I C A T E S A S S U M E D ( A ) 15‐056 Mt Vernon Market  Drainage Calculations  Page | 11     Drainage Inlet Detail