Loading...
HomeMy WebLinkAboutFMC RESULTS 2016IMPACT VALVE LEAK DETECTOR MONITOR CERTIFICATION SPILL BUCKET TEST 11000 N. MoPac Expressway, Suite 500 Austin, Texas 78759 Phone: (512) 451-6334 Fax: (512) 459-1459 Date Printed and Mailed: 11/9/2016 BAKERSFIELD FIRE DEPARTMENT OFFICE OF ENVIRONMENTAL SERVICES INSPECTOR ERNIE MEDINA 1501 TRUXTUN AVE. BAKERSFIELD, CA 93301 Test Date: 11/7/2016 Order Number: 3432455 Dear Regulator, Enclosed are the results of recent testing performed at the following facility: 7-ELEVEN #32241, MKT 2368 4101 CALLOWAY DRIVE BAKERSFIELD, CA 93312 In an effort to keep all our record keeping and reporting requirements as current as possible, Tanknology kindly requests you notify Dawn Kohlmeyer in writing at dkohlmeyer@tanknology.com when your CUPA requires all records to be submitted electronically via the CERS database. Your assistance in this endeavor is greatly appreciated. Testing performed: Sincerely, Dawn Kohlmeyer Manager, Field Reporting LDT 5000 Field Test Apparatus Line Leak Detector Test Page 1 of 1 Work Order:3432455 Date:11/7/2016 Site Name / ID:7-ELEVEN #32241, MKT 2368 / 32241 Address:4101 CALLOWAY DRIVE City:BAKERSFIELD State:CA Zip:93312 Tank ID Product Product Line Tested From Existing/New Mechanical/Electronic Manufacturer/Model Serial No. Pump Operating Pressure (psi) Calibrated Leak (ml/min) Calibrated Leak (gph) Holding PSI *N/A for Electronic LD's Resiliency (ml) *N/A for Electronic LD's Metering PSI *N/A for Electronic LD's Opening Time (sec) *N/A for Electronic LD's Test Results T4 RUL RUL 1 3 Existing Mechanical Vaporless LD-2000 10061089 30.00 189.0 3.00 30.00 140.00 20 4.60 Pass T5 PUL PUL 1 3 Existing Mechanical Vaporless LD-2000 070886 30.00 189.0 3.00 30.00 145.00 20 11.47 Pass Technician Comments: Technician Name:Jorge Hernandez Certification #:114337 Technician Signature:Expire Date:12/21/2018 Environmental Compliance for Petroleum Systems © 2016 Tanknology Inc., Austin, TX.    All rights reserved.    tanknology.com Impact Valve Inspection Impact Valve Operational Inspection Work Order:3432455 Date:11/7/2016 Site Name/ID:7-ELEVEN #32241, MKT 2368 Address:4101 CALLOWAY DRIVE City:BAKERSFIELD State:CA Zip:93312 Dispenser Number Grade Secure Mount? Valve Lock?Pass/ Fail Comments 1/2 87 Pass Fail Not Tested 1/2 91 Pass Fail Not Tested 3/4 87 Pass Fail Not Tested 3/4 91 Pass Fail Not Tested 5/6 87 Pass Fail Not Tested 5/6 91 Pass Fail Not Tested 7/8 87 Pass Fail Not Tested 7/8 91 Pass Fail Not Tested Technician Comments: Technician Name:Jorge Hernandez Signature: Environmental Compliance for Petroleum Systems ©2016 Tanknology Inc., Austin, TX. All rights reserved. tanknology.com Appendix VI (Copies of Monitoring System Certification form and UST Monitoring Plot Plan available at http://www.swrcb.ca.gov.) MONITORING SYSTEM CERTIFICATION For Use By All Jurisdictions Within the State of California Authority Cited: Chapter 6.7, Health and Safety Code; Chapter 16, Division 3, Title 23, California Code of Regulations This form must be used to document testing and servicing of monitoring equipment. A separate certification or report must be prepared for each monitoring system control panel by the technician who performs the work. A copy of this form must be provided to the tank system owner/operator. The owner/operator must submit a copy of this form to the local agency regulating UST systems within 30 days of test date. A. General Information Facility Name:7-ELEVEN #32241, MKT 2368 Bldg. No.: Site Address:4101 CALLOWAY DRIVE City:BAKERSFIELD Zip:93312 Facility Contact Person:Iman 5/18/16 Contact Phone No.:661-587-8826 Make/Model of Monitoring System: Date of Testing/Servicing:11/7/2016 B. Inventory of Equipment Tested/Certified Check the appropriate boxes to indicate specific equipment inspected/serviced: Tank ID:T4 RUL - RUL In-Tank Gauging Probe.Model:846390-107 Annular Space or Vault Sensor.Model:794380-303 Piping Sump / Trench Sensor(s).Model:794380-208 Fill Sump Sensor(s).Model:794380-208 Mechanical Line Leak Detector.Model:Vaporless LD-2000 Electronic Line Leak Detector.Model: Tank Overfill / High-Level Sensor.Model:Flapper Other (specify equipment type and model in Section E on Page 2). Tank ID:T5 PUL - PUL In-Tank Gauging Probe.Model:846390-107 Annular Space or Vault Sensor.Model:794380-303 Piping Sump / Trench Sensor(s).Model:794380-208 Fill Sump Sensor(s).Model:794380-208 Mechanical Line Leak Detector.Model:Vaporless LD-2000 Electronic Line Leak Detector.Model: Tank Overfill / High-Level Sensor.Model:Flapper Other (specify equipment type and model in Section E on Page 2). Tank ID: In-Tank Gauging Probe.Model: Annular Space or Vault Sensor.Model: Piping Sump / Trench Sensor(s).Model: Fill Sump Sensor(s).Model: Mechanical Line Leak Detector.Model: Electronic Line Leak Detector.Model: Tank Overfill / High-Level Sensor.Model: Other (specify equipment type and model in Section E on Page 2). Tank ID: In-Tank Gauging Probe.Model: Annular Space or Vault Sensor.Model: Piping Sump / Trench Sensor(s).Model: Fill Sump Sensor(s).Model: Mechanical Line Leak Detector.Model: Electronic Line Leak Detector.Model: Tank Overfill / High-Level Sensor.Model: Other (specify equipment type and model in Section E on Page 2). Dispenser ID:1/2 Dispenser Containment Sensor(s).Model:794380-208 Shear Valve(s). Dispenser Containment Float(s) and Chain(s). Dispenser ID:3/4 Dispenser Containment Sensor(s).Model:794380-208 Shear Valve(s). Dispenser Containment Float(s) and Chain(s). Dispenser ID:5/6 Dispenser Containment Sensor(s).Model:794380-208 Shear Valve(s). Dispenser Containment Float(s) and Chain(s). Dispenser ID:7/8 Dispenser Containment Sensor(s).Model:794380-208 Shear Valve(s). Dispenser Containment Float(s) and Chain(s). Dispenser ID: Dispenser Containment Sensor(s).Model: Shear Valve(s). Dispenser Containment Float(s) and Chain(s). Dispenser ID: Dispenser Containment Sensor(s).Model: Shear Valve(s). Dispenser Containment Float(s) and Chain(s). *If the facility contains more tanks or dispensers, copy this form. Include information for every tank and dispenser at the facility. C. Certification - I certify that the equipment identified in this document was inspected/serviced in accordance with the manufacturers’ guidelines. Attached to this Certification is information (e.g. manufacturers' checklists) necessary to verify that this information is correct and a Plot Plan showing the layout of monitoring equipment. For any equipment capable of generating such reports, I have also attached a copy of the report; (check all that apply): System set- up Alarm history report Technician Name (print):Jorge Hernandez Signature: Certification No.: License. No.:743160 Class 'A' Testing Company Name:Tanknology Phone No.:(800) 800-4633 Testing Company Address:11000 N. MoPac Expressway Suite 500 Date of Testing/Servicing:11/7/2016 Monitoring System Certification Page 1 of 4 12/07 D. Results of Testing/Servicing Software Version Installed:329.02 Complete the following checklist: Yes No*Is the audible alarm operational? Yes No*Is the visual alarm operational? Yes No*Were all sensors visually inspected, functionally tested, and confirmed operational? Yes No*Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their proper operation? Yes No* N/A If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) operational? Yes No* N/A For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate positive shut-down? (Check all that apply) Sump/Trench Sensors; Dispenser Containment Sensors. Did you confirm positive shut-down due to leaks and sensor failure/disconnection? Yes; No Yes No* N/A For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank fill point(s) and operating properly? If so, at what percent of tank capacity does the alarm trigger? 90% Yes* No Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the manufacturer name and model for all replacement parts in Section E, below. Yes* No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) Product; Water. If yes, describe causes in Section E, below. Yes No*Was monitoring system set-up reviewed to ensure proper settings? Attach set up reports, if applicable Yes No*Is all monitoring equipment operational per manufacturer's specifications? * In Section E below, describe how and when these deficiencies were or will be corrected. E. Comments: Monitoring System Certification Page 2 of 4 12/07 F. In-Tank Gauging / SIR Equipment: Check this box if tank gauging is used only for inventory control. Check this box if no tank gauging or SIR equipment is installed. This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. Complete the following checklist: Yes No*Has all input wiring been inspected for proper entry and termination, including testing for ground faults? Yes No*Were all tank gauging probes visually inspected for damage and residue buildup? Yes No*Was accuracy of system product level readings tested? Yes No*Was accuracy of system water level readings tested? Yes No*Were all probes reinstalled properly? Yes No*Were all items on the equipment manufacturer's maintenance checklist completed? * In the Section H, below, describe how and when these deficiencies were or will be corrected. G. Line Leak Detectors (LLD): Check this box if LLDs are not installed. Complete the following checklist: Yes No* N/A For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) Simulated leak rate: 3 g.p.h.; 0.1 g.p.h; 0.2 g.p.h. Yes No*Were all LLDs confirmed operational and accurate within regulatory requirements? Yes No*Was the testing apparatus properly calibrated? Yes No* N/A For mechanical LLDs, does the LLD restrict product flow if it detects a leak? Yes No* N/A For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? Yes No* N/A For electronic LLDs that are programmed for positive shut down, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? Yes No* N/A For electronic LLDs that are programmed for positive shut down, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? Yes No* N/A For electronic LLDs, have all accessible wiring connections been visually inspected? Yes No*Were all items on the equipment manufacturer's maintenance checklist completed? * In the Section H, below, describe how and when these deficiencies were or will be corrected. H.Comments: Page 3 of 4 12/07 Monitoring System Certification Form: Addendum for Vacuum/Pressure Interstitial Sensors LG 163-1, Enc. II I.Results of Vacuum/Pressure Monitoring Equipment Testing This page should be used to document testing and servicing of vacuum and pressure interstitial sensors. A copy of this form must be included with the Monitoring System Certification Form, which must be provided to the tank system owner/operator. The owner/operator must submit a copy of the Monitoring System Certification Form to the local agency regulating UST systems within 30 days of test date. Manufacturer: Veeder Root Model: TLS350R System Type: Pressure Vacuum Sensor ID s9 Component(s) Monitored by this Sensor:87 Fill VRL UDC VAC Sensor Functionality Test Result: Pass Fail Interstitial Communication Test Result: Pass Fail s10 Component(s) Monitored by this Sensor:87 Product Line VAC Sensor Functionality Test Result: Pass Fail Interstitial Communication Test Result: Pass Fail s11 Component(s) Monitored by this Sensor:87 STPSUMP-Fillcnct Sensor Functionality Test Result: Pass Fail Interstitial Communication Test Result: Pass Fail s12 Component(s) Monitored by this Sensor:91 fill-vent-contsump Sensor Functionality Test Result: Pass Fail Interstitial Communication Test Result: Pass Fail s13 Component(s) Monitored by this Sensor:91 Product Line Vac Sensor Functionality Test Result: Pass Fail Interstitial Communication Test Result: Pass Fail s14 Component(s) Monitored by this Sensor:91 STPSUMP-FILLCNCT Sensor Functionality Test Result: Pass Fail Interstitial Communication Test Result: Pass Fail Component(s) Monitored by this Sensor: Sensor Functionality Test Result: Pass Fail Interstitial Communication Test Result: Pass Fail Component(s) Monitored by this Sensor: Sensor Functionality Test Result: Pass Fail Interstitial Communication Test Result: Pass Fail Component(s) Monitored by this Sensor: Sensor Functionality Test Result: Pass Fail Interstitial Communication Test Result: Pass Fail Component(s) Monitored by this Sensor: Sensor Functionality Test Result: Pass Fail Interstitial Communication Test Result: Pass Fail How was interstitial communication verified? Leak Introduced at Far End of Interstitial Space1 Gauge Visual Inspection Other (Describe in Sec. J, below) Vacuum was restored to operating levels in all interstitial spaces: Yes No (If no, describe in Sec. J, below) J. Comments (500 characters max. use additional sheets if needed): Page 4 of 4 1 If the sensor successfully detects a simulated vacuum/pressure leak introduced in the interstitial space at the furthest point from the sensor, vacuum/pressure has been demonstrated to be communicating throughout the interstice. WO: 3432455 SWRCB, January 2006 Spill Bucket Testing Report Form This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. 1. FACILITY INFORMATION Facility Name: 7-ELEVEN #32241, MKT 2368 Date of Testing: 11/7/2016 Facility Address: 4101 CALLOWAY DRIVE , BAKERSFIELD, CA 93312 Facility Contact: Iman 5/18/16 Phone: 661-587-8826 Date Local Agency Was Notified of Testing: Name of Local Agency Inspector (if present during testing): 2. TESTING CONTRACTOR INFORMATION Company Name: TANKNOLOGY INC. Technician Conducting Test: Jorge Hernandez Credentials1: CSLB Contractor ICC Service Tech. SWRCB Tank Tester Other (Specify) License Number(s): 743160 3. SPILL BUCKET TESTING INFORMATION Test Method Used By: Hydrostatic Vacuum Other Test Equipment Used: LAKE TEST Equipment Resolution: 0.0625 in. Identify Spill Bucket (By Tank Number, Stored Product, etc.) Bucket Installation Type: Bucket Diameter: Bucket Depth: Wait time between applying vacuum/water and start of test Test Start Time (TI): Initial Reading (RI): Test End Time(TF): Final Reading (RF): Test Duration(TF–TI): Change in Reading (RF–RI) : Pass/Fail Threshold or Criteria: Test Result: Spill Box # Tank T4 RUL RUL - Fill 1 - Direct - Below Grade in containment sump Direct Bury Contained in Sump 11.00 14.00 15 min 10:00:00 13.00 in. H20 11:00:00 13.00 in. H20 1 hr 0.00 in. H20 +/- 0.00 Pass Spill Box # Tank T5 PUL PUL - Fill 1 - Direct - Below Grade in containment sump Direct Bury Contained in Sump 11.00 14.00 15 min 10:00:00 13.00 in. H20 11:00:00 13.00 in. H20 1 hr 0.00 in. H20 +/- 0.00 Pass Spill Box # Direct Bury Contained in Sump min +/- Spill Box # Direct Bury Contained in Sump min +/- Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING I hereby certify that all the information contained in this report is true, accurate, and in full compliance with legal requirements. Technician's Signature:Date:11/7/2016 1State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements may be more stringent. WO: 3432455 7-Eleven Test Water Log Work Order: Site Name/ID: Address: City: 3432455 7-ELEVEN #32241, MKT 2368 4101 CALLOWAY DRIVE BAKERSFIELD Date: 11/7/2016 State: CA Zip: 93312 Work Performed:ATG, E-Stop, Impv, LDs, SB's Was Test Water left on site? Yes Test Fluid Transported Off Site by Tanknology Transported off Site by Other Company No Water used If Yes describe how much water and how contained?10 gallons in 2 5 gallon buckets with lids and hazard waste Lable If Yes who and when did you contact from site to report the water?Project Manager If Transported Off Site by Tanknology how much was hauled?NA If Transported Off Site by Other Company what company and how much water?NA Technician Signature: Date: 11/7/2016 WO: 3432455 Site Diagram (This site diagram is for reference only and is not drawn to scale) Work Order:3432455 Site ID / Name:32241 / 7-ELEVEN #32241, MKT 2368 Address:4101 CALLOWAY DRIVE City:BAKERSFIELD State:CA Zip:93312 W.O.# SC1-3432455 I10100 NOV 7, 2016 1:06 PM 235421 7-11 32241 4101 CALLOWAY DR BAKERSFIELD,CA 93312 SYSTEM STATUS REPORT ALL FUNCTIONS NORMAL I50301 NOV 7, 2016 1:06 PM # 1:235421 7-11 32241 I50302 NOV 7, 2016 1:07 PM # 2:4101 CALLOWAY DR I50303 NOV 7, 2016 1:07 PM # 3:BAKERSFIELD,CA 93312 I50304 NOV 7, 2016 1:07 PM # 4: I51700 NOV 7, 2016 1:07 PM SYSTEM TYPE AND LANGUAGE FLAG SYSTEM UNITS U.S. SYSTEM LANGUAGE ENGLISH SYSTEM DATE/TIME FORMAT MON DD YYYY HH:MM:SS xM I50F00 NOV 7, 2016 1:07 PM MON DD YYYY HH:MM:SS xM I60100 NOV 7, 2016 1:07 PM TANK CONFIGURATION DEVICE LABEL CONFIGURED 1 OFF 2 OFF 3 OFF 4 RUL ON 5 PUL ON 6 OFF 7 OFF 8 OFF I60200 NOV 7, 2016 1:07 PM TANK PRODUCT LABEL TANK PRODUCT LABEL 1 2 3 4 RUL 5 PUL 6 7 8 I60300 NOV 7, 2016 1:07 PM TANK PRODUCT CODE TANK PRODUCT LABEL 1 1 2 2 3 3 4 RUL 4 5 PUL 5 6 6 7 7 8 8 I60400 NOV 7, 2016 1:07 PM TANK FULL VOLUME TANK PRODUCT LABEL GALLONS 1 0 2 0 3 0 4 RUL 14544 5 PUL 9695 6 0 7 0 8 0 I60700 NOV 7, 2016 1:07 PM TANK DIAMETER TANK PRODUCT LABEL INCHES 1 0.00 2 0.00 3 0.00 4 RUL 91.63 5 PUL 91.63 6 0.00 7 0.00 8 0.00 I60900 NOV 7, 2016 1:07 PM TANK THERMAL COEFFICIENT TANK PRODUCT LABEL 1 0.000000 2 0.000000 3 0.000000 4 RUL 0.000700 5 PUL 0.000700 6 0.000000 7 0.000000 8 0.000000 I61200 NOV 7, 2016 1:07 PM TANK MANIFOLDED PARTNERS TANK PRODUCT LABEL SIPHON MANIFOLDED TANKS LINE MANIFOLDED TANKS 1 NONE NONE 2 NONE NONE 3 NONE NONE 4 RUL NONE NONE 5 PUL NONE NONE 6 NONE NONE 7 NONE NONE 8 NONE NONE I62100 NOV 7, 2016 1:07 PM TANK LOW PRODUCT LIMIT TANK PRODUCT LABEL GALLONS 1 0 2 0 3 0 4 RUL 800 5 PUL 800 6 0 7 0 8 0 I62200 NOV 7, 2016 1:07 PM TANK HIGH PRODUCT LIMIT TANK PRODUCT LABEL GALLONS 1 0 2 0 3 0 4 RUL 13816 5 PUL 9210 6 0 7 0 8 0 I62300 NOV 7, 2016 1:07 PM TANK OVERFILL LEVEL LIMIT TANK PRODUCT LABEL GALLONS 1 0 2 0 3 0 4 RUL 13089 5 PUL 8725 6 0 7 0 8 0 I62400 NOV 7, 2016 1:07 PM 4 RUL 1.5 5 PUL 1.5 I62800 NOV 7, 2016 1:07 PM TANK MAXIMUM VOLUME LIMIT TANK PRODUCT LABEL GALLONS 1 0 2 0 3 0 4 RUL 14544 5 PUL 9695 6 0 7 0 8 0 I62900 NOV 7, 2016 1:07 PM TANK DELIVERY REQUIRED LIMIT TANK PRODUCT LABEL GALLONS 1 0 2 0 3 0 4 RUL 2181 5 PUL 1454 6 0 7 0 8 0 I70300 NOV 7, 2016 1:07 PM LIQUID TYPE SENSOR LOCATION TYPE 1 DISP 1-2 PAN TRI-STATE (SINGLE FLOAT) 2 DISP 3-4 PAN TRI-STATE (SINGLE FLOAT) 3 DISP 5-6 PAN TRI-STATE (SINGLE FLOAT) 4 DISP PAN 7-8 TRI-STATE (SINGLE FLOAT) 5 87 ANNULAR DUAL POINT HYDROSTATIC 6 87 FILL SUMP TRI-STATE (SINGLE FLOAT) 7 87 STP SUMP TRI-STATE (SINGLE FLOAT) 8 91-ANNULAR DUAL POINT HYDROSTATIC 9 91 FILL SUMP TRI-STATE (SINGLE FLOAT) 10 91 STP SUMP TRI-STATE (SINGLE FLOAT) 11 VAPOR PIPING PAN TRI-STATE (SINGLE FLOAT) 12 TRI-STATE (SINGLE FLOAT) 13 TRI-STATE (SINGLE FLOAT) 14 TRI-STATE (SINGLE FLOAT) 15 TRI-STATE (SINGLE FLOAT) 16 TRI-STATE (SINGLE FLOAT) I72100 NOV 7, 2016 1:07 PM SMART SENSOR CONFIGURATION DEVICE LABEL CONFIGURED 1 1-2 FLOW METER ON 2 3-4 FLOW METER ON 3 5-6 FLOW METER ON 4 7-8 FLOW METER ON 5 OFF 6 OFF 7 OFF 8 PRESSURE SENSOR ON 9 87 FILL VRL UDC VAC ON 10 87 PRODUCT LINE VAC ON 11 87 STPSUMP-FILLCNCT ON 12 91FILL-VENT-CONTSUMP ON 13 91 PRODUCT LINE VAC ON 14 91 STPSUMP-FILLCNCT ON 15 OFF 16 ATM P SENSOR 5-6 ON I72200 NOV 7, 2016 1:07 PM SMART SENSOR LABEL DEVICE LABEL 1 1-2 FLOW METER 2 3-4 FLOW METER 3 5-6 FLOW METER 4 7-8 FLOW METER 5 6 7 8 PRESSURE SENSOR 9 87 FILL VRL UDC VAC 10 87 PRODUCT LINE VAC 11 87 STPSUMP-FILLCNCT 12 91FILL-VENT-CONTSUMP 13 91 PRODUCT LINE VAC 14 91 STPSUMP-FILLCNCT 15 16 ATM P SENSOR 5-6 I72900 NOV 7, 2016 1:07 PM VACUUM SENSOR PUMP NUMBER DEVICE LABEL PUMP NUMBER 9 87 FILL VRL UDC VAC R 5:87 STP 10 87 PRODUCT LINE VAC R 6:PREMIUM STP 11 87 STPSUMP-FILLCNCT R 5:87 STP 12 91FILL-VENT-CONTSUMP R 6:PREMIUM STP 13 91 PRODUCT LINE VAC R 6:PREMIUM STP 14 91 STPSUMP-FILLCNCT R 6:PREMIUM STP I72A00 NOV 7, 2016 1:07 PM VACUUM SENSOR VOLUME DEVICE LABEL VOLUME 9 87 FILL VRL UDC VAC 36.0 GALLONS 10 87 PRODUCT LINE VAC 36.0 GALLONS 11 87 STPSUMP-FILLCNCT 36.0 GALLONS 12 91FILL-VENT-CONTSUMP 36.0 GALLONS 13 91 PRODUCT LINE VAC 36.0 GALLONS 14 91 STPSUMP-FILLCNCT 36.0 GALLONS I72B00 NOV 7, 2016 1:07 PM VACUUM SENSOR RELIEF VALVE PRESENT DEVICE LABEL RELIEF VALVE 9 87 FILL VRL UDC VAC NO 10 87 PRODUCT LINE VAC NO 11 87 STPSUMP-FILLCNCT NO 12 91FILL-VENT-CONTSUMP NO 13 91 PRODUCT LINE VAC NO 14 91 STPSUMP-FILLCNCT NO I72C00 NOV 7, 2016 1:07 PM VACUUM SENSOR RELIEF VALVE PRESSURE DEVICE LABEL RELIEF VALVE PRESSURE 9 87 FILL VRL UDC VAC -9.0 PSI 10 87 PRODUCT LINE VAC -9.0 PSI 11 87 STPSUMP-FILLCNCT -9.0 PSI 12 91FILL-VENT-CONTSUMP -9.0 PSI 13 91 PRODUCT LINE VAC -9.0 PSI 14 91 STPSUMP-FILLCNCT -9.0 PSI I90200 NOV 7, 2016 1:07 PM SOFTWARE REVISION LEVEL VERSION 329.02 SOFTWARE# 346329-100-C CREATED - 09.07.01.16.29 S-MODULE# 330160-104-a SYSTEM FEATURES: PERIODIC IN-TANK TESTS ANNUAL IN-TANK TESTS BIR ISD I20600 NOV 7, 2016 1:07 PM 235421 7-11 32241 4101 CALLOWAY DR BAKERSFIELD,CA 93312 TANK ALARM HISTORY TANK 4 RUL HIGH WATER ALARM NOV 7, 2016 12:03 PM NOV 19, 2015 9:39 AM DEC 3, 2014 11:22 AM OVERFILL ALARM NOV 7, 2016 12:19 PM OCT 4, 2016 6:57 AM JUL 5, 2016 6:58 AM LOW PRODUCT ALARM NOV 19, 2015 9:25 AM APR 25, 2015 3:22 PM DEC 27, 2014 12:07 AM SUDDEN LOSS ALARM NOV 7, 2016 11:59 AM NOV 19, 2015 9:24 AM DEC 3, 2014 11:10 AM HIGH PRODUCT ALARM NOV 7, 2016 12:20 PM DEC 3, 2014 11:15 AM DEC 27, 2013 1:06 PM INVALID FUEL LEVEL DEC 3, 2014 11:10 AM DEC 27, 2013 1:17 PM PROBE OUT NOV 7, 2016 12:33 PM NOV 7, 2016 11:59 AM NOV 19, 2015 9:43 AM HIGH WATER WARNING NOV 7, 2016 12:03 PM NOV 19, 2015 9:39 AM DEC 3, 2014 11:22 AM DELIVERY NEEDED JUL 2, 2016 9:50 AM JUL 1, 2016 12:42 PM MAY 13, 2016 11:45 AM MAX PRODUCT ALARM NOV 7, 2016 12:20 PM DEC 3, 2014 11:16 AM DEC 27, 2013 1:06 PM LOW TEMP WARNING DEC 3, 2014 11:40 AM DEC 12, 2012 12:25 PM TANK 5 PUL HIGH WATER ALARM NOV 7, 2016 12:02 PM NOV 19, 2015 9:37 AM DEC 3, 2014 11:19 AM OVERFILL ALARM NOV 7, 2016 12:23 PM NOV 19, 2015 9:42 AM DEC 3, 2014 11:12 AM LOW PRODUCT ALARM NOV 7, 2016 11:57 AM NOV 19, 2015 9:38 AM NOV 19, 2015 9:22 AM SUDDEN LOSS ALARM NOV 7, 2016 11:57 AM NOV 19, 2015 9:22 AM DEC 3, 2014 11:10 AM HIGH PRODUCT ALARM NOV 7, 2016 12:26 PM NOV 19, 2015 9:43 AM DEC 3, 2014 11:12 AM INVALID FUEL LEVEL NOV 19, 2015 9:44 AM NOV 19, 2015 9:38 AM DEC 27, 2013 1:18 PM PROBE OUT NOV 7, 2016 12:32 PM NOV 7, 2016 11:58 AM NOV 19, 2015 9:43 AM HIGH WATER WARNING NOV 7, 2016 12:02 PM NOV 19, 2015 9:37 AM DEC 3, 2014 11:19 AM DELIVERY NEEDED NOV 7, 2016 11:57 AM JUL 13, 2016 3:58 AM JUN 28, 2016 10:13 PM MAX PRODUCT ALARM NOV 7, 2016 12:27 PM NOV 19, 2015 9:43 AM DEC 3, 2014 11:12 AM LOW TEMP WARNING NOV 19, 2015 9:23 AM DEC 3, 2014 11:41 AM I30200 NOV 7, 2016 1:07 PM 235421 7-11 32241 4101 CALLOWAY DR BAKERSFIELD,CA 93312 LIQUID ALARM HISTORY REPORT SENSOR LOCATION 1 DISP 1-2 PAN NOV 7, 2016 10:50 AM FUEL ALARM NOV 7, 2016 10:29 AM SENSOR OUT ALARM NOV 19, 2015 9:51 AM FUEL ALARM 2 DISP 3-4 PAN NOV 7, 2016 10:51 AM FUEL ALARM NOV 7, 2016 10:29 AM SENSOR OUT ALARM NOV 19, 2015 10:31 AM FUEL ALARM 3 DISP 5-6 PAN NOV 7, 2016 10:48 AM FUEL ALARM NOV 7, 2016 10:29 AM SENSOR OUT ALARM NOV 19, 2015 9:52 AM FUEL ALARM 4 DISP PAN 7-8 NOV 7, 2016 10:47 AM FUEL ALARM NOV 7, 2016 10:29 AM SENSOR OUT ALARM NOV 19, 2015 9:52 AM FUEL ALARM 5 87 ANNULAR NOV 7, 2016 10:37 AM LOW LIQUID ALARM NOV 7, 2016 10:36 AM HIGH LIQUID ALARM NOV 7, 2016 10:36 AM LOW LIQUID ALARM 6 87 FILL SUMP NOV 7, 2016 10:35 AM FUEL ALARM NOV 7, 2016 10:29 AM SENSOR OUT ALARM NOV 19, 2015 9:54 AM FUEL ALARM 7 87 STP SUMP NOV 7, 2016 10:35 AM FUEL ALARM NOV 7, 2016 10:29 AM SENSOR OUT ALARM NOV 19, 2015 9:53 AM FUEL ALARM 8 91-ANNULAR NOV 7, 2016 10:40 AM LOW LIQUID ALARM NOV 7, 2016 10:40 AM HIGH LIQUID ALARM NOV 7, 2016 10:39 AM LOW LIQUID ALARM 9 91 FILL SUMP NOV 7, 2016 10:37 AM FUEL ALARM NOV 7, 2016 10:29 AM SENSOR OUT ALARM NOV 19, 2015 9:54 AM FUEL ALARM 10 91 STP SUMP NOV 7, 2016 11:10 AM FUEL ALARM NOV 7, 2016 10:39 AM FUEL ALARM NOV 7, 2016 10:29 AM SENSOR OUT ALARM 11 VAPOR PIPING PAN NOV 7, 2016 10:54 AM FUEL ALARM NOV 7, 2016 10:29 AM SENSOR OUT ALARM NOV 19, 2015 10:00 AM FUEL ALARM I31600 NOV 7, 2016 1:07 PM 235421 7-11 32241 4101 CALLOWAY DR BAKERSFIELD,CA 93312 SMART SENSOR ALARM HISTORY REPORT SENSOR LOCATION 1 1-2 FLOW METER MAY 24, 2014 7:57 AM COMMUNICATION ALARM MAY 24, 2014 7:11 AM COMMUNICATION ALARM MAY 24, 2014 3:13 AM COMMUNICATION ALARM 2 3-4 FLOW METER MAR 16, 2015 11:13 AM COMMUNICATION ALARM DEC 4, 2012 3:48 PM COMMUNICATION ALARM 3 5-6 FLOW METER DEC 4, 2012 3:48 PM COMMUNICATION ALARM 4 7-8 FLOW METER DEC 4, 2012 3:48 PM COMMUNICATION ALARM 8 PRESSURE SENSOR DEC 22, 2014 11:47 AM COMMUNICATION ALARM DEC 4, 2012 3:49 PM COMMUNICATION ALARM 9 87 FILL VRL UDC VAC NOV 7, 2016 11:00 AM NO VACUUM ALARM NOV 7, 2016 10:57 AM HIGH LIQUID ALARM NOV 19, 2015 10:04 AM HIGH LIQUID ALARM 10 87 PRODUCT LINE VAC NOV 7, 2016 11:01 AM NO VACUUM ALARM NOV 7, 2016 10:57 AM HIGH LIQUID ALARM NOV 19, 2015 10:04 AM HIGH LIQUID ALARM 11 87 STPSUMP-FILLCNCT NOV 7, 2016 11:02 AM NO VACUUM ALARM NOV 7, 2016 10:57 AM HIGH LIQUID ALARM NOV 19, 2015 10:04 AM HIGH LIQUID ALARM 12 91FILL-VENT-CONTSUMP NOV 7, 2016 11:12 AM NO VACUUM ALARM NOV 7, 2016 11:07 AM HIGH LIQUID ALARM NOV 19, 2015 10:08 AM HIGH LIQUID ALARM 13 91 PRODUCT LINE VAC NOV 7, 2016 11:11 AM NO VACUUM ALARM NOV 7, 2016 11:07 AM HIGH LIQUID ALARM NOV 19, 2015 10:08 AM HIGH LIQUID ALARM 14 91 STPSUMP-FILLCNCT NOV 7, 2016 11:11 AM NO VACUUM ALARM NOV 7, 2016 11:07 AM HIGH LIQUID ALARM NOV 19, 2015 10:08 AM HIGH LIQUID ALARM 16 ATM P SENSOR 5-6 I10100 NOV 7, 2016 1:08 PM 235421 7-11 32241 4101 CALLOWAY DR BAKERSFIELD,CA 93312 SYSTEM STATUS REPORT ALL FUNCTIONS NORMAL