Loading...
HomeMy WebLinkAboutAST PROG. 6/22/2015UNIFIED PROGRAM INSPECTION CHECKLIST Aboveground Petroleum Storage Tank Program aRTN BAKERSFIELD FIRE DEPT. Prevention Services 2101 H Street Bakersfield, CA 93301 Tel.: (661) 326 -3979 Fax: (661) 852 -2171 FACILITY NAME INSPECTION DATE INSPECTION TIME ADDRESS �� �^�, �, v � �.. 1 i PONS NOS. NO OF EMPLOYEES FACILITY CONTACT BUSINESS ID NUMBER CONSENT TO INSPECT NAME /TITLE C C'r-r 19-1 RI A . ••l %At- f -IMIVI ^rnl1 MdM91Tn )4 \ =TOT \ / DESCRIPTION YJ N N/A COMMENTS Prepare an SPCC plan [CFR 112.3] .. Review or amend SPCC plan [CFR 112.5 (a)(d)] SPCC plan available on site [CFR 112.3(e)] { A� Conduct inspections and test in accordance with written procedures [CFR 112.7(e)] Maintain records of inspections, tests and/or procedures [CFR 1 12.7(e)];, ;} Records of inspections or tests signed by inspector [CFR 112.7(e)] " _ Q=r'rIr11U 7• C17r -r- LJI-%n 9--;1mmdnntc, r'71itnrnla MOMIM R. tiSITPTV l.nnP_' L"fL_ /11.4_7_ LnL /U- 1L DESCRIPTION YJ N N/A COMMENTS Self- certification for Tier I or II facility [112.6(a)(1),(b)(1)] .. Professional engineer certification CFR112.3(d) and 112.6(b)(4)] Documentation of 5 year review and evaluation of SPCC plan [CFR 112.5(b)] A� Amendments required within 6 months of changes/certifications CFR 112.5(a) and 112.6(a) (2), (b)(4)] Management authorization of resource commitment to implement the SPCC CFR 112.7 & 112.6(a) ;} Diagram with location and contents of containers, transfer stations, connecting piping [112.7(a)(3)] " _ Type of oil and storage capacity for each container CFR 112.7(a)(3) Discharge prevention measures and procedures for routine handling CFR 112.7(a)(3)] Countermeasures for discovery, response and clean-up CFR112.7(a)(3)] ry Ae Required contact list and phone numbers [CFR 112.7(a)(3)] pis I 0 r'T1f'%Kl 4. cUo'f' 17nrnmvirnnnontC1 r- niit^rnla MIaa1Tn rc. tiaTPTU I.nr7P-' LnL /U -:3- LOL /U. IL DESCRIPTION Y N N/A COMMENTS Provide corrosion protection [CFR 112.8(c)(4)(5), (d)(1)] .. Containers compatible with materials stored CFR 112.8(c)(1) Implement SPCC plan review changes or amendments within 6 months CFR 112.5(a)(d)] A� Prepare an oil contingency plan or written, control /removal commitments [CFR 112.7(d)] ccr -T1r -141 A- cor-r- ol--%n -Irnlnonn" r-alltnrnra Moaltn P6 tiarory l:nnP• L!fLn1_a_cl DESCRIPTION Y N N/A COMMENTS Training program [CFR 112.7(f)] .. Train personnel in operation and maintenance of equipment [CFR 112.7(f) Conduct annual spill prevention briefings [CFR 112.7(f)(3)]} 4ZGf'TIf11U ti" Fa/rility Incnce tinn• r_alotnrnla Hcknir 1 & -iatP-Tv t.-nfiP- - "- LhZfU -4 -n DESCRIPTION YJ NJ N/A COMMENTS Meet provisions of conditional exemption [H &S 25270.4.5(b) Facility security adequate CFR 112.7( )] Clean-up materials readily available CFR 112.7(c)] Overfill protection procedures or devices in place and operative [CFR 112.8(c)(8) Portable /mobile containers positioned to prevent discharge [CFR 112.8(c)(11) ;} Loading / unloading rack drains into containment area [CFR 112.7(h)] _ Provide appropriate containment /diversionary structures to prevent discharge [CFR 112.8(a), 112.7(c) Secondary containment adequate to contain capacity of largest container + precipitation [CFR 112.8(c) Remove accumulation of oil in secondary containment [CFR 112.8(c)(10)] Ae Secondary containment valve(s) closed [CFR 112.8]' Implement SPCC plan elements [CFR 112.3] NY HAZARDOUS WASTE ON SITE? YES ❑ NO ISignature ofReceipt X,�' / :Xplain POST INSPECTION INSTRUCTIONS: • Refer to the back of this inspection report for regulatory citations and corrective actions • Correct the violation(s) noted above by • Within 5 days of correcting all of the violations, sign and return a copy of this page to: Bakersfield Fire Dept., Prevention Services, 2101 H Street, California 93301 Signature (that all violations have been corrected as noted) Date White - Business Copy Yellow - Business Copy to be Sent in after return to Compliance Pink - Prevention Services Copy FD2156b (Rev 9/10)