HomeMy WebLinkAboutBUSINESS PLAN 4/3/2015ROUTINE ❑ COMBINED ❑ JOINT AGENCY LJ MULTI - AGENCY LJ CQMI'LAIN I u rcc- iiv�rcu i ivi�.
C V (c =Compliance ® Pi E RATION
V= Violation
COMMENTS
t ❑ APPROPRIATE PERMIT ON HAND (BMC: 1.65.080)
❑ BUSINESS PLAN CONTACT INFORMATION ACCURATE. (CCR: 2729.1)
VISIBLE (CFC: 505.1, BMC: 15.52.020)
110 ❑ CORRECT OCCUPANCY (CBC: 401)
VERIFICATION OF INVENTORY MATERIALS (CCR: 2729.3)
❑ VERIFICATION OF QUANTITIES (CCR: 2729.4)
{
El VERIFICATION OF LOCATION ; ( CCR: 2729.2)
❑ PROPER SEGREGATION OF MATERIAL (CCR: 2704.1)
" ❑ VERIFICATION OF MSDS AVAILABILITY (CCR: 2729.2(3)(6))
i
MY ❑ VERIFICATION OF HAZ MAT TRAINING (CCR: 2732)
r ❑ VERIFICATION OF ABATEMENT SUPPLIES AND PROCEDURES (CCR: 2731))
i
1'. ❑ EMERGENCY PROCEDURES ADEQUATE (CCR: 2731)
CONTAINERS PROPERLY LABELED (CCR: 66262.34(F), CFC 2703.5)
L6 El HOUSEKEEPING (CFC..304
t
❑ FIRE PROTECTION (CFC: 903 & 906),-
❑ SITE DIAGRAM ADEQUATE &i ON HAND (CCR: 2729.2)
ANY HAZARDOUS WASTE ON SITE? ❑ YES ❑ NO
i
i
Signature of Receipt
Explain:
I
POST INSPECTION INSTRUCTIONS:
• Refer to the back of this inspection report for regulatory citations and corrective actions *1 .i u
• Correct the violation(s) noted above by Signature (that all violations have been corrected as noted)
• Within 5 days of correcting all of the violations, sigri and return a copy of this page to:
Bakersfield Fire Dept., Prevention Services, 2101 H Street, California 93301 L4 _J t `2
Date
White — Business Copy Yellow — Business Copy to be Sent in after return to Compliance Pink Prevention Services Copy FD2155 (Rev 12/11)