HomeMy WebLinkAboutSB989 RESULTS 2017SWRCB, January 2002 Page ____ of ____ Secondary Containment Testing Report Form This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the appropriate pages of this form to report results for all components tested. The completed form, written test procedures, and printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. 1.FACILITY INFORMATION Facility Name: Date of Testing: Facility Address: Facility Contact: Phone: Date Local Agency Was Notified of Testing : Name of Local Agency Inspector (if present during testing): 2.TESTING CONTRACTOR INFORMATION Company Name: Technician Conducting Test: Credentials: CSLB Licensed Contractor SWRCB Licensed Tank Tester License Type: License Number: Manufacturer Training Manufacturer Component(s)Date TrainingExpires 3.SUMMARY OF TEST RESULTS Component PassFail Not Tested Repairs Made Component PassFail Not Tested Repairs Made If hydrostatic testing was performed, describe what was done with the water after completion of tests: CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements Technician’s Signature:________________________________________________ Date:_________________________ $POGJEFODF6454FSWJDFT *OD ")B[ $% 1 7 #7773/Fastrip #31 01/17/2017 3501Mt.VernonAvenue Bakersfield,CA93306 OmeroGarcia (661)393-7000 12/29/2016 None KyleSelf ✔ ICC CAUSTServiceTechnician 10/28/2018 INCON TS-STS 11/08/2018 87 STP ✔91 Annular 87 Product Secondary ✔✔ 91 STP ✔ 91 Product Secondary ✔ Diesel STP ✔ Diesel Secondary ✔ Transition Sump ✔ UDC 3-4 ✔ UDC 5-6 ✔ UDC 7-8 ✔ 87 Annular ✔ UDC 1-2 ✔ ✔ Diesel Annular ✔ 87 Fill Bucket ✔ 87 Vapor Bucket ✔ 91 Fill Bucket ✔ 91 Vapor Bucket ✔ Diesel Fill Bucket ✔ Diesel Vapor Bucket ✔ 01/17/2017 Water was hauled off by Confidence UST SERVICES SWRCB, January 2002 Page ____ of ____ 4.TANK ANNULAR TESTING Test Method Developed By: Tank Manufacturer Industry Standard Professional Engineer Other (Specify) Test Method Used: Pressure Vacuum Hydrostatic Other (Specify) Test Equipment Used: Equipment Resolution: Tank # Tank # Tank # Tank # Is Tank Exempt From Testing?1 Yes No Yes No Yes No Yes No Tank Capacity: Tank Material: Tank Manufacturer: ProductStored: Wait time between applying pressure/vacuum/water and starting test: Test Start Time: Initial Reading (RI): Test End Time: Final Reading (RF): TestDuration: Change in Reading (RF-RI): Pass/Fail Threshold or Criteria: Test Result: Pass Fail Pass Fail Pass Fail Pass Fail Was sensor removed for testing? Yes No NA Yes No NA Yes No NA Yes No NA Was sensor properly replaced and verified functional after testing? Yes No NA Yes No NA Yes No NA Yes No NA Comments – (include information on repairs made prior to testing, and recommended follow-up for failed tests) 1 Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment testing. {California Code of Regulations, Title 23, Section 2637(a)(6)} 2 7 ✔ ✔ CalibratedGauges 0.00" 87 ✔ 12,000 Steel Smith 87 Gasoline 5min 0.00hg 1 hour -10.00hg 11:30 am -10.00hg 10:30 am 0.00 ✔ ✔ ✔ Diesel ✔ 12,000 Steel Smith DIESEL 5min 10:30 am -10.00hg 11:30 am -10.00hg 1 hour 0.00hg 0.00 ✔ ✔ ✔ 91 ✔ 12,000 Steel Smith 91 gasoline 5min 10:30 am -10.00hg 11:30 am -10.00hg 1 hour 0.00hg 0.00 ✔ ✔ ✔ ✔ SWRCB, January 2002 Page ____ of ____ 5.SECONDARY PIPE TESTING Test Method Developed By: Piping Manufacturer Industry Standard Professional Engineer Other (Specify) Test Method Used: Pressure Vacuum Hydrostatic Other (Specify) Test Equipment Used: Equipment Resolution: Piping Run # Piping Run # Piping Run # Piping Run # PipingMaterial: Piping Manufacturer: PipingDiameter: Length of Piping Run: ProductStored: Method and location of piping-run isolation: Wait time between applying pressure/vacuum/water and starting test: Test Start Time: Initial Reading (RI): Test End Time: Final Reading (RF): TestDuration: Change in Reading (RF-RI): Pass/Fail Threshold or Criteria: Test Result: Pass Fail Pass Fail Pass Fail Pass Fail Comments – (include information on repairs made prior to testing, and recommended follow-up for failed tests) 3 7 ✔ ✔ CalibratedGauges 0.00" 87 Fiberglass Smith 3.00" 125.00' 87 gasoline Test boot 5min 10:00am 5.00psi 11:00am 5.00psi 1 hour 0.00psi 0.00psi ✔ Diesel Fiberglass Smith 3.00" 135.00' DIESEL Test boot 5min 10:00am 5.00psi 11:00psi 5.00psi 1 hour 0.00psi 0.00psi ✔ 91 Fiberglass Smith 3.00" 150.00" 91 gasoline Test boot 5min 10:00am 5.00psi 11:00am 5.00psi 1 hour 0.00psi 0.00psi ✔ SWRCB, January 2002 Page ____ of ____ 6.PIPING SUMP TESTING Test Method Developed By: Sump Manufacturer Industry Standard Professional Engineer Other (Specify) Test Method Used: Pressure Vacuum Hydrostatic Other (Specify) Test Equipment Used: Equipment Resolution: Sump # Sump # Sump #Sump # Sump Diameter: Sump Depth: Sump Material: Height from Tank Top to Top of Highest Piping Penetration: Height from Tank Top to Lowest Electrical Penetration: Condition of sump prior to testing: Portion of Sump Tested1 Does turbine shut down when sump sensor detects liquid (both product and water)?* Yes No NA Yes No NA Yes No NA Yes No NA Turbine shutdown response time Is system programmed for fail-safe shutdown?* Yes No NA Yes No NA Yes No NA Yes No NA Was fail-safe verified to be operational?* Yes No NA Yes No NA Yes No NA Yes No NA Wait time between applying pressure/vacuum/water and starting test: Test Start Time: Initial Reading (RI): Test End Time: Final Reading (RF): Test Duration: Change in Reading (RF-RI): Pass/Fail Threshold or Criteria: Test Result: Pass Fail Pass Fail Pass Fail Pass Fail Was sensor removed for testing? Yes No NA Yes No NA Yes No NA Yes No NA Was sensor properly replaced and verified functional after testing? Yes No NA Yes No NA Yes No NA Yes No NA Comments – (include information on repairs made prior to testing, and recommended follow-up for failed tests) 1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an asterisk (*) is “NO” or “NA”, the entire sump must be tested. (See SWRCB LG-160) Please see Incon results: 4 7 ✔ ✔ TS-STS 0.00" 87 43.00" 45.00" Fiberglass 24.00" 12.00" Clean dry Highest penetration ✔ N/A ✔ ✔ 5min 15 min +-0.002" ✔ ✔ ✔ Diesel 43.00" 45.00" Fiberglass 23.00" 15.00" Clean dry Highest penetration ✔ N/A ✔ ✔ 5min 15 min +-0.002" ✔ ✔ ✔ 91 43.00" Highest penetration ✔ N/A ✔ +-0.002" 15mim 5min ✔ ✔ ✔ ✔ Clean dry 12.00" 23.00" Fiberglass 45.00" Transfer sump 36.00" 39.00" Fiberglass 18.00" 13.00" Clean dry Highest penetration ✔ ✔ ✔ +-0.002" 15 min 5min ✔ ✔ ✔ SWRCB, January 2002 Page ____ of ____ 7.UNDER-DISPENSER CONTAINMENT (UDC) TESTING Test Method Developed By: UDC Manufacturer Industry Standard Professional Engineer Other (Specify) Test Method Used: Pressure Vacuum Hydrostatic Other (Specify) Test Equipment Used: Equipment Resolution: UDC # UDC # UDC # UDC # UDC Manufacturer: UDC Material: UDC Depth: Height from UDC Bottom to Top of Highest Piping Penetration: Height from UDC Bottom to Lowest Electrical Penetration: Condition of UDC prior to testing: Portion of UDC Tested1 Does turbine shut down when UDC sensor detects liquid (both product and water)?* Yes No NA Yes No NA Yes No NA Yes No NA Turbine shutdown response time Is system programmed for fail- safe shutdown?* Yes No NA Yes No NA Yes No NA Yes No NA Was fail-safe verified to be operational?* Yes No NA Yes No NA Yes No NA Yes No NA Wait time between applying pressure/vacuum/water and starting test Test Start Time: Initial Reading (RI): Test End Time: Final Reading (RF): Test Duration: Change in Reading (RF-RI): Pass/Fail Threshold or Criteria: Test Result: Pass Fail Pass Fail Pass Fail Was sensor removed for testing? Yes No NA Yes No NA Yes No NA Yes No NA Was sensor properly replaced and verified functional after testing? Yes No NA Yes No NA Yes No NA Yes No NA Comments – (include information on repairs made prior to testing, and recommended follow-up for failed tests) 1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an asterisk (*) is “NO” or “NA”, the entire UDC must be tested. (See SWRCB LG-160) Please see Incon results: 5 7 ✔ ✔ TS-STS 0.00" 1-2 Highest penetration Clean dry 10.00" 13.00" 26.00" Fiberglass Unknown ✔ N/A ✔ 5min +-0.002" ✔ ✔ 15min ✔ 3-4 N/A ✔ +-0.002" ✔ 15min 5min ✔ ✔ Highest penetration Clean dry 10.00" 13.00" 26.00" Fiberglass Unknown ✔ ✔ 5-6 7-8 Unknown Unknown Fiberglass Fiberglass 26.00"26.00" 13.00"13.00" 10.00"10.00" Clean dry Clean dry Highest penetration Highest penetration ✔✔ ✔ ✔ ✔ ✔ N/A N/A ✔✔ ✔✔ 5min 5min 15min 15min +-0.002"+-0.002" ✔✔ ✔Pass Fail SWRCB, January 2002 Page ____ of ____ 9.SPILL/OVERFILL CONTAINMENT BOXES Facility is Not Equipped With Spill/Overfill Containment Boxes Spill/Overfill Containment Boxes are Present, but were Not Tested Test Method Developed By: Spill Bucket Manufacturer Industry Standard Professional Engineer Other (Specify) Test Method Used: Pressure Vacuum Hydrostatic Other (Specify) Test Equipment Used: Equipment Resolution: Spill Box # Spill Box # Spill Box # Spill Box # BucketDiameter: BucketDepth: Wait time between applying pressure/vacuum/water and starting test: Test Start Time: Initial Reading (RI): Test End Time: Final Reading (RF): TestDuration: Change in Reading (RF-RI): Pass/Fail Threshold or Criteria: Test Result: Pass Fail Pass Fail Pass Fail Pass Fail Comments – (include information on repairs made prior to testing, and recommended follow-up for failed tests) 6 7 ✔ ✔ TS-STS 0.00" 87 Fill 87Vap 91 Fill 91Vap 12.00"12.00"12.00"12.00" 14.00"14.00"14.00"14.00" 5min 5min 5min 5min 11:00am 10:00am 10:00am 10:00am 8.75"9.00" 0.00"0.00" 11:00am 11:00am 11:00am 11:00am 8.75"9.00"9.25" 1 hour 1 hour 1 hour 1 hour 10:00am 9.25"9.00" 0.00"0.00" 0.0625"0.0625"0.0625"0.0625" ✔✔✔✔ All buckets will hold 5 gallons SWRCB, January 2002 Page ____ of ____ 9.SPILL/OVERFILL CONTAINMENT BOXES Facility is Not Equipped With Spill/Overfill Containment Boxes Spill/Overfill Containment Boxes are Present, but were Not Tested Test Method Developed By: Spill Bucket Manufacturer Industry Standard Professional Engineer Other (Specify) Test Method Used: Pressure Vacuum Hydrostatic Other (Specify) Test Equipment Used: Equipment Resolution: Spill Box # Spill Box # Spill Box # Spill Box # BucketDiameter: BucketDepth: Wait time between applying pressure/vacuum/water and starting test: Test Start Time: Initial Reading (RI): Test End Time: Final Reading (RF): TestDuration: Change in Reading (RF-RI): Pass/Fail Threshold or Criteria: Test Result: Pass Fail Pass Fail Pass Fail Pass Fail Comments – (include information on repairs made prior to testing, and recommended follow-up for failed tests) 10:00am 77 ✔ ✔ TS-STS 0.00" DSL F DSL V 12.00"12.00" 14.00"14.00" 5min 5min 10:00am 8.75"9.00" 0.00" 11:00am 11:00am 8.75"9.00" 1 hour 1 hour 0.00" 0.0625"0.0625" ✔✔ All buckets will hold 5 gallons