Loading...
HomeMy WebLinkAboutSB989 RESULTS 2016SWRCB, January 2002 Page ____ of ____ Secondary Containment Testing Report Form This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the appropriate pages of this form to report results for all components tested. The completed form, written test procedures, and printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. 1.FACILITY INFORMATION Facility Name: Date of Testing: Facility Address: Facility Contact: Phone: Date Local Agency Was Notified of Testing : Name of Local Agency Inspector (if present during testing): 2.TESTING CONTRACTOR INFORMATION Company Name: Technician Conducting Test: Credentials: CSLB Licensed Contractor SWRCB Licensed Tank Tester License Type: License Number: Manufacturer Training ManufacturerComponent(s)Date TrainingExpires 3.SUMMARY OF TEST RESULTS ComponentPassFail Not Tested Repairs Made ComponentPassFail Not Tested Repairs Made If hydrostatic testing was performed, describe what was done with the water after completion of tests: CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements Technician’s Signature:________________________________________________ Date:_________________________ $POGJEFODF6454FSWJDFT *OD ")B[ $% 14 #7776/Howard'sMarket 11/10/2016 3300PlanzRoad Bakersfield,CA93309 OmeroGarcia(661)393-7000 10/18/2016 ShaneGardner BryanSelf ✔✔ ICC CAUSTServiceTechnician 06/08/2017 INCON TS-STS 11/09/2018 UDC1-2 ✔ UDC3-4 ✔ 87FillSpillBucket ✔ 87VaporSpillBucket ✔ 91FillSpillBucket ✔ 91VaporSpillBucket ✔ DieselFillSpillBucket ✔ 11/10/2016 All test water was put back into test trailer SWRCB, January 2002 Page ____ of ____ 7.UNDER-DISPENSER CONTAINMENT (UDC) TESTING Test Method Developed By: UDC Manufacturer Industry Standard Professional Engineer Other (Specify) Test Method Used: Pressure Vacuum Hydrostatic Other (Specify) Test Equipment Used: Equipment Resolution: UDC # UDC # UDC # UDC # UDC Manufacturer: UDC Material: UDC Depth: Height from UDC Bottom to Top of Highest Piping Penetration: Height from UDC Bottom to Lowest Electrical Penetration: Condition of UDC prior to testing: Portion of UDC Tested1 Does turbine shut down when UDC sensor detects liquid (both product and water)?* Yes No NA Yes No NA Yes No NA Yes No NA Turbine shutdown response time Is system programmed for fail- safe shutdown?* Yes No NA Yes No NA Yes No NA Yes No NA Was fail-safe verified to be operational?* Yes No NA Yes No NA Yes No NA Yes No NA Wait time between applying pressure/vacuum/water and starting test Test Start Time: Initial Reading (RI): Test End Time: Final Reading (RF): Test Duration: Change in Reading (RF-RI): Pass/Fail Threshold or Criteria: Test Result: Pass Fail Pass Fail Pass Fail Pass Fail Was sensor removed for testing? Yes No NA Yes No NA Yes No NA Yes No NA Was sensor properly replaced and verified functional after testing? Yes No NA Yes No NA Yes No NA Yes No NA Comments – (include information on repairs made prior to testing, and recommended follow-up for failed tests) 1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an asterisk (*) is “NO” or “NA”, the entire UDC must be tested. (See SWRCB LG-160) See Incon results 24 ✔ ✔ TS-STS 0.002" 1-2 PIpePenetration Dry NA 4.00" 9.00" FRP Western ✔ NA ✔ 5min. 0.00" ✔ ✔ ✔ 1hour ✔ 3-4 NA ✔ 0.00" ✔ 1hour 5min. ✔ ✔ PIpePenetration Dry NA 4.75" 9.00" FRP Western ✔ ✔ ✔ SWRCB, January 2002 Page ____ of ____ 9.SPILL/OVERFILL CONTAINMENT BOXES Facility is Not Equipped With Spill/Overfill Containment Boxes Spill/Overfill Containment Boxes are Present, but were Not Tested Test Method Developed By: Spill Bucket Manufacturer Industry Standard Professional Engineer Other (Specify) Test Method Used: Pressure Vacuum Hydrostatic Other (Specify) Test Equipment Used: Equipment Resolution: Spill Box # Spill Box # Spill Box # Spill Box # BucketDiameter: BucketDepth: Wait time between applying pressure/vacuum/water and starting test: Test Start Time: Initial Reading (RI): Test End Time: Final Reading (RF): TestDuration: Change in Reading (RF-RI): Pass/Fail Threshold or Criteria: Test Result: Pass Fail Pass Fail Pass Fail Pass Fail Comments – (include information on repairs made prior to testing, and recommended follow-up for failed tests) See Incon results 34 ✔ ✔ TS-STS 0.002" 87-F 87-V 91-F 91-V 12.00"12.00"12.00"12.00" 12.00"12.00"12.00"12.00" 5min.5min.5min.5min. 1hour 1hour 1hour 1hour 0.00"0.00"0.00"0.00" ✔✔✔✔ SWRCB, January 2002 Page ____ of ____ 9.SPILL/OVERFILL CONTAINMENT BOXES Facility is Not Equipped With Spill/Overfill Containment Boxes Spill/Overfill Containment Boxes are Present, but were Not Tested Test Method Developed By: Spill Bucket Manufacturer Industry Standard Professional Engineer Other (Specify) Test Method Used: Pressure Vacuum Hydrostatic Other (Specify) Test Equipment Used: Equipment Resolution: Spill Box # Spill Box # Spill Box # Spill Box # BucketDiameter: BucketDepth: Wait time between applying pressure/vacuum/water and starting test: Test Start Time: Initial Reading (RI): Test End Time: Final Reading (RF): TestDuration: Change in Reading (RF-RI): Pass/Fail Threshold or Criteria: Test Result: Pass Fail Pass Fail Pass Fail Pass Fail Comments – (include information on repairs made prior to testing, and recommended follow-up for failed tests) See Incon results 1010 ✔ ✔ TS-STS 0.002" DSL-F 12.00" 12.00" 5min. 1hour 0.00" ✔ ,- JACo 7776 33OO PLANZ RD iAC0 77i6 33OO PLANZ RD BAKERSFiELD CA 33309 11/1012016 10i51 Al1 SUI'IP LEAK TEST REPORT UDC 1-2 BAKERSFIELD CA S3309 1111012016 ',10:51 AN SUHP LEAK TEST REPORT 87 FIL TEST STARTED 10:36 AI4 TEST STARTED 11110/2016 BEGIN LEVEL 5. g'I35 IN END TII4E 10:51 AI.I END DATE 1111012016 END LEVEL 5.9132 IN LEAK THRESHOLD O, OO2 IN IEST RESULT PASSED 87 VAP TEST STARTED 10:36 AI'I TEST STARTED 11I'I0/2016 BEGIN LEVEL 7.3680 IN END TII.IE 10:51 A1'I END DATE 11/10/20'16 END LEVEL 7,3673 IN LEAK THRESHOLD O. OO2 IN TEST RESULT fiMSSTO END TII,IE 10:51 Atl END DATE 11/1012016 END LEVEL 7.3277 IN LEAK THRESHOLD O. OO2 IN TEST RESULT PASSEO JAC0 7776 33OO PLANZ RD 8A(ERSFIELD CA 93309 11/10/2016 il:21 Atl SUHP LEAK IESI REPORT TEST SIARTED TEST STARTED BEGIN LEVEL END TIIlE END DATE END LEVEL 10:36 Al'l 111 10/2016 1,3156 IN 10:51 AH iui0/20i6 1,3164 IN 91 l/AP TEST SmgTEg**"10"LQ6* A"[_"*_, , TEST STARTED'I'I/10/2016 BEGIN LEVEL 7.3266 IN 91 FIL TEST STARTED 1 1 :05 AI,I IEST STARTED 11/10/2016 BEGIN LEVEL 6,7724 IN END TIt'tE 11:2.1 At1 END oATE 11/10/2016 END LEVEL 6.7715 IN LEAK THRESHOLD O. OO2 IN TEST RESULI PASSED LEAli THRESHOLD O, OC2 IN TEST RESULT PASSED UDC 3-4 TEST STARTED 10:36 AI4 TEST STARTED 11/1012016 BEGIN LEVEL 2.6474 IN END TII'IE .IO:51 AH END DATE 1111012116 END LEVEL 2.6474 IN LEAK THRESHOLD O. OO2 IN TESI RESULT PASSED DSL FIL TEST STARTED 10:36 AI'I TEST STARTED 11/10/2016 BEGIN LEVEL 5.3673 IN END Tit4E 10:51 AI'l END DATE 1U1O/2O16 END LEVEL 5.3672 IN LEAK THRESHOLD O. OO2 ]N TEST RESULT PASSED